CN102287192A - Six-layer construction platform for installing vertical shaft installation - Google Patents

Six-layer construction platform for installing vertical shaft installation Download PDF

Info

Publication number
CN102287192A
CN102287192A CN2011101825258A CN201110182525A CN102287192A CN 102287192 A CN102287192 A CN 102287192A CN 2011101825258 A CN2011101825258 A CN 2011101825258A CN 201110182525 A CN201110182525 A CN 201110182525A CN 102287192 A CN102287192 A CN 102287192A
Authority
CN
China
Prior art keywords
layers
hanging scaffold
square plate
shaft
platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011101825258A
Other languages
Chinese (zh)
Inventor
杨益明
黄家贫
马智民
谌喜华
杨雪银
张新启
郑国青
张海侠
苗靓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Coal No 5 Construction Co Ltd
Original Assignee
China Coal No 5 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Coal No 5 Construction Co Ltd filed Critical China Coal No 5 Construction Co Ltd
Priority to CN2011101825258A priority Critical patent/CN102287192A/en
Publication of CN102287192A publication Critical patent/CN102287192A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a six-layer construction platform for installing vertical shaft installation, and belongs to shaft building equipment. The main body of the platform has six layers; three upper layers of platforms are discs consisting of square plates and four-side movable plates hinged to the periphery of the square plate, three lower layers of platforms are square plates, and the six layers of platforms are connected through upright posts to form the main body of the platform; the square plate of the uppermost layer of platform is provided with four symmetrically arranged suspension connecting devices; the uppermost layer of platform is a protective platform; second, third, fourth, fifth and sixth layers of platforms are working platforms; each layer of platform is provided with a lifting hole and a ladder hole, which are provided with overturn movable cover plates; ladders are arranged among the six layers of platforms; and safety protecting fences are arranged at peripheries of the three lower layers of platforms. The construction platform for installing the vertical shaft installation has the advantages that: the speed is high, the working conditions are good, the work hour utilization rate is high, safe construction is facilitated and the engineering quality of installing the vertical shaft installation is improved.

