CN202023149U - Hanging basket used in construction - Google Patents

Hanging basket used in construction Download PDF

Info

Publication number
CN202023149U
CN202023149U CN2011200429409U CN201120042940U CN202023149U CN 202023149 U CN202023149 U CN 202023149U CN 2011200429409 U CN2011200429409 U CN 2011200429409U CN 201120042940 U CN201120042940 U CN 201120042940U CN 202023149 U CN202023149 U CN 202023149U
Authority
CN
China
Prior art keywords
hanging basket
construction
fixed frame
bridge
building according
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011200429409U
Other languages
Chinese (zh)
Inventor
王海
赵殿峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Tonggang Building Engineering Co.,Ltd.
Original Assignee
SHANGHAI TONGCHENG BUILDING ENGINEERING CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI TONGCHENG BUILDING ENGINEERING CO LTD filed Critical SHANGHAI TONGCHENG BUILDING ENGINEERING CO LTD
Priority to CN2011200429409U priority Critical patent/CN202023149U/en
Application granted granted Critical
Publication of CN202023149U publication Critical patent/CN202023149U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to a hanging basket used in construction, in particular to a fixed hanging basket used in bridge construction, which comprises a hanging basket main frame body, a basket bottom platform and an operation channel. The hanging basket used in the construction is characterized by comprising fixed frames arranged as the length required and a spring board. The fixed frames are independent from each other and are fixedly arranged on a vertical face of a bridge girder to be constructed. The bottom edges of the fixed frames are paved to form a walking channel through the spring board. The fixed frames are provided with rods used for hanging and arranged at the top of the bridge girder to be constructed. The hanging basket used in the construction has the advantages of not being limited by construction environment under the bridge girder and capable of finishing construction under bridge girders, highway and rivers. In addition, instead of being lifted from under the bridge girder, the hanging basket is lifted from above the bridge girder. Therefore, construction difficulty of lifting is reduced, and lifting time is shortened.

Description

Hanging Basket for building
Technical field
The utility model relates to a kind of Hanging Basket for building, particularly a kind of fixed Hanging Basket that is used for bridge construction.
Background technology
In bridge construction, the Hanging Basket construction installation that is absolutely necessary.Hanging Basket in the past is typically designed to integral installation, overall pulling down, and the workman operates in casing during construction, during installation, lifts to the construction operation height from the bridge below.Consider the requirement of safety, environmental protection, standardization construction, semi-enclosed Hanging Basket arises at the historic moment.But this Hanging Basket also is overall pulling down, integral installation, when environment that construction below is not suitable for constructing for highway, railway, rivers etc., is inconvenient to install and remove.China utility model prospectus ZL200820149852.7 discloses a kind of Hanging Basket, can be with the position dismounting of suspended basket to suitable dismounting.But this cradle structure complexity, and be furnished with various attachment devices, as jack, steel strand, Chain block etc.But, in construction, adopt this Hanging Basket can run into following problem: when the bridge below is railway, highway or rivers, can't to lift from the below; Hanging Basket is an integral design, and its entire length is once determining and can't change that the set-up time is long, and consume material is many; The Hanging Basket own wt is big; Hanging Basket has supporting attachment device to help it to move, otherwise can't finish staged construction.This Hanging Basket is that material cost, installation cost, attachment device cost are all than higher.
The utility model content
The purpose of this utility model is: the Hanging Basket of using when a kind of bridge construction is provided, and this Hanging Basket can not be subjected to the restriction of bridge below construction environment from the bridge upper lifting; Need not mobile attachment device; Set-up time is short, installation and removal are simple; Consume material is few, cost is low, and own wt is little; Platform is firm at the bottom of the basket; The Hanging Basket entire length can be determined flexibly according to the construction needs.
The purpose of this utility model is achieved in that a kind of Hanging Basket for building, comprises fixed frame, the springboard that need be provided with by length, is structure independent of each other between the described fixed frame, and its stationary arrangement is in by the facade of bridge construction beam; Described fixed frame is laid to the walking passage by springboard between the base; Described fixed frame is provided with to be used for hanging takes the bar that is placed on by bridge construction crossbeam top.
The arranged outside safety net of described walking passage.
Described fixed frame constitutes a rectangular configuration by two vertical poles and cross bar, and its cross tube one side is stretched out vertical pole, be provided with at least on this side vertical pole one with the installing hole that is connected by bridge construction beam crossbeam.
The extension of the cross bar of described fixed frame inserts and is positioned over by in the slit of bridge construction crossbeam and bridge floor bottom.
Described fixed frame cross bar and vertical pole are the bar shaped angle steel.
Described angle steel is the bending of 90 degree, and described kink is provided with lead angle, and the both sides of the edge of its angle steel are circular arc.
The optimum distance of described two fixed frames is 80 centimeters.
The utility model has the advantages that: not limited by bridge below construction environment, no matter the bridge below is that railway, highway or rivers can be finished construction.Hanging Basket is compared with lifting below bridge from the bridge upper lifting, has reduced the difficulty of construction of lifting, shortens the lifting time.The Hanging Basket main frame splices at the construction field (site) to be finished, and construction only need to finish the making of fixed frame, and stationary frame structure is simple in earlier stage, and consume material is few, and cost is low, and it is little to conduct oneself with dignity.Platform adopts the staggered splicing of plank at the bottom of the basket, has increased the steadiness of platform at the bottom of the basket.The Hanging Basket entire length can determine flexibly according to the needs of job site actual conditions, and when works area during near bridge crossbeam top outer, Hanging Basket length can be less; When near bridge crossbeam crown center position, Hanging Basket length can be longer.
Description of drawings
Fig. 1 is the Hanging Basket schematic diagram
Fig. 2 is Hanging Basket support splicing schematic diagram
Fig. 3 is a springboard connecting method schematic diagram
Fig. 4 is the front schematic view of fixed frame
Fig. 5 is that fixed frame A is to schematic diagram
Fig. 6 is that fixed frame B is to schematic diagram
Fig. 7 is the angle steel schematic diagram.
Embodiment
The Hanging Basket a kind of for building that the utility model relates to adopts fixed frame 10 as shown in Figure 4, the formation that is arranged in parallel continuously, and during arrangement, each fixed frame 10 is with vertical by bridge construction beam facade.Between the lower crosspiece 102 of fixed frame 10, be laid to travelling platform by springboard 4, fixed frame 10 central space 110 form walking passage 11 after arranging continuously, and the workman can construction in walking passage 11.The arranged outside safety net 3 of walking passage 11 to prevent in the operating process that behaviour is personnel and object drops, increases the safety of Hanging Basket.In the concrete construction, the spacing between two fixed frames 10 is greatly about 50-100cm.Springboard 4 is for being layed between adjacent two fixed frames 1, and is parallel with bridge depth direction, the staggered plank of putting.When plank was put, as shown in Figure 3, the head of plank 4a had one section to overlap with the afterbody of plank 4b, staggered successively putting, this disposing way can increase travelling platform and Hanging Basket integral body steadiness.During concrete enforcement, adopt the Q235 steel to make fixed frame 10, the Hanging Basket actual carrying capacity can reach about 200kg.
By fixed frame 10 assembling is installed at the scene because of Hanging Basket 1 and forms, can determine the integral installation length of Hanging Basket 1 according to actual conditions.When the close together of the position of needs construction, the fixed frame 10 of negligible amounts can be installed, form the short Hanging Basket of length.When the position of needs construction distance is far away, a fairly large number of fixed frame 10 can be installed, form the long Hanging Basket of length.Like this, the entire length of Hanging Basket can determine that flexibility is big according to concrete condition of construction, does not need also can extend the arrival construction location as other additional equipment running gear equipment of other Hanging Baskets, enlarges the construction operation face.When removing, will unload with the bolt that bridge is fixed, make fixed frame 10 separate with the bridge facade.It is few that this extension indigo plant has a consume material, installs and dismantle easy, saves the advantage in man-hour.
Make the used fixed frame 1 of the Hanging Basket 1 of this usefulness in novel, as shown in Figure 4, constitute by upper cross bar 10, two vertical poles 11 and lower crosspiece 12.The two ends of the lower end of two vertical poles 11 and base cross members 12 are welded as a whole.The top of two vertical poles 11 and upper cross bar 10 welding surround a space 110.The length of upper cross bar 10 is stretched out about the about 20cm in vertical pole 11 edges greater than the distance between two vertical poles, the 11 top welding endss.Extension extend in the space of bridge crossbeam top platform and bridge bottom surface, and takes on the platform that is placed on bridge crossbeam end face.On the vertical pole 11 of fixed frame 10 and the side of being fitted by bridge construction beam facade, be provided with two installing holes 1010.During installation, whole fixed frame 10 hangs on by the facade of bridge construction beam, and bolt or setscrew pass installing hole 1010, and the facade of fixed frame 10 with bridge is connected and fixed.
In concrete the enforcement, upper cross bar 10, vertical pole 11 and lower crosspiece 12 can be made of angle steel 3 as shown in Figure 7.Angle steel 3 is 90 degree bendings for integraty designs, and kink is provided with lead angle 30, and the edge is circular arc 31.

Claims (7)

1. a Hanging Basket for building comprises fixed frame (10), the springboard (2) that need be provided with by length, it is characterized in that: be structure independent of each other between the described fixed frame (10), and its stationary arrangement is in by the facade of bridge construction beam; Be laid to walking passage (11) by springboard (2) between described fixed frame (10) base; Described fixed frame (10) is provided with to be used for hanging takes the bar that is placed on by bridge construction crossbeam top.
2. Hanging Basket for building according to claim 1 is characterized in that: the arranged outside safety net (3) of described walking passage (11).
3. Hanging Basket for building according to claim 3, it is characterized in that: described fixed frame (10) constitutes a rectangular configuration by two vertical poles (101) and cross bar, its cross tube (100) one sides are stretched out vertical pole (101), be provided with at least on this side vertical pole (101) one with the installing hole (1010) that is connected by bridge construction beam crossbeam.
4. Hanging Basket for building according to claim 3 is characterized in that: the extension of the cross bar (100) of described fixed frame (10) inserts and is positioned over by in the slit of bridge construction crossbeam and bridge floor bottom.
5. Hanging Basket for building according to claim 3 is characterized in that: described fixed frame cross bar and vertical pole are the bar shaped angle steel.
6. Hanging Basket for building according to claim 5 is characterized in that: described angle steel (3) is the bending of 90 degree, and described kink is provided with lead angle (30), and the both sides of the edge of its angle steel (3) are circular arc (31).
7. Hanging Basket for building according to claim 1 and 2 is characterized in that: the optimum distance of described two fixed frames (10) is 80 centimeters.
CN2011200429409U 2011-02-21 2011-02-21 Hanging basket used in construction Expired - Fee Related CN202023149U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011200429409U CN202023149U (en) 2011-02-21 2011-02-21 Hanging basket used in construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011200429409U CN202023149U (en) 2011-02-21 2011-02-21 Hanging basket used in construction

Publications (1)

Publication Number Publication Date
CN202023149U true CN202023149U (en) 2011-11-02

Family

ID=44848105

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011200429409U Expired - Fee Related CN202023149U (en) 2011-02-21 2011-02-21 Hanging basket used in construction

Country Status (1)

Country Link
CN (1) CN202023149U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102900025A (en) * 2012-09-28 2013-01-30 广州佳隽路桥工程有限公司 Suspension working platform for bridge detection
CN102995563A (en) * 2012-12-10 2013-03-27 常熟建工建设集团有限公司苏州分公司 Hanging basket for bridge building
CN107604829A (en) * 2017-09-18 2018-01-19 中国十七冶集团有限公司 A kind of pier cap beam tensioning assembled tensioning job platform and preparation method thereof

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102900025A (en) * 2012-09-28 2013-01-30 广州佳隽路桥工程有限公司 Suspension working platform for bridge detection
CN102995563A (en) * 2012-12-10 2013-03-27 常熟建工建设集团有限公司苏州分公司 Hanging basket for bridge building
CN102995563B (en) * 2012-12-10 2015-08-26 温州市创新市政建设工程有限公司 A kind of bridge construction Hanging Basket
CN107604829A (en) * 2017-09-18 2018-01-19 中国十七冶集团有限公司 A kind of pier cap beam tensioning assembled tensioning job platform and preparation method thereof
CN107604829B (en) * 2017-09-18 2019-10-18 中国十七冶集团有限公司 A kind of pier cap beam tensioning assembled tensioning job platform and preparation method thereof

Similar Documents

Publication Publication Date Title
JP5047680B2 (en) Construction method of continuous viaduct
CN205171378U (en) Assembling lifting type construction platform for pier column construction
CN103643800B (en) The erection & lift system of buckling-restrained bracing member and construction method thereof
CN104652298B (en) A kind of whole dismounting system and construction method thereof transferred across box beam supported based on bridge floor
CN104310165A (en) Guide rail type adhesion construction lifter and construction method thereof
CN105484164B (en) Spanning type bailey beam bracket and construction method thereof
CN203855895U (en) Mobile jib operation platform for constructing and overhauling bridges
CN106193568A (en) Mobile steel truss operating platform
CN108979131A (en) A kind of high-building construction steel form and operation frame integral hoisting stage apparatus
CN202023149U (en) Hanging basket used in construction
CN109296192B (en) Lifting frame for assembled building
JP7265967B2 (en) Cantilever device for bridge construction and bridge construction and demolition method
KR101232704B1 (en) The installation and dismantlement method of main girder for bridge temporary
CN204386135U (en) Portable Hanging Basket
CN104131706A (en) Vertical steel bar two-layer connecting structure of concrete framework structure and construction method of vertical steel bar two-layer connecting structure
CN204212065U (en) Bridge crossing anticollision barrier punching block erection equipment
CN205955164U (en) Portable steel truss operation platform
CN102191866A (en) Device and method for removal construction of vertical posts positioned on lower part of large-span net rack
CN205152805U (en) Portable precast beam stretch -draw protector
CN209958220U (en) Movable trolley for mounting and dismounting railing
CN211815605U (en) Construction device for pile column type pier tie beam and capping beam
CN204038917U (en) Detachable external hanging type operating platform
JP5437876B2 (en) Method of dismantling and removing support members in the construction process of RC RC ramen structure viaduct
CN219998972U (en) Cable bridge rack installation reinforcing apparatus
CN220767721U (en) Protective frame suitable for bridge construction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: SHANGHAI TONGGANG ARCHITECTURAL ENGINEERING CO., L

Free format text: FORMER OWNER: SHANGHAI TONGCHENG BUILDING ENGINEERING CO., LTD.

Effective date: 20130205

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 201505 JINSHAN, SHANGHAI TO: 201101 MINHANG, SHANGHAI

TR01 Transfer of patent right

Effective date of registration: 20130205

Address after: 201101, room 11, building first, building 7001, 1152 middle spring road, Shanghai, Minhang District

Patentee after: Shanghai Tonggang Building Engineering Co.,Ltd.

Address before: 201505 Shanghai city Jinshan District ting Lin Lin Po No. 39 building 3 room D3

Patentee before: Shanghai Tongcheng Building Engineering Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111102

Termination date: 20190221