CN208732486U - Roofing monorail crane - Google Patents

Roofing monorail crane Download PDF

Info

Publication number
CN208732486U
CN208732486U CN201821149197.5U CN201821149197U CN208732486U CN 208732486 U CN208732486 U CN 208732486U CN 201821149197 U CN201821149197 U CN 201821149197U CN 208732486 U CN208732486 U CN 208732486U
Authority
CN
China
Prior art keywords
roofing
vertical supporting
track
steel
monorail crane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821149197.5U
Other languages
Chinese (zh)
Inventor
蒋志云
任宇翔
盛晓东
张希
缪建杨
沈辉辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai No 7 Construction Co Ltd
Original Assignee
Shanghai No 7 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai No 7 Construction Co Ltd filed Critical Shanghai No 7 Construction Co Ltd
Priority to CN201821149197.5U priority Critical patent/CN208732486U/en
Application granted granted Critical
Publication of CN208732486U publication Critical patent/CN208732486U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to a kind of roofing monorail cranies, for solving the problems, such as that the construction of curtain wall for high rise building large area cell board is difficult.Roofing monorail crane provided by the utility model, it includes the vertical supporting system affixed with roofing Vierendeel girder, and the lateral cantilevered system being welded to connect with the top of vertical supporting system, the two connects to form " cross structure " at lateral cantilevered system one third;The oblique pull wirerope both ends drawknot of ancillary equipment is supported on the pulley on vertical supporting system top in the both ends of lateral cantilevered system, and drawknot round tube one end of ancillary equipment and the galianconism end of lateral cantilevered system are affixed, and the other end and roof structure floor are affixed;It is bolted several track I-steel below lateral cantilevered system and sequentially forms track system around arrangement along roofing surrounding;Mouth hangs the electric block of lifting appliance under track I-steel, and the hoist engine of lifting appliance drives the lifting for the lifting wirerope progress curtain wall unit plate being equipped with electric block.

Description

Roofing monorail crane
Technical field
The utility model belongs to technical field of building construction, and in particular to a kind of roofing monorail crane.
Background technique
Currently, China is just carrying forward vigorously the transformation of Economic Development Mode, " energy-saving and emission-reduction ", " safety and environmental protection " etc. are actively advocated Theory.Therefore, the target of " energy saving building ", " green installation " must be also reached as construction industry.
In the construction curtain wall unit plate lifting construction stage, for the ease of high-rise building large area curtain wall unit plate peace It fills, needs one kind and efficiently, easily increase construction site utilization for the hanging device in curtain wall unit plate lifting construction stage Rate, accelerates working efficiency, and save the cost meets the theory of " energy saving building ", " green installation ".
Utility model content
The purpose of this utility model is to provide it is a kind of for the curtain wall unit plate lifting construction stage and can be improved and hang Fill the hanging device of working efficiency.Roofing monorail crane improves lifting as a kind of i.e. safety conveniently hanging device again Working efficiency shortens the lifting duration, has saved time cost for each associated construction node.In order to solve the above technical problems, this The technical solution of utility model is as follows:
Roofing monorail crane is lifted for curtain wall unit plate, it includes vertical supporting system, lateral cantilevered system, track body System, lifting appliance and ancillary equipment, wherein
The vertical supporting system is fixed on roofing Vierendeel girder, and the top of the vertical supporting system is equipped with pulley;
The top of the transverse direction cantilevered system and the vertical supporting system is welded, by the cross at the connecting node of the two It is divided into long arm section and galianconism section to cantilevered system;
The track system is sequentially connected with the circular orbit to be formed along roofing surrounding for several track I-steel;
The lifting appliance includes hoist engine, electric block and lifting wirerope;The electric block hang on the rail Mouth under road I-steel, the hoist engine drive the lifting wirerope being equipped with the electric block to carry out curtain wall unit plate Lifting;
The ancillary equipment includes oblique pull wirerope and drawknot round tube, and oblique pull wirerope both ends drawknot is in the transverse direction Cantilevered system both ends, and be supported on the pulley;Drawknot round tube one end is fixedly connected with the end of the galianconism section, separately One end is fixedly connected with roof structure floor.
Compared with prior art, the utility model is beneficial has the technical effect that
(1) the roofing monorail crane of the utility model, it includes vertical supporting system, lateral cantilevered system, track system, rises Equipment and ancillary equipment are hung, vertical supporting system is fixed on roofing Vierendeel girder, and the top of vertical supporting system is equipped with pulley;It is horizontal It is welded to the one third node of cantilevered system with the top of vertical supporting system;Track system is arranged along roofing surrounding; Lifting appliance includes that hoist engine, electric block and lifting wirerope, electric block hang on mouth under track I-steel, hoist engine band The dynamic lifting wirerope being equipped with electric block carries out the lifting of curtain wall unit plate;The oblique pull wirerope both ends of ancillary equipment Drawknot is supported on pulley in the lateral cantilevered system both ends;Drawknot round tube one end of ancillary equipment and laterally overhanging body End of the system at node is fixedly connected, and the other end is fixedly connected with roof structure floor.Curtain is lifted by roofing monorail crane Wall cell board not only solves the problems, such as that the construction of curtain wall for high rise building large area cell board is difficult, uses manpower and material resources sparingly, and can Repetition is used in turn, and is conducive to save construction cost.
(2) the roofing monorail crane of the utility model, reasonable utilization limited space, operating personnel can save construction operation Time improves construction efficiency, meets construction needs, has reached the theory of energy saving building, green construction, construction method behaviour Make simplicity, there is preferably promotional value.
Further, the vertical supporting system is spliced by two channel steels by vertical spaced junction steel plate At.Certainly, the spacing between of vertically-adjacent two junction steel plates can choose as 400mm, and the thickness of junction steel plate can be 10mm。
Further, the lateral cantilevered system is spliced by two I-steel, and ear is welded on the top of the I-steel Plate.The both ends of oblique pull wirerope pass through otic placode drawknot in the both ends of lateral cantilevered system respectively, and are supported in vertical supporting system Pulley on.
Further, in order to guarantee roofing surrounding formed one circle monorail crane rail, the track I-shaped being generally aligned in the same plane Need to connect between steel, in order to meet bonding strength and save material cost, in the track system adjacent orbit I-steel it Between be fixedly connected by M12 bolt group.
Further, the track system is fixedly connected by M16 bolt group with the end of the long arm section, so that Track system forms a fixed connection with lateral cantilevered system.
Further, the vertical supporting system and the lateral cantilevered system and the connection with the roofing Vierendeel girder Place is respectively equipped with ribbed stiffener.That is, in order to enhance the intensity of vertical supporting system itself and guarantee its room with bottom end Surface frame sets a roof beam in place, the bonding strength between the lateral cantilevered system on top, is respectively equipped with the steel plate work with a thickness of 12mm in junction For ribbed stiffener.
Further, it is 1000mm that the track body, which ties up to the turning radius of structure corner,.In view of track system edge Roofing surrounding around one circle setting, track system need structure privileged sites for example structure corner be arranged turning radius, And two lateral Cantilever Beams I-steel are set in the structure privileged sites, and make drawknot round tube drawknot in roofing Vierendeel girder On built-in fitting.
Detailed description of the invention
A kind of roofing monorail crane described in the utility model is provided by examples and drawings below.
Fig. 1 is the structural schematic diagram of roofing monorail crane in an embodiment of the present invention.
In figure:
10- vertical supporting system, 11- junction steel plate, 12- ribbed stiffener;20- transverse direction cantilevered system, 22- otic placode;30- track System, 31-M12 bolt group, 32-M16 bolt group;40- lifting appliance, 41- electric block, 42- lift wirerope;50- auxiliary Equipment, 51- oblique pull wirerope, 52- drawknot round tube;60- roofing Vierendeel girder;70- pulley;80- roof structure floor;90- curtain wall Cell board.
Specific embodiment
Below in conjunction with the drawings and specific embodiments to the utility model proposes roofing monorail crane be described in further detail. According to following explanation and claims, will be become apparent from feature the advantages of the utility model.It should be noted that attached drawing is all made of Very simplified form and use non-accurate ratio, only to it is convenient, lucidly aid in illustrating the utility model embodiment Purpose.For sake of convenience, "upper" described below, "lower" are consistent with the upper and lower direction of attached drawing, but this can't be this The limitation of utility model technical solution.
Embodiment one
The structure composition of the roofing monorail crane of the utility model is described in detail below with reference to Fig. 1.
Referring to FIG. 1, a kind of roofing monorail crane, lifts for curtain wall unit plate 90, it includes vertical supporting system 10, cross To cantilevered system 20, track system 30, lifting appliance 40 and ancillary equipment 50, wherein vertical supporting system 10 is fixed in roofing On Vierendeel girder 60, the top of vertical supporting system 10 is equipped with pulley 70;The top of lateral cantilevered system 20 and vertical supporting system 10 Portion's welding, (such as one third extension position of lateral cantilevered system 20) is by lateral cantilevered system 20 at the connecting node of the two It is divided into two sections, respectively long arm section and galianconism section;Track system 30 is that several track I-steel are sequentially connected with along roofing surrounding The circular orbit of formation;Lifting appliance 40 includes hoist engine (not shown), electric block 41 and lifting wirerope 42;Electric block 41 hang on mouth under track I-steel, and hoist engine drives the lifting wirerope 42 being equipped with electric block 41 to carry out curtain wall list The lifting of first plate 90;Ancillary equipment 50 includes oblique pull wirerope 51 and drawknot round tube 52, and 51 both ends drawknot of oblique pull wirerope is in cross To the both ends of cantilevered system 20, and it is supported on pulley 70;The galianconism section of 52 one end of drawknot round tube and lateral cantilevered system 20 End is fixedly connected, and the other end is fixedly connected with roof structure floor 80.
Specifically, the roofing monorail crane of the utility model, it includes the vertical supporting body affixed with roofing Vierendeel girder 60 It is 10, the top of the vertical supporting system 10 is equipped with pulley 70, and the transverse direction being welded to connect with the top of vertical supporting system 10 is outstanding Choose system 20, the two forms a cross structure, the node of the cross structure be located exactly at lateral overhanging system 20 three/ At one node, so that lateral cantilevered system 20 to be divided to the cantilever different for two segment length;The oblique pull wirerope 51 of ancillary equipment 50 Both ends drawknot is supported on pulley 70 in the both ends of lateral cantilevered system 20,52 one end of drawknot round tube of ancillary equipment 50 with The shorter cantilever end of lateral 20 length of cantilevered system is fixedly connected, and the other end is fixedly connected with roof structure floor 80;Laterally It is bolted several track I-steel below cantilevered system 20 and sequentially forms track system 30 around arrangement along roofing surrounding; Mouth hangs the electric block 41 of lifting appliance 40 under track I-steel, and the hoist engine drive of lifting appliance 40 is matched with electric block 41 The lifting wirerope 42 for closing setting carries out the lifting of curtain wall unit plate 90.By roofing monorail crane lifting curtain wall cell board, not only It solves the problems, such as that the construction of curtain wall for high rise building large area cell board is difficult, uses manpower and material resources sparingly, and can repeat to be used in turn, Be conducive to save construction cost.
In the present embodiment, it is highly preferred that vertical supporting system 10 passes through vertical spaced connection by two channel steels Steel plate 11 is spliced.Certainly, the spacing between of vertically-adjacent two junction steel plates 11 can choose as 400mm, connection steel The thickness of plate 11 can be 10mm.
In the present embodiment, it is highly preferred that lateral cantilevered system 20 is spliced by two I-steel, the top of I-steel Weld otic placode 22.The both ends of oblique pull wirerope 51 pass through 22 drawknot of otic placode in the both ends of lateral cantilevered system 20 respectively, and support In on the pulley 70 of vertical supporting system 10.
In the present embodiment, it is highly preferred that being located at same flat to guarantee to form a circle monorail crane rail in roofing surrounding It needs to connect between the track I-steel in face, in order to meet bonding strength and save material cost, adjacent rail in track system 30 It is fixedly connected between road I-steel by M12 bolt group 31.
In the present embodiment, it is highly preferred that track system 30 connects by the way that the end of M16 bolt group 32 and long arm section is fixed It connects, so that track system 30 forms a fixed connection with lateral cantilevered system 20.
In the present embodiment, it is highly preferred that vertical supporting system 10 and lateral cantilevered system 20 and with roofing Vierendeel girder 60 junction is respectively equipped with ribbed stiffener 12.That is, in order to enhance the intensity and guarantee of vertical supporting system 10 itself Its bonding strength between the roofing Vierendeel girder 60 of bottom end, the lateral cantilevered system 20 on top, is respectively equipped with thickness in junction Degree is the steel plate of 12mm as ribbed stiffener 12.
In the present embodiment, it is highly preferred that turning radius of the track system 30 in structure corner is 1000mm.It considers Track system 30 is arranged along roofing surrounding around a circle, and track system 30 is needed in structure privileged sites such as structure corner Turning radius is set, and two lateral Cantilever Beams I-steel are set in the structure privileged sites, and drawknot round tube 52 is drawn It ties on the built-in fitting of roofing Vierendeel girder 60.
Embodiment two
With continued reference to FIG. 1, in the present embodiment, the utility model additionally provides the construction party of aforementioned roofing monorail crane Method, the construction method include the following steps:
Step 1: it is spare to provide several roofing monorail cranies, it is respectively arranged at building roof Vierendeel girder 60 or floor structure On plate, several curtain wall unit plates 90 are pushed into lifting corresponding position by operator;
Step 2: being buckled in the sink of curtain wall unit plate 90 using dedicated fastener or being hung on pendant and with shackle connection Tool, electric block 41 suspension hook fastening suspender after corresponding curtain wall unit plate 90 is gradually drawn high, until curtain wall unit plate 90 from It opens corresponding construction part and keeps plumbness;
Step 3: the lifting wirerope 42 that control electric block 41 connects moves downward, the extension on curtain wall unit plate 90 On code alignment operation floor structure after the connector of opposite position, gradually loosens lifting wirerope 42, rely on curtain wall unit plate 90 self weight is downwardly into connector notch.
Foregoing description is only the description to the utility model preferred embodiment, not to any limit of the scope of the utility model Fixed, any change, the modification that the those of ordinary skill in the utility model field does according to the disclosure above content belong to right and want Seek the protection scope of book.

Claims (7)

1. roofing monorail crane is lifted for curtain wall unit plate, which is characterized in that it includes vertical supporting system, laterally overhanging body System, track system, lifting appliance and ancillary equipment, wherein
The vertical supporting system is fixed on roofing Vierendeel girder, and the top of the vertical supporting system is equipped with pulley;
The top of the transverse direction cantilevered system and the vertical supporting system is welded, and hangs the transverse direction at the connecting node of the two The system of choosing is divided into long arm section and galianconism section;
The track system is sequentially connected with the circular orbit to be formed along roofing surrounding for several track I-steel;
The lifting appliance includes hoist engine, electric block and lifting wirerope;The electric block hang on the track work Mouth under word steel, the hoist engine drive the lifting wirerope being equipped with the electric block to carry out hanging for curtain wall unit plate Dress;
The ancillary equipment includes oblique pull wirerope and drawknot round tube, and oblique pull wirerope both ends drawknot is in the laterally overhanging System both ends, and be supported on the pulley;Drawknot round tube one end is fixedly connected with the end of the galianconism section, the other end It is fixedly connected with roof structure floor.
2. roofing monorail crane as described in claim 1, which is characterized in that the vertical supporting system is passed through perpendicular by two channel steels It is spliced to spaced junction steel plate.
3. roofing monorail crane as described in claim 1, which is characterized in that the transverse direction cantilevered system is spliced by two I-steel It forms, otic placode is welded on the top of the I-steel.
4. roofing monorail crane as described in claim 1, which is characterized in that in the track system between adjacent orbit I-steel It is fixedly connected by M12 bolt group.
5. roofing monorail crane as described in claim 1, which is characterized in that the track system by M16 bolt group with it is described The end of long arm section is fixedly connected.
6. roofing monorail crane as described in claim 1, which is characterized in that the vertical supporting system and the laterally overhanging body It is and is respectively equipped with ribbed stiffener with the junction of the roofing Vierendeel girder.
7. roofing monorail crane as described in claim 1, which is characterized in that the track body ties up to the turning half of structure corner Diameter is 1000mm.
CN201821149197.5U 2018-07-19 2018-07-19 Roofing monorail crane Expired - Fee Related CN208732486U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821149197.5U CN208732486U (en) 2018-07-19 2018-07-19 Roofing monorail crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821149197.5U CN208732486U (en) 2018-07-19 2018-07-19 Roofing monorail crane

Publications (1)

Publication Number Publication Date
CN208732486U true CN208732486U (en) 2019-04-12

Family

ID=66027723

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821149197.5U Expired - Fee Related CN208732486U (en) 2018-07-19 2018-07-19 Roofing monorail crane

Country Status (1)

Country Link
CN (1) CN208732486U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108675170A (en) * 2018-07-19 2018-10-19 上海建工七建集团有限公司 Roofing monorail crane and its construction method
CN112390163A (en) * 2020-11-16 2021-02-23 上海市机械施工集团有限公司 Hoisting equipment and hoisting method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108675170A (en) * 2018-07-19 2018-10-19 上海建工七建集团有限公司 Roofing monorail crane and its construction method
CN112390163A (en) * 2020-11-16 2021-02-23 上海市机械施工集团有限公司 Hoisting equipment and hoisting method

Similar Documents

Publication Publication Date Title
CN208732486U (en) Roofing monorail crane
CN108675170A (en) Roofing monorail crane and its construction method
CN210460016U (en) Integrated form single power lift material platform
CN105019664A (en) High-altitude sliding installation method for box room type electric room
CN103397782A (en) Construction method and device for installing connecting beams on frame-type steel structure
CN108277994B (en) Method for quickly dismantling safety protection shed of overhead high-speed rail operation line
CN107587885B (en) Two-lining trolley structure in standard section of tunnel and assembling method
CN110359671A (en) A kind of assembled rail pipeline construction method against the wind
CN108946542A (en) A kind of small gun carriage and its construction method
CN212599995U (en) Welding installation equipment for hot-melt welded pipe
CN109958819A (en) A kind of gas pipeline laying method and its supporting structure
CN209353734U (en) For installing the double-track device of curtain wall
CN208732495U (en) A kind of small gun carriage
CN203383516U (en) Construction device for installing connecting beam on frame type steel structure
CN215755931U (en) Large transformer hoisting equipment in factory building
CN214573768U (en) Self-climbing sliding formwork pouring system for second-stage concrete pouring of gate slot
CN107675892A (en) A kind of glass curtain wall monorail hoisting structure
CN106988543A (en) Lower supporting type overhanging unloading platform and construction technology
CN211257761U (en) Lifting type elevator shaft operating platform
CN209957241U (en) Steel hanger
CN210316599U (en) A curtain ring rail for roofing truss beam position
CN207484991U (en) A kind of glass curtain wall monorail hoisting structure
CN108928729B (en) Lifting appliance and lifting device using same
CN205077876U (en) Prestressed steel strand pulling machine and tensioning jack suspension device
CN206319622U (en) A kind of roof system steel truss sliding rail

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190412