CN101224856A - Long-span load-carrying cable lifting machine and mounting method therefor - Google Patents

Long-span load-carrying cable lifting machine and mounting method therefor Download PDF

Info

Publication number
CN101224856A
CN101224856A CNA2007101689736A CN200710168973A CN101224856A CN 101224856 A CN101224856 A CN 101224856A CN A2007101689736 A CNA2007101689736 A CN A2007101689736A CN 200710168973 A CN200710168973 A CN 200710168973A CN 101224856 A CN101224856 A CN 101224856A
Authority
CN
China
Prior art keywords
cable
pylon
rope
tower
sport car
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2007101689736A
Other languages
Chinese (zh)
Inventor
秦顺全
潘东发
周外男
李军堂
毛伟琦
王东辉
姚发海
周超舟
李兴华
刘翠云
马涛
张瑞霞
魏善平
贾卫中
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Major Bridge Engineering Co Ltd
Original Assignee
China Railway Major Bridge Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Major Bridge Engineering Co Ltd filed Critical China Railway Major Bridge Engineering Co Ltd
Priority to CNA2007101689736A priority Critical patent/CN101224856A/en
Publication of CN101224856A publication Critical patent/CN101224856A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention provides a long-span over loading cable crane and an installation method thereof which relates to a cable crane used in bridge construction and consists of a guy rope tower 1, a cable tower 2, a main cable and a hoisting traction system 3, an anchoring system 4, an electromechanical system 5 and a wind cable system 6. The tower of the cable crane consists of the guy rope tower 1 and the cable tower 2 which is hinged on the top of the guy rope tower 1 and fixedly connected with the bottom of the guy rope tower 1. The invention adopts the techniques of the parallel bearing of a plurality of main cables, the wind cables connected in series, the joint construction of the cable towel and the guy rope tower, etc., thereby greatly improving the loading capability of the long-span cable crane and lowering the manufacturing cost as much as possible. The invention can reduce the influence of the unbalanced horizontal force on the top of the cable tower 2 on the guy rope tower 1 and greatly save the construction cost of the guy rope tower 1. The loading cable crane has strong load-carrying capability, wide loading range and high economic performance.

