CN101177959A - Curtain wall unit hanging equipment and construction method thereof - Google Patents
Curtain wall unit hanging equipment and construction method thereof Download PDFInfo
- Publication number
- CN101177959A CN101177959A CNA2007102027899A CN200710202789A CN101177959A CN 101177959 A CN101177959 A CN 101177959A CN A2007102027899 A CNA2007102027899 A CN A2007102027899A CN 200710202789 A CN200710202789 A CN 200710202789A CN 101177959 A CN101177959 A CN 101177959A
- Authority
- CN
- China
- Prior art keywords
- curtain wall
- wall unit
- hoist engine
- mast
- suspension rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention relates to the curtain wall unit hoisting construction method of a curtain wall unit hoisting equipment. A windlass is fixed on the ground firstly and a hoisting bracket is fixed at the top of a wall body; one end of a steel wire rope is connected with the winding drum of the windlass and the other end thereof passes by the crown block of the hosting bracket and is connected with a hand-drive block after being connected with the top of the curtain wall unit; then the windlass is started to lift the curtain wall unit and ground constructors use a rope to catch on the end opening of the curtain wall unit to let the curtain wall unit keep balanced until the curtain wall unit is lifted near to specified installation position; after that, high altitude constructors fixedly connects the curtain wall unit with a steel bracket connected to the wall body and the curtain wall unit is arranged at the specified installation position. The invention is simple and rational, which has light equipment, small occupied space and convenient disassembly and assembly and can be reused. The invention can not only greatly improve efficiency and fast finish the hoisting of the curtain wall in order, but also save a large quantity of labors and reduce construction cost and accident rate. The invention is applicable to the curtain wall installation projects of various buildings.
Description
(1) technical field
The present invention relates to a kind of hanging device and job practices thereof of building curtain wall.
(2) background technology
Traditional building curtain wall unit generally adopts mobile crane to lift, and the expense of mobile crane lifting is very high, also underaction.Sometimes usually to use a large amount of manpowers auxiliary in order to work to tight deadlines, not only efficiency is low, also can increase construction cost, particularly when the construction plant is narrow, just very inconvenient with mobile crane lifting, not only wasting manpower and material resources and time, and often because the cause of having a large population in a small area, occur some unnecessary accidents easily, reduce the speed of construction.
(3) summary of the invention
The purpose of this invention is to provide a kind of curtain wall unit hanging equipment and job practices thereof, solve the lifting of traditional architecture curtain wall inefficiency, construction cost height and the high technical problem of accident rate.
For achieving the above object, the present invention adopts following technical scheme: this curtain wall unit hanging equipment, it is characterized in that: 1-2 mast-up at the top that comprise the 1-2 platform hoist engine that is fixed on the ground 2, is fixed on body of wall 3 and 1-2 root wire rope, wire rope 5 one ends are connected with lifting drum 603, the fixed pulley 701 that the other end is walked around mast-up be connected with bottle gouard moved by hands 9 again after curtain wall unit 1 top is connected;
Above-mentioned hoist engine 6 comprises hoist engine support 601, hoist engine balancing weight 602, lifting drum 603 and hoist engine fixture;
Above-mentioned mast-up 7 comprises a suspension rod 704 of encorbelmenting and being connected in the body of wall top, be hung on the fixed pulley 701 of suspension rod front portion, the mast 703 that is connected with suspension rod top inverted T-shaped, one end is fixed in the suspension rod front end, be fixed in the oblique rollering steel silk rope 702 of suspension rod rear end through the mast top tensioning, the stiffener 705 that is connected with suspension rod both sides cross, be connected in two boom plates 706 at suspension rod front end and stiffener two ends, be connected with suspension rod, and be clipped in the front plate 707 and the rear plate 708 of body of wall front-back, be connected in pull bar 709 and frame 710 between front plate 707 and the rear plate 708 by bolt 711.
Above-mentioned hoist engine fixture can be steel pipe or the bar reinforcement 604 that hoist engine 6 connects earth quality face 2.
Above-mentioned hoist engine fixture also can be the expansion bolt 605 that hoist engine 6 connects concrete quality face 2.
Above-mentioned suspension rod front end is raised, and the elevation angle can be 0-10o.
The two sides of above-mentioned mast 703 connect two diagonal braces 712.
The bottom of above-mentioned curtain wall unit 1 can connect cable wind rope 8.
The curtain wall unit lifting job practices of above-mentioned curtain wall unit hanging equipment is characterized in that construction sequence is:
Step 1: hoist engine 6 is fixed on the ground 2, mast-up 7 is fixed on the top of body of wall 3, wire rope 5 one ends are connected with lifting drum 603, the fixed pulley 701 that the other end is walked around mast-up be connected with bottle gouard moved by hands 9 again after curtain wall unit 1 top is connected.
Step 2: open hoist engine 6 lifting curtain wall units 1, ground construction personnel 4 usefulness cable ropes 8 tangle the end opening of curtain wall unit 1 during lifting, make curtain wall unit 1 maintenance balance, until curtain wall unit 1 being risen near the designated mounting position.
Step 3: by high-altitude constructor 18 curtain wall unit 1 is fixedlyed connected with the steel angle hitch 12 that is connected in body of wall, curtain wall unit 1 is dropped into the designated mounting position.
In above-mentioned steps 2, adopt a hoist engine and a mast-up construction in the time of near curtain wall unit 1 is directly over hoist engine 6, bottle gouard moved by hands 9 is hung on steel supports on 13, hoist engine 6 is progressively transferred wire rope 5, with bottle gouard moved by hands 9 curtain wall unit 1 is moved to assigned address then.
In above-mentioned steps 2, when curtain wall unit 1 away from hoist engine 6 directly over the time enable second hoist engine 16 and the construction of second mast-up 17, earlier tangle curtain wall unit 1 with two hoist engines, one of them hoist engine is progressively transferred wire rope then, makes curtain wall unit 1 move to assigned address.
Compared with prior art the present invention has following characteristics and beneficial effect:
Advantages of simple of the present invention, equipment light and take up an area of few, easy accessibility and reusing.It is simple to operate easy, convenient, flexible to use, and guarantee safe and reliable, can be according to different engineerings and ambient conditions, dispose many playscripts with stage directions invention equipment in engineering, can raise the efficiency greatly, reduce the engineering time, the lifting of finishing curtain wall unit of quickly and orderly, save a large amount of labours again, reduced construction cost and accident rate.
The present invention is economical and practical, can be applicable in the installing engineering of various constructure screen walls unit with curtain wall unit lifting to assigned address.
(4) description of drawings
The present invention will be further described in detail below in conjunction with accompanying drawing.
Fig. 1 is that the hoist engine of the embodiment of the invention one curtain wall unit hanging equipment is placed schematic diagram.
Fig. 2 is that the hoist engine of the embodiment of the invention two curtain wall unit hanging equipments is placed schematic diagram.
Fig. 3 is the mast-up structural representation of curtain wall unit hanging equipment of the present invention.
Fig. 4 is the vertical view of Fig. 3.
Fig. 5 is the schematic diagram of construction method step 3 of the present invention.
Fig. 6 is the schematic diagram of construction method step 4 embodiment 1 of the present invention.
Fig. 7 is the schematic diagram of step 4 embodiment 2 of job practices of the present invention.
Fig. 8 is the operation chart of construction method step 5 of the present invention.
Fig. 9 is the schematic diagram of mast-up mast both sides diagonal brace.
Reference numeral: 1-curtain wall unit, 2-ground, 3-body of wall, 4-ground construction personnel, 5-wire rope, 8-cable rope, 9-bottle gouard moved by hands, 10-scaffold, 11-step plank, 12-steel angle hitch, the support of 13-steel, 14-safety belt, 15-second wire rope, 16-second hoist engine, 17-second mast-up, 18-high-altitude constructor.
6-hoist engine, 601-hoist engine support, 602-hoist engine balancing weight, 603-lifting drum, 604-steel pipe or bar reinforcement, 605-expansion bolt.
7-mast-up, 701-fixed pulley, 702-oblique rollering steel silk rope, 703-mast, 704-suspension rod, 705-stiffener, 706-boom plate, 707-front plate, 708-rear plate, 709-pull bar, 710-frame, 711-bolt, 712-diagonal brace.
(5) specific embodiment
The embodiment of this curtain wall unit hanging equipment is referring to shown in Fig. 1-4,1-2 mast-up at the top that it comprises the 1-2 platform hoist engine that is fixed on the ground 2, be fixed on body of wall 3 and 1-2 root wire rope, wire rope 5 one ends are connected with lifting drum 603, the fixed pulley 701 that the other end is walked around mast-up be connected with bottle gouard moved by hands 9 again after curtain wall unit 1 top is connected.
Hoist engine embodiment one is referring to Fig. 1, hoist engine 6 comprises hoist engine support 601, hoist engine balancing weight 602, lifting drum 603 and hoist engine fixture, and above-mentioned hoist engine fixture can be 2 M12 expansion bolts 605 that hoist engine 6 connects concrete quality face 2.
Hoist engine embodiment two is referring to Fig. 2, and above-mentioned hoist engine fixture can be 4 steel pipes or the bar reinforcement 604 that hoist engine 6 connects earth quality faces 2, and implantation depth is 400mm, and hoist engine is lain on steel pipe or the bar reinforcement, prevents the hoist engine horizontal slip.
Mast-up 7 is referring to Figure 34, and it comprises a suspension rod 704 of encorbelmenting and being connected in the body of wall top, be hung on the fixed pulley 701 of suspension rod front portion, the mast 703 that is connected with suspension rod top inverted T-shaped, one end is fixed in the suspension rod front end, be fixed in the oblique rollering steel silk rope 702 of suspension rod rear end through the mast top tensioning, the stiffener 705 that is connected with suspension rod both sides cross, be connected in two boom plates 706 at suspension rod front end and stiffener two ends, be connected with suspension rod, and be clipped in the front plate 707 and the rear plate 708 of body of wall front-back, be connected in pull bar 709 and frame 710 between front plate 707 and the rear plate 708 by bolt 711.Above-mentioned suspension rod front end is raised, and the elevation angle can be 0-10o.The bottom of above-mentioned curtain wall unit 1 can connect cable wind rope 8.The suspension rod of mast-up adopts 160*80*4 steel square tube, fixing fixed pulley, on add oblique rollering steel silk rope, side direction adds the 8mm stiffener.
Referring to Fig. 9, mast 703 two sides of mast-up connect two diagonal braces 712.
Referring to Figure 58, the construction sequence of curtain wall unit lifting job practices is:
Step 1: the weight according to the cell curtain wall plate is selected suitable hoist engine.For example, for the curtain wall unit of cell curtain wall plate weight near 1 ton, can adopt lifting force is 2 tons hoist engine, 0.5 ton of hoist engine deadweight, 1 ton of counterweight.
Hoist engine 6 is fixed on the ground 2, mast-up 7 is fixed on the top of body of wall 3, wire rope 5 one ends are connected with lifting drum 603, the fixed pulley 701 that the other end is walked around mast-up be connected with bottle gouard moved by hands 9 again after curtain wall unit 1 top is connected.
Step 2: open hoist engine 6 lifting curtain wall units 1, ground construction personnel 4 usefulness cable ropes 8 tangle the end opening of curtain wall unit 1 during lifting, make curtain wall unit 1 maintenance balance, until curtain wall unit 1 being risen near the designated mounting position.
Near the embodiment 1 of above-mentioned steps 2: adopt a hoist engine and a mast-up construction in the time of curtain wall unit 1 is directly over hoist engine 6, being hung on steel with 2 tons of bottle gouards moved by hands 9 when falling supports on 13, bottle gouard moved by hands tangles the unit, hoist engine is progressively transferred wire rope, with bottle gouard moved by hands 9 curtain wall unit 1 is moved to assigned address then.
The embodiment 2 of above-mentioned steps 2: when curtain wall unit 1 away from hoist engine 6 directly over the time enable second hoist engine 16 and the construction of second mast-up 17, tangle curtain wall unit with hoist engine when falling, second hoist engine 16 is progressively transferred second wire rope 15, makes the curtain wall unit position that falls.
Step 3: by high-altitude constructor 18 drape wall unit operations.When the unit falls, laying the step plank on the scaffold of appropriate location, unit plate both sides, fastens seat belts on the step plank in high-altitude constructor 18 stations, with hand operation curtain wall unit 1 is fixedlyed connected with the steel angle hitch 12 that is connected in body of wall, curtain wall unit 1 is dropped into the designated mounting position.
Claims (9)
1. curtain wall unit hanging equipment, it is characterized in that: 1-2 mast-up at the top that comprise the 1-2 platform hoist engine that is fixed on the ground (2), is fixed on body of wall (3) and 1-2 root wire rope, wire rope (5) one ends are connected with lifting drum (603), the fixed pulley (701) that the other end is walked around mast-up be connected with bottle gouard moved by hands (9) again after curtain wall unit (1) top is connected;
Above-mentioned hoist engine (6) comprises hoist engine support (601), hoist engine balancing weight (602), lifting drum (603) and hoist engine fixture;
Above-mentioned mast-up (7) comprises a suspension rod (704) of encorbelmenting and being connected in the body of wall top, be hung on the fixed pulley (701) of suspension rod front portion, the mast (703) that is connected with suspension rod top inverted T-shaped, one end is fixed in the suspension rod front end, be fixed in the oblique rollering steel silk rope (702) of suspension rod rear end through the mast top tensioning, the stiffener (705) that is connected with suspension rod both sides cross, be connected in two boom plates (706) at suspension rod front end and stiffener two ends, be connected with suspension rod, and be clipped in the front plate (707) and the rear plate (708) of body of wall front-back, be connected in pull bar (709) and frame (710) between front plate (707) and the rear plate (708) by bolt (711).
2. curtain wall unit hanging equipment according to claim 1 is characterized in that: above-mentioned hoist engine fixture is steel pipe or the bar reinforcement (604) that hoist engine (6) connects earth quality face (2).
3. curtain wall unit hanging equipment according to claim 1 is characterized in that: above-mentioned hoist engine fixture is the expansion bolt (605) that hoist engine (6) connects concrete quality face (2).
4. curtain wall unit hanging equipment according to claim 1 is characterized in that: above-mentioned suspension rod front end is raised, and the elevation angle is 0-10o.
5. curtain wall unit hanging equipment according to claim 1 is characterized in that: the two sides of above-mentioned mast (703) connect two diagonal braces (712).
6. curtain wall unit hanging equipment according to claim 1 is characterized in that: the bottom of above-mentioned curtain wall unit (1) connects cable wind rope (8).
7. an application rights requires the curtain wall unit lifting job practices of any described curtain wall unit hanging equipment of 1-6, it is characterized in that construction sequence is:
Step 1: hoist engine (6) is fixed on the ground (2), mast-up (7) is fixed on the top of body of wall (3), wire rope (5) one ends are connected with lifting drum (603), the fixed pulley (701) that the other end is walked around mast-up be connected with bottle gouard moved by hands (9) again after curtain wall unit (1) top is connected;
Step 2: open hoist engine (6) lifting curtain wall unit (1), ground construction personnel (4) tangle the end opening of curtain wall unit (1) during lifting with cable rope (8), make curtain wall unit (1) keep balance, until curtain wall unit (1) being risen near the designated mounting position;
Step 3: by high-altitude constructor (18) curtain wall unit (1) is fixedlyed connected with the steel angle hitch that is connected in body of wall (12), curtain wall unit (1) is dropped into the designated mounting position.
8. curtain wall unit lifting job practices according to claim 7, it is characterized in that: in above-mentioned steps 2, adopt a hoist engine and a mast-up construction in the time of near curtain wall unit (1) is directly over hoist engine (6), bottle gouard moved by hands (9) is hung on steel to be supported on (13), hoist engine (6) is progressively transferred wire rope (5), uses bottle gouard moved by hands (9) that curtain wall unit (1) is moved to assigned address then.
9. curtain wall unit lifting job practices according to claim 7, it is characterized in that: in above-mentioned steps 2, when curtain wall unit (1) away from hoist engine (6) directly over the time enable the construction of second hoist engine (16) and second mast-up (17), earlier tangle curtain wall unit (1) with two hoist engines, one of them hoist engine is progressively transferred wire rope then, makes curtain wall unit (1) move to assigned address.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNA2007102027899A CN101177959A (en) | 2007-11-29 | 2007-11-29 | Curtain wall unit hanging equipment and construction method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNA2007102027899A CN101177959A (en) | 2007-11-29 | 2007-11-29 | Curtain wall unit hanging equipment and construction method thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101177959A true CN101177959A (en) | 2008-05-14 |
Family
ID=39404357
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNA2007102027899A Pending CN101177959A (en) | 2007-11-29 | 2007-11-29 | Curtain wall unit hanging equipment and construction method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101177959A (en) |
Cited By (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101913542A (en) * | 2010-06-30 | 2010-12-15 | 浙江鸿翔建设集团有限公司 | Curtain wall unit lifting device and construction method thereof |
CN102285588A (en) * | 2011-07-27 | 2011-12-21 | 沈阳远大铝业工程有限公司 | Wheel type hoisting device for curtain wall plate |
CN102864859A (en) * | 2012-10-19 | 2013-01-09 | 上海市机械施工有限公司 | Curtain wall steel support structure, construction method thereof and lifting device for construction |
CN102912991A (en) * | 2012-10-31 | 2013-02-06 | 中建三局第二建设工程有限责任公司 | Track hosting device and track hoisting method of large curtain wall unit plate |
CN103663217A (en) * | 2013-09-12 | 2014-03-26 | 浙江东冠通信技术股份有限公司 | Communication tower equipment hoisting method |
CN104960855A (en) * | 2015-06-12 | 2015-10-07 | 中国建筑第八工程局有限公司 | Transporting device for spherical surface curtain wall structure and transporting method |
CN104981575A (en) * | 2012-12-07 | 2015-10-14 | 伊利诺斯工具制品有限公司 | Curtain wall panel installation system |
CN105152034A (en) * | 2015-09-22 | 2015-12-16 | 江河创建集团股份有限公司 | Cableway lifting system for pitched-roof curtain wall |
CN109132912A (en) * | 2018-08-16 | 2019-01-04 | 上海宝冶冶金工程有限公司 | A kind of hanging apparatus |
CN109132951A (en) * | 2018-08-16 | 2019-01-04 | 上海宝冶冶金工程有限公司 | A kind of hanging method |
CN110374236A (en) * | 2019-07-22 | 2019-10-25 | 中建三局集团有限公司 | A kind of super large hyperbolic integrated unit aluminum facade construction method for lifting whole |
CN111021744A (en) * | 2019-12-27 | 2020-04-17 | 上海建工五建集团有限公司 | Curtain wall installation system and application construction method thereof |
CN112196159A (en) * | 2020-09-28 | 2021-01-08 | 深圳市建艺装饰集团股份有限公司 | Glass curtain wall construction structure and construction method thereof |
CN113602966A (en) * | 2021-08-06 | 2021-11-05 | 中建二局第一建筑工程有限公司 | Rail type hoisting tool for high-rise building curtain wall construction |
CN115370096A (en) * | 2022-08-26 | 2022-11-22 | 陕西建工鼎盛装饰有限公司 | Installation and construction method for oversized space dry-hanging wall surface based on large-scale clear water concrete slabs |
-
2007
- 2007-11-29 CN CNA2007102027899A patent/CN101177959A/en active Pending
Cited By (23)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101913542B (en) * | 2010-06-30 | 2013-06-19 | 浙江鸿翔建设集团有限公司 | Curtain wall unit lifting device and construction method thereof |
CN101913542A (en) * | 2010-06-30 | 2010-12-15 | 浙江鸿翔建设集团有限公司 | Curtain wall unit lifting device and construction method thereof |
CN102285588A (en) * | 2011-07-27 | 2011-12-21 | 沈阳远大铝业工程有限公司 | Wheel type hoisting device for curtain wall plate |
CN102864859A (en) * | 2012-10-19 | 2013-01-09 | 上海市机械施工有限公司 | Curtain wall steel support structure, construction method thereof and lifting device for construction |
CN102864859B (en) * | 2012-10-19 | 2014-12-10 | 上海市机械施工有限公司 | Curtain wall steel support structure, construction method thereof and lifting device for construction |
CN102912991A (en) * | 2012-10-31 | 2013-02-06 | 中建三局第二建设工程有限责任公司 | Track hosting device and track hoisting method of large curtain wall unit plate |
US9663961B2 (en) | 2012-12-07 | 2017-05-30 | Illinois Tool Works Inc. | Curtain wall panel installation system |
CN104981575A (en) * | 2012-12-07 | 2015-10-14 | 伊利诺斯工具制品有限公司 | Curtain wall panel installation system |
CN104981575B (en) * | 2012-12-07 | 2018-04-27 | 伊利诺斯工具制品有限公司 | Curtain wall panel installation system |
CN103663217A (en) * | 2013-09-12 | 2014-03-26 | 浙江东冠通信技术股份有限公司 | Communication tower equipment hoisting method |
CN104960855A (en) * | 2015-06-12 | 2015-10-07 | 中国建筑第八工程局有限公司 | Transporting device for spherical surface curtain wall structure and transporting method |
CN105152034B (en) * | 2015-09-22 | 2017-04-05 | 江河创建集团股份有限公司 | For the cableway Lift-on/Lift-off System of pitched roof curtain wall |
CN105152034A (en) * | 2015-09-22 | 2015-12-16 | 江河创建集团股份有限公司 | Cableway lifting system for pitched-roof curtain wall |
CN109132912A (en) * | 2018-08-16 | 2019-01-04 | 上海宝冶冶金工程有限公司 | A kind of hanging apparatus |
CN109132951A (en) * | 2018-08-16 | 2019-01-04 | 上海宝冶冶金工程有限公司 | A kind of hanging method |
CN110374236A (en) * | 2019-07-22 | 2019-10-25 | 中建三局集团有限公司 | A kind of super large hyperbolic integrated unit aluminum facade construction method for lifting whole |
CN111021744A (en) * | 2019-12-27 | 2020-04-17 | 上海建工五建集团有限公司 | Curtain wall installation system and application construction method thereof |
CN112196159A (en) * | 2020-09-28 | 2021-01-08 | 深圳市建艺装饰集团股份有限公司 | Glass curtain wall construction structure and construction method thereof |
CN112196159B (en) * | 2020-09-28 | 2022-02-15 | 深圳市建艺装饰集团股份有限公司 | Glass curtain wall construction structure and construction method thereof |
CN113602966A (en) * | 2021-08-06 | 2021-11-05 | 中建二局第一建筑工程有限公司 | Rail type hoisting tool for high-rise building curtain wall construction |
CN113602966B (en) * | 2021-08-06 | 2024-05-17 | 中建二局第一建筑工程有限公司 | Rail-mounted lifting tool for high-rise building curtain wall construction |
CN115370096A (en) * | 2022-08-26 | 2022-11-22 | 陕西建工鼎盛装饰有限公司 | Installation and construction method for oversized space dry-hanging wall surface based on large-scale clear water concrete slabs |
CN115370096B (en) * | 2022-08-26 | 2023-10-24 | 陕西建工鼎盛装饰有限公司 | Large-sized clear water concrete slab-based ultra-large space dry-hanging wall surface mounting construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101177959A (en) | Curtain wall unit hanging equipment and construction method thereof | |
CN104652807A (en) | Self-turnover construction system and method for internal-climbing tower crane supporting steel beams in hydraulic formwork climbing system | |
CN105692470A (en) | Internal climbing tower crane and operating method thereof | |
CN101734560A (en) | High-altitude dismantling method of inside-climbing tower crane for towering structure construction | |
CN205387439U (en) | Mast hoisting accessory | |
CN105621280A (en) | Device and method for mounting and dismounting crane boom | |
CN104153586B (en) | A kind of suspension cable hangs the construction method of mounting purlines | |
CN203128099U (en) | Slipping type pipeline lifting device | |
CN101649684B (en) | Installing method of roof mast | |
CN107190991A (en) | The special-shaped curtain wall vertical lifting system of glass plate | |
CN104030176B (en) | The equalizer bar of hoisting platform truss and hanging method thereof | |
CN103982046A (en) | Lifting and installation method of buckling restrained braces | |
CN101768925B (en) | Mounting equipment of beam falling prevention stopping block and construction method thereof | |
CN203959697U (en) | The equalizing bar of hoisting platform truss | |
CN104627849B (en) | Hoisting equipment and hoisting method for hoisting inner courtyard pipeline | |
CN113264458A (en) | Tower crane system and method for removing attachment rod thereof | |
CN214899827U (en) | High-altitude outdoor cable terminal operation platform | |
CN105152052A (en) | Glass curtain wall component lifting device and glass curtain wall component installing method | |
CN214653190U (en) | Adjustable portable lifting device | |
CN213085209U (en) | Balance beam type component hoisting device | |
CN211971577U (en) | Tower crane system | |
CN113445723A (en) | Construction platform for mounting overhanging structure curtain wall and mounting method | |
CN205294671U (en) | Device of falling roof beam | |
CN102795558A (en) | Method for dismounting tower crane installed by lift well, and mast hanger | |
CN209760840U (en) | Light partition plate installation device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Open date: 20080514 |