CN103979383B - Building operation multiple layer up-down plateform system - Google Patents

Building operation multiple layer up-down plateform system Download PDF

Info

Publication number
CN103979383B
CN103979383B CN201410176504.9A CN201410176504A CN103979383B CN 103979383 B CN103979383 B CN 103979383B CN 201410176504 A CN201410176504 A CN 201410176504A CN 103979383 B CN103979383 B CN 103979383B
Authority
CN
China
Prior art keywords
platform
elevator
column
construction
building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410176504.9A
Other languages
Chinese (zh)
Other versions
CN103979383A (en
Inventor
钟世宪
王乔
钟锋
马华伟
刘真泉
王士法
徐福祥
袁辉鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Rapid Development Construction Implement Engineering Co Ltd
Original Assignee
Shandong Rapid Development Construction Implement Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Rapid Development Construction Implement Engineering Co Ltd filed Critical Shandong Rapid Development Construction Implement Engineering Co Ltd
Priority to CN201410176504.9A priority Critical patent/CN103979383B/en
Publication of CN103979383A publication Critical patent/CN103979383A/en
Application granted granted Critical
Publication of CN103979383B publication Critical patent/CN103979383B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Types And Forms Of Lifts (AREA)

Abstract

本发明提出了一种多层升降平台,使之既适合建筑主体施工、又能同时应用于外装饰施工,可改变目前建筑主体和外装饰施工过程需要安装使用两种不同作业设施的现状。本发明是通过以下措施来实现的:一种建筑施工多层升降平台系统,其特征是:包括立柱、沿立柱可上下运行的套架和连接在套架上的操作平台,立柱通过附墙架每隔一段间距与建筑物连接,立柱上面还装有独立于操作平台的可在地面与操作平台之间高速运行的升降机。本发明提出了一种与建筑施工升降平台配套并形成系统的运送人员物料的升降机,该体系可以提供施工人员的操作平台,同时可以将施工人员及物料运送到操作平台,对提高施工效率、消除安全隐患具有重要意义。

The invention proposes a multi-layer lifting platform, which is suitable for the construction of the main body of the building and can be applied to the construction of the exterior decoration at the same time, which can change the current situation that two different operating facilities need to be installed and used in the construction process of the main body of the building and the exterior decoration. The present invention is achieved through the following measures: a building construction multi-layer lifting platform system, which is characterized in that it includes a column, a sleeve frame that can run up and down along the column, and an operating platform connected to the sleeve frame. It is connected to the building at intervals, and an elevator that is independent of the operating platform and can run at high speed between the ground and the operating platform is installed on the column. The present invention proposes a lift that is matched with the building construction lifting platform and forms a system for transporting personnel and materials. Safety hazards are of great significance.

Description

建筑施工多层升降平台系统Multi-storey lifting platform system for building construction

技术领域 technical field

本发明涉及一种适用于建筑主体和外装饰施工的多层升降平台和与之配套的升降机系统及其工作方法。 The invention relates to a multi-layer lifting platform suitable for building main body and exterior decoration construction, a matching lifting system and a working method thereof.

背景技术 Background technique

建筑施工分为主体施工和内外装饰施工两个阶段,目前在主体施工阶段,多层和低层建筑普遍采用落地式脚手架,高层建筑一般采用悬挑式脚手架。附着升降脚手架由于搭设复杂,只在50米以上高层建筑施工中部分采用,且由于升降动作操作复杂、不能分段升降等原因,不能应用于建筑外装饰施工过程。主体施工封顶后,需要将上述脚手架拆除,再采用高处作业吊篮进行建筑外装饰施工。因此,目前国内尚没有一种既能适合主体施工、又能同时应用于建筑外装饰施工的安全可靠的作业设施或设备。施工过程需要安装使用两种不同的作业设施,成本大、效率低。 Building construction is divided into two stages: main construction and interior and exterior decoration construction. At present, in the main construction stage, floor-to-ceiling scaffolding is generally used for multi-storey and low-rise buildings, and cantilevered scaffolding is generally used for high-rise buildings. Attached lifting scaffolding is only partially used in the construction of high-rise buildings above 50 meters due to its complicated erection, and it cannot be applied to the construction process of building exterior decoration due to the complicated lifting operation and the inability to lift in sections. After the main body construction is capped, the above-mentioned scaffolding needs to be dismantled, and then the hanging basket for high-altitude operation is used for building exterior decoration construction. Therefore, there is still no safe and reliable operating facility or equipment that can be suitable for main body construction and can be applied to building exterior decoration construction at present in China. The construction process requires the installation and use of two different operating facilities, which is costly and inefficient.

