CN202672694U - Circulating operation platform for hoistway construction - Google Patents

Circulating operation platform for hoistway construction Download PDF

Info

Publication number
CN202672694U
CN202672694U CN2012203052095U CN201220305209U CN202672694U CN 202672694 U CN202672694 U CN 202672694U CN 2012203052095 U CN2012203052095 U CN 2012203052095U CN 201220305209 U CN201220305209 U CN 201220305209U CN 202672694 U CN202672694 U CN 202672694U
Authority
CN
China
Prior art keywords
operation platform
operating platform
hoistway
hoistway construction
crossbeam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2012203052095U
Other languages
Chinese (zh)
Inventor
唐白奎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fifth Bureau Third Construction Co Ltd
Original Assignee
China Construction Fifth Bureau Third Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fifth Bureau Third Construction Co Ltd filed Critical China Construction Fifth Bureau Third Construction Co Ltd
Priority to CN2012203052095U priority Critical patent/CN202672694U/en
Application granted granted Critical
Publication of CN202672694U publication Critical patent/CN202672694U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Types And Forms Of Lifts (AREA)

Abstract

本实用新型公开了一种井道施工循环周转操作平台,包括设在剪力墙上的预留洞口内的横梁,在所述的横梁上设有由立杆(5)、水平杆(6)和剪刀撑(7)采用钢管扣件搭设的操作平台,在所述的操作平台的四周设有与井道壁顶牢的顶墙件(3),在所述的操作平台的顶部的所述的水平杆(6)的中部焊接有吊耳(8),在所述的操作平台的中部位置设置有安全平网(9)。本实用新型是一种安全性高、搭拆方便快捷、工作效率高、能够循环周转使用的且结构简单、节能环保、值得推广应用的施工现场用的井道施工循环周转操作平台。

Figure 201220305209

The utility model discloses a hoistway construction circulation turnover operation platform, which comprises a crossbeam arranged in a reserved hole in a shear wall, and a vertical pole (5), a horizontal pole (6) and a vertical pole (5) are arranged on the crossbeam. The scissor support (7) is an operation platform built with steel pipe fasteners, and a top wall (3) that is firmly connected to the well wall is provided around the operation platform, and the level at the top of the operation platform Lifting lugs (8) are welded in the middle of the rod (6), and a safety flat net (9) is set in the middle of the operating platform. The utility model is a hoistway construction cycle turnover operation platform for construction sites with high safety, convenient and quick assembly and disassembly, high work efficiency, simple structure, energy saving and environmental protection, and high work efficiency.

Figure 201220305209

Description

Hoistway construction circulation turnover operating platform
Technical field
The utility model relates to a kind of operating platform, particularly relates to a kind of hoistway construction circulation turnover operating platform.
Background technology
In high-rise and high-rise hoistway construction, employing is built interim hoistway construction operation platform and is constructed at present, and this interim hoistway construction operation platform exists safety low, takes the expense height of tearing operating platform open, ineffective shortcoming.
The utility model content
Technical problem to be solved in the utility model provide a kind of safe, take tear convenient and swift, high efficiency open, hoistway construction circulation turnover operating platform that the turnover that can circulate is used.
In order to solve the problems of the technologies described above, the hoistway construction circulation turnover operating platform that the utility model provides, comprise the crossbeam in the reserved opening that is located on the shear wall, be provided with the operating platform that adopts steel tube fastener to set up by vertical rod, horizon bar and bridging at described crossbeam, around described operating platform, be provided with the crown wall spare with jail, well enclosure top, middle part at the described horizon bar at the top of described operating platform is welded with hanger, is provided with safety net at the medium position of described operating platform.
Be provided with the reinforcing bar anchor point that docks with described vertical rod at described crossbeam.
Described reinforcing bar anchor point is the high A20 reinforcing bar of 20mm anchor point.
Described crossbeam is the 12# i iron.
Adopt the hoistway construction circulation turnover operating platform of technique scheme, offer reserved opening at shear wall, reserved opening internal frame crossbeam, establish by vertical rod, horizon bar and bridging at crossbeam and to adopt steel tube fastener to set up the high operating platform of three floors, around operating platform, stretch out crown wall spare and jail, well enclosure top, guarantee the stability of operating platform, at the middle part of top horizon bar welding hanger, so that tower crane lifting turnover, medium position at operating platform arranges safety net, guarantee personnel's job safety, prevent high pendant.Crossbeam guarantees that at the high A20 reinforcing bar of vertical rod place welding 20mm anchor point operating platform is unshift.The every construction one deck turnover of operating platform once.
Adopt the hoistway construction circulation turnover operating platform of technique scheme, simple to operate, technical essential is grasped easily.Compare with traditional hoistway handling frame, economize on resources, save trouble, save time, the saving of labor, safe and reliable, drop into low, good in economic efficiency.
In sum, the utility model be a kind of safe, take tear convenient and swift, high efficiency open, hoistway construction circulation turnover operating platform that turnover is used and simple in structure, the energy-conserving and environment-protective of can circulating, the job site that is worthy of popularization are used.
Description of drawings
Fig. 1 is the elevational schematic view of the utility model structure.
Fig. 2 is the floor map of the utility model structure.
The specific embodiment
The utility model is described in further detail below in conjunction with the drawings and specific embodiments.
Referring to Fig. 1 and Fig. 2, reserve 100 * 160 reserved opening 4 at the shear wall of hoistway both sides, treat that its intensity reaches 20MPa when above, penetrate 12# i iron 1 as crossbeam, on 12# i iron 1, weld the high A20 reinforcing bar of 20mm anchor point 2 apart from the inboard 300mm of hoistway shear wall place, by vertical rod 5, the operating platform that horizon bar 6 and bridging 7 adopt steel tube fastener to set up, operating platform is set up three story heights, the lower end docking of the vertical rod 5 of operating platform is inserted on the A20 reinforcing bar anchor point 2, guarantee that operating platform is unshift, crown wall bar 3 is set around operating platform to be fixed with the borehole wall, guarantee the stability of operating platform, at the hanger 8 of the top of operating platform horizon bar middle part welding A20 reinforcing bar, so that lifting during the operating platform turnover.Need to check the screw-down torque of each fastening bolt after operating platform is set up and finished, guarantee to meet code requirement.Be provided with safety net 9 at the middle part of operating platform, be fixed on the horizon bar 6 of operating platform, prevent that the eminence of people and thing from falling down from the building.
The complete one deck turnover of the every construction of operating platform once, crown wall spare 3 around unclamping first during turnover, rear operating platform being hung with tower crane rises one deck, the workman takes out of 12# i iron 1 through walls and forwards last layer week to and install, operating platform is installed on the 12# i iron 1 that fixes with tower crane again, crown wall spare 3 around the operating platform is fixed, namely finished the once turnover of operating platform.

Claims (4)

1.一种井道施工循环周转操作平台,其特征是:包括设在剪力墙上的预留洞口内的横梁,在所述的横梁上设有由立杆(5)、水平杆(6)和剪刀撑(7)采用钢管扣件搭设的操作平台,在所述的操作平台的四周设有与井道壁顶牢的顶墙件(3),在所述的操作平台的顶部的所述的水平杆(6)的中部焊接有吊耳(8),在所述的操作平台的中部位置设置有安全平网(9)。1. A hoistway construction cycle turnover operation platform, characterized in that: it includes a beam in the reserved opening of the shear wall, and the beam is provided with a vertical pole (5), a horizontal pole (6) and the scissor support (7) is an operation platform built with steel pipe fasteners, and a top wall (3) that is firmly connected to the hoistway wall is provided around the operation platform, and the top wall on the top of the operation platform The middle part of the horizontal bar (6) is welded with lifting lugs (8), and a safety flat net (9) is arranged at the middle part of the operation platform. 2.根据权利要求1所述的井道施工循环周转操作平台,其特征是:在所述的横梁上设有与所述的立杆对接的钢筋定位点。2. The hoistway construction cycle turnover operation platform according to claim 1, characterized in that: the crossbeam is provided with a reinforcing bar positioning point that is docked with the vertical pole. 3.根据权利要求2所述的井道施工循环周转操作平台,其特征是:所述的钢筋定位点为20mm高的A20钢筋定位点(2)。3. The hoistway construction cycle turnover operation platform according to claim 2, characterized in that: the anchoring point of the steel bar is an A20 anchoring point (2) of 20 mm high. 4.根据权利要求1或2所述的井道施工循环周转操作平台,其特征是:所述的横梁为12#工字钢(1)。4. The hoistway construction cycle turnover operation platform according to claim 1 or 2, characterized in that: the beam is 12# I-beam (1).
CN2012203052095U 2012-06-27 2012-06-27 Circulating operation platform for hoistway construction Expired - Fee Related CN202672694U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012203052095U CN202672694U (en) 2012-06-27 2012-06-27 Circulating operation platform for hoistway construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012203052095U CN202672694U (en) 2012-06-27 2012-06-27 Circulating operation platform for hoistway construction

Publications (1)

Publication Number Publication Date
CN202672694U true CN202672694U (en) 2013-01-16

Family

ID=47493604

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012203052095U Expired - Fee Related CN202672694U (en) 2012-06-27 2012-06-27 Circulating operation platform for hoistway construction

Country Status (1)

Country Link
CN (1) CN202672694U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103352573A (en) * 2013-07-08 2013-10-16 陕西煤业化工建设(集团)有限公司 Construction method for lifting butt joint of single cylindrical pier steel bar
CN104264964A (en) * 2014-09-19 2015-01-07 中铁十四局集团有限公司 Open excavation section lateral wall waterproof construction support and utilization method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103352573A (en) * 2013-07-08 2013-10-16 陕西煤业化工建设(集团)有限公司 Construction method for lifting butt joint of single cylindrical pier steel bar
CN104264964A (en) * 2014-09-19 2015-01-07 中铁十四局集团有限公司 Open excavation section lateral wall waterproof construction support and utilization method thereof
CN104264964B (en) * 2014-09-19 2016-11-30 中铁十四局集团有限公司 Open excavation section side wall waterproof construction support and using method thereof

Similar Documents

Publication Publication Date Title
CN203905425U (en) Elevator shaft construction tool type operation platform and safety protection integrated structure
CN207144449U (en) A kind of hoistway operation platform
CN103410101B (en) Tower crane conversion method for construction of parabola-shaped ultrahigh pier
CN202509754U (en) High-altitude steel structure node construction working platform
CN207268073U (en) Novel flexible formwork bearing frame
CN202370234U (en) Tool type elevator hoistway construction platform
CN202481956U (en) Attached climbing type conventionalized dual-purpose platform
CN204299145U (en) For the operating platform that external climbing tower crane support frame is installed
CN105952129A (en) Elevator shaft combined type integral lifting operation platform and construction method thereof
CN206233546U (en) A kind of elevator hoistways workbench
CN202672694U (en) Circulating operation platform for hoistway construction
CN102828608A (en) Hydraulic climbing protection device for high-rise building construction
CN205773024U (en) Convenient pipeline promotes auxiliary device
CN201908447U (en) Lift-type horizontal safety net
CN102061810B (en) Construction method of safe flat net positioned on periphery of building
CN203531352U (en) Hanging type movable working platform for storage tank maintenance
CN102661035A (en) Tool type wall connecting piece for exterior wall scaffold
CN202544379U (en) Automatic climbing device
CN204238537U (en) A kind of elevated hoistway operation platform
CN204059906U (en) Elevator hoistways Integral lifting type steel scaffold
CN203320922U (en) Supporting device for forming of elevator shaft template
CN106006301A (en) High-altitude switching assisting device and construction method of super-high-rise construction elevator
CN202000647U (en) Base device for lifting scaffold in elevator shaft
CN105926915B (en) Grow the construction method for workbench of encorbelmenting in Bailey beam high-altitude
CN204023414U (en) The few fulcrum support entirety of a kind of novel large falls rack device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130116

Termination date: 20160627

CF01 Termination of patent right due to non-payment of annual fee