CN105752826B - Movable hanging assembling platform and its construction method - Google Patents

Movable hanging assembling platform and its construction method Download PDF

Info

Publication number
CN105752826B
CN105752826B CN201610257496.XA CN201610257496A CN105752826B CN 105752826 B CN105752826 B CN 105752826B CN 201610257496 A CN201610257496 A CN 201610257496A CN 105752826 B CN105752826 B CN 105752826B
Authority
CN
China
Prior art keywords
movable hanging
assembling platform
frame
hanging assembling
bottom plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610257496.XA
Other languages
Chinese (zh)
Other versions
CN105752826A (en
Inventor
汤桂林
王磊
殷学义
高猛
丁照阳
刘建
曲广聚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Third Engineering Bureau Co Ltd
Original Assignee
China Construction Third Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Third Engineering Bureau Co Ltd filed Critical China Construction Third Engineering Bureau Co Ltd
Priority to CN201610257496.XA priority Critical patent/CN105752826B/en
Publication of CN105752826A publication Critical patent/CN105752826A/en
Application granted granted Critical
Publication of CN105752826B publication Critical patent/CN105752826B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/22Rigid members, e.g. L-shaped members, with parts engaging the under surface of the loads; Crane hooks

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Jib Cranes (AREA)

Abstract

The invention discloses a kind of movable hanging assembling platforms and its construction method simple in structure, easy to operate, safe and reliable, including bottom plate and the frame in bottom plate surrounding is set, the bottom plate includes base support member, multiple track supporting racks are distributed on the base support member side by side, it is connected with roll shaft on each track supporting rack, the frame includes four columns and the fender rod that is fixed between column, the upper end of four columns is respectively and fixedly provided with lifting lug, and the frame is equipped with switch gate at least side.Application of the movable hanging assembling platform in the construction of Super High electromechanical engineering eliminate in time existing discharging platform cave in etc. security risks, improve vertical transport efficiency, reduce and occupy tower crane and alien invasion resource, provide powerful guarantee for the safety management during equipment hoisting.