Description

The shaft of vertical well equipment is installed with six layers of construction hanging scaffold
Technical field
The present invention relates to a kind of shaft equipment the job platform of usefulness is installed, specifically a kind of shaft of vertical well equipment is installed with six layers of construction hanging scaffold.Be mainly used in the trouble free service platform of doing constructor between mine construction shaft of vertical well equipment installation period.
Background technology
During the installation of shaft of vertical well equipment, the staff will utilize hanging scaffold to carry out the installation of shaft equipment member and lay at present.Traditional construction hanging scaffold is: equip construction period at shaft of vertical well, two layers of hanging scaffold when utilizing the mine shaft construction carry out shaft equipment installation work dish, or adopt homemade three layers of work hanging scaffold.There is following drawback:
Two layers of hanging scaffold when 1, utilizing the mine shaft construction carry out shaft equipment installation work dish, need carry out secondary and change strand, and pit shaft buntons, cage guide and pipeline are installed in gradation.
2, adopt homemade three layers of work hanging scaffold to make shaft equipment installation work dish, also need change strand at twice could installation shaft equipment member.
3, above two kinds of scratch diskettes all need to install earlier from top to bottom buntons, and cage guide, pipeline are installed then from the bottom up, and working procedure repeats, and loaded down with trivial details, the engineering time is long.
4, the first floor constructor of above two kinds of scratch diskettes is more, and under the situation for frequent lifting member, the weight that is subject to transfer with the first floor construction hits, and security reliability is relatively poor.
Summary of the invention
The objective of the invention is to overcome the above-mentioned deficiency of prior art, provide a kind of shaft of vertical well equipment to install, can carry out the installation of shaft of vertical well equipment member with six layers of construction hanging scaffold.And speed of application is fast, operating condition is good, the rate of utilization of work hour is high and the security performance height.
The present invention realizes with following technical scheme: a kind of shaft of vertical well equipment is installed with six layers of construction hanging scaffold, six layers of hanging scaffold body portion, the disk of last three layers of hanging scaffold for forming by square plate and the four sides removable pan that is hinged on the square plate periphery, following three layers of hanging scaffold are square plate, are connected into the hanging scaffold main body by column between six layers of hanging scaffold; Symmetrically arranged 4 suspention linkages are arranged on the square plate of the superiors' hanging scaffold; The superiors' hanging scaffold is a protective disc, is used to arrange signal cabin and electric fixtures, and commander's scratch diskette when promoting as blanking and hanging scaffold; When constructing as shaft equipment, the second layer and the 3rd layer of hanging scaffold beat the scratch diskette of square, skyhook, carriage, buntons, pipeline beam, cage guide, cable bearer, solar beam and landing slab; Fourth, fifth, six layers of dish are for installing the scratch diskette of cage guide, pipeline, solar ladder and fence; On every layer of hanging scaffold, be provided with and promote hole and ladder aperture, promote on hole and the ladder aperture and be separately installed with convertible removable cover; Respectively be provided with ladder between six layers of hanging scaffold, be provided with the security protection barrier that the personnel of preventing or smallclothes fall around following three layers of hanging scaffold.Spacing is identical with shaft equipment typical floor spacing between six layers of hanging scaffold.
The invention has the beneficial effects as follows: solved the shortcoming that shaft equipment is installed in traditional hanging scaffold construction unprotect dish and necessary gradation; the constructor can be intersected parallel operations on six layers of hanging scaffold; from under live in once-forming and install shaft of vertical well equipment, and can use hanging scaffold to carry out cable laying and tail rope lays.Use this construction hanging scaffold to carry out the shaft of vertical well equipment; uppermost first floor dish is as protective disc; guarantee constructor's protection safety; two, three, four, five, six layers are the operation dish, guarantee that speed of application is fast, operating condition good, the rate of utilization of work hour is high, help safe construction and improve shaft of vertical well equipment installation engineering quality.
Description of drawings
The present invention is further described below in conjunction with accompanying drawing.
Fig. 1 is a structural representation of the present invention;
Fig. 2 is the square plate structural representation;
Fig. 3 is a four sides movable disk structural representation;
Fig. 4 is the pillar construction schematic diagram;
Fig. 5 is a guiding cage shoe scheme of installation;
Fig. 6 is the left view of Fig. 5.
Among the figure: 1, square plate, 2, the four sides movable disk, 21, angle steel; 22, checkered steel plate, 3, column, 31, two catching groove steel; 32, stiffener, 33, gusset, 34, the column base plate; 4, ladder, 41, channel-section steel, 42, checkered steel plate; 43, angle steel, 5, barrier, 6, promote blind patch; 7, ladder blind patch, 8, the wire rope lift, 9, folding; 10, guiding cage shoe; 11, protection rope, 12, connecting bolt, 13, the borehole wall; 101, channel-section steel workpiece; 102, the lumps of wood, 103, bolt, 104, square plate framework channel-section steel.
The specific embodiment
As Fig. 1, Fig. 2 and shown in Figure 3, a kind of shaft of vertical well equipment is installed and is arranged in the borehole wall 13 of pit shaft with six layers of hanging scaffold, six layers of hanging scaffold body portion, last three layers of hanging scaffold are by square plate 1 and 4 disks that four sides removable pan 2 is formed that are hinged on square plate 1 periphery, and square plate 1 and four sides removable pan 2 adopt foldings 9 hinged.Following three layers of hanging scaffold are square plate, are connected into the hanging scaffold main body by column 3 between six layers of hanging scaffold; Symmetrically arranged 4 suspention linkages 8 are arranged on the square plate of the superiors' hanging scaffold; The hanging scaffold of the superiors is a protective disc, is used to arrange signal cabin and electric fixtures, and commander's scratch diskette when promoting as blanking and hanging scaffold; When constructing as shaft equipment, the second layer and the 3rd layer of hanging scaffold beat the scratch diskette of square, skyhook, carriage, buntons, pipeline beam, cage guide, cable bearer, solar beam and landing slab; Fourth, fifth, six layers of dish are for installing the scratch diskette of cage guide, pipeline, solar ladder and fence; On every layer of hanging scaffold, be provided with and promote hole 61 and ladder aperture 71, promote on hole 61 and the ladder aperture 71 and be separately installed with convertible removable cover; Be respectively hanging scaffold and promote blind patch 6, ladder aperture cover plate 7; Respectively be provided with ladder 4 between six layers of hanging scaffold, be provided with the security protection barrier 5 that the personnel of preventing or smallclothes fall around following three layers of hanging scaffold.Six layers of hanging scaffold interlamellar spacing are identical with shaft equipment standard paragraphs design level spacing.4 symmetrically arranged guiding cage shoes 10 are arranged on described square plate 1, and square plate 1 is connected by bolt connection piece 12 with square plate 1 with column 3, guiding cage shoe 10.The arc of described four sides removable pan 2 for matching with the length of side of square plate, is hinged on respectively on 4 limits of square plate 1 totally by 4.The column 3 of each layer is fastening by connecting bolt 12 with square plate 1; ladder 4 and barrier 5 are fixing with the square plate welding; hanging scaffold promotes blind patch 6 and ladder aperture cover plate 7 hinged securement on square plate; wire rope lift 8 quadruplet altogether adopts the bearing pin welding fixing with the first floor square plate respectively; guiding cage shoe 10 and square plate bolt, protection rope 11 promotes with wire clips fixed with hanging scaffold.
Square plate 1 can adopt channel-section steel and checkered steel plate welding processing squarely, and appearance and size is according to maximum size design in buntons in the pit shaft and the cage guide layout scope.Hanging scaffold promotes blind patch 6 and ladder aperture cover plate 7 is hinged by folding with the channel-section steel of square plate, and it is square that ladder aperture cover plate 7 adopts checkered steel plate to be processed into, and is advisable to cover full ladder aperture.
As shown in Figure 3, four sides removable pan 2 adopts angle steel 21 and checkered steel plate 22 is processed into fan-shaped and hinged by folding 9 and square plate 1 channel-section steel.
As shown in Figure 4, column 3 adopts pair catching groove steel 31 and column 34 welding processing to form, and opposite joint adopts and is welded to connect in two catching groove steel, and welds with two catching groove steel every 1m in two catching groove steel commissure with stiffener 32.Two ends also are welded with gusset 33.Hole on the column, be convenient to wear bolt and square plate is fixed.
As Fig. 5, shown in Figure 6, guiding cage shoe 10 adopts channel-section steel 101 and steel plate 102 processing, and is connected and fixed by connecting bolt 104 and square plate profile channel-section steel 105 with the lumps of wood 103.

Claims (5)

1. a shaft of vertical well equipment is installed with six layers of construction hanging scaffold, it is characterized in that: six layers of hanging scaffold body portion, last three layers of hanging scaffold are for by square plate (1) be hinged on 4 of square plate (1) the periphery disks formed of removable pans (2) on four sides, following three layers of hanging scaffold are square plate, connect into the hanging scaffold main body by column (3) between six layers of hanging scaffold; Symmetrically arranged 4 suspention linkages (8) are arranged on the square plate of the superiors' hanging scaffold; The hanging scaffold of the superiors is a protective disc, is used to arrange signal cabin and electric fixtures, and commander's scratch diskette when promoting as blanking and hanging scaffold; Second and third, four, five, six layers hang and be the operation dish; On every layer of hanging scaffold, be provided with and promote hole (61) and ladder aperture (71), promote on hole (61) and ladder aperture (71) and be separately installed with convertible removable cover; Respectively be provided with ladder (4) between six layers of hanging scaffold, be provided with the security protection barrier (5) that the personnel of preventing or smallclothes fall around following three layers of hanging scaffold.
2. shaft of vertical well equipment according to claim 1 is installed with six layers of construction hanging scaffold, and it is characterized in that: six layers of hanging scaffold interlamellar spacing are identical with shaft equipment standard paragraphs design level spacing.
3. shaft of vertical well equipment according to claim 1 is installed with six layers of construction hanging scaffold, it is characterized in that: described square plate (1) and four sides removable pan (2) adopt folding (9) hinged.
4. shaft of vertical well equipment according to claim 1 is installed with six layers of construction hanging scaffold, it is characterized in that: 4 symmetrically arranged guiding cage shoes (10) are arranged on described square plate (1), and square plate (1) is connected by bolt connection piece (12) with square plate (1) with column (3), guiding cage shoe (10).
5. shaft of vertical well equipment according to claim 1 is installed with six layers of construction hanging scaffold, it is characterized in that: the arc of described four sides removable pan (2) for matching with the length of side of square plate, is hinged on respectively on 4 limits of square plate totally by 4.
CN2011101825258A 2011-06-24 2011-06-24 Six-layer construction platform for installing vertical shaft installation Pending CN102287192A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011101825258A CN102287192A (en) 2011-06-24 2011-06-24 Six-layer construction platform for installing vertical shaft installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011101825258A CN102287192A (en) 2011-06-24 2011-06-24 Six-layer construction platform for installing vertical shaft installation

Publications (1)

Publication Number Publication Date
CN102287192A true CN102287192A (en) 2011-12-21

Family

ID=45333915

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011101825258A Pending CN102287192A (en) 2011-06-24 2011-06-24 Six-layer construction platform for installing vertical shaft installation

Country Status (1)

