CN216235647U - Unit curtain wall on-site unit hoisting device - Google Patents
Unit curtain wall on-site unit hoisting device Download PDFInfo
- Publication number
- CN216235647U CN216235647U CN202122812414.2U CN202122812414U CN216235647U CN 216235647 U CN216235647 U CN 216235647U CN 202122812414 U CN202122812414 U CN 202122812414U CN 216235647 U CN216235647 U CN 216235647U
- Authority
- CN
- China
- Prior art keywords
- main
- curtain wall
- steel frame
- main steel
- hoisting device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Load-Bearing And Curtain Walls (AREA)
Abstract
The utility model discloses a unit body curtain wall on-site unit hoisting device, and relates to the technical field of building structures. The utility model comprises the following steps: the main mounting mechanism comprises a main floor, wherein the front end of the bottom of the main floor is connected with a main concrete beam, two sides of the upper front end of the main floor are fixedly connected with main steel frames at equal intervals, and the upper part of the rear end of each main steel frame is connected with a stabilizing mechanism; the horizontal running mechanism comprises a plurality of running rails which are horizontally arranged, and the running rails are connected to the front end of the bottom of the main steel frame through a connecting mechanism. The curtain wall horizontal hoisting device solves the problems that the existing hoisting device generally adopts a winch to hoist the curtain wall vertically, horizontal hoisting in transportation is difficult to meet the use requirement, and the curtain wall horizontal hoisting device has the advantages of realizing horizontal transportation and hoisting of the curtain wall, reducing labor intensity, being easy to use and improving operation efficiency.
Description
Technical Field
The utility model belongs to the technical field of building structures, and particularly relates to a unit curtain wall on-site unit hoisting device.
Background
The curtain wall is the outer wall enclosure of the building, does not bear the weight, hangs like a curtain, so is also called as a curtain wall, and is a light wall with decorative effect commonly used by modern large-scale and high-rise buildings. The lifting device is composed of a panel and a supporting structure system, can have certain displacement capacity or certain deformation capacity relative to a main body structure, belongs to equipment for curtain walls, and still has the following defects in practical use:
the existing hoisting device generally adopts a winch to carry out vertical hoisting treatment on the curtain wall, and horizontal hoisting in transportation has certain difficulty, so that the use requirement cannot be met.
Therefore, the existing hoisting device for the on-site unit of the unit curtain wall cannot meet the requirements in practical use, so that an improved technology is urgently needed in the market to solve the problems.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a unit body curtain wall on-site unit hoisting device, which solves the problems that the existing hoisting device generally adopts a winch to hoist a curtain wall vertically, horizontal hoisting in transportation has certain difficulty, and the use requirement cannot be met by arranging a horizontal operation mechanism.
In order to solve the technical problems, the utility model is realized by the following technical scheme:
the utility model relates to a unit body curtain wall on-site unit hoisting device, which comprises:
the main mounting mechanism comprises a main floor, wherein the front end of the bottom of the main floor is connected with a main concrete beam, two sides of the upper front end of the main floor are fixedly connected with main steel frames at equal intervals, and the upper part of the rear end of each main steel frame is connected with a stabilizing mechanism;
the horizontal running mechanism comprises a plurality of running rails which are horizontally arranged, and the running rails are connected to the front end of the bottom of the main steel frame through a connecting mechanism.
Furthermore, main steelframe upper portion is the triangle-shaped setting, and the outside of main steelframe bottom is external lug setting, lug both sides tip is the screw setting that runs through.
Based on the technical characteristics, the stability of the main steel frame structure is improved through the tripod-shaped structure, and the main steel frame structure is connected and fixed through the convex blocks through the threaded connection between the outer bolts and the screw holes.
Further, stabilizing mean includes a plurality of stabilizer bars of equidistance level setting, the cable bottom that main steelframe rear end upper portion was tied is connected with buries the board, and buries the board and be connected with main floor up end through the fastening bolt of both sides tip.
Based on the technical characteristics, the main steel frames are connected and fixed through the stabilizing rods, the stability of the main steel frames is improved, the end portions of the inhaul cables are connected with the embedded plate and the main steel frames respectively, and the structural stability of the inhaul cables is further improved.
Further, the stabilizer bar is connected with the main steel frame through a fixing mechanism at the end part, the fixing mechanism comprises a set of fixing plates which are centrosymmetric, side plates are welded at the front end and the rear end of one side of each fixing plate, and fixing bolts are connected to the upper end part and the lower end part of each side plate in a penetrating mode.
Based on the technical characteristics, the fixing bolts penetrate through the side plates, the main steel frame and the stabilizer bars to be connected, the stabilizer bar structures are positioned, and the structure is easy to disassemble and assemble.
Furthermore, the connecting mechanism comprises an upper connecting plate and a front connecting plate which are arranged at the upper end part and the front end part of the running track, and an upper connecting bolt and a front connecting bolt are respectively connected to the two side end parts of the upper connecting plate and the front connecting plate in a penetrating manner.
Based on the technical characteristics, the upper connecting bolt and the front connecting bolt penetrate through the upper connecting plate and the connection between the front connecting plate and the main steel frame to connect and fix a plurality of running rails, and the structure is easy to disassemble and assemble.
The utility model has the following beneficial effects:
the curtain wall horizontal transportation device is provided with the horizontal running mechanisms, adopts a mechanical structure to replace manual work to carry out horizontal transportation and movement of the curtain wall, reduces labor intensity and improves working efficiency, specifically, the horizontal running mechanism comprises a plurality of running rails which are horizontally connected, the running rails are used for carrying the external electric hoist, horizontal transportation and treatment of the curtain wall are carried out through the horizontal movement of the external electric hoist on the running rails, meanwhile, a certain distance is reserved between the horizontal running mechanisms, and vertical transportation and hoisting treatment of the curtain wall can be carried out, so that different use requirements are met.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings used in the description of the embodiments will be briefly introduced below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art that other drawings can be obtained according to the drawings without creative efforts.
FIG. 1 is an assembled view of the present invention;
FIG. 2 is a single exploded schematic view of the present invention;
FIG. 3 is an enlarged view taken at A in FIG. 1 according to the present invention;
FIG. 4 is an enlarged view of the utility model at B of FIG. 1;
FIG. 5 is an enlarged view of the utility model at C of FIG. 1.
In the drawings, the components represented by the respective reference numerals are listed below:
100. a main mounting mechanism; 110. a main floor slab; 120. a main concrete beam; 130. a main steel frame; 200. a stabilizing mechanism; 210. a stabilizer bar; 220. burying a plate; 230. fastening a bolt; 240. a cable; 300. a fixing mechanism; 310. a fixing plate; 320. a side plate; 330. fixing the bolt; 400. a connecting mechanism; 410. a front connecting plate; 420. an upper connecting bolt; 430. a front connecting bolt; 440. an upper connecting plate; 500. and a horizontal running mechanism.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention.
Referring to fig. 1-4, the present invention is a unit hoisting device for a unit curtain wall on-site, comprising:
the main installation mechanism 100 comprises a main floor 110, wherein the front end of the bottom of the main floor 110 of the main installation mechanism 100 is connected with a main concrete beam 120, two sides of the front end of the main floor 110 are fixedly connected with main steel frames 130 at equal intervals, and the upper part of the rear end of each main steel frame 130 is connected with a stabilizing mechanism 200;
the horizontal running mechanism 500, the horizontal running mechanism 500 includes a plurality of running rails horizontally arranged, and the running rails are connected to the front end of the bottom of the main steel frame 130 through the connecting mechanism 400, when the hoisting device is used specifically;
firstly, a plurality of main steel frames 130 are equidistantly placed on the upper two sides of the main floor 110, and the outer bolts are screwed in the screw holes on the lugs on the lower part of the main steel frames 130 to connect and fix the main steel frame 130;
next, the buried plate 220 is placed at a designated position at the rear of the upper end surface of the main floor 110, and the tightening operation of the tightening bolts 230 is performed, at this time, the ends of the guy wires 240 are respectively connected to the buried plate 220 and the main steel frame 130 by bolts;
then, horizontally placing the plurality of stabilizer bars 210 at the rear end of the main steel frame 130, attaching the inner end of the fixing plate 310 to the two sides of the upper portion of the main steel frame 130, and simultaneously, tightening the fixing bolt 330 to connect the plurality of horizontal stabilizer bars 210 with the main steel frame 130;
secondly, repeating the steps, and screwing the upper connecting bolts 420 and the front connecting bolts 430 on the end parts at the two sides of the upper connecting plate 440 and the front connecting plate 410 for connecting a plurality of horizontally arranged running rails with the main steel frame 130;
and finally, placing an outer electric hoist on the operation track, hoisting the curtain wall through the outer electric hoist, and horizontally transporting the curtain wall through the operation track.
As shown in fig. 2-5, the upper portion of the main steel frame 130 is disposed in a triangular shape, the outer side of the bottom end of the main steel frame 130 is disposed as an outward protruding block, and the end portions of the two sides of the protruding block are disposed as through screw holes;
specifically, when the main steel frame 130 is used, the triangular structure can ensure the structural stability, and at the moment, the lugs at the bottom end of the main steel frame 130 are equidistantly placed at the front part of the upper end surface of the main floor slab 110, and the screw holes of the main steel frame are screwed with external bolts;
the stabilizing mechanism 200 comprises a plurality of stabilizing bars 210 which are horizontally arranged at equal intervals, the bottom end of a guy cable 240 which is fastened to the upper part of the rear end of the main steel frame 130 is connected with a buried plate 220, and the buried plate 220 is connected with the upper end surface of the main floor 110 through fastening bolts 230 at the end parts of two sides;
specifically, when the stabilizing mechanism 200 is used, the embedded plate 220 is placed at a designated position at the rear of the upper end surface of the main floor 110, and the fastening bolts 230 are tightened, at this time, the end portions of the guy cables 240 are respectively fastened to the embedded plate 220 and the main steel frame 130, and at the same time, the plurality of stabilizer bars 210 are horizontally placed at the rear end portion of the main steel frame 130, and the inner ends of the fixing plates 310 are attached to both sides of the upper portion of the main steel frame 130, and the fixing bolts 330 are tightened;
the stabilizer bar 210 is connected with the main steel frame 130 through a fixing mechanism 300 at the end part, the fixing mechanism 300 comprises a group of fixing plates 310 which are centrosymmetric, side plates 320 are welded at the front and rear ends of one side of each fixing plate 310, and fixing bolts 330 are connected to the upper and lower end parts of each side plate 320 in a penetrating manner;
specifically, when the multiple stabilizer bars 210 are connected, the multiple stabilizer bars 210 are horizontally placed at the rear end of the main steel frame 130, and the inner end of the fixing plate 310 is attached to the two sides of the upper portion of the main steel frame 130, and at this time, the fixing bolt 330 is screwed to a designated position on the fixing plate 310;
the connecting mechanism 400 comprises an upper connecting plate 440 and a front connecting plate 410 which are arranged at the upper end part and the front end part of the running track, and an upper connecting bolt 420 and a front connecting bolt 430 are respectively connected with the two side end parts of the upper connecting plate 440 and the front connecting plate 410 in a penetrating way;
specifically, when the multiple moving rails are connected, the upper end surfaces of the multiple horizontally disposed moving rails are in contact with the bottom front end of the main steel frame 130, and the upper connecting bolts 420 and the front connecting bolts 430 are screwed to the upper connecting plate 440 and the front connecting plate 410 at both side ends.
The above are only preferred embodiments of the present invention, and the present invention is not limited thereto, and any modification, equivalent replacement, and improvement made to the technical solutions described in the above embodiments, and to some of the technical features thereof, are included in the scope of the present invention.
Claims (5)
1. The utility model provides a cell cube curtain site unit hoist device which characterized in that includes:
the main mounting mechanism (100) comprises a main floor (110), the front end of the bottom of the main floor (110) of the main mounting mechanism (100) is connected with a main concrete beam (120), two sides of the front end of the main floor (110) are fixedly connected with main steel frames (130) at equal intervals, and the upper part of the rear end of each main steel frame (130) is connected with a stabilizing mechanism (200);
the horizontal running mechanism (500) comprises a plurality of running rails which are horizontally arranged, and the running rails are connected to the front end of the bottom of the main steel frame (130) through a connecting mechanism (400).
2. The on-site unit hoisting device for the unit curtain wall according to claim 1, wherein the upper part of the main steel frame (130) is arranged in a triangular shape, the outer side of the bottom end of the main steel frame (130) is provided with an outward projection, and the end parts of two sides of the projection are provided with through screw holes.
3. The on-site unit hoisting device for the unit curtain wall according to claim 1, wherein the stabilizing mechanism (200) comprises a plurality of stabilizing bars (210) which are horizontally arranged at equal intervals, the bottom end of a guy cable (240) which is fastened to the upper portion of the rear end of the main steel frame (130) is connected with a buried plate (220), and the buried plate (220) is connected with the upper end face of the main floor (110) through fastening bolts (230) arranged at the end portions of two sides.
4. The unit curtain wall field unit hoisting device according to claim 3, wherein the stabilizer bar (210) is connected with the main steel frame (130) through a fixing mechanism (300) at the end part, the fixing mechanism (300) comprises a set of fixing plates (310) which are centrosymmetric, side plates (320) are welded at the front and rear ends of one side of each fixing plate (310), and fixing bolts (330) are connected to the upper and lower end parts of each side plate (320) in a penetrating manner.
5. The unit curtain wall field unit hoisting device of claim 1, wherein the connecting mechanism (400) comprises an upper connecting plate (440) and a front connecting plate (410) which are arranged at the upper end part and the front end part of the operation rail, and an upper connecting bolt (420) and a front connecting bolt (430) are respectively connected to the two side end parts of the upper connecting plate (440) and the front connecting plate (410) in a penetrating manner.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202122812414.2U CN216235647U (en) | 2021-11-17 | 2021-11-17 | Unit curtain wall on-site unit hoisting device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202122812414.2U CN216235647U (en) | 2021-11-17 | 2021-11-17 | Unit curtain wall on-site unit hoisting device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN216235647U true CN216235647U (en) | 2022-04-08 |
Family
ID=80942961
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202122812414.2U Active CN216235647U (en) | 2021-11-17 | 2021-11-17 | Unit curtain wall on-site unit hoisting device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN216235647U (en) |
-
2021
- 2021-11-17 CN CN202122812414.2U patent/CN216235647U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN213329955U (en) | Flower basket diagonal rod type overhanging scaffold | |
CN216235647U (en) | Unit curtain wall on-site unit hoisting device | |
CN214739106U (en) | Curtain wall steel frame node | |
CN211172708U (en) | Column foot structure of channel steel column | |
CN211899232U (en) | External hanging wallboard of prestressed steel pipe truss and wall manufactured and installed by using same | |
CN103225390B (en) | Hollow facade pulley guide attached-type lifting scaffold | |
CN210086725U (en) | Assembled for building externally-hung wallboard fossil fragments convenient to installation | |
CN215860270U (en) | Assembled wind channel unit and rail top wind channel | |
CN213115092U (en) | Large-scale steel frame double-skin wall structure | |
CN218933806U (en) | Detachable auxiliary stand | |
CN216380521U (en) | Girder steel double track curtain hoist and mount system encorbelments | |
CN219100848U (en) | Unit type auxiliary house | |
CN212053696U (en) | Steel beam wall high altitude welding safety protection operation platform | |
CN215803090U (en) | Hanging basket support frame | |
CN220978759U (en) | Arc climbing frame structure for building construction | |
CN213391146U (en) | Anti-falling support mounting structure for elevator shaft steel structure frame | |
CN218161569U (en) | Tunnel cable installing support cross arm mounting structure | |
CN214899969U (en) | High-strength subway bridge | |
CN217602044U (en) | Construction and installation structure for convex beam slab frame body | |
CN220267177U (en) | Elevator well operation platform | |
CN214144633U (en) | Upside-down hanging attached lifting scaffold | |
CN218117146U (en) | Assembled building outer wall protection frame | |
CN219840200U (en) | Assembled steel structure frame for frame building construction | |
CN217076777U (en) | Tower crane attachment system for frame structure | |
CN214752455U (en) | Assembled wallboard teaching aid for teaching |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |