CN102061810B - Construction method of safe flat net positioned on periphery of building - Google Patents

Construction method of safe flat net positioned on periphery of building Download PDF

Info

Publication number
CN102061810B
CN102061810B CN2010105833850A CN201010583385A CN102061810B CN 102061810 B CN102061810 B CN 102061810B CN 2010105833850 A CN2010105833850 A CN 2010105833850A CN 201010583385 A CN201010583385 A CN 201010583385A CN 102061810 B CN102061810 B CN 102061810B
Authority
CN
China
Prior art keywords
beam track
rack
safe
plain net
net
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2010105833850A
Other languages
Chinese (zh)
Other versions
CN102061810A (en
Inventor
李�真
郭颖
王延富
高菲菲
陆海英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Construction Co ltd Of China Construction Sixth Engineering Bureau
China Construction Sixth Engineering Division Co Ltd
Original Assignee
China Construction Sixth Engineering Division Co Ltd
Third Construction Engineering Co Ltd of China Construction Sixth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Sixth Engineering Division Co Ltd, Third Construction Engineering Co Ltd of China Construction Sixth Engineering Division Co Ltd filed Critical China Construction Sixth Engineering Division Co Ltd
Priority to CN2010105833850A priority Critical patent/CN102061810B/en
Publication of CN102061810A publication Critical patent/CN102061810A/en
Application granted granted Critical
Publication of CN102061810B publication Critical patent/CN102061810B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses a construction method of a safe flat net positioned on the periphery of a building, comprising the following steps of: (1) installing the safe flat net on a first layer, machining a predetermined amount of net rack single body, a joist steel and a rail pre-buried bolt; (2) lifting the safe flat net to a second layer, mounting the rail pre-buried bolt on the building main body outer wall, and fixing the joist steel rail on the building main body outer wall through the pre-buried bolt and forming a primary joist steel rail; and (3) repeating the step (2) till main engineering is completed. The lift type safe flat net is adopted in the invention, and forms a flat net framework on the ground, the first layer is assembled and installed and is connected with the building together through a joist steel track, and the safe flat net is synchronously lifted with a main body under the combined action of a lifting appliance and the joist steel track, thereby not only enhancing the work efficiency and reducing the labor intensity, but also having good integrity, safe and reliable construction operation and convenient disassembly and assembly; and in addition, the safe flat net is recycled so as to save materials and has outstanding economic benefits.

