CN104358336A - Unit type curtain wall installation system and installation method thereof - Google Patents

Unit type curtain wall installation system and installation method thereof Download PDF

Info

Publication number
CN104358336A
CN104358336A CN201410626892.6A CN201410626892A CN104358336A CN 104358336 A CN104358336 A CN 104358336A CN 201410626892 A CN201410626892 A CN 201410626892A CN 104358336 A CN104358336 A CN 104358336A
Authority
CN
China
Prior art keywords
curtain wall
electric hoist
lifting
lifting means
floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410626892.6A
Other languages
Chinese (zh)
Inventor
林爱花
陈桂波
陈加才
陈北溪
林彧婷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FUJIAN JIULONG CONSTRUCTION GROUP Co Ltd
Original Assignee
FUJIAN JIULONG CONSTRUCTION GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FUJIAN JIULONG CONSTRUCTION GROUP Co Ltd filed Critical FUJIAN JIULONG CONSTRUCTION GROUP Co Ltd
Priority to CN201410626892.6A priority Critical patent/CN104358336A/en
Publication of CN104358336A publication Critical patent/CN104358336A/en
Pending legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a unit type curtain wall installation system and an installation method thereof. The system comprises an annular track, an electric hoist and a lifting device, wherein the annular track is arranged in a way of surrounding the external circumference of the external frame of a building, and is within the same plane; the upper end of the electric hoist is in sliding connection onto the annular track, and can move along the annular track; the lifting device is installed on one side of the annular track; moreover, the moving path of the lifting end of the lifting device is overlapped with the moving path of the lifting end of the electric hoist. As the system is mainly composed of the annular track, the electric hoist, the lifting device and the like, the structure is quite simple and reliable; for perpendicular transportation, lifting equipment such as a tower crane, a forklift or a cantilever crane is adopted; horizontal transportation is realized through the electric hoist in sliding connection onto the annular track; the time occupied by the lifting equipment is furthest reduced, a curtain wall can be constructed without external scaffolds, so that the measure cost is lowered; meanwhile, with the curtain wall engineering and the main body structure engineering above the track working face constructed at the same time, the schedule is shortened greatly.

Description

Unit type curtain wall installation system and mounting method thereof
Technical field
The present invention relates to the realm of building construction, particularly relates to a kind of unit type curtain wall installation system and mounting method thereof.
Background technology
Along with the construction and development in city, high-rise, super highrise building gets more and more, architectural image is also more and more newer, unit type curtain wall is novel with its architectural image, light and handy attractive in appearance, the plurality of advantages such as factory operation degree is high, speed of application is fast, installation and maintenance is convenient and constantly occurring in executive information systems, but which kind of construction method the construction difficult problems such as that the thing followed is material technology is wide in variety, construction hoisting difficulty is large, technology content is high, select can control to produce material impact to construction safety, quality, cost and duration.
The unit board of unit glass curtain wall transports to building site at professional processing factory combination forming to install, and on the one hand, the every block weight of unit board is comparatively large, and quantity is also more, need consider that it is stacked place and by what means unit board handling is stacked to each floor face.On the other hand, although job site is provided with tower crane, but outer attached scaffold is arranged at top, the operability that unit board tower crane carries out lifting and installing is poor, and upper body structure also synchronous construction, the use of tower crane is restricted, therefore the handling of curtain wall unit plate and installation are in the urgent need to a kind of crane that can use in unit glass curtain wall installation position, to reduce the dependence to tower crane.
Summary of the invention
One object of the present invention is to provide a kind of structure simple, reliable unit type curtain wall installation system.
Another object of the present invention is to provide that a kind of efficiency of construction is high, simple operation, lower-cost unit type curtain wall installation system.
For achieving the above object, technical solution of the present invention is:
The present invention is a kind of unit type curtain wall installation system, comprises circular orbit, electric hoist and lifting means; Described circular orbit around the all-round fixed and arranged of building housing and in one plane, the upper end of electric hoist to be slipped on circular orbit and can annularly rail moving, and lifting means is arranged on the side of circular orbit and the motion track of the lifting end of lifting means is overlapping with the motion track of the lifting end of electric hoist.
Described circular orbit comprises installs floor fixture, upper floors fixture, many brace summers, multiple suspension apparatus, many rail beams; Described installation floor fixture is fixed on installation floor, upper floors fixture is fixed on the upper floors that is positioned at and installs floor last layer floor, the inner interval of many brace summers is fixed on installs on floor fixture, the outer end of brace summer stretches out, the upper end of suspension apparatus is connected on upper floors fixture, and the lower end of suspension apparatus is connected with the outer end of brace summer; The end face of described rail beam is fixed on the outer end of brace summer, and many rail beams join end to end successively, forms an annular track.
Described lifting means is tower crane, fork truck or cantilever crane.
The present invention is a kind of unit type curtain wall mounting method, comprises the following steps: several cell cubes that curtain wall is divided into according to floor, design lattice according to design by (1); (2) with lifting means, whole overhead baggage rack unit body is transported on assigned address; (3) cell cube linked up with lifting means and be connected, the very long startup lifting means of the good wire rope of hook, makes cell cube slowly promote along wire rope, carries out changing hook after being promoted to specified altitude assignment with the electric hoist on circular orbit; (4) be articulated in cell cube on electric hoist annularly track be transported to installation site and carry out installation in place.
After adopting such scheme, the present invention has the following advantages:
1,the present invention is primarily of formations such as circular orbit, electric hoist and lifting means, structure is very simple, reliable, vertical transport adopts the lifting means such as tower crane, fork truck or cantilever crane, horizontal transport is realized by the electric hoist slipped on circular orbit, and decrease lifting means holding time to greatest extent, curtain wall construction can without external scaffolding, save measure cost, meanwhile, the main structural engineering on curtain wall engineering and top, track operation face is constructed simultaneously, the reduction of erection time greatly.Through estimation, the building that single story building area about 1500 square metres, facade are more upright, every layer of curtain wall unit body is installed and is only needed 7-8 working day, compares traditional hanging method, improves work efficiency about 40% ~ 50%.
2,lifting work does not need to set up hoisting platform or material loading platform, avoids and sets up platform and the hazards of operation on platform, effectively reduce dangerous matter sources.Working measure and safe hard protection are combined together, reduce hanging basket and drop into and counterweight installation, the lifting position of cantilever crane is fixed, and does not need mobile, be beneficial to management in same construction section, improves lifting efficiency simultaneously, reduces labour's recruitment cost.
3, curtain wall unit body adopts batch production processing, improves working (machining) efficiency and precision, decreases rejection and waste and building waste, and hanging device can install and remove mobile use repeatedly, meets the requirement carrying out green construction, energy-conserving and environment-protective at building field.
Below in conjunction with the drawings and specific embodiments, the present invention is further illustrated.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention;
Fig. 2 is the top view of circular orbit of the present invention;
Fig. 3 is the scheme of installation of circular orbit of the present invention;
Fig. 4 is the lateral view of circular orbit of the present invention;
Fig. 5 is lifting elements body schematic diagram of the present invention;
Fig. 6 is invention unit formula curtain wall installation procedure figure.
Detailed description of the invention
As shown in Figure 1-Figure 3, the present invention is a kind of unit type curtain wall installation system, comprises circular orbit 1, electric hoist 2 and lifting means 3.
Described circular orbit 1 around the all-round fixed and arranged of building 10 housing and in one plane, to slip on circular orbit 1 and can annularly move by track 1, for horizontal lifting curtain wall cell cube by the upper end of electric hoist 2.Described lifting means 3 is arranged on the side of circular orbit and the motion track of the lifting end of lifting means is overlapping with the motion track of the lifting end of electric hoist 2, to carry out changing hook with the electric hoist 2 on circular orbit.Described lifting means 3 is tower crane, fork truck or cantilever crane.
Described circular orbit 1 comprises installs floor fixture 11, upper floors fixture 12, many brace summers 13, multiple suspension apparatus 14, many rail beams 15.Described installation floor fixture 11 is fixed on installs floor 101, upper floors fixture 12 is fixed on the upper floors 102 that is positioned at and installs floor 101 last layer floor, the inner interval of many brace summers 13 is fixed on installs on floor fixture 11, the outer end of brace summer 13 stretches out, the upper end of suspension apparatus 14 is connected on upper floors fixture 12, the lower end of suspension apparatus 14 is connected with the outer end of brace summer 13, plays the effect of upwards oblique pull brace summer 13.See in the present embodiment, suspension apparatus 14 is wire rope 14 again, and upper floors fixture 12 is a draw ring 12, and the upper end of wire rope 14 is connected on draw ring 12, and the lower end of wire rope 14 is connected (as shown in Figure 4) with the draw ring 131 of brace summer 13 outer end.The end face of described rail beam 15 is fixed on the outer end of brace summer 13, and many rail beams 15 join end to end successively, forms an annular track.
As shown in Fig. 1, Fig. 6, present invention also offers a kind of unit type curtain wall mounting method, comprise the following steps:
(1) according to several cell cubes 20 that curtain wall is divided into according to floor, design lattice by design.
(2) cell cube 20 is assembled by processing factory, utilize and be surrounded on the circular orbit 1 that building arranges outward and building 10 from bottom to top divided some sections (10 layers or about 40m), with lifting means 3, whole overhead baggage rack unit body 20 (every frame 3-4 part) is transported on assigned address.
(3) cell cube 20 is linked up with lifting means 3 be connected, the very long startup lifting means 3 of the good wire rope of hook, makes cell cube 20 slowly promote along wire rope, in cell cube 20 uphill process, swung (as shown in Figure 5) by cable wind rope 30 control unit body 20, avoid colliding with structure.
(4) carry out changing hook with the electric hoist 2 on circular orbit 1 after being promoted to specified altitude assignment.
(5) be articulated in cell cube 20 on electric hoist 2 annularly track 1 be transported to installation site and carry out installation in place.
The above, be only present pre-ferred embodiments, lifting means cocoa has multiple, therefore can not limit scope of the invention process with this, namely the equivalence done according to the present patent application the scope of the claims and description changes and modifies, and all should still remain within the scope of the patent.

