CN101993002B - Automatic lift type shaft hanging stage - Google Patents

Automatic lift type shaft hanging stage Download PDF

Info

Publication number
CN101993002B
CN101993002B CN 200910183789 CN200910183789A CN101993002B CN 101993002 B CN101993002 B CN 101993002B CN 200910183789 CN200910183789 CN 200910183789 CN 200910183789 A CN200910183789 A CN 200910183789A CN 101993002 B CN101993002 B CN 101993002B
Authority
CN
China
Prior art keywords
winch
hanging scaffold
fixed
stage
hanging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200910183789
Other languages
Chinese (zh)
Other versions
CN101993002A (en
Inventor
沈慰安
孟凡良
王鹏越
张小美
吴悦光
吕红娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Coal No 5 Construction Co Ltd
Original Assignee
China Coal No 5 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Coal No 5 Construction Co Ltd filed Critical China Coal No 5 Construction Co Ltd
Priority to CN 200910183789 priority Critical patent/CN101993002B/en
Publication of CN101993002A publication Critical patent/CN101993002A/en
Application granted granted Critical
Publication of CN101993002B publication Critical patent/CN101993002B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses an automatic lift type shaft hanging stage, relating to a mine device, in particular to a stage for transporting personnel and materials in a shaft when a mine well is constructed. A plurality of bracket members on each row of a plurality of rows are fixed in a well wall, a plurality of winches are respectively fixed on an upper-layer stage, and one cable outlet end of a winch wire cable is wound on a fixed pulley arranged on the bracket member to draw the stage to move up and down. Underground operating staff can automatically operate on the stage according to requirements, the stage can quickly and accurately reach a needed height, does not need to be operated on the mine well and saves communication time and devices above and under the mine well. The invention increases production efficiency, is safe and reliable and is convenient to operate.

Description

Automatic lift type shaft hanging stage
Technical field
The present invention relates to a kind of mining equiment, be specifically related to be used for transporting in the vertical during a kind of mine construction the hanging scaffold of personnel and material.
Background technology
Hanging scaffold is in the mine vertical shaft shaft construction, is used for putting the down-hole pumping equipment, the face of assigning a work illumination and aboveground lower contact signal, personnel reach up and down the construction installation that transports other effects such as underground construction equipment.At present in mine construction, used hanging scaffold in the general shaft building construction enterprises pit shaft, its hang is: at the stable car of 2 or 4 hanging stages of ground well head arranged around, lay winding wire ropes, the head sheave fixing by the headgear pulley platform is connected with hanging scaffold in the pit shaft, the suspention facility that moves up and down in pit shaft as hanging scaffold.This kind sinking platform suspending mode need to fill several stable cars on ground, and the head sheave equipment investment is large, the construction preparation duration is longer, has increased many interim installation work amounts, has prolonged total duration of engineering construction, causes large unnecessary waste.On the other hand, the suspention stable car is located at ground, and hanging scaffold is in the down-hole, personnel notify the terrestrial operation hanging scaffold in the down-hole by signal about, often causing signal to pass out mistake or several suspention stage ropes up and down can not synchronized operation, cause hanging scaffold can not balance about, bring potential safety hazard to construction.
Summary of the invention
In order to address the above problem, the invention provides a kind of automatic lift type shaft hanging stage, fixing many rows, many bracket members of every row in the borehole wall, many winches are separately fixed at the upper strata hanging scaffold, rope stretching one end of winch cable is walked around the fixed pulley that is installed on the bracket member, pulling hanging scaffold up-and-down movement.
The present invention is achieved through the following technical solutions: a kind of automatic lift type shaft hanging stage, comprise the hanging scaffold that is suspended in the borehole wall and spur the winch that hanging scaffold moves up and down, it is characterized in that: many bracket members are fixed by anchor pole in the inboard at the borehole wall, steel wire ring of suit on every bracket member, fixed pulley is mounted on the steel wire ring; Many group winches are separately fixed at the top of hanging scaffold, and an end of winch cable is wrapped on the winch, and the other end is walked around fixed pulley and is fixed on the winch rope hook, and the winch rope hook is fixed on the hanging scaffold; Fixing many interim hooks in described hanging scaffold top; It is for subsequent use to do with short rope sling also to put many long rope slings at hanging scaffold.
The layering in the borehole wall of described many bracket members is deployed, and interfloor distance equates every layer of uniform many bracket member.
The quantity of described winch, winch rope hook equates with the quantity of every layer bracket member, and consistency from top to bottom.
Described long rope sling, short rope sling one end are fixed on the hook, and the other end is made into the collar.
Good effect of the present invention is:
1, the hanging scaffold uplink and downlink all operate in pit shaft, needn't be in aboveground operation, save aboveground, downhole communication time and equipment.
2, underground operators can be as required, and autonomous operation makes hanging scaffold fast, accurately arrive the height that needs.Enhance productivity, safe and reliable, easy to operate.
3, compact conformation, low cost of manufacture reduces the equipment investment fund, is convenient to promote the use of.
Description of drawings
Below in conjunction with the drawings and specific embodiments the present invention is described in further detail.
Fig. 1 is structural representation of the present invention;
Fig. 2 is the birds-eye view of Fig. 1;
Fig. 3 is the A place partial enlarged drawing of Fig. 1.
Among the figure: 1, the borehole wall, 2 bracket members, 3, steel wire ring, 4, anchor pole, 5, hanging scaffold, 6, interim hook, 7, the winch rope hook, 8, long rope sling, 9, short rope sling, 10, fixed pulley, 11, winch cable, 12, winch, 13, link up with, 14, the collar.
The specific embodiment
Such as Fig. 1, Fig. 2, shown in Figure 3: a kind of automatic lift type shaft hanging stage, comprise the hanging scaffold 5 that is suspended in the borehole wall 1 and spur the winch 12 that hanging scaffold 5 moves up and down, it is characterized in that: many bracket members 2 are fixed by anchor pole 4 in the inboard at the borehole wall 1, steel wire ring 3 of suit on every bracket member 2, fixed pulley 10 is mounted on the steel wire ring 3; Many group winches 12 are separately fixed at the top of hanging scaffold 5, and an end of winch cable 11 is wrapped on the winch 12, and the other end is walked around fixed pulley 10 and is fixed on the winch rope hook 7, and winch rope hook 7 is fixed on the hanging scaffold 5; Fixing many interim hooks 6 in described hanging scaffold 5 tops; It is for subsequent use to do with short rope sling 9 also to put many long rope slings 8 at hanging scaffold 5.
In the present embodiment, bracket member 2 every rows' spacing is 30~40 meters, and long rope sling 8 is also made equal length.Every row arranges four bracket members 2, and four groups of corresponding winches 12 also are set on the hanging scaffold 5.
When hanging scaffold 5 needs when descending, the hook 13 of long rope sling 8 upper ends is hung on the steel wire ring 3, start four groups of winch 12 synchronous workings, make hanging scaffold 5 descending.When hanging scaffold 5 comes downwards to long rope sling 8 and will use up, above the hanging scaffold of upper strata, reinstall next row bracket member 2, the collar 14 of long rope sling 8 lower ends is sleeved on the interim hook 6; Be rotated further winch 12 and make hanging scaffold 5 descending, make long rope sling 8 stressed pulling hanging scaffolds 5, winch cable 11 loosens, and the workmen takes well-bucket to upper row's bracket member 2 places, and fixed pulley 10 is taken, and hangs on the steel wire ring 3 of next row bracket member 2 again.Then winch 12 tightens up winch cable 11, and long rope sling 8 is loosened, and takes off long rope sling 8 from steel wire ring 3, is put on the hanging scaffold 5 stand-byly, finishes descend 30~40 meters in an interval of hanging scaffold 5.Next is interval when estimating to install bracket member 2 place level attitudes when hanging scaffold 5 drops to, and according to making said method, realizes the descending purpose in hanging scaffold 5 by stages.
Hanging scaffold 5 up steps are: hanging scaffold 5 is parked in bracket member 2 places, bottom, and the hook 13 of lacking rope sling 9 upper ends is hung on the steel wire ring 3, starts four groups of winches 12, and hanging scaffold 5 is up, loosens winch cable 11.Take fixed pulley 10, the workmen takes advantage of well-bucket that fixed pulley 10 is hung on the last layer bracket member 2, tightens up winch cable 11, takes short rope sling 9, is put on the hanging scaffold 5 stand-by.It is up to start winch 12 pulling hanging scaffolds, until upper row's bracket member 2 places reach 30~40 meters in the up interval of hanging scaffold, the like, realize the up purpose in hanging scaffold 5 by stages.

