CN103896127A - Connecting structure of construction hoist and building climbing formwork frame - Google Patents
Connecting structure of construction hoist and building climbing formwork frame Download PDFInfo
- Publication number
- CN103896127A CN103896127A CN201410101967.9A CN201410101967A CN103896127A CN 103896127 A CN103896127 A CN 103896127A CN 201410101967 A CN201410101967 A CN 201410101967A CN 103896127 A CN103896127 A CN 103896127A
- Authority
- CN
- China
- Prior art keywords
- frame
- building
- guide rail
- rail frame
- climbing form
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention provides a connecting structure of a construction hoist and a building climbing formwork frame. The structure is composed of a main guide rail frame, an auxiliary guide rail frame, connecting arms, a fixed attachment frame, rolling attachment frames and the like. One side of the auxiliary guide rail frame is connected with the main guide rail frame through the connecting arms, the other side of the auxiliary guide rail frame is connected with the rolling attachment frames, the rolling attachment frames are fixedly connected with the building climbing formwork frame, one end of the fixed attachment frame is connected with the main guide rail frame, the other end of the fixed attachment frame is connected with a building wall, the auxiliary guide rail frame is composed of sheet standard joints, the height of the auxiliary guide rail frame is fixed, the number of sets of the rolling attachment frames is one or three, and idler wheels are arranged on the rolling attachment frames. According to the connecting structure of the construction hoist and the building climbing formwork frame, the construction hoist can move upwards to work on the top of the climbing formwork frame in a building in which the climbing formwork frame is used, and personal or materials can be sent to required floors.
Description
Technical field
The present invention relates to building hoist field, be specifically related to the structure that a kind of building hoist is connected with building climbing form frame.
Background technology
Along with the high speed development of national economy, building hoist starts bringing into play huge effect at increasing building field, some special places also need to apply some special functions, but, due to the continuous progress of production level, in order to boost productivity, economize labor time, properity and the safety performance of people to elevator requires also more and more higher.
In the construction method of many skyscrapers, engender and used a kind of top creeping formwork structure to help the new construction means of pouring, fixed column, this creeping formwork structure is steel structure, be positioned at building top, around the core tube region of whole building, can self upwards be mentioned by equipment such as hydraulic efficiency gear.Because this climbing form frame is an integral structure, and have and occupy larger spatial altitude, make cannot install in this altitude range the wall-attached frame of elevator, and due to the restriction of elevator guide bracket cantilever height, make elevator cannot transport personnel and goods and materials arriving the construction area (top layer) of climbing form frame top.
Summary of the invention
The object of the present invention is to provide a kind of building hoist and the connection structure of building climbing form frame, can solve existing building hoist cannot up work in the building that has used climbing form frame to the present situation at climbing form frame top, the through required floor of operation that can make personnel or goods and materials, offers convenience to transport.
In order to realize above object, the invention provides a kind of building hoist and the connection structure of building climbing form frame, comprise building hoist, building climbing form frame, described structure also comprises main guide rail frame, auxiliary guide rail frame, connecting arm, fixing attaching frame, rolling attaching frame; Building hoist is fixed on main guide rail frame, auxiliary guide rail frame one side connects main guide rail frame by connecting arm, and opposite side connects rolling attaching frame, and rolling attaching frame is fixedly connected with building climbing form frame, fixing attaching frame one end connects main guide rail frame, other end connecting building body of wall.
Further, auxiliary guide rail frame is made up of chip standard knot, and is highly fixed value.
The quantity of further, rolling attaching frame is many groups.
The quantity of further, rolling attaching frame is one group or three groups.
Further, rolling attaching frame is provided with roller.
The invention provides a kind of building hoist and the connection structure of building climbing form frame, building hoist can be having used in the building of climbing form frame, make building hoist can up work to climbing form frame top, make the through required floor of operation of personnel or goods and materials, brought facility to camp site.
Brief description of the drawings
In order to be illustrated more clearly in the embodiment of the present invention or technical scheme of the prior art, to the accompanying drawing of required use in embodiment or description of the Prior Art be briefly described below, apparently, accompanying drawing in the following describes is only some embodiments of the present invention, for those of ordinary skill in the art, do not paying under the prerequisite of creative work, can also obtain according to these accompanying drawings other accompanying drawing.
Fig. 1 is the decomposing schematic representation of connection structure provided by the invention;
Fig. 2 is the schematic top plan view of connection structure provided by the invention;
Fig. 3 is the schematic side view of connection structure provided by the invention.
Detailed description of the invention
The connection structure that the invention provides a kind of building hoist and building climbing form frame, building hoist can be having used in the building of climbing form frame, make building hoist can up work to climbing form frame top, make the through required floor of operation of personnel or goods and materials.
Below in conjunction with the accompanying drawing in the present invention, the technical scheme in the present invention is clearly and completely described, obviously, described is only the present invention's part embodiment, instead of whole embodiment.Based on the embodiment in the present invention, the every other embodiment that those of ordinary skill in the art obtain under the prerequisite of not making creative work, belongs to the scope of protection of the invention.
Referring to Fig. 1, Fig. 2, Fig. 3, a kind of building hoist and the connection structure of building climbing form frame, comprise building hoist 10, building climbing form frame 4, and described structure also comprises main guide rail frame 1, auxiliary guide rail frame 2, connecting arm 5, fixing attaching frame 6, rolling attaching frame 3; Building hoist 10 is fixed on main guide rail frame 1, auxiliary guide rail frame 2 one sides connect main guide rail frame 1 by connecting arm 5, opposite side connects rolling attaching frame 3, rolling attaching frame 3 is fixedly connected with building climbing form frame 4, fixing attaching frame 6 one end connect main guide rail frame 1, other end connecting building body of wall 7, auxiliary guide rail frame 2 is made up of several chip standard knots, and be highly fixed value, the quantity of rolling attaching frame 3 is many groups, further, the quantity of rolling attaching frame is one group or three groups, and rolling attaching frame 3 is provided with roller.When normal work, in the time that building climbing form frame 4 need to upwards be creeped, first main guide rail frame 1 and auxiliary guide rail frame 2 are increased to the standard knot of some, then prepare the up operation of building climbing form frame 4, after climbing form frame 4 to be built is up, corresponding fixing attaching frame 6 is installed on the position of vacating after building climbing form frame 4 is up; The standard knot dismounting transfer that again auxiliary guide rail frame 2 belows has been departed to rolling attaching frame 3 is mounted to top, and elevator can continue to rise to top layer construction area.
Known by above description, the invention provides a kind of building hoist and the connection structure of building climbing form frame, building hoist can be having used in the building of climbing form frame, make building hoist can up work to climbing form frame top, the through required floor of operation that makes personnel or goods and materials, has brought facility to camp site.
Above content is in conjunction with concrete preferred implementation further description made for the present invention, can not assert that specific embodiment of the invention is confined to these explanations.For general technical staff of the technical field of the invention, without departing from the inventive concept of the premise, can also make some simple deduction or replace, all should be considered as belonging to protection scope of the present invention.
Claims (5)
1. building hoist and the structure that building climbing form frame is connected, comprises building hoist, building climbing form frame, it is characterized in that, described structure also comprises main guide rail frame, auxiliary guide rail frame, connecting arm, fixing attaching frame, rolling attaching frame; Building hoist is fixed on main guide rail frame, auxiliary guide rail frame one side connects main guide rail frame by connecting arm, and opposite side connects rolling attaching frame, and rolling attaching frame is fixedly connected with building climbing form frame, fixing attaching frame one end connects main guide rail frame, other end connecting building body of wall.
2. a kind of building hoist according to claim 1 and the structure that building climbing form frame is connected, is characterized in that, auxiliary guide rail frame is made up of chip standard knot, and is highly fixed value.
3. a kind of building hoist according to claim 1 and the structure that building climbing form frame is connected, is characterized in that, the quantity of rolling attaching frame is many groups.
4. a kind of building hoist according to claim 3 and the structure that building climbing form frame is connected, is characterized in that, the quantity of rolling attaching frame is one group or three groups.
5. according to a kind of building hoist described in claim 1 or 3 and the structure that building climbing form frame is connected, it is characterized in that, rolling attaching frame is provided with roller.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410101967.9A CN103896127A (en) | 2014-03-19 | 2014-03-19 | Connecting structure of construction hoist and building climbing formwork frame |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410101967.9A CN103896127A (en) | 2014-03-19 | 2014-03-19 | Connecting structure of construction hoist and building climbing formwork frame |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103896127A true CN103896127A (en) | 2014-07-02 |
Family
ID=50987765
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410101967.9A Pending CN103896127A (en) | 2014-03-19 | 2014-03-19 | Connecting structure of construction hoist and building climbing formwork frame |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103896127A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105366482A (en) * | 2014-08-08 | 2016-03-02 | 北京天和建筑机械设备租赁有限责任公司 | A sliding anchoring device for a construction hoist |
CN106639303A (en) * | 2016-11-21 | 2017-05-10 | 中国建筑股份有限公司 | Hydraulic climbing formwork frame special for lift |
CN106995016A (en) * | 2017-02-22 | 2017-08-01 | 郑义恒 | A kind of spliced antifreeze skin climbing rail system with deceleration |
CN107605152A (en) * | 2017-07-28 | 2018-01-19 | 中建四局第建筑工程有限公司 | The combination unit and its application method of a kind of construction elevator and creeping formwork support body |
CN108996363A (en) * | 2018-07-21 | 2018-12-14 | 筑梦高科建筑有限公司 | A kind of structure that lifter for building construction is connected with building climbing mould bases |
CN113501404A (en) * | 2021-07-27 | 2021-10-15 | 中国建筑一局(集团)有限公司 | Ultrahigh construction elevator and wall attaching method for same |
-
2014
- 2014-03-19 CN CN201410101967.9A patent/CN103896127A/en active Pending
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105366482A (en) * | 2014-08-08 | 2016-03-02 | 北京天和建筑机械设备租赁有限责任公司 | A sliding anchoring device for a construction hoist |
CN106639303A (en) * | 2016-11-21 | 2017-05-10 | 中国建筑股份有限公司 | Hydraulic climbing formwork frame special for lift |
CN106639303B (en) * | 2016-11-21 | 2019-06-28 | 中国建筑股份有限公司 | Elevator dedicated hydraulic creeping formwork frame body |
CN106995016A (en) * | 2017-02-22 | 2017-08-01 | 郑义恒 | A kind of spliced antifreeze skin climbing rail system with deceleration |
CN107605152A (en) * | 2017-07-28 | 2018-01-19 | 中建四局第建筑工程有限公司 | The combination unit and its application method of a kind of construction elevator and creeping formwork support body |
CN108996363A (en) * | 2018-07-21 | 2018-12-14 | 筑梦高科建筑有限公司 | A kind of structure that lifter for building construction is connected with building climbing mould bases |
CN113501404A (en) * | 2021-07-27 | 2021-10-15 | 中国建筑一局(集团)有限公司 | Ultrahigh construction elevator and wall attaching method for same |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103896127A (en) | Connecting structure of construction hoist and building climbing formwork frame | |
CN103711323B (en) | Utilize the anti-ceiling board construction method of portable tubular truss stage+module roofing | |
CN202767494U (en) | Hanging basket for high-altitude roof inner plate construction | |
CN202416882U (en) | Track for slippage installation of large-span pipe truss | |
CN202248941U (en) | Integral lifting, positioning and mounting device for large-scale steel members | |
CN107288352B (en) | The transport of the closed shed dormer roof boarding of overlarge area and installation method | |
CN103899093A (en) | Step-by-step hoisting construction method of mega-frame steel truss beam | |
CN202785176U (en) | Novel construction hoist | |
CN203794533U (en) | Light portable mobile lifting equipment | |
CN106013453B (en) | Long-span Cantilever transfinites structure construction engineering method | |
MX2021010866A (en) | Vertical slip form construction system with multi-function platform, and method of constructing a building therewith. | |
CN203213622U (en) | Construction material handling equipment | |
CN203947755U (en) | A kind of large Steel Cantilever trussed construction high-altitude construction first floor steel truss erecting device | |
CN105839907A (en) | Suspension type steel platform scaffold foundation and method for mounting same | |
CN205873594U (en) | Special construction elevator of cooling tower section of thick bamboo wall | |
CN203284126U (en) | Simple composite gantry high-altitude weight hoisting device | |
CN205777438U (en) | A kind of suspension type steel platform legs hand cradle basis | |
CN105625732B (en) | Superelevation overhanging steel structure truss support free construction method | |
CN202658867U (en) | Overhanging construction platform | |
CN207063484U (en) | Movable operating platform for corridor construction | |
CN207827621U (en) | Movable type super high-rise construction elevator guide rail frame attachment device | |
CN202882377U (en) | Hanging scaffold for integral hanging construction of truss | |
CN103174292B (en) | Frame construction multiaspect concrete joint pouring construction method | |
CN203755173U (en) | Formwork device used for hydraulic climbing of bridge high pier | |
CN203096620U (en) | Steel pipe arch rib operation platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20140702 |