CN117328590A
CN117328590A CN202311480260.9A CN202311480260A CN117328590A CN 117328590 A CN117328590 A CN 117328590A CN 202311480260 A CN202311480260 A CN 202311480260A CN 117328590 A CN117328590 A CN 117328590A
Authority
CN
China
Prior art keywords
curtain wall
unit body
inverted
body module
wall unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202311480260.9A
Other languages
Chinese (zh)
Inventor
孙玉厚
王俊杰
许建
高文光
李国强
兰斐
张俊清
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Urban Construction Sixth Group Co Ltd
Original Assignee
Beijing Urban Construction Sixth Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Urban Construction Sixth Group Co Ltd filed Critical Beijing Urban Construction Sixth Group Co Ltd
Priority to CN202311480260.9A priority Critical patent/CN117328590A/en
Publication of CN117328590A publication Critical patent/CN117328590A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/88Curtain walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/41Connecting devices specially adapted for embedding in concrete or masonry
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work

Abstract

The invention discloses a unit body assembly type curtain wall construction system for super high-rise building reconstruction, which is divided into a plurality of vertical installation unit areas by taking the width of a curtain wall unit body module as a unit along the outer wall of a building seat, wherein each vertical installation unit area comprises: the embedded assemblies comprise embedded plates, the inner ends of the embedded plates are fixed at the top of the concrete beam at the installation position of each curtain wall unit body module, the outer ends of the embedded plates extend out of the structural wall body, and the outer ends of the embedded plates are provided with hanging parts; the curtain wall unit body module comprises a main keel, wherein an inverted U-shaped hanging piece is fixedly connected to the inner side of the upper part of the main keel, the inverted U-shaped hanging piece is hung on a hanging part of the embedded plate, a U-shaped clamping groove is formed in the upper end of the main keel, and a clamping block is arranged at the lower end of the main keel; the hoisting system comprises a tripod guide rail hoisting device and a hoisting tool, and the curtain wall unit body module is hoisted to an installation working surface by using the tripod guide rail hoisting device.