Description

Movable hanging assembling platform and its construction method
Technical field
The present invention relates to high-rise building electromechanical engineering equipment vertical transport fields, more particularly to a kind of mobile hoisting Platform and its construction method.
Background technology
In high-rise building electromechanical engineering work progress, need the large scale equipment of substantial amounts being transported to each floor, and Tower crane can not be directly taken accurate location, so just need hoisting platform that tower crane is coordinated to complete, the rule of hoisting platform Lattice size, should be according to distance, construction requirement, tower crane lifting ability and construction experience between large scale equipment specification, building axis Many factors are waited to determine.Existing hoisting platform is broadly divided into console mode discharging platform, overhanging type discharging according to the form of setting up Platform and retractable discharge platform.
And high-rise building electromechanical engineering large scale equipment vertical transport process using it is more be overhanging type discharging platform And retractable discharge platform.Above two form discharging platform during high-rise building use, due to putting up platform arbitrarily, Blindly the reasons such as use by strict design and worker, causing platform cave-in accident in the construction process often has hair It is raw, and cause different degrees of casualties and economic loss.
Invention content
In order to solve the above technical problem, the present invention provides a kind of simple in structure, easy to operate, safe and reliable, make With existing discharging platform is reduced in the process in different floor repeated disassembled and assembleds, it is hidden to eliminate the safety that existing hoisting platform caves in Suffer from, improves the efficiency of equipment vertical transport, reduce the movable hanging assembling platform of construction cost.
The technical problems to be solved by the invention are achieved through the following technical solutions:
The movable hanging assembling platform of the present invention, including bottom plate and the frame in bottom plate surrounding is set, the bottom plate includes bottom Portion's support member, the base support member are quadrangle frame structure, are distributed with side by side on the base support member multiple Track supporting rack is each connected with roll shaft on the track supporting rack, and the frame is fixedly installed in bottom plate surrounding, institute It is tower structure to state frame, and the frame includes four columns and the fender rod that is fixed between column, four columns Upper end be respectively and fixedly provided with lifting lug, the frame is equipped with switch gate at least side.
Further, 2 switch gates are provided on the frame, 2 switch gates are relatively arranged on frame, described Switch gate is opposite with roll shaft to be arranged in parallel.
Further, the lower end of the switch gate is fixed by axis pin and the installation of frame bottom, the upper end of the switch gate It is installed by bolt and frame activity.
Further, it is tied with safety rope on four columns.
Further, each dog-ear junction of the frame is welded with gusset.
Further, the base support member and track supporting rack are welded by channel steel.
The construction method of the movable hanging assembling platform of the present invention, includes the following steps:
The transport of equipment before S1, lifting:The equipment conveying lifted will be needed to the bottom of movable hanging assembling platform using fork truck On plate, door, and installation insurance pin are turned off the switch;
It is examined before S2, lifting:Hoist cable, steel wire rope are installed on lifting lug, hoist cable and steel wire rope are fixed by tower crane, is checked flat The steady and safe condition of platform;
The binding of S3, safety rope:Bind a safety rope respectively in the four columns of frame;
S4, hoisting transportation:By tower crane come vertical lifting movable hanging assembling platform;
The fixation of S5, movable hanging assembling platform:After movable hanging assembling platform reaches designated floor, by four columns Safety rope adjusts the direction of movable hanging assembling platform, allows switch gate towards inside floor, and safety rope is fixed on floor At reinforcing bar;
Equipment unloads after S6, lifting:After movable hanging assembling platform is fixed, door, the roller that equipment passes through bottom plate are turned on the switch Mobile unloading, completes lifting construction in axial floor.
Further, when being examined before the lifting, the bottom plate of movable hanging assembling platform is less than 200mm apart from ground.
Further, in the fixation of step S5 movable hangings assembling platform, the movable hanging assembling platform is tilted to floor Certain angle is fixed.
Further, the movable hanging assembling platform is fixed to tilted 10 ° of -30 ° of angles of floor.
According to the above aspect of the present invention, the present invention has at least the following advantages:
The movable hanging assembling platform of the present invention, will by being improved to overhanging type hoisting platform and Telescopic suspended assembling platform The stationary state that hoisting platform is presented in use is changed to, with vertical transport equipment mobile status, pass through tower crane and movable type Hoisting platform coordinates, and large scale equipment is efficiently and safely transported to designated floor.
Application of the movable hanging assembling platform in the construction of Super High electromechanical engineering eliminates existing discharging platform and caves in time Etc. security risks, improve vertical transport efficiency, reduce and occupy tower crane and alien invasion resource, be the safety during equipment hoisting Management provides powerful guarantee.
Meanwhile the vertical transport of electromechanical equipment is completed in high-rise building using movable hanging assembling platform, it improves and sets The defeated efficiency of received shipment, and ensure that personnel safety to greatest extent.
Above description is only the general introduction of technical solution of the present invention, in order to better understand the technical means of the present invention, And can be implemented in accordance with the contents of the specification, below with presently preferred embodiments of the present invention and after coordinating attached drawing to be described in detail such as.
Description of the drawings
Fig. 1 is the structural schematic diagram of the movable hanging assembling platform of the present invention;
Fig. 2 is the frame of movable hanging assembling platform shown in FIG. 1 and the welding structure schematic diagram of bottom plate.
1, bottom plate;2, frame;3, fender rod;4, track supporting rack;5, roll shaft;6, switch gate;7, column;8, lifting lug;9, Gusset;10, base support member.
Specific implementation mode
With reference to the accompanying drawings and examples, the specific implementation mode of the present invention is described in further detail.Implement below Example is not limited to the scope of the present invention for illustrating the present invention.
Shown in Fig. 1-2, movable hanging assembling platform, including bottom plate 1 and the frame 2 in 1 surrounding of bottom plate, bottom plate 1 are set Including base support member 10, base support member 10 is quadrangle frame structure, is distributed with side by side on base support member 10 Multiple track supporting racks 4 are connected with roll shaft 5 on each track supporting rack 4, and frame 2 is fixedly installed in 1 surrounding of bottom plate, Frame 2 is tower structure, and frame 2 includes four columns 7 and the fender rod 3 that is fixed between column 7, four columns 7 it is upper End is respectively and fixedly provided with lifting lug 8, and frame 1 is equipped with switch gate 6 at least side.
It is provided with 2 switch gates, 6,2 switch gates 6 on frame 2 to be relatively arranged on frame 2, switch gate 6 and 5 phase of roll shaft To being arranged in parallel.
In practice of construction, it is true that the size of bottom plate 1 and frame 2 is required for the size of the equipment of hoisting transportation as needed Fixed, in hoisting process, apparatus enclosure need not dismantle, directly place it in it is fixed on bottom plate 1, in construction, construction The case where unit can be according to the equipment used, the movable hanging assembling platform of the several different sizes of designed in advance hang to construct Ship defeated use.
The setting of switch gate 6 allows and placement and unloads equipment and be more prone to, and the quantity of switch gate 6 is preferably 2, can also 1 A or other quantity allows it to be symmetricly set on frame 2 when being 2, and switch gate 6 is parallel to the roll shaft 5 of bottom plate 1 and sets It sets, it is more convenient when equipment is placed and unloaded in this way, equipment conveying will not be hampered.
The lower end of switch gate 6 is fixed by axis pin and the installation of 2 bottom of frame, and the upper end of switch gate 6 passes through bolt and frame 2 Activity installation.
It is tied with safety rope in four columns 7.Each dog-ear junction of frame 2 is welded with gusset 9.
Base support member 10 and track supporting rack 4 are welded by channel steel.
The construction method of the movable hanging assembling platform of the present invention, includes the following steps:
The transport of equipment before S1, lifting:The equipment conveying lifted will be needed to the bottom of movable hanging assembling platform using fork truck On plate 1, door 6, and installation insurance pin are turned off the switch;
It is examined before S2, lifting:Hoist cable, steel wire rope are installed on lifting lug, hoist cable and steel wire rope are fixed by tower crane, is checked flat The steady and safe condition of platform;
The binding of S3, safety rope:A safety rope is bound respectively on four columns 7 of frame 2;
S4, hoisting transportation:By tower crane come vertical lifting movable hanging assembling platform;
The fixation of S5, movable hanging assembling platform:After movable hanging assembling platform reaches designated floor, by four columns 7 Safety rope adjustment movable hanging assembling platform direction, allow switch gate 6 towards inside floor, and safety rope is fixed on floor Reinforcing bar at;
Equipment unloads after S6, lifting:After movable hanging assembling platform is fixed, door 6 is turned on the switch, equipment passes through bottom plate 1 The mobile unloading into floor of roll shaft 5, completes lifting construction.
When being examined before lifting, the bottom plate 1 of movable hanging assembling platform is less than 200mm apart from ground.
In the fixation of step S5 movable hanging assembling platforms, movable hanging assembling platform is fixed to the tilted certain angle of floor. Movable hanging assembling platform is fixed to tilted 10 ° of -30 ° of angles of floor.Inclined angle is intended merely to that equipment is facilitated to unload, towards building Layer is tilted, and inclined angle is not easy excessive, prevents equipment from wounding technical staff.
When lifting, the steel wire rope between tower crane and lifting lug has to keep length consistent, needs son before technical staff's lifting Examining is looked into, and unexpected generation is prevented.
The movable hanging assembling platform of the present invention, will by being improved to overhanging type hoisting platform and Telescopic suspended assembling platform The stationary state that hoisting platform is presented in use is changed to, with vertical transport equipment mobile status, pass through tower crane and movable type Hoisting platform coordinates, and large scale equipment is efficiently and safely transported to designated floor.
Application of the movable hanging assembling platform in the construction of Super High electromechanical engineering eliminates existing discharging platform and caves in time Etc. security risks, improve vertical transport efficiency, reduce and occupy tower crane and alien invasion resource, be the safety during equipment hoisting Management provides powerful guarantee.
Meanwhile the vertical transport of electromechanical equipment is completed in high-rise building using movable hanging assembling platform, it improves and sets The defeated efficiency of received shipment, and ensure that personnel safety to greatest extent.
Above description is only the general introduction of technical solution of the present invention, in order to better understand the technical means of the present invention, And can be implemented in accordance with the contents of the specification, below with presently preferred embodiments of the present invention and after coordinating attached drawing to be described in detail such as.
The above is only a preferred embodiment of the present invention, it is not intended to restrict the invention, it is noted that for this skill For the those of ordinary skill in art field, without departing from the technical principles of the invention, can also make it is several improvement and Modification, these improvements and modifications also should be regarded as protection scope of the present invention.

Claims (8)

1. movable hanging assembling platform, which is characterized in that including bottom plate (1) and the frame (2) in bottom plate (1) surrounding is set, it is described Bottom plate (1) includes base support member (10), and the base support member (10) is quadrangle frame structure, the bottom support Multiple track supporting racks (4) are distributed on component (10) side by side, roll shaft is connected on each track supporting rack (4) (5), the frame (2) is fixedly installed in bottom plate (1) surrounding, and the frame (2) is tower structure, and the frame (2) includes Four columns (7) and the fender rod (3) being fixed between column (7), the upper end of four columns (7) are respectively and fixedly provided with lifting lug (8), switch gate (6) is installed on the frame (2) at least side;It is provided with 2 switch gates (6) on the frame (2), 2 The switch gate (6) is relatively arranged on frame (2), and the switch gate (6) is opposite with roll shaft (5) to be arranged in parallel;
The construction method of the movable hanging assembling platform, includes the following steps:
The transport of equipment before S1, lifting:The equipment conveying lifted will be needed to the bottom plate (1) of movable hanging assembling platform using fork truck On, turn off the switch door (6), and installation insurance pin;
It is examined before S2, lifting:Hoist cable, steel wire rope are installed on lifting lug (8), hoist cable and steel wire rope are fixed by tower crane, is checked flat The steady and safe condition of platform;
The binding of S3, safety rope:A safety rope is bound respectively in the four columns (7) of frame;
S4, hoisting transportation:By tower crane come vertical lifting movable hanging assembling platform;
The fixation of S5, movable hanging assembling platform:After movable hanging assembling platform reaches designated floor, by four columns (7) Safety rope adjusts the direction of movable hanging assembling platform, allows switch gate towards inside floor, and safety rope is fixed on floor At reinforcing bar;
Equipment unloads after S6, lifting:After movable hanging assembling platform is fixed, door (6) is turned on the switch, equipment passes through bottom plate (1) Roll shaft (5) mobile unloading into floor, completes lifting construction.
2. movable hanging assembling platform according to claim 1, which is characterized in that the lower end of the switch gate (6) passes through pin Axis is fixed with the installation of frame (2) bottom, and the upper end of the switch gate (6) is installed by bolt and frame (2) activity.
3. movable hanging assembling platform according to claim 1, which is characterized in that be tied with peace on four columns (7) Quan Sheng.
4. movable hanging assembling platform according to claim 1, which is characterized in that each dog-ear of the frame (2) connects Place is welded with gusset (9).
5. movable hanging assembling platform according to claim 1, which is characterized in that the base support member (10) and track Supporting rack (4) is welded by channel steel.
6. movable hanging assembling platform according to claim 1, which is characterized in that when being examined before the lifting, movable hanging The bottom plate (1) of assembling platform is less than 200mm apart from ground.
7. movable hanging assembling platform according to claim 1, which is characterized in that the fixation of step S5 movable hanging assembling platforms In, the movable hanging assembling platform is fixed to the tilted certain angle of floor.
8. movable hanging assembling platform according to claim 1, which is characterized in that the movable hanging assembling platform is to floor Tilted 10 ° of -30 ° of angles are fixed.
CN201610257496.XA 2016-04-22 2016-04-22 Movable hanging assembling platform and its construction method Expired - Fee Related CN105752826B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610257496.XA CN105752826B (en) 2016-04-22 2016-04-22 Movable hanging assembling platform and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610257496.XA CN105752826B (en) 2016-04-22 2016-04-22 Movable hanging assembling platform and its construction method

Publications (2)

Publication Number Publication Date
CN105752826A CN105752826A (en) 2016-07-13
CN105752826B true CN105752826B (en) 2018-11-09

Family

ID=56325648

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610257496.XA Expired - Fee Related CN105752826B (en) 2016-04-22 2016-04-22 Movable hanging assembling platform and its construction method

Country Status (1)

Country Link
CN (1) CN105752826B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107814299B (en) * 2017-11-06 2020-04-17 重庆工业职业技术学院 Rapid construction method of building construction unloading platform and rapid unloading lift car
CN109205455B (en) * 2018-07-19 2022-06-10 中建二局第一建筑工程有限公司 Integral hoisting platform of air conditioning unit and construction method thereof
CN110240058B (en) * 2019-06-13 2020-07-03 常州博瑞电力自动化设备有限公司 Valve tower module replacing device and valve tower module replacing method
CN113756591A (en) * 2021-09-10 2021-12-07 上海建工集团股份有限公司 Composite discharging platform and construction method thereof

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3890514B2 (en) * 1999-01-14 2007-03-07 清水建設株式会社 Carrying suspension
CN202810176U (en) * 2012-08-23 2013-03-20 山西省第五建筑工程公司 Mobile operation platform
CN203846785U (en) * 2013-12-14 2014-09-24 重庆陶家都市工业园开发建设有限公司 Baffle structure of discharging platform
CN104310195A (en) * 2014-09-25 2015-01-28 中建三局第二建设工程有限责任公司 Hoisting cage for hoisting electromechanical device
CN104963496B (en) * 2015-07-10 2017-09-01 北京六建集团有限责任公司 Super High special mobile formula platform and its transportation resources
CN205555867U (en) * 2016-04-22 2016-09-07 中建三局集团有限公司 Portable hoist and mount platform

Also Published As

Publication number Publication date
CN105752826A (en) 2016-07-13

Similar Documents

Publication Publication Date Title
CN105752826B (en) Movable hanging assembling platform and its construction method
KR102132503B1 (en) Load carrying platform shuttle
CN110329919A (en) A kind of stable type gantry crane with anti-falling function
CN201809036U (en) Hanging hopper with detachable chassis
CN107083843A (en) It is a kind of to be used for the mobile platform of high-rise building equipment and material fast transportation
KR101883219B1 (en) Port container crane with improved vibration control performance
CN107082354B (en) Self-tipping type transports cage and its construction method
KR101068229B1 (en) Dismantled tower crane cargo handling system and cargo handling method using thereof
CN205555867U (en) Portable hoist and mount platform
CN211078274U (en) Lifting and carrying integrated device
CN204778340U (en) Automatic couple device breaks off relations
CN107060474A (en) A kind of sleeve-type chimney people goods shunting vertical transferring apparatus and construction method
CN204001751U (en) Super high steel structure construction overhanging unloading platform
CN203833587U (en) Automatic discharging device
CN106088569A (en) Collapsible material platform on construction scaffold
CN203667268U (en) Hoisting transportation system and J-shaped hoisting transportation bracket
CN105152034B (en) For the cableway Lift-on/Lift-off System of pitched roof curtain wall
TWI557299B (en) Method for constructing cylindrical tank
CN102674134A (en) Rotatable lifting beam for gantry crane
RU177894U1 (en) FREIGHT LIFT MINE
CN207537036U (en) A kind of construction elevator
CN206476710U (en) Fork truck hoisting apparatus
CN103101844A (en) Convenient high-rise lifting apparatus
CN209685187U (en) A kind of Self-loading & self-unloading device peculiar to vessel
CN206327391U (en) wheelbarrow and transportation system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181109

Termination date: 20200422