有公司从国外引进了电动施工升降平台,同时提供一人或多人在其上工作。如图1所示:平台结构采用单层平台,施工人员只能在建筑物的一个层面操作;如图2所示:连接操作平台沿立柱运行的套架采用6个滚轮只与立柱的2个主肢接触、立柱传力点少、刚度差,导致最上一个附着点以上的悬臂高度受到限制;如图3所示:悬臂高度刚超过建筑物的2个层高。一般操作平台附墙架的间距就为2个层高,在建筑主体施工时、特别是混凝土主体结构,需要一定的时间养护。如果操作平台悬臂高度刚超过建筑物的2个层高,就无法在没有达到养护周期的主体结构上安装附墙架,所以此类电动施工升降平台不能适应主体施工阶段的要求,目前只能用于建筑外装饰施工。同时由于造价高,单独在建筑外装饰阶段使用从经济性上无法与高处作业吊篮竞争,目前在工程中很少使用。 Some companies have introduced electric construction lifting platforms from abroad, and provide one or more people to work on them at the same time. As shown in Figure 1: the platform structure adopts a single-layer platform, and construction personnel can only operate on one level of the building; as shown in Figure 2: the sleeve frame connecting the operation platform and running along the column uses 6 rollers and only 2 of the column The contact of the main limbs, few force transmission points of the column, and poor rigidity lead to the limitation of the cantilever height above the last attachment point; as shown in Figure 3: the cantilever height just exceeds the height of 2 floors of the building. Generally, the distance between the operation platform and the wall frame is 2 storeys high. During the construction of the main body of the building, especially the main structure of concrete, it needs a certain amount of time for maintenance. If the cantilever height of the operating platform just exceeds the height of two floors of the building, it is impossible to install a wall frame on the main structure that has not reached the maintenance period. Therefore, this type of electric construction lifting platform cannot meet the requirements of the main construction stage. At present, it can only be used Decorate construction outside the building. At the same time, due to the high cost, it is economically unable to compete with the hanging basket for high-altitude operations when used alone in the building exterior decoration stage, so it is rarely used in projects at present.

目前建筑施工中,操作人员及所需物料的运送主要采用施工升降机和塔机。在主体施工阶段,人员及物料需要先运送到建筑物内或作业面,再通过二次搬运,倒运到脚手架或操作平台上;在外装饰阶段,一般塔机已经拆除,人员及物料的运送只能靠施工升降机,尤其是外装饰所用物料,需要先进入建筑物内部,再二次搬运到脚手架或操作平台,严重影响了施工效率、增加了工人的劳动强度、存在安全隐患。 At present, in building construction, construction elevators and tower cranes are mainly used to transport operators and required materials. In the main construction stage, personnel and materials need to be transported to the building or the working surface first, and then transported to the scaffold or operation platform through secondary transportation; in the external decoration stage, the general tower crane has been dismantled, and the transportation of personnel and materials can only Relying on construction elevators, especially the materials used for exterior decoration, needs to enter the interior of the building first, and then be transported to the scaffolding or operating platform for the second time, which seriously affects the construction efficiency, increases the labor intensity of workers, and poses safety hazards.

发明内容 Contents of the invention

本发明为了克服以上技术的不足,提出了一种多层升降平台,使之既适合建筑主体施工、又能同时应用于外装饰施工,可改变目前建筑主体和外装饰施工过程需要安装使用两种不同作业设施的现状。本发明提出了一种与建筑施工升降平台配套并形成系统的运送人员物料的升降机,该体系可以提供施工人员的操作平台,同时可以将施工人员及物料运送到操作平台,对提高施工效率、消除安全隐患具有重要意义。 In order to overcome the deficiencies of the above technologies, the present invention proposes a multi-layer lifting platform, which is not only suitable for the construction of the main body of the building, but also can be applied to the construction of the exterior decoration at the same time, which can change the current construction process of the main body of the building and the construction of the exterior decoration. Current status of different operating facilities. The present invention proposes a lift that is matched with the building construction lifting platform and forms a system for transporting personnel and materials. Safety hazards are of great significance.

本发明是通过以下措施来实现的: The present invention is achieved through the following measures:

一种建筑施工多层升降平台系统,其特征是:包括立柱、沿立柱可上下运行的套架和连接在套架上的操作平台,立柱通过附墙架每隔一段间距与建筑物连接,立柱上面还装有独立于操作平台的可在地面与操作平台之间高速运行的升降机。 A building construction multi-layer lifting platform system, characterized in that it includes a column, a frame that can run up and down along the column, and an operating platform connected to the frame. The column is connected to the building at intervals through the attached wall frame. The column It is also equipped with a lift that is independent of the operating platform and can run at high speed between the ground and the operating platform.

根据所述的建筑施工多层升降平台系统,所述的升降机采用六个升降机滚轮与立柱外侧两个主肢接触,升降机安装有防坠落保护器。 According to the multi-layer lifting platform system for building construction, the lift adopts six lift rollers to contact the two main limbs outside the column, and the lift is equipped with a fall protection device.

根据所述的建筑施工多层升降平台系统,所述的连接在操作平台沿立柱运行的套架采用八个滚轮与立柱的四个主肢均匀接触; According to the multi-layer lifting platform system for building construction, the sleeve frame connected to the operation platform running along the column uses eight rollers to evenly contact the four main limbs of the column;

所述的操作平台包括上层主操作平台和悬挂在上层主操作平台下面的副平台,副平台上设置有高度调节装置,高度调节装置包括两个套接在一起的钢管,钢管通过固定销穿过两个钢管来固定。 The operating platform includes an upper main operating platform and an auxiliary platform suspended below the upper main operating platform. The auxiliary platform is provided with a height adjustment device. The height adjustment device includes two steel pipes that are socketed together, and the steel pipes pass through the fixed pins. Two steel pipes to fix.

根据所述的建筑施工多层升降平台系统,上层主操作平台的套架上设置有吊杆,上层主操作平台外侧有与升降机对接的对接工作平台,对接工作平台上安装有向下延伸的导向杆,升降机上装有向上伸出的爬梯,上层主操作平台上还挂接有可拆卸的爬梯; According to the multi-layer lifting platform system for building construction, a suspender is arranged on the frame of the main operating platform on the upper floor, and there is a docking work platform docked with the elevator on the outside of the main operation platform on the upper floor, and a guide extending downward is installed on the docking work platform. Rod, the elevator is equipped with a climbing ladder extending upwards, and a detachable climbing ladder is also attached to the main operating platform on the upper floor;

所述的操作平台上安装有操作平台限位开关和极限开关组件,操作平台安装有向下伸出的操作平台碰块,升降机上安装有升降机碰块,升降机上安装有升降机限位开关和极限开关组件。 An operating platform limit switch and a limit switch assembly are installed on the operating platform, an operating platform touch block protruding downward is installed on the operating platform, an elevator touch block is installed on the elevator, and an elevator limit switch and a limit switch are installed on the elevator. Switch components.

本发明主要有以下特点: The present invention mainly has following characteristics:

1、既适合建筑主体施工、又能同时应用于外装饰施工的操作; 1. It is not only suitable for the construction of the main body of the building, but also can be applied to the operation of exterior decoration construction at the same time;

2、采用多层操作平台方案,根据需要,施工人员可同时在单层、上下两层或三层施工作业面操作,特别适合于主体施工时大模板支护及建筑工业化成品部件的安装; 2. The multi-layer operation platform scheme is adopted. According to the needs, the construction personnel can operate on the single-layer, upper-lower two-layer or three-layer construction work surface at the same time, which is especially suitable for the large formwork support during the main construction and the installation of industrialized building components;

3、采用在主平台悬挂副平台6的结构,受力更合理、结构更轻巧,同时使安全监控系统更为简洁可靠; 3. Adopting the structure of suspending the sub-platform 6 on the main platform, the force is more reasonable, the structure is lighter, and the safety monitoring system is more concise and reliable;

4、多层平台之间的高度差可以根据不同楼层间距进行调整; 4. The height difference between multi-storey platforms can be adjusted according to different floor spacings;

5、该体系采用独立于操作平台的、可高速运行的升降机。除可以提供施工人员的操作平台外,同时可以利用自身设备,高效地完成施工人员及物料的转运,解决了以往利用其它施工设备运送,需要二次转运的难题; 5. The system adopts a lift that is independent of the operating platform and can run at high speed. In addition to providing an operating platform for construction personnel, at the same time, it can use its own equipment to efficiently complete the transfer of construction personnel and materials, which solves the problem of secondary transfer when using other construction equipment in the past;

6、该系统具备完善可靠的安全监控系统。在升降机与操作平台接近时,首先停止升降机的运行,然后开动平台下降,具备减速停车、防止碰撞的功能,并使之达到转运状态; 6. The system has a perfect and reliable safety monitoring system. When the elevator is close to the operating platform, first stop the operation of the elevator, and then start the platform to descend, with the function of decelerating to stop, preventing collision, and making it reach the transfer state;

7、达到转运状态后,该体系具备一种人员从升降机到操作平台的安全通道; 7. After reaching the transfer state, the system has a safe passage for personnel from the elevator to the operating platform;

8、达到转运状态后,利用安装在操作平台上的吊杆,吊运升降机内的物料; 8. After reaching the transfer state, use the boom installed on the operating platform to lift the materials in the elevator;

9、本发明在高层建筑特别是超高层建筑中使用,可以大幅度提高建筑施工操作平台的施工效率,增强了建筑施工操作平台推广使用的可行性。 9. When the present invention is used in high-rise buildings, especially super high-rise buildings, it can greatly improve the construction efficiency of the construction operation platform, and enhance the feasibility of popularizing and using the construction operation platform.

附图说明 Description of drawings

图1为传统单层操作平台示意图。 Figure 1 is a schematic diagram of a traditional single-layer operating platform.

图2为传统单层操作平台套架与立柱主肢接触结构示意图。 Figure 2 is a schematic diagram of the traditional single-layer operation platform sleeve frame and the main limb of the column contact structure.

图3为单层操作平台最上一个附着点以上的悬臂高度示意图。 Fig. 3 is a schematic diagram of the height of the cantilever above the uppermost attachment point of the single-layer operation platform.

图4为主副结构型式多层操作平台示意图。 Figure 4 is a schematic diagram of a multi-layer operating platform with main and auxiliary structures.

图5为建筑施工操作平台和人员物料运送升降机系统主视图。 Fig. 5 is a front view of the construction operation platform and the elevator system for transporting personnel and materials.

图6操作平台局部俯视图。 Figure 6 Partial top view of the operating platform.

图7为多层操作平台套架与立柱主肢接触结构示意图。 Fig. 7 is a schematic diagram of the contact structure between the multi-layer operating platform sleeve frame and the main leg of the column.

图8为多层操作平台最上一个附着点以上的悬臂高度示意图。 Fig. 8 is a schematic diagram of the height of the cantilever above the uppermost attachment point of the multi-layer operation platform.

图9为副平台吊挂杆件高度调节装置示意图。 Fig. 9 is a schematic diagram of the height adjustment device for hanging rods of the auxiliary platform.

图10为建筑施工升降操作平台俯视图。 Fig. 10 is a top view of the building construction lifting operation platform.

图11人员物料运送升降机系统俯视图。 Figure 11 is the top view of the elevator system for transporting personnel and materials.

图12为图10的B部分放大视图。 FIG. 12 is an enlarged view of part B of FIG. 10 .

图13为建筑施工操作平台和人员物料升降机系统主视图。 Fig. 13 is a front view of the construction operation platform and the personnel material elevator system.

图中,1、立柱;2、套架;3、上层主操作平台;4、附墙架;5、建筑物;6、副平台;7、吊杆;8、爬梯;9、升降机;10、对接工作平台;11、高度调节装置;12、升降机滚轮;13、升降机防坠落保护器;14、操作平台限位开关和极限开关组件;15、操作平台碰块;16、升降机碰块;17、升降机限位开关和极限开关组件;18、导向杆;19、装料筐。 In the figure, 1, column; 2, sleeve frame; 3, upper main operation platform; 4, attached wall frame; 5, building; 6, auxiliary platform; 7, boom; 8, climbing ladder; Docking work platform; 11. Height adjustment device; 12. Elevator roller; 13. Elevator fall protection device; 14. Operating platform limit switch and limit switch assembly; 15. Operating platform bumper block; 16. Elevator bumper block; 17. Lift limit switch and limit switch assembly; 18, guide rod; 19, charging basket.

具体实施方式 detailed description

本发明是适用于建筑主体和外装施工的多层升降平台和与之配套的升降机,包括采用附着架与建筑物连接固定的立柱1、能够沿立柱1上下运行的套架2、连接在套架2上的主平台和通过可调拉杆连接的副平台6,还包括独立于升降平台的、可高速运行的升降机9。该升降机利用升降平台运行的立柱1作为轨道,在地面和平台之间运送人员物料。 The present invention is a multi-layer elevating platform suitable for building main body and external decoration construction and a matching elevator, comprising a column 1 connected and fixed with a building by an attachment frame, a sleeve frame 2 capable of running up and down along the column 1, and a frame connected to the frame The main platform on the 2 and the auxiliary platform 6 connected by adjustable pull rods also include an elevator 9 that is independent of the lifting platform and can run at a high speed. The lift utilizes the column 1 running on the lifting platform as a track to transport personnel and materials between the ground and the platform.

本发明还包括一种四面包箍的、连接操作平台沿立柱1运行的套架2,如图6所示。套架2采用八个滚轮与立柱1的四个主肢均匀接触,消除了国外电动施工升降平台套架采用六个滚轮只与立柱两个主肢接触的缺陷(如图2所示)。本发明同时加大立柱的截面、提高了立柱1的刚度,使立柱1在附墙架4以上的悬臂高度可以超过三个建筑物层高,保证了主体施工过程中两个层高的附墙架间距,对实现操作平台既能适合建筑主体施工、又能同时应用于外装饰施工起到了关键作用,如图7所示。因此,本发明可同时适用于建筑主体和外装饰施工。 The present invention also includes a four-sided hooped frame 2 connected to the operating platform running along the column 1 , as shown in FIG. 6 . The frame 2 uses eight rollers to evenly contact the four main legs of the column 1, eliminating the defect that the foreign electric construction lifting platform frame uses six rollers to only contact the two main legs of the column (as shown in Figure 2). The present invention increases the section of the column and improves the rigidity of the column 1 at the same time, so that the cantilever height of the column 1 above the attached wall frame 4 can exceed the height of three building floors, ensuring that the attached wall with two storeys is high during the construction of the main body The frame spacing plays a key role in realizing that the operation platform can not only be suitable for the construction of the main body of the building, but also be applied to the construction of exterior decoration at the same time, as shown in Figure 7. Therefore, the present invention can be applicable to building main body and exterior decoration construction simultaneously.

本发明的多层操作平台悬挂一层或两层副平台6的结构形式。首先,从结构受力上更合理、结构更轻巧、自重轻;其次,可以只在上层主操作平台3上设置传感器,就可以检测多层平台上的载荷参数,如图4所示。 The multi-layer operating platform of the present invention has a structure in which one or two layers of sub-platforms 6 are suspended. Firstly, it is more reasonable in terms of structural force, lighter in structure, and lighter in weight; secondly, only sensors can be installed on the upper main operating platform 3 to detect the load parameters on the multi-layer platform, as shown in Figure 4.

如图9所示:本发明主平台下悬挂副平台6,在连接吊杆上设有高度调节装置11,可以根据建筑物的层高在平台安装前调整多层平台的间距,更好地适应施工人员同时在多层施工作业面操作。 As shown in Figure 9: the secondary platform 6 is suspended under the main platform of the present invention, and a height adjustment device 11 is provided on the connecting boom, which can adjust the distance between the multi-layer platforms before the platform installation according to the floor height of the building, so as to better adapt to the The construction workers are operating on the multi-layer construction work surface at the same time.

本发明还装有一种独立于升降平台的、可高速运行的升降机9。该升降机9利用操作平台运行的立柱1的轨道,在地面和操作平台之间运送人员物料。其工作机构驱动齿轮沿立柱1上安装的齿条运行,并安装有升降机防坠落保护器13。如图11所示,该设备采用六个滚轮与立柱1外侧(远离建筑物一侧)的两个主肢接触,可以避免在运行中与立柱1的附墙架4干涉,保证在地面和操作平台之间的运行平稳可靠。升降机9两侧向建筑主体方向延伸,便于施工人员拆装附墙架4。 The present invention is also equipped with a lift 9 that is independent of the lifting platform and can run at high speed. The elevator 9 utilizes the track of the column 1 running on the operating platform to transport personnel and materials between the ground and the operating platform. Its working mechanism driving gear runs along the tooth bar installed on the column 1, and the elevator anti-fall protector 13 is installed. As shown in Figure 11, the device uses six rollers to contact the two main limbs on the outside of the column 1 (the side away from the building), which can avoid interference with the wall bracket 4 of the column 1 during operation, and ensure that it is on the ground and in operation. The operation between platforms is smooth and reliable. Both sides of the lifter 9 extend toward the main body of the building, which is convenient for construction personnel to disassemble and assemble the attached wall frame 4 .

本发明还安装一套建筑施工升降操作平台和升降机系统的安全监控系统,可以监控升降机9的载重量,当升降机9与操作平台接近时,可以实现减速防止碰撞的功能。如图13所示:升降机9安装有限位开关和极限开关,在接近操作平台时,安装在操作平台上向下伸出的操作平台碰块15,与升降机9的升降机限位开关和极限开关组件17接触,使升降机9停止运行,防止碰撞。 The present invention also installs a safety monitoring system of a building construction lifting operation platform and the elevator system, which can monitor the load capacity of the elevator 9, and when the elevator 9 is close to the operation platform, the function of deceleration and collision prevention can be realized. As shown in Figure 13: the elevator 9 is equipped with a limit switch and a limit switch. When approaching the operation platform, it is installed on the operation platform bumper block 15 protruding downward on the operation platform, and the elevator limit switch and the limit switch assembly of the elevator 9 17 contact, make elevator 9 stop running, prevent collision.

升降机9停止后,采取下降平台的方式使其与升降机9靠近,以便于人员和物料的转运;操作平台上也安装有操作平台限位开关和极限开关组件14,操作平台下降时,升降机9上安装有向上伸出的升降机碰块16,与操作平台限位开关和极限开关组件14接触,切断平台的电源,防止与升降机9碰撞。 After elevator 9 stops, take the mode of descending platform to make it close to elevator 9, so that the transshipment of personnel and material; Operation platform limit switch and limit switch assembly 14 are also installed on the operation platform, when operation platform descends, elevator 9 goes up. The lift block 16 that protrudes upwards is installed, contacts with operating platform limit switch and limit switch assembly 14, cuts off the power supply of platform, prevents from colliding with lift 9.

本发明还涉及一种人员从升降机9到操作平台的安全通道。升降机9停止运行后、操作平台进一步靠近,达到操作平台和人员物料运送升降机9的转运状态,如图6所示,操作平台安装有与升降机对接的对接工作平台10。如图13所示,升降机上有向上伸出的爬梯8,在转运状态可以到达副平台底部,施工人员可以通过爬梯8转入副平台6。达到建筑操作平台和升降机9系统的转运状态后,如图13所示,利用安装在操作平台上的吊杆7,沿着导向杆18吊起装料平台19内的物料,施工人员可以在对接工作平台10上搬运物料到操作平台上进行施工。 The invention also relates to a safe passage of personnel from the lift 9 to the operating platform. After the elevator 9 stops running, the operating platform is further approached to reach the transfer state of the operating platform and the personnel and material transport elevator 9. As shown in Figure 6, the operating platform is equipped with a docking work platform 10 docked with the elevator. As shown in Figure 13, there is a climbing ladder 8 protruding upwards on the elevator, which can reach the bottom of the auxiliary platform in the transfer state, and construction personnel can transfer to the auxiliary platform 6 through the climbing ladder 8. After reaching the transfer state of the construction operation platform and the elevator 9 system, as shown in Figure 13, use the suspender 7 installed on the operation platform to lift the materials in the charging platform 19 along the guide rod 18, and the construction personnel can dock Materials are carried on the working platform 10 to the operating platform for construction.

下面结合附图和具体实施方式对本发明的同时适用于建筑主体和外装施工的多层升降平台和与之配套的升降机系统,做进一步的说明。 The following is a further description of the multi-layer elevating platform and the supporting elevator system of the present invention, which are applicable to both building main body and exterior construction, in conjunction with the accompanying drawings and specific embodiments.

参考附图4,本发明由立柱1、可沿立柱1上下运行的套架2、上层主操作平台3、吊挂在主操作平台3下的副平台6组成多层升降操作平台。多层操作平台采用上层主操作平台3、悬挂一层或两层副平台6的结构形式。 With reference to accompanying drawing 4, the present invention is made up of multilayer lifting operation platform by column 1, the cover frame 2 that can run up and down along column 1, the main operation platform 3 of upper strata, the secondary platform 6 that hangs under the main operation platform 3. The multi-layer operation platform adopts the structural form of the main operation platform 3 on the upper floor and one or two layers of auxiliary platforms 6 suspended.

参考附图7,套架2采用8个滚轮与立柱1的四个主肢均匀接触,消除了国外电动施工升降平台套架采用六个滚轮只与立柱1两个主肢接触的缺陷(参考附图2),同时加大的立柱1的截面使立柱在附墙架4以上的悬臂高度可以超过三个建筑物层高,保证主体施工过程中两个层高的附墙架4间距。参考附图7,本发明可同时适用于建筑主体和外装饰施工。 Referring to accompanying drawing 7, the frame 2 uses 8 rollers to evenly contact the four main legs of the column 1, eliminating the defect that the foreign electric construction lifting platform frame uses six rollers to only contact the two main legs of the column 1 (refer to the attached Fig. 2), at the same time, the enlarged section of the column 1 enables the cantilever height of the column above the wall frame 4 to exceed three building storey heights, ensuring the distance between the wall frame 4 with two storey heights during the construction of the main body. With reference to accompanying drawing 7, the present invention can be applicable to building main body and exterior decoration construction simultaneously.

参考附图9,在副平台6连接吊杆上设有高度调节装置11,副平台6吊挂杆件高度调节装置11是由两个钢管套接在一起,钢管上穿有固定销,通过调节细钢管插入的深度就可以根据建筑物的层高调整副平台6的间距,更好地适应施工人员同时在多层施工作业面操作。 With reference to accompanying drawing 9, be provided with height adjustment device 11 on auxiliary platform 6 connecting suspenders, auxiliary platform 6 suspension rod height adjustment device 11 is to be socketed together by two steel pipes, and fixed pin is worn on steel pipe, by adjusting The depth of thin steel pipe insertion just can adjust the spacing of sub-platform 6 according to the storey height of building, better adapt to builder and simultaneously operate in multi-layer construction work surface.

参考附图6,建筑施工操作平台包括立柱1、沿立柱1上下运行的套架2和连接在套架2上的上层主操作平台3,立柱1通过附墙架4每隔一定间距与建筑物5连接。安装在操作平台的套架2上有可以吊装货物的吊杆7,安装在操作平台上的还有活动的可以拆卸的爬梯8,操作人员利用这个梯子可以上下主副平台,此外立柱1上装有独立于操作平台的、可高速运行的升降机9和安装操作平台上与升降机9对接的对接工作平台10。 With reference to accompanying drawing 6, building construction operation platform comprises column 1, the cover frame 2 that moves up and down along column 1 and the upper main operation platform 3 that is connected on the cover frame 2, column 1 is connected with building at regular intervals by attached wall frame 4. 5 connections. There is a suspender 7 that can hoist goods on the sleeve frame 2 installed on the operation platform. There is also a movable and detachable climbing ladder 8 installed on the operation platform. The operator can use this ladder to go up and down the main and auxiliary platforms. In addition, the column 1 is equipped with An elevator 9 that is independent of the operating platform and capable of high-speed operation and a docking work platform 10 that is docked with the elevator 9 is installed on the operating platform.

参考附图11,升降机9采用六个升降机滚轮12与立柱1外侧(远离建筑物一侧)的两个主肢接触,可以避免在运行中与立柱1的附墙架4干涉,保证在地面和操作平台之间的运行平稳可靠,升降机9驱动齿轮沿立柱1上安装的齿条运行。 With reference to accompanying drawing 11, elevator 9 adopts six elevator rollers 12 to contact with two main limbs of column 1 outside (far away from the building side), can avoid interfering with the attached wall frame 4 of column 1 in operation, guarantees on the ground and The operation between the operating platforms is stable and reliable, and the drive gear of the elevator 9 runs along the rack installed on the column 1.

参考附图13,操作平台上安装有操作平台限位开关和极限开关组件14,升降机9上安装有向上伸出的升降机碰块16,升降机9上安装有升降机限位开关和极限开关组件17,升降机9上还安装有升降机防坠落保护器13,操作平台安装有向下伸出的操作平台碰块15。 With reference to accompanying drawing 13, operating platform limit switch and limit switch assembly 14 are installed on the operating platform, elevator bumper block 16 protruding upwards is installed on the elevator 9, elevator limit switch and limit switch assembly 17 are installed on the elevator 9, Lift 9 is also equipped with lift anti-falling protector 13, and operating platform is equipped with the operating platform bump block 15 that protrudes downwards.

一种同时适用于建筑主体和外装施工的多层升降平台和与之配套的升降机系统的安装和使用方法如下, The installation and use methods of a multi-layer lifting platform suitable for building main body and exterior construction and the matching lifting system are as follows,

1)首先安装立柱1,根据使用高度,一般需要采用附墙架4将立柱与建筑物5连接固定; 1) Install the column 1 first. According to the height of use, it is generally necessary to use the wall bracket 4 to connect the column to the building 5;

2)安装套架2,套架2采用八个滚轮与立柱1的四个主肢均匀接触; 2) Install the sleeve frame 2, and the sleeve frame 2 uses eight rollers to evenly contact the four main limbs of the column 1;

3)安装主副操作平台,上层主操作平台3下悬挂副平台6,在连接吊杆上设有高度调节装置11,它可以根据建筑物的层高,在平台安装前调整多层平台的间距; 3) Install the main and auxiliary operating platforms, the upper main operating platform 3 hangs the auxiliary platform 6, and a height adjustment device 11 is provided on the connecting boom, which can adjust the distance between the multi-layer platforms before the platform is installed according to the height of the building ;

4)安装升降机9。升降机9采用六个升降机滚轮12与立柱1外侧(远离建筑物一侧)的2个主肢接触,可以避免在运行中与立柱的附墙架4干涉,其工作机构驱动齿轮沿立柱1上安装的齿条高速运行,并安装有升降机防坠落保护器13; 4) Install lift 9. The elevator 9 uses six elevator rollers 12 to contact the two main limbs on the outside of the column 1 (away from the building side), which can avoid interference with the wall bracket 4 of the column during operation, and the driving gear of its working mechanism is installed along the column 1 The rack runs at high speed and is equipped with an elevator anti-fall protector 13;

5)在操作平台套架2上安装可以吊装货物的吊杆7,在操作平台上安装对接工作平台10,在对接工作平台10上安装导向杆18; 5) Install the boom 7 capable of hoisting goods on the operation platform sleeve frame 2, install the docking work platform 10 on the operation platform, and install the guide rod 18 on the docking work platform 10;

6)在操作平台上安装操作平台限位开关和极限开关组件14、操作平台碰块15;在升降机9上安装升降机限位开关和极限开关组件17、升降机碰块16。 6) Install the operating platform limit switch and limit switch assembly 14 and the operating platform bumper 15 on the operating platform; install the elevator limit switch and limit switch assembly 17 and the elevator bumper 16 on the elevator 9 .

升降机与操作平台接近时,减速、防撞、转运功能的实现。 When the elevator is close to the operating platform, the functions of deceleration, collision avoidance and transfer are realized.

1)升降机9在接近操作平台时,安装在操作平台上向下伸出的操作台碰块15与升降机限位开关和极限开关组件17接触,使升降机9停止运行,防止与操作平台碰撞。 1) When the elevator 9 approaches the operation platform, the operating platform bumper 15 installed on the operation platform and protruding downwards contacts the elevator limit switch and the limit switch assembly 17, so that the elevator 9 stops running and prevents it from colliding with the operation platform.

2)升降机9停止后,采取下降平台的方式使其与升降机9靠近,以便于人员和物料的转运;操作平台下降时,升降机碰块16与操作平台限位开关和极限开关组件14接触,切断操作平台的电源,防止与升降机9碰撞。 2) After the elevator 9 stops, lower the platform to make it close to the elevator 9, so as to facilitate the transfer of personnel and materials; The power supply of the operating platform prevents from colliding with the elevator 9.

3)达到建筑操作平台和人员物料运送升降机系统的转运状态后,对接工作平台10上的爬梯8可以到达升降机9的吊笼内,施工人员可以通过爬梯8转入操作平台工作。 3) After reaching the transfer state of the construction operation platform and the personnel material transport elevator system, the ladder 8 on the docking work platform 10 can reach the cage of the elevator 9, and the construction personnel can transfer to the operation platform through the ladder 8 to work.

4)达到建筑操作平台和升降机系统的转运状态后,利用安装在操作平台上的吊杆7,吊起升降机内的物料,施工人员可以在对接工作平台10上将搬运物料到操作平台上,进行施工。 4) After reaching the transfer state of the construction operation platform and the elevator system, use the boom 7 installed on the operation platform to lift the materials in the elevator, and the construction personnel can transfer the materials to the operation platform on the docking work platform 10 to carry out construction.

Claims (2)

1. a building operation multiple layer up-down plateform system, it is characterized in that: the stock (2) that comprise column (1), can run along column (1) up and down and the service platform be connected on stock (2), column (1) is connected with building (5) every a certain distance by wall-attached frame (4), column (1) be also equipped with above independent of service platform can between ground and service platform the elevator (9) of high-speed cruising;
Be connected to described service platform adopts eight rollers and column (1) four main limb uniform contact along the stock (2) that column (1) runs;
Described service platform comprises upper strata main operation platform (3) and is suspended on the auxiliary platform (6) below upper strata main operation platform (3), auxiliary platform (6) is provided with arrangement for adjusting height (11), arrangement for adjusting height (11) comprises two steel pipes connected together, and steel pipe is fixed through two steel pipes by set pin;
The stock (2) of upper strata main operation platform (3) is provided with suspension rod (7), and there is the mating operation platform (10) docked with elevator (9) in upper strata main operation platform (3) outside, mating operation platform (10) is provided with the cat ladder (8) to downward-extension;
Described service platform is provided with service platform limit switch and limit switch assembly (14), service platform is provided with the service platform collision block (15) stretched out downwards, elevator (9) is provided with elevator collision block (16), elevator (9) is provided with elevator limit switch and limit switch assembly (17).
2. building operation multiple layer up-down plateform system according to claim 1; it is characterized in that: described elevator (9) adopts six elevator rollers (12) and column (1) outside two main limbs to contact, and elevator (9) is provided with fall protector (13).
CN201410176504.9A 2014-04-29 2014-04-29 Building operation multiple layer up-down plateform system Active CN103979383B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410176504.9A CN103979383B (en) 2014-04-29 2014-04-29 Building operation multiple layer up-down plateform system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410176504.9A CN103979383B (en) 2014-04-29 2014-04-29 Building operation multiple layer up-down plateform system

Publications (2)

Publication Number Publication Date
CN103979383A CN103979383A (en) 2014-08-13
CN103979383B true CN103979383B (en) 2016-03-16

Family

ID=51271598

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410176504.9A Active CN103979383B (en) 2014-04-29 2014-04-29 Building operation multiple layer up-down plateform system

Country Status (1)

Country Link
CN (1) CN103979383B (en)

Families Citing this family (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104355077B (en) * 2014-10-14 2017-03-15 中国十七冶集团有限公司 A kind of conveying arrangement of the resistance to material of coke oven and transportation resources
CN104627786B (en) * 2014-12-23 2016-03-02 广州市水电设备安装有限公司 A kind of building material bont
CN104627776B (en) * 2014-12-23 2016-08-17 江苏腾发建筑机械有限公司 A kind of building material lifting device that can automatically lock
CN104555664B (en) * 2014-12-23 2016-09-21 梁蓓 A kind of building material lifting device with left and right limit sensors
CN104495575B (en) * 2014-12-23 2016-08-24 江苏腾发建筑机械有限公司 A kind of building material lifting device of low noise
CN106276549B (en) * 2015-06-01 2019-02-26 丁灏 Two layers of single-column lifting working platform of two-stage
CN106276552A (en) * 2015-06-01 2017-01-04 江苏京龙工程机械有限公司 Two-stage two-layer twin columns lifting working platform
CN106276550A (en) * 2015-06-01 2017-01-04 江苏京龙工程机械有限公司 Two-layer single-column lifting working platform
CN106276551A (en) * 2015-06-01 2017-01-04 江苏京龙工程机械有限公司 Two-layer twin columns lifting working platform
CN106522548A (en) * 2015-09-15 2017-03-22 马义和 Construction machine for spot 3D printing building
CN106064801A (en) * 2016-08-01 2016-11-02 申锡机械有限公司 A kind of multilamellar construction lifting platform
CN107416701A (en) * 2017-05-22 2017-12-01 无锡石油化工起重机有限公司 The derrick crane of double lifts inside and outside installation
CN107128772A (en) * 2017-07-14 2017-09-05 四川华西集团有限公司 Construction elevator can be made to reach platform attachment structure and the connection method in working platform face
CN107988913A (en) * 2017-12-12 2018-05-04 中交公局第二工程有限公司 A kind of bridge bilayer box beam upper former method for dismounting
CN112065015A (en) * 2020-08-14 2020-12-11 湖南创一机械有限公司 Lifting platform with double-layer structure for elevator
CN114412156A (en) * 2022-02-08 2022-04-29 杨荣珺 Tower column construction internal climbing frame and construction method thereof

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4293054A (en) * 1980-05-19 1981-10-06 Piat Impalcature Automatiche S.P.A. Scaffolding for supporting lifting working bridges and platforms
US4809814A (en) * 1988-04-01 1989-03-07 St Germain Jean Scaffolding
US5579865A (en) * 1994-02-23 1996-12-03 Butler; J. Frank Scaffold
DE20101020U1 (en) * 2001-01-19 2001-05-03 GEDA-Dechentreiter GmbH & Co. KG, 86663 Asbach-Bäumenheim Platform for devices for lifting people and / or loads
CN100549344C (en) * 2007-01-19 2009-10-14 西北工业大学 Attached self-elevating aerial work platform
JP5264581B2 (en) * 2009-03-23 2013-08-14 株式会社エスシー・マシーナリ Self-climbing lift
CN201400500Y (en) * 2009-03-24 2010-02-10 中国建筑科学研究院建筑机械化研究分院 Special-shaped high-rise building construction with multi-functional elevator with platform
CN201506699U (en) * 2009-09-25 2010-06-16 北京星河模板脚手架工程有限公司 Electric lifting bridge rack for construction
CN103669867B (en) * 2013-12-25 2016-09-28 山东省建筑科学研究院 Building body and outer decoration construction discrepancy in elevation adjustable double-layer operating platform and installation method

Also Published As

Publication number Publication date
CN103979383A (en) 2014-08-13

Similar Documents

Publication Publication Date Title
CN103979383B (en) Building operation multiple layer up-down plateform system
CN109095319B (en) Construction elevator and climbing frame integrated operation system
KR20110137864A (en) Builder lift
CN110485290A (en) It is a kind of can the three-dimensional movable type cable-stayed bridge king-post of falling Y shape medial surface repair apparatus
CN206753012U (en) A kind of attachment type raise scaffold just hangs hanging apparatus
CN104453201A (en) Automatic ascending and descending type material platform
CN103193137A (en) Full-automatic overhead lifting machine and application method thereof
CN103375022B (en) Multi-functional dynamic rail attached lifting scaffold
CN105776092B (en) A kind of extended position nacelle device
CN203783109U (en) Building construction operation facility and personnel material transport equipment system
CN206273951U (en) The hoisting apparatus of attachment type raise scaffold
NL2035364B1 (en) Green slip-form construction platform without supporting rod for cylindrical structure
CN202441045U (en) Rail-type electric attached lifting scaffold
CN103669867B (en) Building body and outer decoration construction discrepancy in elevation adjustable double-layer operating platform and installation method
CN203767802U (en) Special device for elevator installation
CN101852008A (en) Lifting scaffold device
CN203247829U (en) Movable slope construction platform for working at heights
CN103879860A (en) Device special for elevator installation
CN102807178A (en) Chamfered hanging basket device with slide rail
CN203640291U (en) Height-difference adjustable double-layer operating platform for construction of building body and external ornaments
CN104973515B (en) A multi-section safety operating room for a crane and its operating method
CN204286353U (en) For the guide rail bracket joint pick-up unit of lifter
CN211037771U (en) Hanging basket device for outer slope construction
CN203320415U (en) Novel large-scale pier coating operation hanging basket
CN209770224U (en) Suspension rail lifting device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Multi storey lifting platform system for building construction

Effective date of registration: 20221201

Granted publication date: 20160316

Pledgee: Shandong Tengzhou Rural Commercial Bank Co.,Ltd.

Pledgor: SHANDONG TENGFEI CONSTRUCTION MECHANICAL ENGINEERING CO.,LTD.

Registration number: Y2022980024509

PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20231117

Granted publication date: 20160316

Pledgee: Shandong Tengzhou Rural Commercial Bank Co.,Ltd.

Pledgor: SHANDONG TENGFEI CONSTRUCTION MECHANICAL ENGINEERING CO.,LTD.

Registration number: Y2022980024509

PC01 Cancellation of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Multi story lifting platform system for construction

Effective date of registration: 20231123

Granted publication date: 20160316

Pledgee: Shandong Tengzhou Rural Commercial Bank Co.,Ltd.

Pledgor: SHANDONG TENGFEI CONSTRUCTION MECHANICAL ENGINEERING CO.,LTD.

Registration number: Y2023980067074

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Granted publication date: 20160316

Pledgee: Shandong Tengzhou Rural Commercial Bank Co.,Ltd.

Pledgor: SHANDONG TENGFEI CONSTRUCTION MECHANICAL ENGINEERING CO.,LTD.

Registration number: Y2023980067074

PC01 Cancellation of the registration of the contract for pledge of patent right