Description

Unit body assembled curtain wall construction system and method for super high-rise building reconstruction
Technical Field
The invention relates to the technical field of existing building reconstruction construction, in particular to a unit body assembly type curtain wall construction system and method for super high-rise building reconstruction.
Background
Along with development of super high-rise buildings, curtain wall structures are more and more widely applied to building outer walls, and visual effects of curtain walls often depend on installation modes of the curtain walls, and the curtain walls are provided with exposed frames, hidden frames, suction disc fixing and bracket fixing. However, in recent years, with the development of the assembled structure, the assembled curtain wall of the unit body plate is also silently rising, and how to mount a unit body curtain wall plate, which not only reduces the cost, but also ensures the quality and the quality, is a construction difficulty currently faced.
Firstly, how the curtain wall unit block is installed in an assembled mode, and how the firmness and the tightness after installation are solved. Secondly, the unit curtain wall block body weight is larger, the construction requirement can not be basically met by adopting a common vertical transport means, if the construction of a tower crane is adopted, the unit curtain wall block body at each part can not be well hoisted in place due to the influence of the vertical angle of the tower crane, certain safety risks exist during installation, and the safety and quality during construction can not be guaranteed. If an outdoor lifter is adopted, the curtain wall unit body plate has a large volume, cannot enter a transportation car, and is difficult to reach a mounting surface even if entering the box, so that the mounting operation is very difficult.
Disclosure of Invention
The invention aims to provide a unit body assembly type curtain wall construction system and method for super high-rise building reconstruction, which are used for solving the problems in the background art.
In order to achieve the above object, the present invention provides a unit body assembly type curtain wall construction system for super high-rise building reconstruction, the unit body assembly type curtain wall construction system dividing a curtain wall unit body module width into a plurality of vertical installation unit areas along a floor outer wall, each vertical installation unit area comprising:
the embedded assemblies are arranged on the installation positions of the curtain wall unit body modules along the vertical direction, each embedded assembly comprises an embedded plate, the inner ends of the embedded plates are fixed at the top of the concrete beam at the installation position of each curtain wall unit body module, the outer ends of the embedded plates extend out of the structural wall body, and the outer ends of the embedded plates are provided with hanging parts;
the curtain wall unit body module comprises a main keel, wherein an inverted U-shaped hanging piece is fixedly connected to the inner side of the upper part of the main keel, the inverted U-shaped hanging piece is hung on a hanging part of the embedded plate, a U-shaped clamping groove is formed in the upper end of the main keel, and a clamping block used for being connected with the U-shaped clamping groove in a plug-in mode is arranged at the lower end of the main keel;
the lifting system comprises a tripod guide rail lifting device and a lifting appliance, wherein the tripod guide rail lifting device is fixedly arranged on a structural wall body at the top of a vertical installation unit area, the lifting appliance is connected with a U-shaped clamping groove of the curtain wall unit module, and the tripod guide rail lifting device is used for lifting the curtain wall unit module to an installation operation surface.
In a preferred embodiment, the embedded plate comprises three vertical ribbed plates and two transverse steel plates, wherein the three vertical ribbed plates are uniformly arranged at intervals, the two transverse steel plates are arranged between the bottoms of the three vertical ribbed plates, the two transverse steel plates are attached to the top of the concrete beam, the rear end of each transverse steel plate is provided with a vertical bolt hole and fixedly connected with an embedded bolt of the concrete beam, the front ends of the three vertical ribbed plates are correspondingly provided with horizontal bolt holes, stainless steel screws are arranged in the horizontal bolt holes in a penetrating mode, and the stainless steel screws are used for hanging curtain wall unit body modules.
In a preferred embodiment, the height dimension of the outer side part of the vertical rib plate extending out of the structural wall body is larger than the height dimension of the part of the vertical rib plate positioned at the top of the concrete beam, and the vertical bolt holes and the horizontal bolt holes are long waist holes.
In a preferred embodiment, the clamping groove is located at a position, close to the inner side, of the top of the main keel, the lower end of the main keel is provided with a groove, one side of the groove is provided with a clamping block, when the clamping block of the curtain wall unit module located above is inserted into the clamping groove of the curtain wall unit module located below, the clamping groove wall located outside is inserted into the groove, sealing rubber strips are filled between the clamping groove wall located outside and the inner wall of the groove, and the rubber strips extend outwards between the contact surfaces of the two curtain wall unit modules.
In a preferred embodiment, the inverted U-shaped hanging piece comprises a connecting portion and an inverted U-shaped hanging portion, the connecting portion is fixedly connected with the side face of the main keel through a mechanical bolt, and the top of the inverted U-shaped hanging portion is provided with a height adjusting screw for adjusting the installation elevation of the curtain wall unit body module.
In a preferred embodiment, glass is installed on the outer side of the main keel, the left side and the right side of the main keel are respectively a sub-opening end of the unit plate and a female opening end of the unit plate, the sub-opening is inserted into the female opening groove during installation, and sealing rubber strips are arranged at the outer edges of the female opening ends of the unit plate.
In a preferred embodiment, the hoist includes the T type pendant that falls and falls U type buckle closure, two draw-in groove wall tops of draw-in groove have the U type bending groove that inwards sets up, the horizontal part both ends of T type pendant that falls are provided with the convex part, during the hoist and mount, the T type pendant that falls is placed in the inside of draw-in groove, and the U type bending groove hangs on the convex part, the U type buckle closure detains and establishes in T type pendant top that falls, and two vertical portions of T type pendant that fall are located the outside of draw-in groove, the U type buckle closure that falls is fixed through high strength mechanical bolt with T type pendant that falls, the wire rope is connected through rings to the vertical portion upper end of T type pendant that falls.