Claims (4)

1. automatic lift type shaft hanging stage, comprise the hanging scaffold (5) that is suspended in the borehole wall (1) and spur the winch (12) that hanging scaffold (5) moves up and down, it is characterized in that: many bracket members (2) are fixed by anchor pole (4) in the inboard at the borehole wall (1), the upper suit of every bracket member (a 2) steel wire ring (3), fixed pulley (10) is mounted on the steel wire ring (3); Many group winches (12) are separately fixed at the top of hanging scaffold (5), one end of winch cable (11) is wrapped on the winch (12), the other end is walked around fixed pulley (10) and is fixed on the winch rope hook (7), and winch rope hook (7) is fixed on the hanging scaffold (5); Fixing many interim hooks in described hanging scaffold (5) top (6); Also put many long rope slings (8) and short rope sling (9) is for subsequent use to do at hanging scaffold (5).
2. automatic lift type shaft hanging stage according to claim 1 is characterized in that: described many bracket members (2) layering in the borehole wall (1) is deployed, and interfloor distance equates every layer of uniform many bracket member (2).
3. automatic lift type shaft hanging stage according to claim 1 is characterized in that: the quantity of described winch (12), winch rope hook (7) equates with the quantity of every layer bracket member (2), and consistency from top to bottom.
4. automatic lift type shaft hanging stage according to claim 1 is characterized in that: described long rope sling (8), short rope sling (9) one ends are fixed on the hook (13), and the other end is made into the collar (14).
CN 200910183789 2009-08-11 2009-08-11 Automatic lift type shaft hanging stage Expired - Fee Related CN101993002B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200910183789 CN101993002B (en) 2009-08-11 2009-08-11 Automatic lift type shaft hanging stage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200910183789 CN101993002B (en) 2009-08-11 2009-08-11 Automatic lift type shaft hanging stage

Publications (2)

Publication Number Publication Date
CN101993002A CN101993002A (en) 2011-03-30
CN101993002B true CN101993002B (en) 2013-04-24

Family

ID=43783849

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200910183789 Expired - Fee Related CN101993002B (en) 2009-08-11 2009-08-11 Automatic lift type shaft hanging stage

Country Status (1)

Country Link
CN (1) CN101993002B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104344075A (en) * 2014-10-24 2015-02-11 铜陵有色金属集团铜冠矿山建设股份有限公司 Rapid hoisting and mounting method for suspending temporary air/water pipeline on shaft wall in vertical shaft construction

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102287192A (en) * 2011-06-24 2011-12-21 中煤第五建设有限公司 Six-layer construction platform for installing vertical shaft installation
CN110921484B (en) * 2019-11-15 2021-11-09 惠州市宏瑞环保能源有限公司 Hoisting device and hoisting method for wet-process sulfuric acid production equipment

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4033551A (en) * 1976-07-06 1977-07-05 Lindstrom Ralph E Tool for pulling underground service wire up a conduit
CN1078016A (en) * 1993-01-15 1993-11-03 山西矿业学院 All supporting type well rigs of vertical borehole wall ring and job practices thereof
CN2253370Y (en) * 1995-08-18 1997-04-30 西北电力建设第四工程公司 Electric form-lifting construction equipment for chimney
US6231030B1 (en) * 2000-05-12 2001-05-15 Robert C. Smith Minimal topsoil disturbance log skidder
CN2614201Y (en) * 2003-05-09 2004-05-05 孙在鲁 Towing self-lifting type elevator for loading man and goods
CN2703077Y (en) * 2004-05-10 2005-06-01 施圣贤 Novel electric mould lifting construction device
CN2703832Y (en) * 2004-05-10 2005-06-08 唐裕新 Elevator well creeping formwork hoisting frame
CN201473159U (en) * 2009-08-11 2010-05-19 中煤第五建设公司 Self-controlled lifting type suspension sinking platform for vertical shaft

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2676131B2 (en) * 1994-02-04 1997-11-12 ドーエイ外装有限会社 Work gondola
JPH10316375A (en) * 1997-05-20 1998-12-02 Toshiba Eng & Constr Co Ltd High-lift fitting/removing device and method for chain block device

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4033551A (en) * 1976-07-06 1977-07-05 Lindstrom Ralph E Tool for pulling underground service wire up a conduit
CN1078016A (en) * 1993-01-15 1993-11-03 山西矿业学院 All supporting type well rigs of vertical borehole wall ring and job practices thereof
CN2253370Y (en) * 1995-08-18 1997-04-30 西北电力建设第四工程公司 Electric form-lifting construction equipment for chimney
US6231030B1 (en) * 2000-05-12 2001-05-15 Robert C. Smith Minimal topsoil disturbance log skidder
CN2614201Y (en) * 2003-05-09 2004-05-05 孙在鲁 Towing self-lifting type elevator for loading man and goods
CN2703077Y (en) * 2004-05-10 2005-06-01 施圣贤 Novel electric mould lifting construction device
CN2703832Y (en) * 2004-05-10 2005-06-08 唐裕新 Elevator well creeping formwork hoisting frame
CN201473159U (en) * 2009-08-11 2010-05-19 中煤第五建设公司 Self-controlled lifting type suspension sinking platform for vertical shaft

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104344075A (en) * 2014-10-24 2015-02-11 铜陵有色金属集团铜冠矿山建设股份有限公司 Rapid hoisting and mounting method for suspending temporary air/water pipeline on shaft wall in vertical shaft construction
CN104344075B (en) * 2014-10-24 2017-03-29 铜陵有色金属集团铜冠矿山建设股份有限公司 Shaft construction hangs the quick handling of interim edema due to wind pathogen pipeline and installation method using the borehole wall

Also Published As

Publication number Publication date
CN101993002A (en) 2011-03-30

Similar Documents

Publication Publication Date Title
CN103979383B (en) Building operation multiple layer up-down plateform system
CN104358336A (en) Unit type curtain wall installation system and installation method thereof
EP2636629A1 (en) A method and an elevator arrangement
CN108678752A (en) Shaft equipment rapid installation process
CN111021749A (en) Simple hoisting mechanism for bare concrete exterior wall cladding and construction method thereof
CN101993002B (en) Automatic lift type shaft hanging stage
CN102536249A (en) Fast construction method of headframe lifting system
CN209873584U (en) Hang basket template and demolish device
CN103277104A (en) Sinking platform in-well hanging equipment and method
CN105544957B (en) A kind of jenny scaffold and its construction method for the construction of horizontal aerial pipeline
CN201473159U (en) Self-controlled lifting type suspension sinking platform for vertical shaft
CN204186314U (en) For the induction system that drilling rod or sleeve pipe are carried
CN211691536U (en) Simple lifting mechanism for bare concrete exterior wall cladding
CN102777048A (en) Vertical transportation device
CN205348734U (en) A jenny scaffold for construction of horizontal bracket vacant duct
CN107288640B (en) A kind of nothing is surely restricted self-supporting modularization vertical shaft driving and masonry construction device
CN203959697U (en) The equalizing bar of hoisting platform truss
CN104030176B (en) The equalizer bar of hoisting platform truss and hanging method thereof
CN201223653Y (en) Bight for safety operation of conical roof
CN103977512A (en) Building climbing rescue vehicle
CN210829101U (en) Mine derrick
CN203428878U (en) Post top lifting hoisting device
CN207812982U (en) A kind of inner wall of oil tank construction hanging basket
CN208980193U (en) The curtain wall hanging apparatus of anticollision
CN103121629B (en) Hoisting method of large support equipment for basement

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130424

Termination date: 20180811

CF01 Termination of patent right due to non-payment of annual fee