Country Link
CN (1) CN102287192A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102602858A (en) * 2012-03-23 2012-07-25 常熟市平冶机械有限公司 Climb operation device
CN103244125A (en) * 2013-05-09 2013-08-14 北京中煤矿山工程有限公司 Hydraulic integral walking sinking platform and applications thereof
CN104229631A (en) * 2014-08-27 2014-12-24 中煤第一建设有限公司 Double-wall small template hoister of vertical well

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2003078795A1 (en) * 2002-03-20 2003-09-25 Tracto-Technik Gmbh Working platform
CN101397909A (en) * 2008-09-17 2009-04-01 中冶集团武勘岩土基础工程公司 Artificial digging repair novel construction method for collapse ultra-deep shaft
CN201436366U (en) * 2009-02-10 2010-04-07 中煤第三建设(集团)有限责任公司 Construction hanging scaffold for mining shaft equipment
CN101993002A (en) * 2009-08-11 2011-03-30 中煤第五建设公司 Automatic lift type shaft hanging stage
CN102080446A (en) * 2011-02-18 2011-06-01 中国水利水电第七工程局成都水电建设工程有限公司 Lifting platform for shaft construction

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2003078795A1 (en) * 2002-03-20 2003-09-25 Tracto-Technik Gmbh Working platform
CN101397909A (en) * 2008-09-17 2009-04-01 中冶集团武勘岩土基础工程公司 Artificial digging repair novel construction method for collapse ultra-deep shaft
CN201436366U (en) * 2009-02-10 2010-04-07 中煤第三建设(集团)有限责任公司 Construction hanging scaffold for mining shaft equipment
CN101993002A (en) * 2009-08-11 2011-03-30 中煤第五建设公司 Automatic lift type shaft hanging stage
CN102080446A (en) * 2011-02-18 2011-06-01 中国水利水电第七工程局成都水电建设工程有限公司 Lifting platform for shaft construction

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
潘述君,杨尚森: "梁家矿副井利用六层吊盘一次完成井筒装备", 《山东煤炭科技》 *
田德文: "立井井筒装备施工吊盘布置方式探讨", 《煤炭技术》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102602858A (en) * 2012-03-23 2012-07-25 常熟市平冶机械有限公司 Climb operation device
CN103244125A (en) * 2013-05-09 2013-08-14 北京中煤矿山工程有限公司 Hydraulic integral walking sinking platform and applications thereof
CN103244125B (en) * 2013-05-09 2015-03-25 北京中煤矿山工程有限公司 Hydraulic integral walking sinking platform and applications thereof
CN104229631A (en) * 2014-08-27 2014-12-24 中煤第一建设有限公司 Double-wall small template hoister of vertical well
CN104229631B (en) * 2014-08-27 2016-03-16 中煤第一建设有限公司 The multiple little template gig of wall of vertical

Similar Documents

Publication Publication Date Title
CN201286669Y (en) Folding type window cleaning device
CN205077885U (en) Building core section of thick bamboo hydraulic pressure intelligence protection platform that climbs
CN104989094B (en) Installing method of walking hanging basket
CN202144437U (en) Standing type single-person hanging seat device
CN204899184U (en) Hanging flower basket equipment
CN105692470A (en) Internal climbing tower crane and operating method thereof
CN202689495U (en) Self-elevating chimney and water tower construction tower frame
CN103967263B (en) Hydraulic automatic jumping discharging platform
CN203394685U (en) Lattice wind turbine tower and wind turbine generator system comprising same
CN103422664A (en) Attached lifting scaffold
CN102287192A (en) Six-layer construction platform for installing vertical shaft installation
CN217028004U (en) Annular hanging basket suspension device for curtain wall construction of super high-rise building
CN106150057B (en) A kind of split blade type hydraulic pressure lift climbing frame
CN203947758U (en) Novel hydraulic automatic climbing discharging platform
CN204418629U (en) A kind of integrated form climbing frame
CN103306218B (en) Bottom width overhaul hanging basket of bridge
CN204625045U (en) A kind of steel structure hoisting door shaped stent formula hanging apparatus
CN202108514U (en) Six-layer construction hanging scaffold for installing vertical shaft equipment
CN105155427A (en) Construction method for laying suspension bridge catwalk
CN210886924U (en) Maintenance platform in retractable double-cable-plane cable-stayed bridge tower stay cable area
CN210856930U (en) Maintenance system of cable-stay bridge inverted Y-shaped tower column
CN201627398U (en) Sandstorm-proof and warm-keeping system of mine steel headframe
CN210369846U (en) Operating platform capable of being clamped on elevator shaft shear wall surface and lifted layer by layer
CN203878957U (en) Protective screen module unit
CN202831591U (en) Special-shaped truss operation platform capable of hoisting to super high space

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20111221