In a preferred embodiment, the tripod guide rail lifting device comprises a tripod which is vertically arranged with the structural wall body, vertical angle steel of the tripod is fixedly connected with the structural wall body through a wall penetrating screw rod, two groups of first steel plates are welded at the bottom of horizontal angle steel at the bottom of the tripod guide rail lifting device, second steel plates are arranged at the bottoms of the first steel plates and are connected with the horizontal angle steel through opposite-pull bolts, two guide rails with the same length are welded at the bottoms of the second steel plates, electric hoist systems are respectively arranged at the lower parts of the two guide rails, a set of electric hoist system connecting lifting tool close to the structural wall body is arranged, and a set of electric hoist system connecting lifting basket far away from the structural wall body is arranged.
The invention also provides a construction method of the unit body assembled curtain wall for the super high-rise building reconstruction, which comprises the following steps:
s1, dividing the building into a plurality of vertical installation unit areas by taking the width of a curtain wall unit body module as a unit along the outer wall of a building;
s2, fixedly arranging a tripod guide rail lifting device on a structural wall body at the top of each vertical installation unit area;
s3, arranging a plurality of embedded assemblies on the installation positions of the curtain wall unit body modules along the vertical direction, fixing the inner ends of the embedded plates on the top of the concrete beam at the installation position of each curtain wall unit body module, and extending the hanging parts at the outer ends of the embedded plates to the outer sides of the structural walls;
s4, connecting a lifting appliance with the curtain wall unit body module, lifting the curtain wall unit body module to an installation position by using a tripod guide rail lifting device, and conveying the curtain wall unit body module to an installation operation surface by using a guide rail to assemble the curtain wall unit body module, wherein an inverted U-shaped hanging piece of the curtain wall unit body module positioned above is hung on a hanging part at the outer end of a pre-buried plate, and a clamping block at the lower end of a main keel of the curtain wall unit body module positioned above is inserted into a U-shaped clamping groove at the upper end of the main keel of the curtain wall unit body module positioned below;
s5, after the hanging and assembling of each curtain wall unit body module are sequentially completed in each vertical installation unit area from the lower part to the upper part, hanging and assembling of the curtain wall unit body modules in the adjacent vertical installation unit areas are carried out.
In a preferred embodiment, when the upper curtain wall unit body module and the lower curtain wall unit body module are assembled in each vertical installation unit area, the clamping groove wall of the clamping groove of the lower curtain wall unit body module, which is positioned at the outer side, is inserted into the groove of the upper curtain wall unit body module, sealing rubber strips are filled between the clamping groove wall positioned at the outer side and the inner wall of the groove, and the rubber strips extend outwards between the contact surfaces of the upper curtain wall unit body module and the lower curtain wall unit body module;
when assembling curtain wall unit body modules in adjacent vertical installation unit areas, the child openings of the child opening ends of the unit plates are inserted into the female opening grooves of the female opening ends of the unit plates, and sealing rubber strips are arranged at the outer edges of the female opening ends of the unit plates;
when the curtain wall unit body module is hoisted, the inverted-T-shaped hanging piece of the lifting appliance is placed inside the clamping groove, the U-shaped bending groove at the top of the clamping groove wall is hung on the convex parts at the two ends of the horizontal part of the inverted-T-shaped hanging piece, the inverted-U-shaped buckling cover is buckled above the inverted-T-shaped hanging piece, the two vertical parts of the inverted-T-shaped hanging piece are located on the outer sides of the clamping groove, the inverted-U-shaped buckling cover is fixed with the inverted-T-shaped hanging piece through high-strength mechanical bolts, the upper end of the vertical part of the inverted-T-shaped hanging piece is connected with a steel wire rope through a hanging ring, and the steel wire rope is connected with a set of electric hoist system close to the structural wall body.
Compared with the prior art, the invention has the following beneficial effects:
according to the characteristics that the super high-rise building is reformed, the existing equipment exists on the roof and the working face and the space for supporting the hanging basket cannot be provided, and the curtain wall unit blocks are heavy, the curtain wall unit block is divided into a plurality of vertical installation unit areas by taking the width of the curtain wall unit block as a unit along the outer wall of the building, and the curtain wall unit block is assembled in sequence for each vertical installation unit area. The curtain wall unit block adopts an upper hanging and lower supporting assembly technology, the embedded assembly is arranged on the installation position of the curtain wall unit block in advance, the U-shaped clamping groove and the inverted U-shaped hanging piece are arranged on the main keel of the curtain wall unit block, the upper end of the curtain wall unit block is hung on the embedded assembly through the inverted U-shaped hanging piece, and the lower end of the upper curtain wall unit block is supported through the U-shaped clamping groove of the lower curtain wall unit block, so that the firmness after assembly is ensured. Meanwhile, sealing rubber strips are filled between the groove walls and the inner walls of the grooves, which are positioned on the outer sides, in the upper curtain wall unit body modules, and extend outwards between the contact surfaces of the upper curtain wall unit body module and the lower curtain wall unit body module, so that the sealing problem of the upper curtain wall unit body module and the lower curtain wall unit body module is effectively solved.
The tripod guide rail lifting device is arranged on the roof to hoist the curtain wall unit blocks to the installation position, and the guide rail is horizontally conveyed to the installation working surface, so that the assembly type curtain wall construction can be completed safely and efficiently.
Drawings
FIG. 1 is a schematic view of a pre-buried assembly of the present invention;
FIG. 2 is a plan view of the completion of the installation of the embedment of the present invention;
FIG. 3 is an elevational cross-sectional view of the present invention with the embedment installed;
FIG. 4 is a vertical cross-sectional view of a curtain wall unit module of the present invention;
FIG. 5 is an enlarged schematic view of FIG. 4 at A;
FIG. 6 is a top view of a curtain wall unit module of the present invention;
FIG. 7 is a schematic view of the attachment of a hanger to a curtain wall unit module of the present invention;