Claims (4)

1. a unit type curtain wall installation system, is characterized in that: comprise circular orbit, electric hoist and lifting means; Described circular orbit around the all-round fixed and arranged of building housing and in one plane, the upper end of electric hoist to be slipped on circular orbit and can annularly rail moving, and lifting means is arranged on the side of circular orbit and the motion track of the lifting end of lifting means is overlapping with the motion track of the lifting end of electric hoist.
2. unit type curtain wall installation system according to claim 1, is characterized in that: described circular orbit comprises installs floor fixture, upper floors fixture, many brace summers, multiple suspension apparatus, many rail beams; Described installation floor fixture is fixed on installation floor, upper floors fixture is fixed on the upper floors that is positioned at and installs floor last layer floor, the inner interval of many brace summers is fixed on installs on floor fixture, the outer end of brace summer stretches out, the upper end of suspension apparatus is connected on upper floors fixture, and the lower end of suspension apparatus is connected with the outer end of brace summer; The end face of described rail beam is fixed on the outer end of brace summer, and many rail beams join end to end successively, forms an annular track.
3. unit type curtain wall installation system according to claim 1, is characterized in that: described lifting means is tower crane, fork truck or cantilever crane.
4. a unit type curtain wall mounting method according to claim 1, is characterized in that: comprise the following steps: several cell cubes that curtain wall is divided into according to floor, design lattice according to design by (1); (2) with lifting means, whole overhead baggage rack unit body is transported on assigned address; (3) cell cube linked up with lifting means and be connected, the very long startup lifting means of the good wire rope of hook, makes cell cube slowly promote along wire rope, carries out changing hook after being promoted to specified altitude assignment with the electric hoist on circular orbit; (4) be articulated in cell cube on electric hoist annularly track be transported to installation site and carry out installation in place.
CN201410626892.6A 2014-11-10 2014-11-10 Unit type curtain wall installation system and installation method thereof Pending CN104358336A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410626892.6A CN104358336A (en) 2014-11-10 2014-11-10 Unit type curtain wall installation system and installation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410626892.6A CN104358336A (en) 2014-11-10 2014-11-10 Unit type curtain wall installation system and installation method thereof

Publications (1)

Publication Number Publication Date
CN104358336A true CN104358336A (en) 2015-02-18

Family

ID=52525633

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410626892.6A Pending CN104358336A (en) 2014-11-10 2014-11-10 Unit type curtain wall installation system and installation method thereof

Country Status (1)

Country Link
CN (1) CN104358336A (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105649241A (en) * 2015-12-31 2016-06-08 中国建筑第八工程局有限公司 Method for mounting curtain wall glass in restricted space
CN106013819A (en) * 2016-07-19 2016-10-12 中建局集团建设发展有限公司 Hoisting system and method for hoisting prefabricated exterior wall cladding based on overhead hooking exchange
CN106481062A (en) * 2016-11-21 2017-03-08 上海建工四建集团有限公司 The hoisting apparatus of attachment type raise scaffold and its installation method
CN106939660A (en) * 2017-02-08 2017-07-11 中国建筑第八工程局有限公司 Curtain wall positioning apparatus and its construction method
CN106948604A (en) * 2017-04-16 2017-07-14 中铁三局集团建筑安装工程有限公司 The irregular alien invasion glass curtain wall positioning apparatus of high-rise building and construction method
CN107304631A (en) * 2016-04-22 2017-10-31 中建四局第六建筑工程有限公司 The installation method and system of a kind of high-rise building large area cell cube curtain wall block
CN107700719A (en) * 2017-09-11 2018-02-16 贵州建工集团第建筑工程有限责任公司 A kind of hanging method of high-rise building glass curtain wall
CN108343180A (en) * 2018-02-24 2018-07-31 佛山市知而行信息科技有限公司 High-rise building unit glass curtain wall installation engineering method
CN111576892A (en) * 2020-05-18 2020-08-25 四川轻化工大学 Construction machine
CN112537721A (en) * 2020-11-10 2021-03-23 中建深圳装饰有限公司 Glass curtain wall is with cyclic annular double track lifting device
CN112627405A (en) * 2020-12-15 2021-04-09 中铁十一局集团建筑安装工程有限公司 Curtain wall installation and construction method for variable cross-section track system
CN113309363A (en) * 2021-06-30 2021-08-27 中建六局建设发展有限公司 Installation method of double-ring rail system of super high-rise unit type curtain wall

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS58135269A (en) * 1981-10-15 1983-08-11 ヨ−ゼフ・ガルトナ−・アンド・カンパニ− Method of installing curtain wall and wall element used therein
CN101239693A (en) * 2008-02-18 2008-08-13 广州市建筑集团有限公司 Overhead monorail for unit type glass curtain wall mounting construction and its mounting method
CN202227708U (en) * 2011-08-18 2012-05-23 上海美特幕墙有限公司 Installation device for unit curtain wall board sheet
CN202245811U (en) * 2011-09-16 2012-05-30 姜清海幕墙系统工程武汉有限公司 Combined curtain wall hoisting equipment
CN102912991A (en) * 2012-10-31 2013-02-06 中建三局第二建设工程有限责任公司 Track hosting device and track hoisting method of large curtain wall unit plate

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS58135269A (en) * 1981-10-15 1983-08-11 ヨ−ゼフ・ガルトナ−・アンド・カンパニ− Method of installing curtain wall and wall element used therein
CN101239693A (en) * 2008-02-18 2008-08-13 广州市建筑集团有限公司 Overhead monorail for unit type glass curtain wall mounting construction and its mounting method
CN202227708U (en) * 2011-08-18 2012-05-23 上海美特幕墙有限公司 Installation device for unit curtain wall board sheet
CN202245811U (en) * 2011-09-16 2012-05-30 姜清海幕墙系统工程武汉有限公司 Combined curtain wall hoisting equipment
CN102912991A (en) * 2012-10-31 2013-02-06 中建三局第二建设工程有限责任公司 Track hosting device and track hoisting method of large curtain wall unit plate

