CN105152034B - For the cableway Lift-on/Lift-off System of pitched roof curtain wall - Google Patents

For the cableway Lift-on/Lift-off System of pitched roof curtain wall Download PDF

Info

Publication number
CN105152034B
CN105152034B CN201510608835.XA CN201510608835A CN105152034B CN 105152034 B CN105152034 B CN 105152034B CN 201510608835 A CN201510608835 A CN 201510608835A CN 105152034 B CN105152034 B CN 105152034B
Authority
CN
China
Prior art keywords
steel
steel bracket
bracket
edge
lift
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510608835.XA
Other languages
Chinese (zh)
Other versions
CN105152034A (en
Inventor
付小兵
陈明华
崔庆茹
杨经兴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jangho Group Co Ltd
Beijing Jangho Curtain Wall Co Ltd
Original Assignee
Jangho Group Co Ltd
Beijing Jangho Curtain Wall Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jangho Group Co Ltd, Beijing Jangho Curtain Wall Co Ltd filed Critical Jangho Group Co Ltd
Priority to CN201510608835.XA priority Critical patent/CN105152034B/en
Publication of CN105152034A publication Critical patent/CN105152034A/en
Application granted granted Critical
Publication of CN105152034B publication Critical patent/CN105152034B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a kind of cableway Lift-on/Lift-off System for pitched roof curtain wall, it includes edge steel bracket, corner steel bracket, cable wire and lifting external member, wherein:Some edge steel brackets are separately installed with the multiple continuous side that the main body steel construction of top droop is formed, the corner that the two neighboring side of edge steel bracket constitutes is installed in main body steel construction corner steel bracket is installed, be provided with main body steel construction edge steel bracket in adjacent with other the while corner installation that constitutes or not installing angle steel bracket for being fitted without edge steel bracket;Cable wire and lifting external member are installed between two adjacent edge steel brackets and between adjacent edge steel bracket and corner steel bracket.The present invention efficiently solves a lifting construction difficult problem for pitched roof curtain wall, is easy to the face glass to pitched roof curtain wall to implement quick, safe and effective lifting.

Description

For the cableway Lift-on/Lift-off System of pitched roof curtain wall
Technical field
The present invention relates to a kind of curtain wall Lift-on/Lift-off System, espespecially a kind of is pitched roof curtain wall for agent structure roof alien invasion The cableway Lift-on/Lift-off System of form.
Background technology
Currently for Super High agent structure roof alien invasion --- roof curtain wall, hanging method relate generally to roof tower Hang, window cleaning equipment, steel track, telpher several method, but these methods respectively have restraining factors and defect, are specifically described as follows:
1st, tower crane hanging method in roof needs voluntarily to set up tower crane on roof, and this will certainly be subject to the site operation entirety time The restriction of arrangement, exist the work holdup, affect curtain wall installation progress defect, and voluntarily set up tower crane security risk it is higher, dismounting Program is loaded down with trivial details, and lease expenses is higher.
2nd, lifting is carried out using window cleaning equipment and can be subject to lift heavy restricted influence, be usually present and can not meet lifting weight demands Defect, and lifting after the completion of needing to treat window cleaning equipment installation and debugging, could be started, greatly delay the overall progress constructed.
3rd, flat roof curtain wall is relatively specific for using steel track lifting, and the making of steel track, installation cost are higher, for The lifting of pitched roof curtain wall, steel track then effectively cannot set up.
4th, carrying out lifting using homemade telpher needs roofing to have sufficiently large plane and need to meet telpher peace Put the requirement of stress, and the speed of telpher lifting be slower, travel frequency is higher, for pitched roof and roofing less, Wu Faan For putting the curtain wall of telpher, it is impossible to using this telpher hanging method.
In the face of the problem that above-mentioned various hanging methods are present, it is seen that design one kind for the special construction of pitched roof curtain wall Practical, efficient hoisting technology scheme, is current urgent problem.
The content of the invention
It is an object of the invention to provide a kind of cableway Lift-on/Lift-off System suitable for pitched roof curtain wall, efficiently solves oblique room A lifting construction difficult problem for top curtain wall, is easy to the face glass to pitched roof curtain wall to implement quick, safe and effective lifting.
To achieve these goals, present invention employs technical scheme below:
A kind of cableway Lift-on/Lift-off System for pitched roof curtain wall, it is characterised in that:It includes edge steel bracket, corner steel Frame, cable wire and lifting external member, wherein:It is separately installed with the multiple continuous side that the main body steel construction of top droop is formed some Edge steel bracket, the corner that the two neighboring side composition of edge steel bracket is provided with main body steel construction are provided with corner steel Frame, be provided with main body steel construction edge steel bracket while it is adjacent with other be fitted without edge steel bracket while constitute turn Install or not installing angle steel bracket at angle;Between two adjacent edge steel brackets and adjacent edge steel bracket and corner Cable wire and lifting external member are installed between steel bracket.
The lifting external member between two adjacent edge steel brackets is included installed in the main body steel construction top In two adjacent edge steel brackets of the hoist engine in portion, installation here on the edge steel bracket of higher position Lifting block on fixed pulley, the cable wire for mounting between two adjacent edge steel brackets of here, lifting block with It is connected by bypassing the steel wire rope of fixed pulley between hoist engine, electric block is installed below lifting block.
The corner steel bracket includes main steel bracket and is arranged on the secondary steel bracket of main steel bracket both sides, secondary steel bracket with Angle is formed between main steel bracket and is welded and fixed between main steel bracket and secondary steel bracket, it is described that secondary steel bracket is adjacent The cable wire and the lifting external member are installed between edge steel bracket.
The lifting external member between the edge steel bracket that the secondary steel bracket is adjacent is included installed in described Hoist engine at the top of main body steel construction, the adjacent described secondary steel bracket of here and the edge steel bracket are installed in be in high bit Fixed pulley on the described secondary steel bracket put or the edge steel bracket, mount the adjacent described secondary steel bracket of here and the side The lifting block on the cable wire between steel bracket, by bypassing the steel wire rope of fixed pulley between lifting block and hoist engine It is connected, electric block is installed below lifting block.
The edge steel bracket includes two columns vertically be arrangeding in parallel, is mutually welded by connecting rod between two columns, Steel I-beam of the bottom of two columns via steel plate with the main body steel construction is welded and fixed, and the welded top of two columns has Crossbeam, is welded with diagonal brace between two columns, between crossbeam and column, one end of crossbeam is offered for wearing the cable wire Through hole.It is preferred that U is used after being arranged the through hole of the crossbeam that sebific duct penetrates the edge steel bracket in the two ends of the cable wire Type snap ring is locked.
The main steel bracket includes two columns vertically be arrangeding in parallel, is mutually welded by connecting rod, one between two columns The bottom of individual column is welded and fixed with the steel I-beam of the main body steel construction, and the bottom of another column is tied with the main body steel Structure is located at the corner girder steel of corner and is welded and fixed, and the welded top of two columns has crossbeam, between two columns, crossbeam with it is vertical Diagonal brace is welded between post, between the column being fixed on corner girder steel and corner girder steel, diagonal brace is welded with;The secondary steel bracket Including two columns vertically be arrangeding in parallel, mutually welded by connecting rod between two columns, the bottom of two columns and the master The steel I-beam of body steel construction is welded and fixed, and the welded top of two columns has crossbeam, between two columns, crossbeam and column it Between be welded between the steel I-beam of diagonal brace, column and the main body steel construction and be welded with diagonal brace, one end of crossbeam offers use In the through hole for wearing the cable wire.It is preferred that the two ends of the cable wire are arranged the crossbeam that sebific duct penetrates the secondary steel bracket The through hole after with U-shaped card ring it is locked.
The described some edge steel brackets installed on one side of the main body steel construction are spacedly distributed.
It is an advantage of the invention that:
Cableway Lift-on/Lift-off System of the present invention can meet the face glass lifting that weight is 500kg~1 ton pitched roof curtain wall and use, The materials such as the face glass of pitched roof curtain wall can be implemented laterally, vertically to transport and install, voluntarily set up convenient, fast, make, Installation cost is low, and safety coefficient is high, is not integrally arranged to be limited by site operation, effectively ensure that the overall progress of construction can be suitable Profit is completed, and can be efficiently adapted to the face glass lifting of pitched roof curtain wall.
Description of the drawings
Fig. 1 is an embodiment schematic diagram of cableway Lift-on/Lift-off System of the present invention.
Fig. 2 is main body steel construction while the edge steel bracket for arranging and the scheme of installation for lifting external member.
Fig. 3 is the schematic front view of edge steel bracket.
Fig. 4 is the left view schematic diagram of Fig. 3.
Fig. 5 is the schematic top plan view of Fig. 3.
Fig. 6 is the scheme of installation of the corner steel bracket of main body steel construction corner.
Fig. 7 is the structural representation of the secondary steel bracket of corner steel bracket.
Fig. 8 is the structural representation of the main steel bracket of corner steel bracket.
Specific embodiment
As shown in figure 1, the present invention includes edge steel bracket 20, corner steel for the cableway Lift-on/Lift-off System of pitched roof curtain wall Frame 30, cable wire 10 and lifting external member, wherein:From the point of view of on the basis of ground, it is multiple that the main body steel construction 50 of top droop is formed Some edge steel brackets 20 are separately installed with continuous side, adjacent the two of edge steel bracket 20 in main body steel construction 50, are provided with The corner that individual side is constituted is provided with corner steel bracket 30, be provided with main body steel construction 50 edge steel bracket 20 side and other The corner installation of the adjacent side composition for being fitted without edge steel bracket 20 or not installing angle steel bracket 30;Adjacent two Install between edge steel bracket 20 and between adjacent edge steel bracket 20 and corner steel bracket 30 and can form horizontal cableway Cable wire 10 and can horizontal, vertical handling face glass (not shown) lifting external member.
Such as Fig. 2, the lifting external member between two adjacent edge steel brackets 20 are included at the top of main body steel construction 50 Hoist engine 41, install in the adjacent two edge steel brackets 20 of here and to determine cunning on the edge steel bracket 20 of higher position Take turns the lifting block 43 on the 42, cable wire 10 mounted between two adjacent edge steel brackets 20 of here, lifting block 43 and volume Raise, install below lifting block 43 and be responsible for main body steel construction 50 The electric block 44 of the horizontal and vertical handling of adjacent edges face glass.
Such as Fig. 6, corner steel bracket 30 includes main steel bracket 31 and is arranged on the secondary steel bracket 32 of 31 both sides of main steel bracket, Angle is formed between secondary steel bracket 32 and main steel bracket 31 and between main steel bracket 31 and secondary steel bracket 32 by connecting rod 33 Be welded and fixed mutually, between the edge steel bracket 20 that secondary steel bracket 32 is adjacent install cable wire 10 and lifting external member (to Go out diagram).
As the lifting external member arranged between two adjacent edge steel brackets 20, the side that secondary steel bracket 32 is adjacent Lifting external member between steel bracket 20 includes hoist engine at the top of main body steel construction 50, installs the adjacent secondary steel of here Fixed pulley in support 32 and edge steel bracket 20 on the secondary steel bracket 32 or edge steel bracket 20 of higher position, it is mounted on The lifting block on cable wire 10 between this adjacent secondary steel bracket 32 and edge steel bracket 20, between lifting block and hoist engine It is connected by bypassing the steel wire rope of fixed pulley, the corner face glass horizontal stroke for being responsible for main body steel construction 50 is installed below lifting block To and vertical handling electric block.The lifting external member arranged between the edge steel bracket 20 that secondary steel bracket 32 is adjacent to Go out diagram, refer to the lifting external member that arranges between adjacent two edge steel bracket 20 to understand.
In actual enforcement, with reference to Fig. 2, main body steel construction 50 includes top box beam 53, passes through T in top box beam 53 Section steel beam 52 is welded with steel I-beam 51, in addition, the top box beam 53 of 50 corner of main body steel construction can also be according to need Ask and be welded with corner girder steel 54 (such as Fig. 8).
In lifting face glass come, before installing pitched roof curtain wall, the outline of the main body steel construction 50 of top droop is presented The polygon of closed loop, the present invention are for lifting face glass to complete pitched roof curtain wall at the top of main body steel construction 50 Install.Pitched roof curtain wall is mainly made up of face glass.
In the present invention, structure the knowing in technology for those skilled in the art of main body steel construction 50, pitched roof curtain wall Hold, therefore repeat no more here.
For main body steel construction 50, the outline of its parapet can be various, and such as Fig. 1 shows that outline is square The main body steel construction 50 of shape.For the main body steel construction 50 shown in Fig. 1, it is preferred that only installing edge on continuous two sides Steel bracket 20 is advisable, and installing angle steel bracket 30 is answered in the corner between two sides, but the outer end on two sides can be according to actual need To decide whether installing angle steel bracket 30.Fig. 1 shows that the outer end on a side is mounted with corner steel bracket 30, another side Outer end be fitted without the situation of corner steel bracket 30.In actual enforcement, edge is installed on which side of main body steel construction 50 Steel bracket 20 and which corner installing angle steel bracket 30 can be designed according to the actual requirements, unrestricted.
As Fig. 3 to Fig. 5, edge steel bracket 20 include two columns 21 vertically be arrangeding in parallel, lead between two columns 21 Cross connecting rod 23 mutually to weld, the steel I-beam 51 of the bottom of two columns 21 via steel plate 25 with main body steel construction 50 is welded and fixed, The welded top of two columns 21 has the crossbeam 22 of horizontally set, welds between two columns 21, between crossbeam 22 and column 21 There is a diagonal brace 24, one end of crossbeam 22 is offered for wearing the through hole 221 of cable wire 10.In actual enforcement, edge steel bracket 20 The steel wire rope 60 for playing fixed supporting role also additionally can be set, as shown in Figure 2.
In actual applications, it is preferred that the two ends of cable wire 10 be arranged sebific duct penetrate edge steel bracket 20 crossbeam 22 it is logical It is locked with U-shaped card ring behind hole 221, to strengthen the lateral anti-performance of inclining of edge steel bracket 20, prevent cable wire 10 from reciprocal displacement occurring.
As Fig. 8, main steel bracket 31 include two columns 311 vertically be arrangeding in parallel, between two columns 311, pass through connecting rod 313 mutually weld, and the bottom of a column 311 is welded and fixed with the steel I-beam 51 of main body steel construction 50, another column 311 The corner girder steel 54 that bottom is located at corner with main body steel construction 50 is welded and fixed, and the welded top of two columns 311 has laterally The crossbeam 312 of setting, is welded with diagonal brace 314, is fixed on corner steel between two columns 311, between crossbeam 312 and column 311 Diagonal brace 315 is welded between column 311 and corner girder steel 54 on beam 54.
As Fig. 7, secondary steel bracket 32 include two columns 321 vertically be arrangeding in parallel, between two columns 321, pass through connecting rod 323 mutually weld, and the bottom of two columns 321 is welded and fixed with the steel I-beam 51 of main body steel construction 50, the top of two columns 321 Portion is welded with the crossbeam 322 of horizontally set, and diagonal brace 324 is welded between two columns 321, between crossbeam 322 and column 321, Diagonal brace 325 is welded between the steel I-beam 51 of column 321 and main body steel construction 50, one end of crossbeam 322 is offered for wearing If the through hole 3221 of cable wire 10.
In actual applications, it is preferred that the two ends of cable wire 10 are arranged the through hole that sebific duct penetrates the crossbeam 322 of secondary steel bracket 32 It is locked with U-shaped card ring after 3221, to strengthen the lateral anti-performance of inclining of secondary steel bracket 32, prevent cable wire 10 from reciprocal displacement occurring.
In actual fabrication, edge steel bracket 20, the structure composition of corner steel bracket 30 can also have other forms, not office It is limited to above-mentioned.
In actual enforcement, for the hoist engine in lifting external member, which is typically mounted at the I-steel of main body steel construction 50 On beam 51.
In actual enforcement, divide between some edge steel brackets 20 installed in main body steel construction 50 at equal intervals Cloth.Spacing distance between two adjacent edge steel brackets 20 regarding lifting face glass weight depending on, for example, if glass surface Plate weight is about 2 tons, then the spacing distance between two adjacent edge steel brackets 20 should be not more than 9m.And secondary steel bracket 32 Spacing distance between the edge steel bracket 20 being adjacent should be less than the spacer between adjacent two edge steel bracket 20 From.
In the present invention, column 21,311,321, crossbeam 22,312,322, diagonal brace 24,314,315,324,325, connecting rod 23rd, 313,323 etc. can be made using rectangular steel pipe.
In actual installation pitched roof curtain wall, for the face glass that needs are installed on the side of main body steel construction 50 comes Say, face glass is carried out by the lifting external member that designs between two neighboring edge steel bracket 20 it is horizontal, be vertically transported to Install after correct position.For needing in the face glass that the corner of main body steel construction 50 is installed, by corner steel The secondary steel bracket 32 of frame 30 carries out horizontal stroke to face glass with the lifting external member designed and its adjacent edge steel bracket 20 between To, be vertically transported to after correct position install.
Specifically, when face glass is installed on the side of main body steel construction 50, adjusted by controlling hoist engine 41 Position of the weight coaster 43 on cable wire 10, after lifting block 43 runs to correct position, by controlling electric block 44 come right Face glass is vertically sling, and then controls hoist engine 41 again, by motion of the lifting block 43 on cable wire 10 by glass Panel is laterally transported in installation site, then completes to install.When face glass is installed in the corner of main body steel construction 50, glass The installation process of glass panel will not be described here with the above-mentioned process that face glass is installed on the side of main body steel construction 50.
Cableway Lift-on/Lift-off System of the present invention can meet the face glass lifting that weight is 500kg~1 ton pitched roof curtain wall and use, The materials such as the face glass of pitched roof curtain wall can be implemented laterally, vertically to transport and install, voluntarily set up convenient, fast, make, Installation cost is low, and safety coefficient is high, is not integrally arranged to be limited by site operation, effectively ensure that the overall progress of construction can be suitable Profit is completed, and can be efficiently adapted to the face glass lifting of pitched roof curtain wall.
But it may be noted that apply man-hour requirement and curtain wall material is hung to after respective storey using other vertical transport modes pass through again The present invention is lifted, and curtain wall material is it is not recommended that do remote vertical transport, general vertical dimension is controlled in 5~10 floors Within.
The above is presently preferred embodiments of the present invention and its know-why used, for those skilled in the art For, without departing from the spirit and scope of the present invention, it is any based on technical solution of the present invention on the basis of equivalent change Change, simply replacement etc. obviously changes, belong within the scope of the present invention.

Claims (6)

1. a kind of cableway Lift-on/Lift-off System for pitched roof curtain wall, it is characterised in that:It includes edge steel bracket, corner steel Frame, cable wire and lifting external member, wherein:It is separately installed with the multiple continuous side that the main body steel construction of top droop is formed some Edge steel bracket, the corner that the two neighboring side composition of edge steel bracket is provided with main body steel construction are provided with corner steel Frame, be provided with main body steel construction edge steel bracket while it is adjacent with other be fitted without edge steel bracket while constitute turn Install or not installing angle steel bracket at angle;Between two adjacent edge steel brackets and adjacent edge steel bracket and corner Cable wire and lifting external member are installed between steel bracket;Lifting external member between two adjacent edge steel brackets is included installed in master Hoist engine at the top of body steel construction, install in two adjacent edge steel brackets of here on the edge steel bracket of higher position Fixed pulley, mount between two adjacent edge steel brackets of here cable wire on lifting block, lifting block and hoist engine Between by bypass fixed pulley steel wire rope be connected, electric block is installed below lifting block;Corner steel bracket includes main steel Frame and the secondary steel bracket of main steel bracket both sides is arranged on, between secondary steel bracket and main steel bracket, is formed with angle and main steel bracket It is welded and fixed between secondary steel bracket, cable wire and lifting external member is installed between the edge steel bracket that secondary steel bracket is adjacent; Lifting external member between the edge steel bracket that secondary steel bracket is adjacent includes hoist engine at the top of main body steel construction, peace It is mounted in this adjacent secondary steel bracket and edge steel bracket and determines cunning on the secondary steel bracket or edge steel bracket of higher position The lifting block on cable wire for take turns, mounting between the adjacent secondary steel bracket of here and edge steel bracket, lifting block and hoist engine Between by bypass fixed pulley steel wire rope be connected, electric block is installed below lifting block.
2. cableway Lift-on/Lift-off System as claimed in claim 1, it is characterised in that:
The edge steel bracket includes two columns vertically be arrangeding in parallel, is mutually welded by connecting rod, two between two columns Steel I-beam of the bottom of column via steel plate with the main body steel construction is welded and fixed, and the welded top of two columns has horizontal stroke Beam, is welded with diagonal brace between two columns, between crossbeam and column, one end of crossbeam is offered for wearing the logical of the cable wire Hole.
3. cableway Lift-on/Lift-off System as claimed in claim 2, it is characterised in that:
U-shaped retaining ring lock is used after being arranged the through hole of the crossbeam that sebific duct penetrates the edge steel bracket in the two ends of the cable wire Extremely.
4. cableway Lift-on/Lift-off System as claimed in claim 1, it is characterised in that:
The main steel bracket includes two columns vertically be arrangeding in parallel, is mutually welded by connecting rod between two columns, and one is stood The bottom of post is welded and fixed with the steel I-beam of the main body steel construction, the bottom of another column and the main body steel construction position Corner girder steel in corner is welded and fixed, and the welded top of two columns has crossbeam, between two columns, crossbeam and column it Between be welded with diagonal brace, be welded with diagonal brace between the column being fixed on corner girder steel and corner girder steel;
The secondary steel bracket includes two columns vertically be arrangeding in parallel, is mutually welded by connecting rod between two columns, and two are stood The bottom of post is welded and fixed with the steel I-beam of the main body steel construction, and the welded top of two columns has crossbeam, two columns Between, be welded between crossbeam and column and be welded with diagonal brace between the steel I-beam of diagonal brace, column and the main body steel construction, it is horizontal One end of beam is offered for wearing the through hole of the cable wire.
5. cableway Lift-on/Lift-off System as claimed in claim 4, it is characterised in that:
U-shaped retaining ring lock is used after being arranged the through hole of the crossbeam that sebific duct penetrates the secondary steel bracket in the two ends of the cable wire Extremely.
6. cableway Lift-on/Lift-off System as claimed in claim 1, it is characterised in that:
The described some edge steel brackets installed on one side of the main body steel construction are spacedly distributed.
CN201510608835.XA 2015-09-22 2015-09-22 For the cableway Lift-on/Lift-off System of pitched roof curtain wall Active CN105152034B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510608835.XA CN105152034B (en) 2015-09-22 2015-09-22 For the cableway Lift-on/Lift-off System of pitched roof curtain wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510608835.XA CN105152034B (en) 2015-09-22 2015-09-22 For the cableway Lift-on/Lift-off System of pitched roof curtain wall

Publications (2)

Publication Number Publication Date
CN105152034A CN105152034A (en) 2015-12-16
CN105152034B true CN105152034B (en) 2017-04-05

Family

ID=54793167

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510608835.XA Active CN105152034B (en) 2015-09-22 2015-09-22 For the cableway Lift-on/Lift-off System of pitched roof curtain wall

Country Status (1)

Country Link
CN (1) CN105152034B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107558672A (en) * 2016-06-30 2018-01-09 中建八局装饰工程有限公司 Sloping roof super large glaziers method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101177959A (en) * 2007-11-29 2008-05-14 北京城建集团有限责任公司 Curtain wall unit hanging equipment and construction method thereof
JP2008248664A (en) * 2007-03-30 2008-10-16 Shimizu Corp Hoisting method of curtain wall
CN102296830A (en) * 2010-06-22 2011-12-28 武汉凌云建筑装饰工程有限公司 Self-walking track mounting system for special-shaped frame glass curtain wall
CN202672752U (en) * 2012-06-27 2013-01-16 浙江宝业幕墙装饰有限公司 Curtain wall elevating sling cart
CN104444977A (en) * 2014-11-14 2015-03-25 中建三局装饰有限公司 Adjustable vertical material transporting cableway system and construction method thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008248664A (en) * 2007-03-30 2008-10-16 Shimizu Corp Hoisting method of curtain wall
CN101177959A (en) * 2007-11-29 2008-05-14 北京城建集团有限责任公司 Curtain wall unit hanging equipment and construction method thereof
CN102296830A (en) * 2010-06-22 2011-12-28 武汉凌云建筑装饰工程有限公司 Self-walking track mounting system for special-shaped frame glass curtain wall
CN202672752U (en) * 2012-06-27 2013-01-16 浙江宝业幕墙装饰有限公司 Curtain wall elevating sling cart
CN104444977A (en) * 2014-11-14 2015-03-25 中建三局装饰有限公司 Adjustable vertical material transporting cableway system and construction method thereof

Also Published As

Publication number Publication date
CN105152034A (en) 2015-12-16

Similar Documents

Publication Publication Date Title
CN204401997U (en) A kind of suspension type ceiling construction scaffold
CN107304631A (en) The installation method and system of a kind of high-rise building large area cell cube curtain wall block
CN203441073U (en) Hoop-type high-altitude guard platform suitable for super high-rise building outline boarder structural column
CN105019664B (en) High-altitude sliding installation method for box room type electric room
CN105752826B (en) Movable hanging assembling platform and its construction method
CN105133499A (en) Movable hanging basket trolley for bridge concrete anti-collision guardrail construction
CN105603884A (en) Safety protection platform for bridge cap beam construction
CN205934735U (en) A operation platform for stretch -draw of cantilever bent cap
CN203794440U (en) Assembled roofing color plate lifting frame
CN105152034B (en) For the cableway Lift-on/Lift-off System of pitched roof curtain wall
CN104153586A (en) Construction method for installing purline through suspension cable cranes
CN205474859U (en) Bridge bent cap construction safety protection platform
CN205296017U (en) Anticollision barrier template moving as a whole device
CN204212065U (en) Bridge crossing anticollision barrier punching block erection equipment
JP5977224B2 (en) Dismantling method for large tower structure
CN203201149U (en) Electric lifting discharging platform
CN207063484U (en) Movable operating platform for corridor construction
CN205688820U (en) A kind of installation system of high-rise building large area cell cube curtain wall block
CN207374992U (en) The accumulating stent of concrete plate-type component
CN109138492A (en) A kind of curtain wall removes device and method for dismounting
CN202023149U (en) Hanging basket used in construction
CN204224149U (en) Steel structure secondary member hoisting device
CN103287986A (en) Curtain board transport lifting device and method for mounting curtain board by using device
CN209244309U (en) A kind of curtain wall dismounting device
CN103711147B (en) The mounting method of ballast water tank water in immersed tube

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant