CN107304631A - The installation method and system of a kind of high-rise building large area cell cube curtain wall block - Google Patents

The installation method and system of a kind of high-rise building large area cell cube curtain wall block Download PDF

Info

Publication number
CN107304631A
CN107304631A CN201610253138.1A CN201610253138A CN107304631A CN 107304631 A CN107304631 A CN 107304631A CN 201610253138 A CN201610253138 A CN 201610253138A CN 107304631 A CN107304631 A CN 107304631A
Authority
CN
China
Prior art keywords
curtain wall
large area
cell cube
wall block
area cell
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201610253138.1A
Other languages
Chinese (zh)
Inventor
董浩
罗宗礼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Original Assignee
Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd filed Critical Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Priority to CN201610253138.1A priority Critical patent/CN107304631A/en
Publication of CN107304631A publication Critical patent/CN107304631A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/162Handles to carry construction blocks
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/167Tools or apparatus specially adapted for working-up plates, panels or slab shaped building elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a kind of installation method of high-rise building large area cell cube curtain wall block and system, the system includes vertical-lifting device and level allocation and transportation device, described vertical-lifting device includes being arranged on the vertical guide on the outside of high-rise building and the vertical-lifting equipment on vertical guide top floor, and large area cell cube curtain wall block is placed between vertical guide and is connected by allocating and transporting band and steel wire rope with vertical-lifting equipment;The walking lifting means certainly that described level allocation and transportation device includes the horizontal rail being arranged on vertical guide top floor and is arranged in horizontal rail.Curtain wall is changed to track restrained property handling by the present invention by traditional outside handling, it can still be installed even in strong wind weather, installation process is avoided to be influenceed by upper air current, outside install of curtain wall is changed to install in interior of building by the present invention simultaneously, operational security and production efficiency are greatly improved, construction safety and construction speed is effectively ensured.

Description

The installation method and system of a kind of high-rise building large area cell cube curtain wall block
Technical field
The present invention relates to a kind of installation method of high-rise building large area cell cube curtain wall block and system, belong to building curtain wall technical field of construction.
Background technology
When large area cell cube curtain wall block being installed on the high-rise building high more than 300m, because curtain wall block area is excessive, it can not be loaded and be transported using elevator, and when using tower crane handling, curtain wall block can not be hoisted in floor, while curtain wall block is easily influenceed during handling by upper air current, cause curtain wall block to cause significantly to swing in using tower crane handling and outside hanging basket installation process, not only influence is installed, and there is potential safety hazard.
The content of the invention
It is an object of the invention to:The installation method and system of simple in construction, easy for installation, safe and reliable high-rise building large area cell cube curtain wall block are provided, to overcome the deficiencies in the prior art.
Technical scheme:A kind of installation method of high-rise building large area cell cube curtain wall block, first vertical guide is set up on the exterior wall of high-rise building, and vertical-lifting equipment and horizontal rail are installed on the floor at the top of vertical guide, installed simultaneously in horizontal rail from walking lifting means, when the installation of large area cell cube curtain wall block is carried out so on high-rise building, just large area cell cube curtain wall block can be placed between vertical guide and designated floor is promoted to by vertical-lifting equipment, then again by allocating and transporting large area cell cube curtain wall block level to designated mounting position from walking lifting means in horizontal rail, complete the installment work of large area cell cube curtain wall block on the inside of floor by workmen again.
Described high-rise building refers to building of the building height in more than 300m.
Described large area cell cube curtain wall block refers to a width of more than 1.8m, a length of cell cube curtain wall block more than 4m.
A kind of installation system of the high-rise building large area cell cube curtain wall block built by the above method, including vertical-lifting device and level allocation and transportation device, described vertical-lifting device includes being arranged on the vertical guide on the outside of high-rise building and the vertical-lifting equipment on vertical guide top floor, and large area cell cube curtain wall block is placed between vertical guide and is connected by allocating and transporting band and steel wire rope with vertical-lifting equipment;The walking lifting means certainly that described level allocation and transportation device includes the horizontal rail being arranged on vertical guide top floor and is arranged in horizontal rail, it is described from walking lifting means include can in horizontal rail walking in a horizontal state walking dolly, single-stranded electric block and electronic main frame are provided with walking dolly, single-stranded electric block is connected by steel wire rope with large area cell cube curtain wall block.
Described vertical-lifting device is also included with allocating and transporting band or the joist that is connected of steel wire rope, and in the bearing that can be slided in vertical guide of being provided at both ends with of joist, the bottom of large area cell cube curtain wall block is fixed on joist.
The vertical elongated spacing between arrangement, and vertical guide of described vertical guide 500mm on the outside of high-rise building is more than the width of large area cell cube curtain wall block.
Compared with prior art, the advantage of the invention is that:Large area cell cube curtain wall block is placed between vertical guide and is promoted to designated floor by vertical-lifting equipment by the present invention, then again by allocating and transporting large area cell cube curtain wall block level to designated mounting position from walking lifting means in horizontal rail, complete the installment work of large area cell cube curtain wall block on the inside of floor by workmen again, so as to which large area cell cube curtain wall is changed into track restrained property handling by traditional outside handling, it can still be installed even in strong wind weather, installation process is avoided to be influenceed by upper air current, outside install of large area cell cube curtain wall is changed to install in interior of building by the present invention simultaneously, greatly improve operational security and production efficiency, construction safety and construction speed is effectively ensured.Therefore, the present invention not only has the advantages that safe and reliable, stability is good, but also have the advantages that technology simply, establish one's own system, onsite application efficiency high, labor intensive is low, be not take up elevator or the transporting equipment capacity such as tower crane.
Brief description of the drawings
Fig. 1 is structural representation of the invention;
Fig. 2 is the structural representation of vertical-lifting device in the present invention;
Fig. 3 is the structural representation of reclaimed water Heibei provincial opera shipping unit of the present invention.
Description of reference numerals:1- large area cell cube curtain wall blocks, 2- vertical guides, 3- joists, 4- horizontal rails, 5- vertical-lifting equipment, 6- steel wire ropes, 7- allocation and transportation bands, 8- high-strength bolts, 9- high-rise buildings, the single-stranded electric blocks of 10-, 11- walking dollies, the electronic main frames of 12-, 13- track bolts.
Embodiment
In order that the object of the invention, technical scheme and advantage are clearer, the present invention is described in further detail with reference to the accompanying drawings and examples.
Embodiments of the invention:The structural representation of the installation system of high-rise building large area cell cube curtain wall block is as shown in Figures 1 to 3, including vertical-lifting device and level allocation and transportation device, described vertical-lifting device includes being arranged on the vertical guide 2 and the vertical-lifting equipment 5 on the top floor of vertical guide 2 in the outside of high-rise building 9, vertical-lifting equipment 5 can select JK3T type hoist engines, is then fixed on by high-strength bolt 8 on the floor of high-rise building 9;Described vertical guide 2 is apart from the vertical elongated arrangements of the outside 500mm of high-rise building 9, and width of the spacing more than large area cell cube curtain wall block 1 between vertical guide 2;Large area cell cube curtain wall block 1 is placed between vertical guide 2 and is connected by allocating and transporting band 7 and steel wire rope 6 with vertical-lifting equipment 5;The walking lifting means certainly that described level allocation and transportation device includes the horizontal rail 4 being arranged on the top floor of vertical guide 2 and is arranged in horizontal rail 4, horizontal rail 4 is fixed on the floor of high-rise building 9 using track bolt 13, it is described from walking lifting means include can in horizontal rail 4 walking in a horizontal state DPC-03 types walking dolly 11, the single-stranded electric block 10 of HSY03-01 types and electronic main frame 12 are provided with walking dolly 11, single-stranded electric block 10 is connected by steel wire rope 6 with large area cell cube curtain wall block 1.Described vertical-lifting device also include with allocation and transportation band 7 or the joist 3 that is connected of steel wire rope 6, in the bearing that can be slided in vertical guide 2 of being provided at both ends with of joist 3, the bottom of large area cell cube curtain wall block 1 is fixed on joist 3.
Above-mentioned large area cell cube curtain wall block 1 refers to a width of more than 1.8m, a length of cell cube curtain wall block more than 4m.When the installation of large area cell cube curtain wall block 1 is carried out on high-rise building, large area cell cube curtain wall block 1 is placed between vertical guide 2, the bottom of large area cell cube curtain wall block 1 is fixed on joist 3 simultaneously, then large area cell cube curtain wall block 1 and joist 3 are connected with vertical-lifting equipment 5 by allocating and transporting band 7 or steel wire rope 6, so just large area cell cube curtain wall block 1 can be promoted to by designated floor by vertical-lifting equipment 5, then again by allocating and transporting the level of large area cell cube curtain wall block 1 to designated mounting position from walking lifting means in horizontal rail 4, complete the installment work of large area cell cube curtain wall block 1 on the inside of the floor of high-rise building 9 by workmen again.
The method and system of the present invention are carried out checking in the gardens and orchards Petronas Towers project building course of Kweiyang, and complete the installation task of the high large area cell cube curtain wall blocks of 300m, prove that the system has the advantages that safe and reliable, stability is good, operating efficiency is high in implementation process, and the present invention also have the advantages that technology simply, onsite application efficiency high, labor intensive is low, be not take up tower crane, elevator capacity, strong wind weather can still be installed.

Claims (6)

1. a kind of installation method of high-rise building large area cell cube curtain wall block, it is characterised in that:First vertical guide is set up on the exterior wall of high-rise building, and vertical-lifting equipment and horizontal rail are installed on the floor at the top of vertical guide, installed simultaneously in horizontal rail from walking lifting means, when the installation of large area cell cube curtain wall block is carried out so on high-rise building, just large area cell cube curtain wall block can be placed between vertical guide and designated floor is promoted to by vertical-lifting equipment, then again by allocating and transporting large area cell cube curtain wall block level to designated mounting position from walking lifting means in horizontal rail, complete the installment work of large area cell cube curtain wall block on the inside of floor by workmen again.
2. the installation method of high-rise building large area cell cube curtain wall block according to claim 1, it is characterised in that:Described high-rise building refers to building of the building height in more than 300m.
3. the installation method of high-rise building large area cell cube curtain wall block according to claim 1, it is characterised in that:Described large area cell cube curtain wall block refers to a width of more than 1.8m, a length of cell cube curtain wall block more than 4m.
4. a kind of installation system for the high-rise building large area cell cube curtain wall block that method as described in claims 1 to 3 any one is built, including vertical-lifting device and level allocation and transportation device, it is characterised in that:Described vertical-lifting device includes being arranged on high-rise building(9)The vertical guide in outside(2)And installed in vertical guide(2)Vertical-lifting equipment on top floor(5), large area cell cube curtain wall block(1)It is placed in vertical guide(2)Between and by allocating and transporting band(7)And steel wire rope(6)With vertical-lifting equipment(5)Connection;Described level allocation and transportation device includes being arranged on vertical guide(2)Horizontal rail on top floor(4)And it is arranged on horizontal rail(4)On from walking lifting means, it is described that include from walking lifting means can be in horizontal rail(4)The walking dolly of upper walking in a horizontal state(11), in walking dolly(11)On be provided with single-stranded electric block(10)And electronic main frame(12), single-stranded electric block(10)Pass through steel wire rope(6)With large area cell cube curtain wall block(1)Connection.
5. the installation system of high-rise building large area cell cube curtain wall block according to claim 4, it is characterised in that:Described vertical-lifting device also includes and allocation and transportation band(7)Or steel wire rope(6)The joist of connection(3), in joist(3)Be provided at both ends with can be in vertical guide(2)The bearing of upper slip, large area cell cube curtain wall block(1)Bottom be fixed on joist(3)On.
6. the installation system of high-rise building large area cell cube curtain wall block according to claim 4, it is characterised in that:Described vertical guide(2)Apart from high-rise building(9)The vertical elongated arrangements of outside 500mm, and vertical guide(2)Between spacing be more than large area cell cube curtain wall block(1)Width.
CN201610253138.1A 2016-04-22 2016-04-22 The installation method and system of a kind of high-rise building large area cell cube curtain wall block Withdrawn CN107304631A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610253138.1A CN107304631A (en) 2016-04-22 2016-04-22 The installation method and system of a kind of high-rise building large area cell cube curtain wall block

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610253138.1A CN107304631A (en) 2016-04-22 2016-04-22 The installation method and system of a kind of high-rise building large area cell cube curtain wall block

Publications (1)

Publication Number Publication Date
CN107304631A true CN107304631A (en) 2017-10-31

Family

ID=60151724

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610253138.1A Withdrawn CN107304631A (en) 2016-04-22 2016-04-22 The installation method and system of a kind of high-rise building large area cell cube curtain wall block

Country Status (1)

Country Link
CN (1) CN107304631A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106939660A (en) * 2017-02-08 2017-07-11 中国建筑第八工程局有限公司 Curtain wall positioning apparatus and its construction method
CN108483190A (en) * 2018-03-29 2018-09-04 中国建筑股份有限公司 A kind of intelligence aluminum alloy mould plate conveying device and its operating method
CN110329923A (en) * 2019-07-27 2019-10-15 重庆名威建筑幕墙工程有限公司 A kind of curtain wall construction method
CN111287353A (en) * 2020-02-14 2020-06-16 上海上安机械施工有限公司 Unit curtain wall hoisting process
CN116397899A (en) * 2023-04-24 2023-07-07 广东瑞昊建设有限公司 Curtain wall auxiliary installation equipment
CN117166812A (en) * 2023-11-03 2023-12-05 北京市第三建筑工程有限公司 Construction method for reforming protective structure of building curtain wall during tower crane limitation
CN117328590A (en) * 2023-11-08 2024-01-02 北京城建六建设集团有限公司 Unit body assembled curtain wall construction system and method for super high-rise building reconstruction

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2304735A1 (en) * 1975-03-17 1976-10-15 Bassi Roger Erecting outer building panels - using pulleys and rails to move panels vertically, then horizontally to correct positions at which panels attached to support links
GB8418963D0 (en) * 1983-07-29 1984-08-30 Yoshida Kogyo Kk Guide jib
CN101514586A (en) * 2009-01-14 2009-08-26 北京江河幕墙股份有限公司 Hanger rail type electric hanging boat and high-rise long span house, bridge building construction method and use thereof
CN201433079Y (en) * 2009-05-26 2010-03-31 中国建筑第八工程局有限公司 High-altitude inclined supporting wire lifting device for construction curtain wall
KR100954376B1 (en) * 2008-12-10 2010-04-26 강봉조 Lifting device
CN102257229A (en) * 2008-12-19 2011-11-23 布鲁克伯格工业发展公司 A method for mounting facade elements on a multi-storey building
CN102777048A (en) * 2012-06-06 2012-11-14 苏州金螳螂幕墙有限公司 Vertical transportation device
KR101303148B1 (en) * 2012-04-12 2013-09-09 현대알루미늄(주) Construction method for curtain wall
JP5595574B1 (en) * 2013-10-15 2014-09-24 勉 佐藤 Plate-shaped body transfer device
CN104295080A (en) * 2014-08-21 2015-01-21 重庆广建装饰股份有限公司 External wall hanging basket installing structure
CN104358336A (en) * 2014-11-10 2015-02-18 福建省九龙建设集团有限公司 Unit type curtain wall installation system and installation method thereof
CN104563528A (en) * 2014-12-22 2015-04-29 上海建工集团股份有限公司 Rapid in-place device and rapid in-place method for prefabricated wallboard of prefabricated building
CN204782016U (en) * 2015-07-03 2015-11-18 北京建工集团有限责任公司 Hoist and mount of curtain wall glass plate and conveyor
CN205077878U (en) * 2015-06-29 2016-03-09 中冶天工集团有限公司 Unit type curtain plate hoisting device

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2304735A1 (en) * 1975-03-17 1976-10-15 Bassi Roger Erecting outer building panels - using pulleys and rails to move panels vertically, then horizontally to correct positions at which panels attached to support links
GB8418963D0 (en) * 1983-07-29 1984-08-30 Yoshida Kogyo Kk Guide jib
KR100954376B1 (en) * 2008-12-10 2010-04-26 강봉조 Lifting device
CN102257229A (en) * 2008-12-19 2011-11-23 布鲁克伯格工业发展公司 A method for mounting facade elements on a multi-storey building
CN101514586A (en) * 2009-01-14 2009-08-26 北京江河幕墙股份有限公司 Hanger rail type electric hanging boat and high-rise long span house, bridge building construction method and use thereof
CN201433079Y (en) * 2009-05-26 2010-03-31 中国建筑第八工程局有限公司 High-altitude inclined supporting wire lifting device for construction curtain wall
KR101303148B1 (en) * 2012-04-12 2013-09-09 현대알루미늄(주) Construction method for curtain wall
CN102777048A (en) * 2012-06-06 2012-11-14 苏州金螳螂幕墙有限公司 Vertical transportation device
JP5595574B1 (en) * 2013-10-15 2014-09-24 勉 佐藤 Plate-shaped body transfer device
CN104295080A (en) * 2014-08-21 2015-01-21 重庆广建装饰股份有限公司 External wall hanging basket installing structure
CN104358336A (en) * 2014-11-10 2015-02-18 福建省九龙建设集团有限公司 Unit type curtain wall installation system and installation method thereof
CN104563528A (en) * 2014-12-22 2015-04-29 上海建工集团股份有限公司 Rapid in-place device and rapid in-place method for prefabricated wallboard of prefabricated building
CN205077878U (en) * 2015-06-29 2016-03-09 中冶天工集团有限公司 Unit type curtain plate hoisting device
CN204782016U (en) * 2015-07-03 2015-11-18 北京建工集团有限责任公司 Hoist and mount of curtain wall glass plate and conveyor

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106939660A (en) * 2017-02-08 2017-07-11 中国建筑第八工程局有限公司 Curtain wall positioning apparatus and its construction method
CN108483190A (en) * 2018-03-29 2018-09-04 中国建筑股份有限公司 A kind of intelligence aluminum alloy mould plate conveying device and its operating method
CN108483190B (en) * 2018-03-29 2023-11-28 中国建筑股份有限公司 Intelligent aluminum alloy template material conveying device and operation method thereof
CN110329923A (en) * 2019-07-27 2019-10-15 重庆名威建筑幕墙工程有限公司 A kind of curtain wall construction method
CN111287353A (en) * 2020-02-14 2020-06-16 上海上安机械施工有限公司 Unit curtain wall hoisting process
CN111287353B (en) * 2020-02-14 2021-04-13 上海上安机械施工有限公司 Unit curtain wall hoisting process
CN116397899A (en) * 2023-04-24 2023-07-07 广东瑞昊建设有限公司 Curtain wall auxiliary installation equipment
CN116397899B (en) * 2023-04-24 2023-11-21 广东瑞昊建设有限公司 Curtain wall auxiliary installation equipment
CN117166812A (en) * 2023-11-03 2023-12-05 北京市第三建筑工程有限公司 Construction method for reforming protective structure of building curtain wall during tower crane limitation
CN117166812B (en) * 2023-11-03 2024-04-12 北京市第三建筑工程有限公司 Construction method for reforming protective structure of building curtain wall during tower crane limitation
CN117328590A (en) * 2023-11-08 2024-01-02 北京城建六建设集团有限公司 Unit body assembled curtain wall construction system and method for super high-rise building reconstruction

Similar Documents

Publication Publication Date Title
CN107304631A (en) The installation method and system of a kind of high-rise building large area cell cube curtain wall block
CN103711301A (en) Construction method and device for two-track movable electric basket and lifting hoist
CN201276399Y (en) Apparatus hoisting mechanism for tall building floor non-steel platform
CN102777048A (en) Vertical transportation device
CN104818858A (en) Indoor heavy electric cabinet lifting method
CN205688820U (en) A kind of installation system of high-rise building large area cell cube curtain wall block
CN204022201U (en) A kind of weight-lifting equipment for vertical transport
CN107060474A (en) A kind of sleeve-type chimney people goods shunting vertical transferring apparatus and construction method
CN104153586A (en) Construction method for installing purline through suspension cable cranes
CN104444977B (en) Adjustable vertical material transporting cableway system and construction method thereof
CN109763638A (en) A kind of high-altitude overhanging facade special type working vehicle and its construction method
CN206346500U (en) Compact simplified arm extending type straddle truck
CN107190991A (en) The special-shaped curtain wall vertical lifting system of glass plate
CN206693641U (en) The irregular alien invasion glass curtain wall positioning apparatus of high-rise building
CN110593582A (en) High-rise curtain wall installation auxiliary assembly with safety facility
CN207374992U (en) The accumulating stent of concrete plate-type component
CN202208696U (en) Construction platform used for dry quenching furnace
CN214329956U (en) Ring rail hoisting device for curtain wall installation
CN204897102U (en) Electronic cat ladder of instrument formula
CN105152034B (en) For the cableway Lift-on/Lift-off System of pitched roof curtain wall
CN106121254A (en) Heavy component transportation system after disassembly by reverse construction method and construction method
CN104528506B (en) Mine hoist and unhooking test method thereof
CN210029781U (en) Anti-shaking device for hoisting
CN207658895U (en) Working at height glass hanging equipment
CN105781610A (en) Safety cabin for manual hole digging operation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20171031

WW01 Invention patent application withdrawn after publication