Description

Long-span load-carrying cable lifting machine and installation method thereof
Technical field
The present invention relates to the long-span load-carrying cable lifting machine used in the construction of a kind of science of bridge building.
Background technology
Along with the development of domestic and international long span bridge girder segment operating technique, the beam bridge construction presents the batch production manufacturing, the trend that on-the-spot big sections is installed.Cable crane is as a kind of important equipment that transports in the bridge subsection construction with installation component, and can its lift heavy ability size be the key that realize that on-the-spot big sections is installed.The maximum rated lift heavy of present cable crane both domestic and external is 170t (a Chongqing E Gongyan Yangtze Bridge construction cable crane), development along with bridge construction, present cable crane lift heavy ability far from can meet requirements (dam length river, vegetable garden, Chongqing bridge steel truss girder is installed the heavy 280t of sections), presses for the lift heavy ability (specified lift heavy surpasses 280t) that significantly improves cable crane.
Because the lift heavy super large, long-span load-carrying cable lifting machine need be provided with many main ropes, and the difficult problem that many main ropes need to solve in carrying side by side is exactly how to allow many main ropes evenly stressed.To produce huge overbalance horizontal force on cable pylon top in the work of load-carrying cable loop wheel machine, and how can reduce the cost of cable pylon again as much as possible in control cat head off normal, this also is another main difficulty that faces in the cable crane design.
Summary of the invention
The objective of the invention is at above-mentioned present situation, it is strong to aim to provide a kind of load capacity, and the lift heavy scope is big, the long-span load-carrying cable lifting machine that economic performance is high.
The implementation of the object of the invention is, long-span load-carrying cable lifting machine, by knotted rope pylon 1, cable pylon 2, main rope and lifting traction system 3, anchor system 4, Mechatronic Systems 5, cable wind system 6 is formed, two groups of main rope 3-1 are arranged, every group of main rope is made up of many steel ropes, every group of main rope, back guy 6-2 one end is fixed on the anchor system 4, one end is fixed on the cable pylon 2, sport car 3-2 is on main rope 3-1, be cascaded with steel rope, sport car 3-2 upper hanger is provided with multiple tracks distribution beam 3-3, guy is connected into a ventilation cable 6-1 before the cable pylon 2, hoisting line 3-3 is around the polyspast of wearing sport car 3-2, and two ends enter hoisting winding 5-1 after walking around cat head, and trailing cable 3-4 movable pulley places on the sport car 3-2, fixed pulley is fixed in the cable column overhead, trailing cable 3-4 is alive, and head advances two sides rack winch 5-2 respectively, and cable pylon 2 is hinged on knotted rope pylon 1 top, is cemented in main bridge root at the bottom of knotted rope pylon 1 tower.
The installation method of long-span load-carrying cable lifting machine, concrete steps are as follows:
South anchorage 4-2, northern anchorage 4-1 construction, assembly unit knotted rope pylon 1,
Button tower dragline hangs, and ventilation cable 6-1, back guy 6-2 buckle that the tower dragline hangs, stretch-draw;
Assembly unit cable pylon 2 is with cable tower free bearing device 2-1 temporary consolidation;
Saddle and cat head turn to installation, and dragline is transferred to cable pylon 2 cats head from knotted rope pylon 1 cat head, and cable pylon cable wind rope tentatively hangs anchoring, the stretch-draw of cable tower guy, and knotted rope pylon 1 cat head is pre-to be provided with partially, and cable pylon 2 is hinged with knotted rope pylon 1;
Hang main rope 3-1, empty cable force of main rope and sag are accurately adjusted;
Trailing cable 3-4, track cable 3-3 go up knotted rope pylon 1, overhead traveling crane is installed, is divided the rope device, and 3-2 moves to span centre with sport car, adjust main rope 3-1 and ventilation cable 6-1, back guy 6-2.
Employing the present invention can reduce the influence of the overbalance horizontal force make-up Sarasota frame 1 on cable pylon 2 tops, the construction costs of saving knotted rope pylon 1 greatly; Main rope 3-1 is divided into two groups, form by many independent wire strands for every group, sport car 3-2 is bearing on the main bearing rope 3-1, be provided with 4 altogether, two sport car 3-2 are arranged on every group of main rope, be cascaded with steel rope, owing to be that many main rope 3-1 carry side by side, the problem of every main rope unbalance stress is very outstanding, by the multiple tracks distribution beam is set on the upper hanger of sport car 3-2, is beneficial to the force-transfer characteristic of single supported beam, make many main rope 3-1 evenly stressed, because heavy duty will produce huge cat head overbalance horizontal force in the work of this cable crane, by changing usually the method that each cable pylon all is provided with the front and back guy, the preceding guy of two cable pylons 2 is merged into a ventilation cable 6-1, can improve cable pylon 2 rigidity, reduce the cat head off normal, also reduce steel rope material usage and stretch-draw work capacity simultaneously.
Figure of description
Fig. 1 is this cable crane facade arrangement plan
Fig. 2 is this cable crane planar view
Fig. 3 is knotted rope pylon, cable pylon structure scheme drawing
Fig. 4 is a cable tower free bearing apparatus structure scheme drawing
Fig. 5 is the sport car arrangement plan
Fig. 6 is sport car upper hanger distribution beam figure
Fig. 7 is that hoisting line is arranged scheme drawing
Fig. 8 is that trailing cable is arranged scheme drawing
The specific embodiment
With reference to Fig. 1,2,3, this cable crane is by being made up of knotted rope pylon 1, cable pylon 2, main rope and lifting traction system 3, anchor system 4, Mechatronic Systems 5, cable wind system 6.
Be example with dam length river, vegetable garden, Chongqing bridge 420t cable crane below, auspiciously state the present invention:
1, cable pylon
Cable pylon 2 and knotted rope pylon 1 are built jointly, and knotted rope pylon 1 bottom is fixed, and cable crane pylon 2 is articulated in knotted rope pylon 1 top, the influence of the overbalance horizontal force make-up Sarasota frame 1 of generation when working to reduce cable crane.Knotted rope pylon 1 column is assembled by twin columns, three post fabricated universal steel memberss by medial and lateral.Cable crane 2 columns are assembled by the single-column fabricated universal steel members.Temporary consolidation during 2 assembly units of cable pylon, treat that 2 assembly units of cable pylon finish after, hinged by cable tower free bearing device 2-1 shown in Figure 4 again.
2, main rope, lifting traction system and Mechatronic Systems
Be provided with two groups of main rope 3-1, every group of main rope is made up of 12 φ, 60 steel ropes, two groups of main rope spacing 34m, and single rope spacing is 240mm, is fixed type, construction period is not traversing.
With reference to Fig. 5,6,7,8, every line has two sport car 3-2, and totally four sport cars are bearing in respectively on the track cable 3-3.Spacing on every line between two sport car 3-2 is 8m, is cascaded with the steel rope of two φ 44.Every sport car has 48 traveling pulleys, is divided on two groups of track cable 3-3 that are bearing in 12 φ 60.Be furnished with traction running block and 5 fixed pulley groups that hoist at sport car 3-2 upper hanger, under sport car, be furnished with 4 running blocks that hoist on the hanger.Lifting pulley group multiplying power is 8.All pulleys all adopt the nylon manufacturing, and the weight of single nylon wheel is about the sixth of the steel wheel of equivalent diameter, have alleviated the weight of sport car 3-2 greatly.Sport car 3-2 upper hanger is provided with three road distribution beam 3-5, utilizes single supported beam power transmission uniform properties to satisfy the evenly stressed requirement of 12 main ropes.
Arrange a branch rope device 3-6 along spanning every 30m, divide between the rope device to link, and combine as a whole with sport car with bend hawsers, its along bridge to moving with sport car.Cable saddle 3-7 is arranged in (see figure 3) on the pylon of both sides, mainly is furnished with track cable wheel flutter, lifting mechanism deflection sheave and traction running mechanism assembly pulley on cable saddle.
Traction running mechanism 3-5 assembly pulley is made up of deflection sheave and fixed pulley group, and the traction multiplying power is 6.Finish traction work by the synchronous folding and unfolding of cable pylon both sides winch to sport car.
Track cable 3-3 deflection sheave group is made up of two groups of pulleys, and every group has 12 pulleys, and the track cable of 12 φ 60 of the every line of cable crane just is bearing on these 24 pulleys.Track cable 3-3 two ends are fixed on the agent structure of bridge two sides by earth anchor 4 respectively, and by the load-bearing assembly pulley sport car 3-2 are play supporting role.
Track cable 3-3 is designed to 2 15t winchs and walks 8 layouts.Hoisting winding 5-1 is arranged as: two sport car 3-2 of single line respectively have the independent hoisting system of a cover, 2 15t hoisting winding 5-1 of every sport car 3-2 configuration, and two sides are respectively arranged one.Hoisting winding 5-1 is placed on the Y structure back boom, the cat head of knotted rope pylon 1 in the vertical rope stretching.Cat head after turning to for 4 times from the saddle rope stretching, enter sport car 3-2 hanger assembly pulley up and down, the crown sheave group to be configured to upper hanger fixed 5, following hanger moving 4.Bicycle hanger is up and down walked 8 layouts, because of being that two ends are power end, then being equivalent to separate unit hoisting winding 5-1 and walking 4.
22t low speed winch 5-2 is selected in sport car 3-2 traction for use, arranges that to two ends 2 amount to 8 along the vertical bridge of every group of main rope 3-1, and it is 1300m that winch holds the rope amount.Select the hemp center wire line of φ 34 for use, the mode of traction of two sides to drawing adopted in sport car 3-2 vertical shift, and trailing cable 3-3 walks 6 and arranges, dead end is fixed on the lifting dolly, and the head of living advances two sides 22t rack winch respectively.Mode of traction: two sport car 3-2 on one group of main rope 3-1 are together in series, each two rack winch 5-2 of two sides, and a side is initiatively drawn, the passive traction of opposite side.
3, anchor system
With reference to Fig. 1,3, pile foundation is adopted on anchorage 4-1 basis, main rope north, and northern anchorage 4-1 adopts the hot-cast anchor to be connected with main rope 3-1, and is hinged by anchor case and anchor beam arm-tie; 15 bundles, 9 hole prestress wires are adopted in the anchoring of anchor beam and anchorage then, root P anchor, and this type of attachment has overcome the phenomenon of anchorage local pressure inequality, stress concentration in the past.
The south anchor: pile foundation is adopted on anchorage 4-2 basis, main rope south, and main rope 3-1 is connected on the anchorage with anchor pole by the anchor case with after wind cable 6-2.Main rope 3-1 Suo Li adjusts and all places southern anchor 4-2 to carry out, and initial tension adopts a winch and 5 dilatory main ropes of polyspast to finish, and accurately adjusts and realizes by 2 60t jack tension main rope termination finish rolling deformed bars.
4, cable crane cable wind system
Cable crane cable wind system 6 is mainly used to overcome the cable cat head to the overbalance horizontal force of span centre and control the cat head off normal.This cable wind system adopts two cable pylon guy series connection, improves rigidity, reduces the cat head off normal, also reduces cable wind rope material and stretch-draw work capacity simultaneously.
According to tentative calculation, after wind cable 6-2 selects 2 * (6+2)-φ, 52 steel ropes for use, single initial tension 42 t (wherein each 2 of upstream and downstream hang stretch-draw again after installing sport car); Preceding wind cable is ventilation cable 6-1, adopts 2 * 6-φ, 48 steel ropes, single initial tension 36t.Utilize jack tension to adjust large-tonnage guy rope force, more traditional winch band polyspast is more easy, and the Suo Li accuracy rate greatly improves.
Because cat head overbalance horizontal force is too big, main rope and sport car place span centre with sport car after installing, and stretch-draw cable tower wind cable 2-2 Φ 52 back guy 6-2 install the cat head horizontal force that sport car causes with balance again.

Claims (7)

1. long-span load-carrying cable lifting machine, it is characterized in that by knotted rope pylon (1), cable pylon (2), main rope and lifting traction system (3), anchor system (4), Mechatronic Systems (5), cable wind system (6) is formed, two groups of main ropes (3-1) are arranged, every group of main rope is made up of many steel ropes, every group of main rope, back guy (6-2) end is fixed on the anchor system (4), one end is fixed on the cable pylon (2), sport car (3-2) is on main rope (3-1), be cascaded with steel rope, sport car (3-2) upper hanger is provided with the multiple tracks distribution beam, guy is connected into a ventilation cable (6-1) before the cable pylon 2, track cable (3-3) is around the polyspast of wearing sport car (3-2), two ends enter hoisting winding (5-1) after walking around cat head, trailing cable (3-4) movable pulley places on the sport car (3-3), and fixed pulley is fixed in the cable column overhead, and trailing cable (3-4) head alive advances two sides rack winch (5-2) respectively, cable pylon (2) is hinged on knotted rope pylon (1) top, is cemented in main bridge root at the bottom of knotted rope pylon (1) tower.
2. long-span load-carrying cable lifting machine according to claim 1 is characterized in that knotted rope pylon (1) column is assembled by twin columns, three post fabricated universal steel memberss by medial and lateral, and cable crane (2) column is assembled by the single-column fabricated universal steel members.
3. long-span load-carrying cable lifting machine according to claim 1 is characterized in that cable crane is provided with two groups of main ropes (3-1), and every group of main rope is made up of 12 φ 60 steel ropes, two groups of main rope spacing 34m, and single rope spacing is 240mm, is fixed type.
4. long-span load-carrying cable lifting machine according to claim 1, it is characterized in that every sport car has 48 traveling pulleys, be divided on two groups of track cables (3-3) that are bearing in 12 φ 60, sport car (3-2) upper hanger is furnished with traction running block and 5 fixed pulley groups that hoist, and is furnished with 4 running blocks that hoist under sport car on the hanger.
5. long-span load-carrying cable lifting machine according to claim 1 is characterized in that northern anchorage (4-1) and main rope (3-1) adopt the hot-cast anchor to be connected, and is hinged by anchor case and anchor beam arm-tie.
6. 420t long-span load-carrying cable lifting machine according to claim 1 is characterized in that after wind cable (6-2) selects 2 * (6+2)-φ, 52 steel ropes for use, and single initial tension 42t, preceding wind cable are ventilation cable (6-1), adopts 2 * 6-φ, 48 steel ropes, single initial tension 36t.
7. the installation method of the described long-span load-carrying cable lifting machine of claim 1 is characterized in that concrete steps are as follows:
South anchorage (4-2), northern anchorage (4-1) construction, assembly unit knotted rope pylon (1),
Button tower dragline hangs, and ventilation cable (6-1), back guy (6-2) buckle that the tower dragline hangs, stretch-draw;
Assembly unit cable pylon (2) is with cable tower free bearing device (2-1) temporary consolidation;
Saddle and cat head turn to installation, dragline is transferred to cable pylon (2) cat head from knotted rope pylon (1) cat head, and cable pylon cable wind rope tentatively hangs anchoring, the stretch-draw of cable tower guy, knotted rope pylon (1) cat head is pre-to be provided with partially, and cable pylon (2) is hinged with knotted rope pylon (1);
Hang main rope (3-1), empty cable force of main rope and sag are accurately adjusted;
Trailing cable (3-4), track cable (3-3) are gone up knotted rope pylon (1), overhead traveling crane is installed, is divided the rope device, and (3-2) moves to span centre with sport car, adjust main rope (3-1) and ventilation cable (6-1), back guy (6-2).
CNA2007101689736A 2007-12-20 2007-12-20 Long-span load-carrying cable lifting machine and mounting method therefor Pending CN101224856A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2007101689736A CN101224856A (en) 2007-12-20 2007-12-20 Long-span load-carrying cable lifting machine and mounting method therefor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2007101689736A CN101224856A (en) 2007-12-20 2007-12-20 Long-span load-carrying cable lifting machine and mounting method therefor

Publications (1)

Publication Number Publication Date
CN101224856A true CN101224856A (en) 2008-07-23

Family

ID=39857099

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2007101689736A Pending CN101224856A (en) 2007-12-20 2007-12-20 Long-span load-carrying cable lifting machine and mounting method therefor

Country Status (1)

Country Link
CN (1) CN101224856A (en)

Cited By (37)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101858056A (en) * 2010-06-11 2010-10-13 中铁大桥局集团有限公司 Fixing cable anchoring method and special device thereof
CN102190253A (en) * 2011-05-19 2011-09-21 中交第二航务工程局有限公司 Main cable reversing method and structure for cable crane
CN102219157A (en) * 2011-06-03 2011-10-19 长沙中联重工科技发展股份有限公司 Loading trolley-based converting rope winding system with variable multiplying power
CN103072905A (en) * 2011-06-03 2013-05-01 中联重科股份有限公司 Variable-multiplying power conversion rope winding system based on load trolley
CN103508324A (en) * 2013-03-12 2014-01-15 中国有色金属工业第六冶金建设有限公司 Method for hoisting main large components of KP125MN hot die forging press
CN104444851A (en) * 2014-11-17 2015-03-25 广东粤新海洋工程装备股份有限公司 Installation method of marine crane
CN104727227A (en) * 2015-01-29 2015-06-24 中铁港航局集团有限公司 Whole-section erecting method for open lattice type steel beam of half-through steel box tied-arch bridge
CN105645275A (en) * 2016-03-29 2016-06-08 中建钢构江苏有限公司 Cable hoisting crane and construction method thereof
CN105645262A (en) * 2016-03-29 2016-06-08 中建钢构江苏有限公司 Traveling crane structure of cable hoisting crane
CN105822072A (en) * 2016-05-20 2016-08-03 北京西飞世纪门窗幕墙工程有限责任公司 Hoisting construction structure and method for air corridor ceiling
CN106012841A (en) * 2016-05-16 2016-10-12 中交路桥华南工程有限公司 Cable crane and installation method thereof
CN106044579A (en) * 2016-08-01 2016-10-26 长江勘测规划设计研究有限责任公司 Structure and method for assisting traction skyline to cross river by cable crane traveling trolley
CN106276627A (en) * 2016-09-27 2017-01-04 湖南省中南桥梁安装工程有限公司 A kind of multi-tower continuous across hoist cable crane
CN107311048A (en) * 2017-08-30 2017-11-03 广西路桥工程集团有限公司 Cable crane
CN107344697A (en) * 2017-08-30 2017-11-14 广西路桥工程集团有限公司 Cable boom hoisting
CN107354873A (en) * 2017-08-30 2017-11-17 广西路桥工程集团有限公司 A kind of cable hoisting and rotator construction system
CN107673239A (en) * 2017-10-26 2018-02-09 中铁大桥局集团第八工程有限公司 A kind of cable crane tower frame self-balance system and its installation method
CN108203932A (en) * 2018-03-15 2018-06-26 西京学院 A kind of galvanized wire for suspension bridge Lift-on/Lift-off System and its installation method
CN108249317A (en) * 2017-12-29 2018-07-06 中铁大桥局集团有限公司 A kind of cable crane full circle swinging trailer system and construction method
CN108483274A (en) * 2018-05-25 2018-09-04 广西路桥工程集团有限公司 The main rope sport car system of cable crane
CN109083009A (en) * 2018-06-26 2018-12-25 四川公路桥梁建设集团有限公司 The construction method of floorings is transported in a kind of limited mountain area in place using more suspension centre cable cranes
CN109371854A (en) * 2018-10-17 2019-02-22 中交二航局第二工程有限公司 The method of cable crane construction large-span suspension bridge stiff girder
CN109853394A (en) * 2019-03-25 2019-06-07 安徽省路港工程有限责任公司 Arch bridge cable hoisting tower button integrated construction engineering method
CN110510526A (en) * 2019-08-19 2019-11-29 石家庄铁道大学 A kind of cable conveyer for Traffic Emergency Safeguards
CN110886187A (en) * 2019-10-18 2020-03-17 安徽省路港工程有限责任公司 Cable crane system installation system and construction method thereof
CN110939068A (en) * 2019-12-10 2020-03-31 广西路桥工程集团有限公司 Pre-tensioning system for longitudinal horizontal displacement of tower and using method thereof
CN111441594A (en) * 2020-04-21 2020-07-24 中铁大桥局第七工程有限公司 Construction method of multilayer sectional type main cable
CN111622121A (en) * 2020-06-03 2020-09-04 中铁一局集团厦门建设工程有限公司 Reeving method for hoisting single-tower cable
CN112027953A (en) * 2020-08-18 2020-12-04 中冶天工集团有限公司 Portable pipeline bidirectional moving hoisting device and using method thereof
CN112161612A (en) * 2020-09-22 2021-01-01 中交二航局第四工程有限公司 Suspension bridge anchoring system space attitude determination method based on unstable anchorage
CN112225084A (en) * 2020-09-29 2021-01-15 中铁大桥局集团有限公司 Large-tonnage cable crane bearing system and construction method
CN112320615A (en) * 2020-11-12 2021-02-05 武汉市市政建设集团有限公司 Installation method of wide cable crane
CN112411394A (en) * 2020-12-07 2021-02-26 中铁二十局集团第五工程有限公司 Method for hoisting cable of half-through type space Y-shaped steel box arch bridge
CN112591623A (en) * 2020-12-07 2021-04-02 中铁二十局集团第五工程有限公司 Dismounting method for cable hoisting system of half-through type space Y-shaped steel box arch bridge
CN114086479A (en) * 2021-11-30 2022-02-25 广西路桥工程集团有限公司 Tower foot anchoring structure for assembling tower and tower building method
CN114541261A (en) * 2022-01-18 2022-05-27 中铁大桥局集团第五工程有限公司 Combined wind cable structure of different bottom constrained cable towers and initial tower deviation adjusting method
CN116692694A (en) * 2023-08-04 2023-09-05 贵州省公路工程集团有限公司 Cable crane system and erection method thereof

Cited By (51)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101858056A (en) * 2010-06-11 2010-10-13 中铁大桥局集团有限公司 Fixing cable anchoring method and special device thereof
CN102190253A (en) * 2011-05-19 2011-09-21 中交第二航务工程局有限公司 Main cable reversing method and structure for cable crane
CN102190253B (en) * 2011-05-19 2013-04-24 中交第二航务工程局有限公司 Main cable reversing method and structure for cable crane
CN102219157A (en) * 2011-06-03 2011-10-19 长沙中联重工科技发展股份有限公司 Loading trolley-based converting rope winding system with variable multiplying power
CN102219157B (en) * 2011-06-03 2013-04-24 中联重科股份有限公司 Loading trolley-based converting rope winding system with variable multiplying power
CN103072905A (en) * 2011-06-03 2013-05-01 中联重科股份有限公司 Variable-multiplying power conversion rope winding system based on load trolley
CN103508324A (en) * 2013-03-12 2014-01-15 中国有色金属工业第六冶金建设有限公司 Method for hoisting main large components of KP125MN hot die forging press
CN103508324B (en) * 2013-03-12 2015-07-01 中国有色金属工业第六冶金建设有限公司 Method for hoisting main large components of KP125MN hot die forging press
CN104444851A (en) * 2014-11-17 2015-03-25 广东粤新海洋工程装备股份有限公司 Installation method of marine crane
CN104727227A (en) * 2015-01-29 2015-06-24 中铁港航局集团有限公司 Whole-section erecting method for open lattice type steel beam of half-through steel box tied-arch bridge
CN105645275A (en) * 2016-03-29 2016-06-08 中建钢构江苏有限公司 Cable hoisting crane and construction method thereof
CN105645262A (en) * 2016-03-29 2016-06-08 中建钢构江苏有限公司 Traveling crane structure of cable hoisting crane
CN106012841A (en) * 2016-05-16 2016-10-12 中交路桥华南工程有限公司 Cable crane and installation method thereof
CN105822072A (en) * 2016-05-20 2016-08-03 北京西飞世纪门窗幕墙工程有限责任公司 Hoisting construction structure and method for air corridor ceiling
CN105822072B (en) * 2016-05-20 2018-05-18 北京西飞世纪门窗幕墙工程有限责任公司 The lifting construction structure and its construction method of aerial vestibule furred ceiling
CN106044579A (en) * 2016-08-01 2016-10-26 长江勘测规划设计研究有限责任公司 Structure and method for assisting traction skyline to cross river by cable crane traveling trolley
CN106276627A (en) * 2016-09-27 2017-01-04 湖南省中南桥梁安装工程有限公司 A kind of multi-tower continuous across hoist cable crane
CN107311048A (en) * 2017-08-30 2017-11-03 广西路桥工程集团有限公司 Cable crane
CN107344697A (en) * 2017-08-30 2017-11-14 广西路桥工程集团有限公司 Cable boom hoisting
CN107354873A (en) * 2017-08-30 2017-11-17 广西路桥工程集团有限公司 A kind of cable hoisting and rotator construction system
CN107673239A (en) * 2017-10-26 2018-02-09 中铁大桥局集团第八工程有限公司 A kind of cable crane tower frame self-balance system and its installation method
CN107673239B (en) * 2017-10-26 2023-11-28 中铁大桥局集团第八工程有限公司 Cable crane tower self-balancing system and installation method thereof
CN108249317A (en) * 2017-12-29 2018-07-06 中铁大桥局集团有限公司 A kind of cable crane full circle swinging trailer system and construction method
CN108203932A (en) * 2018-03-15 2018-06-26 西京学院 A kind of galvanized wire for suspension bridge Lift-on/Lift-off System and its installation method
CN108483274A (en) * 2018-05-25 2018-09-04 广西路桥工程集团有限公司 The main rope sport car system of cable crane
CN109083009A (en) * 2018-06-26 2018-12-25 四川公路桥梁建设集团有限公司 The construction method of floorings is transported in a kind of limited mountain area in place using more suspension centre cable cranes
CN109083009B (en) * 2018-06-26 2020-03-24 四川公路桥梁建设集团有限公司 Construction method for transferring bridge deck slab by using multi-hoisting-point cable crane in mountainous area with limited site
CN109371854A (en) * 2018-10-17 2019-02-22 中交二航局第二工程有限公司 The method of cable crane construction large-span suspension bridge stiff girder
CN109853394A (en) * 2019-03-25 2019-06-07 安徽省路港工程有限责任公司 Arch bridge cable hoisting tower button integrated construction engineering method
CN110510526B (en) * 2019-08-19 2024-04-02 石家庄铁道大学 Cable conveyor for traffic emergency guarantee
CN110510526A (en) * 2019-08-19 2019-11-29 石家庄铁道大学 A kind of cable conveyer for Traffic Emergency Safeguards
CN110886187A (en) * 2019-10-18 2020-03-17 安徽省路港工程有限责任公司 Cable crane system installation system and construction method thereof
CN110939068A (en) * 2019-12-10 2020-03-31 广西路桥工程集团有限公司 Pre-tensioning system for longitudinal horizontal displacement of tower and using method thereof
CN110939068B (en) * 2019-12-10 2022-03-01 广西路桥工程集团有限公司 Pre-tensioning system for longitudinal horizontal displacement of tower and using method thereof
CN111441594A (en) * 2020-04-21 2020-07-24 中铁大桥局第七工程有限公司 Construction method of multilayer sectional type main cable
CN111441594B (en) * 2020-04-21 2021-10-26 中铁大桥局第七工程有限公司 Construction method of multilayer sectional type main cable
CN111622121A (en) * 2020-06-03 2020-09-04 中铁一局集团厦门建设工程有限公司 Reeving method for hoisting single-tower cable
CN112027953A (en) * 2020-08-18 2020-12-04 中冶天工集团有限公司 Portable pipeline bidirectional moving hoisting device and using method thereof
CN112027953B (en) * 2020-08-18 2023-09-08 中冶天工集团有限公司 Portable pipeline bidirectional moving hoisting device and application method thereof
CN112161612A (en) * 2020-09-22 2021-01-01 中交二航局第四工程有限公司 Suspension bridge anchoring system space attitude determination method based on unstable anchorage
CN112225084A (en) * 2020-09-29 2021-01-15 中铁大桥局集团有限公司 Large-tonnage cable crane bearing system and construction method
CN112320615A (en) * 2020-11-12 2021-02-05 武汉市市政建设集团有限公司 Installation method of wide cable crane
CN112320615B (en) * 2020-11-12 2023-02-03 武汉市市政建设集团有限公司 Installation method of wide cable crane
CN112591623A (en) * 2020-12-07 2021-04-02 中铁二十局集团第五工程有限公司 Dismounting method for cable hoisting system of half-through type space Y-shaped steel box arch bridge
CN112591623B (en) * 2020-12-07 2022-05-17 中铁二十局集团第五工程有限公司 Dismounting method for cable hoisting system of half-through type space Y-shaped steel box arch bridge
CN112411394B (en) * 2020-12-07 2022-03-04 中铁二十局集团第五工程有限公司 Method for hoisting cable of half-through type space Y-shaped steel box arch bridge
CN112411394A (en) * 2020-12-07 2021-02-26 中铁二十局集团第五工程有限公司 Method for hoisting cable of half-through type space Y-shaped steel box arch bridge
CN114086479A (en) * 2021-11-30 2022-02-25 广西路桥工程集团有限公司 Tower foot anchoring structure for assembling tower and tower building method
CN114541261A (en) * 2022-01-18 2022-05-27 中铁大桥局集团第五工程有限公司 Combined wind cable structure of different bottom constrained cable towers and initial tower deviation adjusting method
CN116692694A (en) * 2023-08-04 2023-09-05 贵州省公路工程集团有限公司 Cable crane system and erection method thereof
CN116692694B (en) * 2023-08-04 2023-09-29 贵州省公路工程集团有限公司 Cable crane system and erection method thereof

Similar Documents

Publication Publication Date Title
CN101224856A (en) Long-span load-carrying cable lifting machine and mounting method therefor
CN201172597Y (en) Wide span heavy-load cable hoisting machine
CN100543235C (en) The method and system of erecting steel trusses by stay cable auxiliary complete cantilever
CN202090286U (en) Traction system suitable for self-anchored type double cable plane suspension bridge
CN101476293B (en) Non-stand construction method for large bridge arch rib
CN105565176B (en) A kind of asymmetric cable crane of single column
CN103321416B (en) Construction method for prestress of cable-stayed grid structure
CN203080400U (en) Extra-large span suspension bridge with uniparted hyperboloid space cable net main cables
CN201106155Y (en) Inclined guy cable auxiliary full cantaliver crane trussed steel beam device
CN105274941A (en) General construction method for partially ground-anchored cable-stayed suspension bridge
CN106276627B (en) A kind of multi-tower continuous across hoist cable crane
CN111924720A (en) Wind cable anchoring system of cable crane tower and construction method
CN201473221U (en) Light cable crane for suspension bridge
CN101787677B (en) Method for erecting girder of suspension bridge by double-hoisting hydraulic NC (numerical control) cable crane
CN101481903A (en) Method for erecting main truss of suspension bridge in mountain area by reversely assembling cross-cable cranes
CN114182647A (en) Construction method for lifting and rotating weak arch
CN206069230U (en) A kind of multi-tower continuous across hoist cable crane
CN211255035U (en) Novel heavy-duty cable crane system
CN205329550U (en) Suspension bridge catwalk system
CN109629402B (en) Construction method of three-tower four-span suspension bridge girder
CN106968178B (en) Construction method for main beam of cable-stayed suspension bridge
CN203174516U (en) Suspension bridge closure segment construction beam segment traction pre-deflection device
CN102190253B (en) Main cable reversing method and structure for cable crane
CN202450450U (en) Reinforcement and reconstruction structure of suspension bridge
CN212358014U (en) Single-span cable hoisting device for hoisting suspension bridge girder

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20080723