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105649241B (en) * 2015-12-31 2018-06-19 中国建筑第八工程局有限公司 The installation method of restricted clearance Curtain Wall glass
CN105649241A (en) * 2015-12-31 2016-06-08 中国建筑第八工程局有限公司 Method for mounting curtain wall glass in restricted space
CN107304631A (en) * 2016-04-22 2017-10-31 中建四局第六建筑工程有限公司 The installation method and system of a kind of high-rise building large area cell cube curtain wall block
CN106013819A (en) * 2016-07-19 2016-10-12 中建局集团建设发展有限公司 Hoisting system and method for hoisting prefabricated exterior wall cladding based on overhead hooking exchange
CN106481062A (en) * 2016-11-21 2017-03-08 上海建工四建集团有限公司 The hoisting apparatus of attachment type raise scaffold and its installation method
CN106939660A (en) * 2017-02-08 2017-07-11 中国建筑第八工程局有限公司 Curtain wall positioning apparatus and its construction method
CN106948604A (en) * 2017-04-16 2017-07-14 中铁三局集团建筑安装工程有限公司 The irregular alien invasion glass curtain wall positioning apparatus of high-rise building and construction method
CN107700719A (en) * 2017-09-11 2018-02-16 贵州建工集团第建筑工程有限责任公司 A kind of hanging method of high-rise building glass curtain wall
CN108343180A (en) * 2018-02-24 2018-07-31 佛山市知而行信息科技有限公司 High-rise building unit glass curtain wall installation engineering method
CN111576892A (en) * 2020-05-18 2020-08-25 四川轻化工大学 Construction machine
CN111576892B (en) * 2020-05-18 2021-06-18 四川轻化工大学 Construction machine
CN112537721A (en) * 2020-11-10 2021-03-23 中建深圳装饰有限公司 Glass curtain wall is with cyclic annular double track lifting device
CN112537721B (en) * 2020-11-10 2021-07-27 中建深圳装饰有限公司 Glass curtain wall is with cyclic annular double track lifting device
CN112627405A (en) * 2020-12-15 2021-04-09 中铁十一局集团建筑安装工程有限公司 Curtain wall installation and construction method for variable cross-section track system
CN113309363A (en) * 2021-06-30 2021-08-27 中建六局建设发展有限公司 Installation method of double-ring rail system of super high-rise unit type curtain wall

Similar Documents

Publication Publication Date Title
CN104358336A (en) Unit type curtain wall installation system and installation method thereof
CN103603504B (en) The dynamo-electric heavy caliber standpipe of super highrise building is with the method for main body progress lifting construction
PH12015500868A1 (en) Methods, systems and components for multi-storey building construction
CN102864936A (en) Combination lifting construction method for large-scale high hollow building roof of steel structure
CN103912128B (en) The construction method of high-altitude disjunctor steel truss
CN104929353A (en) Detachable stepwise automatic climbing operating platform for elevator shafts
CN203794533U (en) Light portable mobile lifting equipment
MX2021010866A (en) Vertical slip form construction system with multi-function platform, and method of constructing a building therewith.
CN101818563B (en) Jack-up integral lifting mobile platform and using method
JP2008223317A (en) Gondola device and method of constructing exterior of building using the same
CN202731276U (en) Independent discharge platform capable of synchronously lifting with external lifting scaffold
CN101993002B (en) Automatic lift type shaft hanging stage
JP6646220B2 (en) Construction method of suspended steel frame for suspended ceiling
CN101865593B (en) Method for installing device with air separating tower structure
CN113107180B (en) All-steel structure climbing frame
JP2001132274A (en) Method and apparatus for constructing steel tower
CN205688820U (en) A kind of installation system of high-rise building large area cell cube curtain wall block
CN210561720U (en) Pier stud maintenance repair operation platform
WO2017016392A1 (en) Assembly method for dc converter valve
CN210032543U (en) Scaffold for building external wall construction
CN209723565U (en) Attached tower crane attachment construction operation platform outside a kind of steel-core wall structure
CN210178020U (en) Prefabricated cabin installation limit structure
CN203624932U (en) Portable indoor material lifter
JP5773343B2 (en) Method for constructing multi-story building and lifting device for multi-story scaffold used therefor
CN107700854B (en) Steel plate wall sliding installation device and installation method for super high-rise core tube

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20150218

WD01 Invention patent application deemed withdrawn after publication