FIG. 8 is a schematic view of the structure of the spreader of the present invention;
FIG. 9 is a schematic view of a curtain wall unit module and embedded assembly of the present invention;
FIG. 10 is a schematic view of two adjacent curtain wall unit modules after installation;
FIG. 11 is an enlarged schematic view at B in FIG. 10;
FIG. 12 is a schematic view of the assembly of two adjacent curtain wall unit modules in the left and right direction of the present invention;
FIG. 13 is a schematic view of the overall structure of the hoisting system of the present invention;
fig. 14 is a schematic view of a tripod rail jack apparatus (electric hoist system not shown) of the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below. Embodiments of the present invention are intended to be within the scope of the present invention as defined by the appended claims.
Example 1
According to the characteristics that the super high-rise building is reformed, the existing equipment exists on the roof and the working face and the space for supporting the hanging basket cannot be provided, and the curtain wall unit blocks are heavy, the curtain wall unit block is divided into a plurality of vertical installation unit areas by taking the width of the curtain wall unit block as a unit along the outer wall of the building, and the curtain wall unit block is assembled in sequence for each vertical installation unit area.
As shown in fig. 1 to 14, each vertically installed unit area of the unit body assembled curtain wall construction system for the transformation of super high-rise buildings of the present invention includes: a plurality of pre-buried assemblies 1, curtain wall unit body modules 2 and a hoisting system.
The plurality of embedded assemblies 1 are arranged on the installation position of the curtain wall unit body modules along the vertical direction, each embedded assembly comprises an embedded plate 11, the inner ends of the embedded plates 11 are fixed at the top of the concrete beam 10 of each installation position of the curtain wall unit body module, the outer ends of the embedded plates 11 extend out of the structural wall body, and the outer ends of the embedded plates 11 are provided with hanging parts.
Further, the embedded plate 11 comprises three vertical rib plates 111 and two transverse steel plates 112, the three vertical rib plates 111 are uniformly arranged at intervals, the two transverse steel plates 112 are arranged between the bottoms of the three vertical rib plates 111, and the steel materials are galvanized steel materials through assembly welding connection. Two horizontal steel plates 112 are attached to the top of the concrete beam 10, vertical bolt holes 113 are formed in the rear ends of the horizontal steel plates 112 and are fixedly connected with the embedded bolts 101 of the concrete beam 10, and the positions of the two horizontal steel plates can be adjusted through the vertical bolt holes 113. Horizontal bolt holes 114 are correspondingly formed in the front ends of the three vertical rib plates 111, phi 16 stainless steel screws 115 are arranged in the horizontal bolt holes 114 in a penetrating mode, and the stainless steel screws 115 are used for hanging the curtain wall unit body modules 2.
Further, the height dimension of the part of the vertical rib plate 111 extending out of the outer side of the structural wall body is larger than the height dimension of the part of the vertical rib plate 111 located at the top of the concrete beam, and the vertical bolt holes 113 and the horizontal bolt holes 114 are long waist holes, so that position adjustment is facilitated.
In this embodiment, the number of curtain wall unit modules 2 corresponds to the number of embedded assemblies 1 one by one, so as to ensure that after the curtain wall unit modules are assembled, the curtain wall unit modules are safe and firm and have no leakage phenomenon, and detailed node design needs to be performed at the upper end, the lower end, the left side and the right side of the curtain wall unit modules:
specifically, the curtain wall unit body module 2 comprises a main keel 21, an inverted U-shaped hanging piece 22 is fixedly connected to the inner side of the upper portion of the main keel 21, the inverted U-shaped hanging piece 22 is hung on the hanging portion of the embedded plate 11, a U-shaped clamping groove 211 is formed in the upper end of the main keel 21, and a clamping block 212 used for being connected with the U-shaped clamping groove 211 in a plug-in connection mode is arranged at the lower end of the main keel 21.
Further, the clamping groove 211 is located at the position, close to the inner side, of the top of the main keel 21, a groove 213 is formed in the lower end of the main keel 21, a clamping block 212 is formed on one side of the groove 213, when the clamping block 212 of the curtain wall unit module 2 located above is inserted into the clamping groove 211 of the curtain wall unit module 2 located below, the clamping groove wall located outside is inserted into the groove 213, sealing rubber strips 214 are filled between the clamping groove wall located outside and the inner wall of the groove 213, extend outwards to the position between the contact surfaces of the upper curtain wall unit module 2 and the lower curtain wall unit module 2, and are directly pressed through the main keel of the curtain wall unit module located above, so that the sealing performance of the curtain wall is effectively guaranteed.
Further, a water tank is arranged at the joint part of the main keels of the upper and lower adjacent curtain wall unit body modules, and the water tank and the main keels are glued to prevent water from flowing into a room from a gap between the two keels.
Further, the inverted U-shaped hanging member 22 comprises a connecting portion 221 and an inverted U-shaped hanging portion 220, the connecting portion 221 is fixedly connected with the side face of the main joist 21 through three mechanical bolts 222, and the distance between the mechanical bolts 222 is 60mm and the distance between the mechanical bolts and the edge of the main joist is 40mm. The top of the inverted U-shaped hitching section 220 is provided with a height adjusting screw 223 for adjusting the installation elevation of the curtain wall unit body module 2.
Further, glass 23 is installed in the outside of main joist 21, and the left and right sides of main joist 21 is unit plate sub-mouth end 224 and unit plate female mouth end 225 respectively, and the sub-mouth inserts in female mouthful groove during the installation, and unit plate female mouth end 225 outer fringe department is provided with 25mm wide sealing rubber strip 214, and after two curtain unit body modules were installed in place, sealing rubber strip 214 reached sealed effect through the extrusion.
In this embodiment, the hoisting system includes a tripod guide rail hoisting device and a hoist 4, where the tripod guide rail hoisting device is fixedly disposed on a structural wall 6 at the top of the vertical installation unit region, and the hoist 4 is connected with a U-shaped clamping groove 211 of the curtain wall unit module 2, and the curtain wall unit module 2 is hoisted to the installation working surface by using the tripod guide rail hoisting device.
Example 2