Description

The job practices of architecture enclosing safety plain net
Technical field
The present invention relates to a kind of job practices of safe plain net, particularly a kind of job practices of architecture enclosing safety plain net.
Background technology
Along with the paces of urbanization are accelerated, land resources is also treasured thereupon, and this just impels depth of building also in continuous lifting, and in the high level construction, setting up of the safety net of skin is particularly important, and the safety of constructing is played important role.The general method of fixedly setting up that adopts of now common architecture enclosing level net, like this along with the rising of building, the height of setting up also improves thereupon, has increased the workload of work high above the ground, also caused the danger of operation, and efficient is low, and labour intensity is big.
Summary of the invention
The present invention provides a kind of job practices of safe and reliable, easy to operate architecture enclosing safety plain net for solving the technical problem that exists in the known technology.
The present invention for the technical scheme that solves the technical problem that exists in the known technology and take is: a kind of job practices of architecture enclosing safety plain net may further comprise the steps: one) safe plain net is in the installation of the first floor:
1), processes rack monomer, i-beam track, the track pre-embedded bolt of predetermined quantity in advance according to predetermined scheme; Each said rack monomer comprise one with the adaptive U-steel of said i-beam track; The bottom of said U-steel is connected with the lower end of diagonal brace steel pipe; The middle part of said diagonal brace steel pipe is connected with the inner of horizontal brace steel pipe; The outer end of said horizontal brace steel pipe is connected with the middle part of said diagonal brace steel pipe, and two leg ends of said U-steel are equipped with the flanging part of inside folding;
2) according to predetermined scheme, said track pre-embedded bolt is installed on building main body exterior wall, and said i-beam track is vertically fixed on the building main body exterior wall through said pre-embedded bolt, form first floor i-beam track;
3) on every said i-beam track a said rack monomer is installed; All said rack monomers are installed on the said i-beam track; Said rack monomer of every installation; Just with holding screw itself and i-beam track are locked, adjust the position of all said rack monomers, the minimum point that makes them is on same horizon; Adopt the outer horizontal steel tube that is connected with said rack monomer diagonal brace steel pipe top that all said rack monomers are fused; All said rack monomer U-steel tops adopt the interior horizontal steel tube parallel with said outer horizontal steel tube to connect; Be connected with on the horizontal steel tube in said and hang wire rope, said upper end of hanging wire rope is connected on the scaffold that is positioned at the rack top; The horizontally disposed safety net of bind on said inside and outside horizontal steel tube; So far safe plain net is in first floor installation;
Two) lifting of safe plain net:
With the rising of major project, said i-beam track is also corresponding to be installed thereupon, prolongs said first floor i-beam track; Accomplish the installation of second layer i-beam track, catch on said interior horizontal steel tube, unclamp the said holding screw on all said rack monomers with lifting appliance; Unload the said wire rope of hanging, lift by crane said safe plain net, install again and hang wire rope to predeterminated position; Tighten up holding screw, so far said safe plain net has moved to the second layer;
Three) repeat above-mentioned steps two), accomplish until major project.
This method also comprises, pulls down the i-beam track of N layer, is used to form the i-beam track of N+2 layer, and N is a natural number.
Said lifting appliance comprises bottle gouard moved by hands.
Advantage and good effect that the present invention has are: adopt ascending/decending safety plain net, and the moulding plain net skeleton on ground, the first floor carries out aggregate erection, links together through i-beam track and building; Under the acting in conjunction of lifting appliance and i-beam track, safe plain net is risen with main body synchronously, not only improved work efficiency, reduced labour intensity; And good integrity, construction operation is safe and reliable, easy accessibility; Recycle simultaneously, save material, remarkable in economical benefits.
Description of drawings
Fig. 1 uses structural representation of the present invention;
Fig. 2 uses elevation of the present invention;
Fig. 3 uses plan view of the present invention;
Fig. 4 is the I portion enlarged drawing of Fig. 3.
Among the figure: 1, scaffold, 2, building main body exterior wall, 3, i-beam track, 4, hang wire rope; 5, safety net, 6, the rack monomer, 6-1, diagonal brace steel pipe, 6-2, horizontal brace steel pipe; 6-3, U-steel, 6-4, flanging part, 7, outer horizontal steel tube, 8, safe plain net; 9, interior horizontal steel tube, 10, pre-embedded bolt, 11, holding screw.
The specific embodiment
For further understanding summary of the invention of the present invention, characteristics and effect, the following examples of giving an example now, and conjunction with figs. specifies as follows:
See also Fig. 1~Fig. 4, a kind of job practices of architecture enclosing safety plain net may further comprise the steps:
One) safe plain net is in the installation of the first floor;
1), processes rack monomer 6, i-beam track 3, the track pre-embedded bolt 10 of predetermined quantity in advance on ground according to predetermined scheme; Each rack monomer 6 comprises a U-steel 6-3 adaptive with i-beam track 3; The bottom of U-steel 6-3 is connected with the lower end of diagonal brace steel pipe 6-1; The middle part of diagonal brace steel pipe 6-1 is connected with the end of horizontal brace steel pipe 6-2; The other end of horizontal brace steel pipe 6-2 is connected with the middle part of diagonal brace steel pipe 6-1, and the two leg ends of U-steel 6-3 are equipped with the flanging part 6-4 of inside folding, is used for being connected with i-beam track 3.
2) according to predetermined scheme, first floor i-beam track pre-embedded bolt is installed on building main body exterior wall 2, and i-beam track is vertically fixed on the building main body exterior wall 2 through pre-embedded bolt, form first floor i-beam track.
3) treat that all first floor i-beam tracks install, all rack monomers 6 complete, qualified on inspection after, a rack monomer 6 is installed on the every i-beam track, all rack monomers 6 are installed on the i-beam track.The concrete operations step is: utilize tower crane that rack monomer 6 is sling, from the i-beam track upper end its U-steel 6-3 is enclosed within on the edge of a wing of i-beam track.Adjust the position of rack monomer, and with the holding screw that is connected the U-steel flanging part 11 itself and i-beam track 3 are locked, rack monomer 6 of every installation is just locked itself and i-beam track 6 with holding screw 11; The minimum point that guarantees all rack monomers 6 is on same horizon; Use the outer horizontal steel tube 7 that is connected with rack monomer diagonal brace steel pipe 6-1 top that all rack monomers 6 are fused.Welding is used for the iron hoop of bolt safety net on the outer horizontal steel tube 7, and this steel pipe adopts the standard pipe form of butt joint or overlap joint.Connect the interior horizontal steel tube 9 parallel with outer horizontal steel tube 7 on rack monomer U-steel 6-3 top, wire rope 4 is hung in connection on the interior horizontal steel tube 9, hangs wire rope 4 and is connected on the scaffold 1 that is positioned at above the rack, is used for fixing the rack that fuses.Interior horizontal steel tube 9 also is used for being provided with the Heave Here, and is welded with the iron hoop that is used for the bolt safety net, and interior horizontal steel tube 9 also plays the effect that all rack monomers 6 are fused, and its generation type is identical with outer horizontal steel tube.Wire rope handling is tied up safety net 5 on the iron hoop of horizontal steel tube 9 outside, and the another side of safety net 5 is tied on the iron hoop of interior horizontal steel tube 9.Select big eye safety net for use, and safety net 5 and inside and outside horizontal steel tube 9,7 be connected firmly through iron wire, safety net 5 is omnidistance the laying on the rack that fuses, and so far safe plain net 8 is in first floor installation.
Two) lifting of safe plain net 8;
With the rising of major project, i-beam track is also corresponding to be installed thereupon, prolongs first floor i-beam track, accomplishes the installation of second layer i-beam track.On the scaffold 1 that is positioned at above the safe plain net 8, bearing support is installed, catching device is installed on bearing support, on the hook of catching device, hang up Chain block; Horizontal steel tube 9 in suspension hook catches under the Chain block; Start Chain block and make it to be in stress, unclamp the holding screw 11 on the rack monomer, unload and hang wire rope 4; Lift by crane safe plain net 8 to predeterminated position; At places easy to operate such as window or holes, to install again and hang wire rope 4, tighten up holding screw 10, so far safe plain net 8 has moved to the second layer.
Three) repeat above-mentioned steps two), accomplish until major project.When forming the 3rd layer of i-beam track, can dismantle the i-beam track recycling of the first floor, following steps, and the like, can effectively lower construction cost.
Characteristics of the present invention:
1) reduced a large amount of workloads, and changed work high above the ground into Ground Operation, constructing operation is convenient, and operating environment is good;
2) work high above the ground is few, and the workman can carry out the steady job to plain net frame and track at each window place, has improved safety of construction greatly;
3) Chain block promotes, and it is convenient, steady to promote, and controllability is strong, and is fixed, improves operating efficiency;
4) less equipment investment, and can repeatedly carry out Circularly liftable, simple to operate, work efficiency is high, and speed is fast, and the cost of material is low.
5) scope of application is wide, is applicable to the highrise building main body of form of structure such as various full shear walls, framework, frame are cut, frame tube and the security protection in the construction of outer decorative engineering.
Although combine accompanying drawing that the preferred embodiments of the present invention are described above; But the present invention is not limited to the above-mentioned specific embodiment, and the above-mentioned specific embodiment only is schematically, is not restrictive; Those of ordinary skill in the art is under enlightenment of the present invention; Not breaking away under the scope situation that aim of the present invention and claim protect, can also make a lot of forms, these all belong within protection scope of the present invention.

Claims (3)

1. the job practices of an architecture enclosing safety plain net is characterized in that, may further comprise the steps:
One) safe plain net is in the installation of the first floor:
1), processes rack monomer, i-beam track, the track pre-embedded bolt of predetermined quantity in advance according to predetermined scheme; Each said rack monomer comprise one with the adaptive U-steel of said i-beam track; The bottom of said U-steel is connected with the lower end of diagonal brace steel pipe; The middle part of said diagonal brace steel pipe is connected with the inner of horizontal brace steel pipe; The outer end of said horizontal brace steel pipe is connected with the middle part of said diagonal brace steel pipe, and two leg ends of said U-steel are equipped with the flanging part of inside folding;
2) according to predetermined scheme, said track pre-embedded bolt is installed on building main body exterior wall, and said i-beam track is vertically fixed on the building main body exterior wall through said pre-embedded bolt, form first floor i-beam track;
3) on every said i-beam track a said rack monomer is installed; All said rack monomers are installed on the said i-beam track; Said rack monomer of every installation; Just with holding screw itself and i-beam track are locked, adjust the position of all said rack monomers, the minimum point that makes them is on same horizon; Adopt the outer horizontal steel tube that is connected with said rack monomer diagonal brace steel pipe top that all said rack monomers are fused; All said rack monomer U-steel tops adopt the interior horizontal steel tube parallel with said outer horizontal steel tube to connect; Be connected with on the horizontal steel tube in said and hang wire rope, said upper end of hanging wire rope is connected on the scaffold that is positioned at the rack top; The horizontally disposed safety net of bind on said inside and outside horizontal steel tube; So far safe plain net is in first floor installation;
Two) lifting of safe plain net:
With the rising of major project, said i-beam track is also corresponding to be installed thereupon, prolongs said first floor i-beam track; Accomplish the installation of second layer i-beam track, catch on said interior horizontal steel tube, unclamp the said holding screw on all said rack monomers with lifting appliance; Unload the said wire rope of hanging, lift by crane said safe plain net, install again and hang wire rope to predeterminated position; Tighten up holding screw, so far said safe plain net has moved to the second layer;
Three) repeat above-mentioned steps two), accomplish until major project.
2. the job practices of architecture enclosing safety plain net according to claim 1 is characterized in that this method also comprises, pulls down the i-beam track of N layer, is used to form the i-beam track of N+2 layer, and N is a natural number.
3. the job practices of architecture enclosing safety plain net according to claim 1 and 2 is characterized in that said lifting appliance comprises bottle gouard moved by hands.
CN2010105833850A 2010-12-10 2010-12-10 Construction method of safe flat net positioned on periphery of building Active CN102061810B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010105833850A CN102061810B (en) 2010-12-10 2010-12-10 Construction method of safe flat net positioned on periphery of building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010105833850A CN102061810B (en) 2010-12-10 2010-12-10 Construction method of safe flat net positioned on periphery of building

Publications (2)

Publication Number Publication Date
CN102061810A CN102061810A (en) 2011-05-18
CN102061810B true CN102061810B (en) 2012-07-18

Family

ID=43997289

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010105833850A Active CN102061810B (en) 2010-12-10 2010-12-10 Construction method of safe flat net positioned on periphery of building

Country Status (1)

Country Link
CN (1) CN102061810B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103736217A (en) * 2013-11-23 2014-04-23 俞关清 High-rise anti-falling life net
CN103656894A (en) * 2013-12-04 2014-03-26 俞关清 Falling prevention life net for tall buildings
CN107435394B (en) * 2016-05-25 2020-12-22 北新集团建材股份有限公司 Partition wall and connecting structure thereof
CN111236614A (en) * 2020-02-27 2020-06-05 杭州昂创科技有限公司 Construction method of externally-hung self-climbing type triangular support protective scaffold system
CN111749482A (en) * 2020-06-22 2020-10-09 坤茂建设集团有限公司 Building periphery safety flat net and construction method thereof

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004169484A (en) * 2002-11-22 2004-06-17 Shimizu Corp Construction method of vertical curing
GB2470124A (en) * 2008-12-04 2010-11-10 Sgb Services Ltd Climbing Screen Support Frame

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030168282A1 (en) * 2002-03-06 2003-09-11 Harris Travis W. Moveable safety handrail system

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004169484A (en) * 2002-11-22 2004-06-17 Shimizu Corp Construction method of vertical curing
GB2470124A (en) * 2008-12-04 2010-11-10 Sgb Services Ltd Climbing Screen Support Frame

Also Published As

Publication number Publication date
CN102061810A (en) 2011-05-18

Similar Documents

Publication Publication Date Title
CN101672102B (en) Steel structural overhead ceiling construction platform
CN107558723B (en) Method for manufacturing and installing hanging bracket of hanging basket for inclined roof
CN201826525U (en) Climbing shuttering system device for buildings
CN102061810B (en) Construction method of safe flat net positioned on periphery of building
CN106939707A (en) A kind of restricted clearance large-scale steel structure supporting platform from method for improving
CN201908447U (en) Lift-type horizontal safety net
CN205772984U (en) A kind of hanging apparatus of monolithic steel truss
CN108979131B (en) Integral lifting platform device for high-rise building construction steel formwork and operation frame
CN103669900A (en) Integral reinforcement construction method for outer barrel wall of chimney
CN103643800A (en) Lifting installation system for buckling restrained supporting member and construction method thereof
CN102444271B (en) Suspended scaffolding
CN104675171A (en) Construction method for single-piece hoisting of aluminum alloy vault of large vertical storage tank
CN106499201A (en) A kind of dismountable safety rope tool-type holding clamp and its using method
CN104153586B (en) A kind of suspension cable hangs the construction method of mounting purlines
CN202945798U (en) Overhanging type scaffold corner device
CN204728554U (en) The integral structure of channel and double-deck operation platform
CN103993739B (en) The construction method of granulation tower spraying layer stiff beam
CN110748139B (en) Hanging basket support system
CN211341686U (en) Hanging basket support system
CN102787717B (en) Self-supporting combined steel template construction method
CN202718375U (en) Installation and operation platform of high-altitude cantilever structure
CN108483212A (en) Cladding glass installation self-control electric hoist hanger system and its hanging method
CN113550550A (en) Overhanging unit type scaffold convenient to assemble and disassemble
CN103982046A (en) Lifting and installation method of buckling restrained braces
CN108331335A (en) A kind of pre-splicing separation type hydraulic of steel and wood composite is from climbing support

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200324

Address after: 300451 No. 72, Hangzhou Road, Binhai New Area, Tianjin

Co-patentee after: CHINA CONSTRUCTION SIXTH ENGINEERING DIVISION Corp.,Ltd.

Patentee after: CHINA CONSTRUCTION SIXTH ENGINEERING BUREAU INSTALLATION ENGINEERING Co.,Ltd.

Address before: 300456 No. 75, Xingang Road, Tanggu District, Tianjin

Co-patentee before: CHINA CONSTRUCTION SIXTH ENGINEERING DIVISION Corp.,Ltd.

Patentee before: CHINA CONSTRUCTION SIXTH ENGINEERING DIVISION NO.3 CONSTRUCTION ENGINEERING Co.,Ltd.

CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 710075 room 11001, 10th floor, building 3, Fengxi new town headquarters economic Park project, Xixian New District, Xi'an, Shaanxi Province

Patentee after: China Construction Sixth Engineering Bureau Northwest Construction Co.,Ltd.

Patentee after: CHINA CONSTRUCTION SIXTH ENGINEERING DIVISION Corp.,Ltd.

Address before: No. 72 Hangzhou Road, Tianjin Binhai New Area, 300451

Patentee before: CHINA CONSTRUCTION SIXTH ENGINEERING BUREAU INSTALLATION ENGINEERING Co.,Ltd.

Patentee before: CHINA CONSTRUCTION SIXTH ENGINEERING DIVISION Corp.,Ltd.

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 710075 room 11001, 10th floor, building 3, Fengxi new town headquarters economic Park project, Xixian New District, Xi'an, Shaanxi Province

Patentee after: The First Construction Co.,Ltd. of China Construction Sixth Engineering Bureau

Patentee after: CHINA CONSTRUCTION SIXTH ENGINEERING DIVISION Corp.,Ltd.

Address before: 710075 room 11001, 10th floor, building 3, Fengxi new town headquarters economic Park project, Xixian New District, Xi'an, Shaanxi Province

Patentee before: China Construction Sixth Engineering Bureau Northwest Construction Co.,Ltd.

Patentee before: CHINA CONSTRUCTION SIXTH ENGINEERING DIVISION Corp.,Ltd.