In the assembly process of the curtain wall unit body modules, the hoisting safety is ensured to be the important control point in the construction process, and as each curtain wall unit body module weighs 1-2 tons, the heavy component is hoisted in the air in a moving way, and the lifting hook does not slip, so that the important control link for ensuring the safety is realized. Based on this, in combination with the engineering practical situation, the lifting appliance 4 of the present embodiment includes an inverted T-shaped hanging member 41 and an inverted U-shaped buckle cover 42, and the two slot wall tops of the slot 211 have an inwardly disposed U-shaped bending slot 231. The horizontal portion of the inverted T-shaped hanger 41 is provided with protruding portions 411 at both ends. During hoisting, the inverted T-shaped hanging piece 41 penetrates through the clamping groove 211 of the curtain wall unit block, the U-shaped bending groove 231 is hung on the convex portion 411, the inverted U-shaped buckle cover 42 is buckled above the inverted T-shaped hanging piece 41, two vertical portions of the inverted T-shaped hanging piece 41 are located on the outer side of the clamping groove 211, and the inverted U-shaped buckle cover 42 and the inverted T-shaped hanging piece 41 are connected into a whole through two phi 20 high-strength mechanical bolts 45, so that the lifting appliance is prevented from slipping. The end of the hanging piece is provided with phi 35 bolt holes, hanging rings 43 can be installed in the bolt holes, and the upper end of the vertical part of the inverted T-shaped hanging piece 41 is connected with a steel wire rope 44 through the hanging rings 43.
Further, the tripod guide rail lifting device comprises a tripod 31 which is perpendicular to the structural wall body 6, vertical angle steel 311 of the tripod 31 is fixedly connected with the structural wall body 6 through a wall penetrating screw rod 7, two groups of first steel plates 313 are welded at the bottom of horizontal angle steel 312 at the bottom of the tripod guide rail lifting device, second steel plates 315 are arranged at the bottom of the first steel plates 313, and the second steel plates 315 are connected with the horizontal angle steel 312 through opposite-pull bolts 314. Two guide rails 316 with the same length are welded at the bottom of the second steel plate 315, electric hoist systems 317 are respectively installed at the lower parts of the two guide rails 316, one set of electric hoist system close to the structural wall body 6 is connected with the lifting appliance 4, and the other set of electric hoist system far away from the structural wall body 6 is connected with the hanging basket 8.
In a specific embodiment, the tripod is welded and assembled on the ground before installation, the tripod is formed by welding horizontal angle steel 312 and oblique angle steel 318 of vertical angle steel 311 with the length of L200 being 10 and horizontal angle steel 312 with the length of L180 being 10, and the horizontal angle steel 312 and the oblique angle steel 318 are welded and connected through oblique thin angle steel 319 with the length of L140 being 10. After the tripod is welded, 280 x 12mm first steel plates 313 are welded at the bottom of the tripod, phi 18 split bolts are used for fixing second steel plates 315 on horizontal angle steels 312 at the lower part of the tripod, and 18# I-steel with the length being equal to the length is welded on the second steel plates 315 to serve as guide rails 316.
Example 3
The invention also provides a construction method of the unit body assembled curtain wall for the super high-rise building reconstruction, which comprises the following steps:
s1, dividing the building into a plurality of vertical installation unit areas by taking the width of a curtain wall unit body module as a unit along the outer wall of a building.
And S2, fixedly arranging the tripod guide rail lifting device on the structural wall 6 at the top of each vertical installation unit area.
Step S3, arranging a plurality of embedded assemblies 1 on the installation positions of curtain wall unit body modules along the vertical direction, fixing the inner ends of the embedded plates 11 on the top of the concrete beam 10 at the installation position of each curtain wall unit body module, and extending the hanging parts at the outer ends of the embedded plates 11 to the outer sides of the structural walls.
Step S4, the lifting appliance 4 is connected with the curtain wall unit body module 2, the curtain wall unit body module 2 is lifted to the installation position by utilizing the tripod guide rail lifting device, and then the curtain wall unit body module is assembled by conveying to the installation working surface by utilizing the guide rail 316, wherein the inverted U-shaped hanging piece 22 of the curtain wall unit body module 2 positioned above is hung on the hanging part at the outer end of the embedded plate 11, and the clamping block 212 at the lower end of the main keel of the curtain wall unit body module 2 positioned above is inserted into the U-shaped clamping groove 211 at the upper end of the main keel of the curtain wall unit body module 2 positioned below.
And S5, after the hanging and assembling of each curtain wall unit module 2 are sequentially completed in each vertical installation unit area from the lower part to the upper part, hanging and assembling of curtain wall unit modules in adjacent vertical installation unit areas are carried out.
Further, when the curtain wall unit modules 2 above and below in each vertical installation unit area are assembled, the slot wall on the outer side of the slot 211 of the curtain wall unit module below is inserted into the slot 213 of the curtain wall unit module above, sealing rubber strips are filled between the slot wall on the outer side and the inner wall of the slot 213, and the rubber strips extend outwards between the contact surfaces of the two curtain wall unit modules 2.
When the curtain wall unit body modules are assembled in the adjacent vertical installation unit areas, the child openings of the child opening ends 224 of the unit plates are inserted into the female opening grooves of the female opening ends 225 of the unit plates, and sealing rubber strips 214 with the width of 25mm are arranged at the outer edges of the female opening ends 225 of the unit plates.
When the curtain wall unit body module is hoisted, the inverted-T-shaped hanging piece 41 of the lifting appliance 4 is placed inside the clamping groove 211, the U-shaped bending groove 231 at the top of the clamping groove wall is hung on the convex parts 411 at the two ends of the horizontal part of the inverted-T-shaped hanging piece 41, the inverted-U-shaped buckling cover 42 is buckled and arranged above the inverted-T-shaped hanging piece 41, two vertical parts of the inverted-T-shaped hanging piece 41 are located on the outer side of the clamping groove 211, the inverted-U-shaped buckling cover 42 and the inverted-T-shaped hanging piece 41 are fixed through the high-strength mechanical bolts 45, bolt holes 412 are formed in the upper ends of the vertical parts of the inverted-T-shaped hanging piece 41, the steel wire ropes 44 are connected through the hanging rings 43, and the steel wire ropes 44 are connected with a set of electric hoist system close to the structural wall 6.
Although embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (10)

1. A unit body assembled curtain construction system for super high-rise building transformation, its characterized in that: the utility model provides a curtain construction system is assembled to cell body uses curtain cell body module width as the unit along the building outer wall, divides into a plurality of vertical installation unit areas, and every vertical installation unit area includes:
the embedded assembly (1) is arranged on the installation position of the curtain wall unit body module along the vertical direction, the embedded assembly comprises embedded plates (11), the inner ends of the embedded plates (11) are fixed on the top of the concrete beam (10) at the installation position of each curtain wall unit body module, the outer ends of the embedded plates (11) extend to the outer side of the structural wall body, and the outer ends of the embedded plates (11) are provided with hanging parts;
the curtain wall unit body module (2), the curtain wall unit body module (2) comprises a main keel (21), an inverted U-shaped hanging piece (22) is fixedly connected to the inner side of the upper portion of the main keel (21), the inverted U-shaped hanging piece (22) is hung on the hanging portion of the embedded plate (11), a U-shaped clamping groove (211) is formed in the upper end of the main keel (21), and a clamping block (212) used for being connected with the U-shaped clamping groove (211) in an inserting mode is arranged at the lower end of the main keel (21);
the lifting system comprises a tripod guide rail lifting device and a lifting appliance (4), wherein the tripod guide rail lifting device is fixedly arranged on a structural wall body (6) at the top of a vertical installation unit area, the lifting appliance (4) is connected with a U-shaped clamping groove (211) of a curtain wall unit body module (2), and the tripod guide rail lifting device is used for lifting the curtain wall unit body module (2) to an installation operation surface.
2. The unitized curtain wall construction system for super high rise building reconstruction of claim 1, wherein: the embedded plate (11) comprises three vertical rib plates (111) and two transverse steel plates (112), wherein the three vertical rib plates (111) are uniformly arranged at intervals, the two transverse steel plates (112) are arranged between the bottoms of the three vertical rib plates (111), the two transverse steel plates (112) are attached to the top of the concrete beam (10), vertical bolt holes (113) are formed in the rear end of the transverse steel plates (112) and are used for being fixedly connected with embedded bolts (101) of the concrete beam (10), the three transverse rib plates (111) are correspondingly provided with horizontal bolt holes (114), stainless steel screw rods (115) are arranged in the horizontal bolt holes (114) in a penetrating mode, and the stainless steel screw rods (115) are used for hanging curtain wall unit modules (2).
3. The unitized curtain wall construction system for super high-rise building reconstruction of claim 2, wherein: the height dimension of the outer side part of the vertical rib plate (111) extending out of the structural wall body is larger than the height dimension of the part of the vertical rib plate (111) positioned at the top of the concrete beam, and the vertical bolt holes (113) and the horizontal bolt holes (114) are long waist holes.
4. The unitized curtain wall construction system for super high rise building reconstruction of claim 1, wherein: the clamping groove (211) is located at the position, close to the inner side, of the top of the main keel (21), a groove (213) is formed in the lower end of the main keel (21), one side of the groove (213) is provided with the clamping block (212), when the clamping block (212) of the curtain wall unit body module (2) located above is inserted into the clamping groove (211) of the curtain wall unit body module (2) located below, the clamping groove wall located outside is inserted into the groove (213), sealing rubber strips (214) are filled between the clamping groove wall located outside and the inner wall of the groove (213), and the sealing rubber strips outwards extend between contact surfaces of the two curtain wall unit body modules (2).
5. The unitized curtain wall construction system for super high rise building reconstruction of claim 4, wherein: the inverted U-shaped hanging piece (22) comprises a connecting portion (221) and an inverted U-shaped hanging portion (220), the connecting portion (221) is fixedly connected with the side face of the main keel (21) through a mechanical bolt (222), and the top of the inverted U-shaped hanging portion (220) is provided with a height adjusting screw (223) for adjusting the installation elevation of the curtain wall unit body module (2).
6. The unitized curtain wall construction system for super high rise building reconstruction of claim 5, wherein: glass (23) is installed in the outside of main joist (21), the left and right sides of main joist (21) is unit plate child mouth end (224) and unit plate female mouth end (225) respectively, and child mouth inserts in female mouthful groove during the installation, and unit plate female mouth end (225) outer fringe department is provided with sealing rubber strip (214).
7. The unitized curtain wall construction system for super high rise building reconstruction of claim 6, wherein: the lifting appliance (4) comprises an inverted T-shaped hanging part (41) and an inverted U-shaped buckle cover (42), the tops of two clamping groove walls of the clamping groove (211) are provided with inwards arranged U-shaped bending grooves (231), two ends of the horizontal part of the inverted T-shaped hanging part (41) are provided with protruding parts (411), during lifting, the inverted T-shaped hanging part (41) is placed in the clamping groove (211), the U-shaped bending grooves (231) are hung on the protruding parts (411), the inverted U-shaped buckle cover (42) is buckled and arranged above the inverted T-shaped hanging part (41), two vertical parts of the inverted T-shaped hanging part (41) are located outside the clamping groove (211), the inverted U-shaped buckle cover (42) and the inverted T-shaped hanging part (41) are fixed through high-strength mechanical bolts (45), and the upper ends of the vertical parts of the inverted T-shaped hanging part (41) are connected with steel wire ropes (44) through lifting rings (43).
8. The unitized curtain wall construction system for super high rise building reconstruction of claim 7, wherein: tripod guide rail hoisting accessory includes tripod (31) with structure wall body (6) perpendicular setting, vertical angle steel (311) of tripod (31) are through wearing wall screw rod (7) and structure wall body (6) fixed connection, two sets of first steel sheet (313) are welded to horizontal angle steel (312) bottom of tripod guide rail hoisting accessory bottom, the bottom of first steel sheet (313) is provided with second steel sheet (315), second steel sheet (315) are connected with horizontal angle steel (312) through opposite pull bolt (314), and second steel sheet (315) bottom welding has twice logical long guide rail (316), and electric hoist system (317) are installed respectively to the lower part of twice guide rail (316), are close to one set of electric hoist system connection hoist (4) of structure wall body (6), keep away from one set of electric hoist system connection hanging flower basket (8) of structure wall body (6).
9. The construction method of the unit body assembled curtain wall for the super high-rise building transformation is characterized by comprising the following steps of:
s1, dividing the building into a plurality of vertical installation unit areas by taking the width of a curtain wall unit body module as a unit along the outer wall of a building;
s2, fixedly arranging a tripod guide rail lifting device on a structural wall (6) at the top of each vertical installation unit area;
s3, arranging a plurality of embedded assemblies (1) on the installation positions of curtain wall unit body modules along the vertical direction, fixing the inner ends of the embedded plates (11) on the tops of the concrete beams (10) at the installation positions of each curtain wall unit body module, and enabling the hanging parts at the outer ends of the embedded plates (11) to extend out of the structural wall body;
s4, connecting the lifting appliance (4) with the curtain wall unit body module (2), lifting the curtain wall unit body module (2) to an installation position by utilizing a tripod guide rail lifting device, and conveying the curtain wall unit body module to an installation operation surface by utilizing a guide rail (316) to assemble the curtain wall unit body module, wherein an inverted U-shaped hanging piece (22) of the curtain wall unit body module (2) positioned above is hung on a hanging part at the outer end of the embedded plate (11), and a clamping block (212) at the lower end of a main keel of the curtain wall unit body module (2) positioned above is inserted into a U-shaped clamping groove (211) at the upper end of a main keel of the curtain wall unit body module (2) positioned below;
s5, after the hanging and assembling of each curtain wall unit body module (2) are sequentially completed from the lower part to the upper part in each vertical installation unit area, hanging and assembling of the curtain wall unit body modules in the adjacent vertical installation unit areas are carried out.
10. The method for constructing a modular curtain wall for use in ultra-high-rise building reconstruction of claim 9, wherein,
when the upper curtain wall unit body module (2) and the lower curtain wall unit body module (2) in each vertical installation unit area are assembled, the clamping groove wall (211) of the lower curtain wall unit body module positioned at the outer side is inserted into the groove (213) of the upper curtain wall unit body module, sealing rubber strips are filled between the clamping groove wall positioned at the outer side and the inner wall of the groove (213), and the sealing rubber strips extend outwards between the contact surfaces of the upper curtain wall unit body module and the lower curtain wall unit body module (2);
when assembling curtain wall unit body modules in adjacent vertical installation unit areas, sub-openings of sub-opening ends (224) of unit plates are inserted into a female opening groove of a female opening end (225) of the unit plates, and sealing rubber strips (214) are arranged at the outer edges of the female opening ends (225) of the unit plates;
when the curtain wall unit body module is hoisted, the inverted-T-shaped hanging piece (41) of the lifting tool (4) is placed inside the clamping groove (211), the U-shaped bending groove (231) at the top of the clamping groove wall is hung on the convex parts (411) at the two ends of the horizontal part of the inverted-T-shaped hanging piece (41), the inverted-U-shaped buckling cover (42) is buckled and arranged above the inverted-T-shaped hanging piece (41), two vertical parts of the inverted-T-shaped hanging piece (41) are located at the outer sides of the clamping groove (211), the inverted-U-shaped buckling cover (42) and the inverted-T-shaped hanging piece (41) are fixed through high-strength mechanical bolts (45), the upper end of the vertical part of the inverted-T-shaped hanging piece (41) is connected with a set of electric hoist system close to the structural wall body (6) through the hanging ring (43).
CN202311480260.9A 2023-11-08 2023-11-08 Unit body assembled curtain wall construction system and method for super high-rise building reconstruction Pending CN117328590A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202311480260.9A CN117328590A (en) 2023-11-08 2023-11-08 Unit body assembled curtain wall construction system and method for super high-rise building reconstruction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202311480260.9A CN117328590A (en) 2023-11-08 2023-11-08 Unit body assembled curtain wall construction system and method for super high-rise building reconstruction

Publications (1)

Publication Number Publication Date
CN117328590A true CN117328590A (en) 2024-01-02

Family

ID=89283093

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202311480260.9A Pending CN117328590A (en) 2023-11-08 2023-11-08 Unit body assembled curtain wall construction system and method for super high-rise building reconstruction

Country Status (1)

Country Link
CN (1) CN117328590A (en)

Citations (30)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006022509A (en) * 2004-07-06 2006-01-26 Ykk Ap Inc Curtain wall and its mounting method
KR100984339B1 (en) * 2010-05-04 2010-09-30 나태용 Variable geometry curtain wall fastner
JP2010275838A (en) * 2009-06-01 2010-12-09 Takenaka Komuten Co Ltd Method and mounting fastener for attaching pc board to existing exterior wall
CN202284390U (en) * 2011-09-19 2012-06-27 沈阳远大铝业工程有限公司 Hoisting machine tools for curtain wall unit plate
CN202299005U (en) * 2011-09-09 2012-07-04 沈阳远大铝业工程有限公司 Aluminum unit rotationally connecting component
US20150110581A1 (en) * 2013-10-23 2015-04-23 Shanghai YeSheng Mechanical & Electrical Control Technology Co., LTD Apparatus and method for lifting and sliding a structure attached to the wall
CN204703534U (en) * 2015-05-27 2015-10-14 中建三局(厦门)建设有限公司 A kind of large-scale unit plates of curtain wall two-rail hanging apparatus
WO2016033770A1 (en) * 2014-09-04 2016-03-10 冯新林 Method for construction of suspended rhombic aluminum veneer shading curtain wall for exhibition hall
FR3050468A1 (en) * 2016-04-21 2017-10-27 Pro Mat Service METHOD FOR PRODUCING A DEMOUNTABLE BUILDING AND CORRESPONDING BUILDING
CN107304631A (en) * 2016-04-22 2017-10-31 中建四局第六建筑工程有限公司 The installation method and system of a kind of high-rise building large area cell cube curtain wall block
CN206681220U (en) * 2017-04-17 2017-11-28 刘博� Lift installing type corner connecting device for curtain walls
CN206957241U (en) * 2017-04-08 2018-02-02 广东世纪达建设集团有限公司 A kind of curtain wall handling installation system
CN109306756A (en) * 2017-07-28 2019-02-05 新疆真石科技有限公司 A kind of assembled light insulation curtain wall
CN209601949U (en) * 2019-01-28 2019-11-08 上海市浦东新区建设(集团)有限公司 A kind of track hanging apparatus of curtain wall
CN210238887U (en) * 2019-05-29 2020-04-03 中国建筑第二工程局有限公司 Dry-hanging curtain wall system suitable for stone plates with ultra-large specifications
CN111287370A (en) * 2020-03-10 2020-06-16 中国十七冶集团有限公司 Externally-hung glass curtain wall system and construction method thereof
CN111608306A (en) * 2020-05-11 2020-09-01 北京中铁装饰工程有限公司 Mounting structure of stone material curtain pendant
CN211569911U (en) * 2019-12-12 2020-09-25 北京市第三建筑工程有限公司 Plate hoisting system for curtain wall installation
CN112196156A (en) * 2020-09-17 2021-01-08 中建深圳装饰有限公司 Unit curtain wall plate anti-drop hanging joint and construction method thereof
CN214461547U (en) * 2020-12-16 2021-10-22 上海力进铝质工程有限公司 But angle regulation's curtain hooking device
CN113914638A (en) * 2021-11-29 2022-01-11 中国建筑一局(集团)有限公司 Overhanging steel beam double-rail curtain wall hoisting system and curtain wall plate hoisting method
WO2022032391A1 (en) * 2020-08-13 2022-02-17 Nexii Building Solutions Inc. Systems and methods for retrofitting an existing building
CN216764085U (en) * 2022-01-14 2022-06-17 河南九冶建设有限公司 Be arranged in high-rise steel construction transformation component along outer fringe hoist and mount conveyer
CN115288320A (en) * 2022-07-07 2022-11-04 中建八局第二建设有限公司 Unit type curtain wall system suitable for solid wall and construction method
CN115387516A (en) * 2022-10-08 2022-11-25 中建八局装饰工程有限公司 Newly-built curtain wall system of existing building and construction method thereof
CN218715279U (en) * 2022-10-09 2023-03-24 内蒙古碧轩装饰工程有限责任公司 Building curtain fossil fragments temporary fixation device
CN115839143A (en) * 2022-12-19 2023-03-24 中建一局集团建设发展有限公司 Unit type concrete large-plate curtain wall installation system and construction method thereof
CN219118508U (en) * 2022-12-30 2023-06-02 山东天元装饰工程有限公司 Large-span overhanging unit curtain wall hanging system
CN116378283A (en) * 2023-04-10 2023-07-04 上海宝冶建筑装饰有限公司 Unit body outer wall structure and construction method
CN219672237U (en) * 2023-05-24 2023-09-12 云南省设计院集团有限公司 Truss support structure for glass curtain wall reconstruction

Patent Citations (30)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006022509A (en) * 2004-07-06 2006-01-26 Ykk Ap Inc Curtain wall and its mounting method
JP2010275838A (en) * 2009-06-01 2010-12-09 Takenaka Komuten Co Ltd Method and mounting fastener for attaching pc board to existing exterior wall
KR100984339B1 (en) * 2010-05-04 2010-09-30 나태용 Variable geometry curtain wall fastner
CN202299005U (en) * 2011-09-09 2012-07-04 沈阳远大铝业工程有限公司 Aluminum unit rotationally connecting component
CN202284390U (en) * 2011-09-19 2012-06-27 沈阳远大铝业工程有限公司 Hoisting machine tools for curtain wall unit plate
US20150110581A1 (en) * 2013-10-23 2015-04-23 Shanghai YeSheng Mechanical & Electrical Control Technology Co., LTD Apparatus and method for lifting and sliding a structure attached to the wall
WO2016033770A1 (en) * 2014-09-04 2016-03-10 冯新林 Method for construction of suspended rhombic aluminum veneer shading curtain wall for exhibition hall
CN204703534U (en) * 2015-05-27 2015-10-14 中建三局(厦门)建设有限公司 A kind of large-scale unit plates of curtain wall two-rail hanging apparatus
FR3050468A1 (en) * 2016-04-21 2017-10-27 Pro Mat Service METHOD FOR PRODUCING A DEMOUNTABLE BUILDING AND CORRESPONDING BUILDING
CN107304631A (en) * 2016-04-22 2017-10-31 中建四局第六建筑工程有限公司 The installation method and system of a kind of high-rise building large area cell cube curtain wall block
CN206957241U (en) * 2017-04-08 2018-02-02 广东世纪达建设集团有限公司 A kind of curtain wall handling installation system
CN206681220U (en) * 2017-04-17 2017-11-28 刘博� Lift installing type corner connecting device for curtain walls
CN109306756A (en) * 2017-07-28 2019-02-05 新疆真石科技有限公司 A kind of assembled light insulation curtain wall
CN209601949U (en) * 2019-01-28 2019-11-08 上海市浦东新区建设(集团)有限公司 A kind of track hanging apparatus of curtain wall
CN210238887U (en) * 2019-05-29 2020-04-03 中国建筑第二工程局有限公司 Dry-hanging curtain wall system suitable for stone plates with ultra-large specifications
CN211569911U (en) * 2019-12-12 2020-09-25 北京市第三建筑工程有限公司 Plate hoisting system for curtain wall installation
CN111287370A (en) * 2020-03-10 2020-06-16 中国十七冶集团有限公司 Externally-hung glass curtain wall system and construction method thereof
CN111608306A (en) * 2020-05-11 2020-09-01 北京中铁装饰工程有限公司 Mounting structure of stone material curtain pendant
WO2022032391A1 (en) * 2020-08-13 2022-02-17 Nexii Building Solutions Inc. Systems and methods for retrofitting an existing building
CN112196156A (en) * 2020-09-17 2021-01-08 中建深圳装饰有限公司 Unit curtain wall plate anti-drop hanging joint and construction method thereof
CN214461547U (en) * 2020-12-16 2021-10-22 上海力进铝质工程有限公司 But angle regulation's curtain hooking device
CN113914638A (en) * 2021-11-29 2022-01-11 中国建筑一局(集团)有限公司 Overhanging steel beam double-rail curtain wall hoisting system and curtain wall plate hoisting method
CN216764085U (en) * 2022-01-14 2022-06-17 河南九冶建设有限公司 Be arranged in high-rise steel construction transformation component along outer fringe hoist and mount conveyer
CN115288320A (en) * 2022-07-07 2022-11-04 中建八局第二建设有限公司 Unit type curtain wall system suitable for solid wall and construction method
CN115387516A (en) * 2022-10-08 2022-11-25 中建八局装饰工程有限公司 Newly-built curtain wall system of existing building and construction method thereof
CN218715279U (en) * 2022-10-09 2023-03-24 内蒙古碧轩装饰工程有限责任公司 Building curtain fossil fragments temporary fixation device
CN115839143A (en) * 2022-12-19 2023-03-24 中建一局集团建设发展有限公司 Unit type concrete large-plate curtain wall installation system and construction method thereof
CN219118508U (en) * 2022-12-30 2023-06-02 山东天元装饰工程有限公司 Large-span overhanging unit curtain wall hanging system
CN116378283A (en) * 2023-04-10 2023-07-04 上海宝冶建筑装饰有限公司 Unit body outer wall structure and construction method
CN219672237U (en) * 2023-05-24 2023-09-12 云南省设计院集团有限公司 Truss support structure for glass curtain wall reconstruction

Similar Documents

Publication Publication Date Title
CN111576691B (en) Frame type glass curtain wall mounting method and glass curtain wall system
CN111058555A (en) Windproof fireproof heat-preservation type quick-dismantling assembly building steel structure and splicing method thereof
CN107338892A (en) The dismantled and assembled plate of type unitized curtain wall and dismounting, installation method
CN117328590A (en) Unit body assembled curtain wall construction system and method for super high-rise building reconstruction
CN208732486U (en) Roofing monorail crane
CN108894509B (en) Steel structure assembly type house prefabricated sandwich heat-insulation external wall panel construction method without external frame
CN115288320A (en) Unit type curtain wall system suitable for solid wall and construction method
CN214034706U (en) Tower crane pedestrian safety passage used on attached lifting scaffold
CN113152658B (en) Large-span corridor with comprehensive curtain wall at bottom and construction method
CN210236846U (en) Multi-layer bracket support hoisting device for high-rise building
CN211257761U (en) Lifting type elevator shaft operating platform
CN207715919U (en) A kind of quick-installed wall bushing
CN209556401U (en) A kind of super high-rise building super large curtain wall unit hydraulic synchronizing lifting system
CN109707084B (en) Flexible curtain wall elastic support and external ribbon system
CN219100848U (en) Unit type auxiliary house
CN216235647U (en) Unit curtain wall on-site unit hoisting device
CN207484991U (en) A kind of glass curtain wall monorail hoisting structure
CN216276804U (en) Elevator shaft follow-up construction platform system
CN218779912U (en) Installation auxiliary tool for unipump room monorail crane
CN217581111U (en) Base rigging platform for jacket of booster station
CN215666644U (en) A operation ladder for installing factory building outer wall material
CN217128915U (en) Hanging flower basket equipment rack
CN218114945U (en) Synchronous lifting control cable wind rope system
CN212406119U (en) A pre-buried box that is used for steel platform bracket to shelve wall body entrance to a cave
CN214034699U (en) Lower hanging bracket structure of attached lifting scaffold

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination