CN105603884A - Safety protection platform for bridge cap beam construction - Google Patents

Safety protection platform for bridge cap beam construction Download PDF

Info

Publication number
CN105603884A
CN105603884A CN201610129506.1A CN201610129506A CN105603884A CN 105603884 A CN105603884 A CN 105603884A CN 201610129506 A CN201610129506 A CN 201610129506A CN 105603884 A CN105603884 A CN 105603884A
Authority
CN
China
Prior art keywords
protection platform
safety protection
channel
steel
section steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610129506.1A
Other languages
Chinese (zh)
Inventor
刘立贵
李伟泉
余绍江
陈正聪
林峰垚
王小通
杨鼎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 14 Co Ltd
Original Assignee
Sinohydro Bureau 14 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 14 Co Ltd filed Critical Sinohydro Bureau 14 Co Ltd
Priority to CN201610129506.1A priority Critical patent/CN105603884A/en
Publication of CN105603884A publication Critical patent/CN105603884A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention provides a safety protection platform for bridge cap beam construction. The safety protection platform comprises a front platform unit, a rear platform unit, a left platform unit and a right platform unit. The safety protection platform is mounted on a core-penetrating steel bar through platform hoisting ropes and arranged around a pier column. The safety protection platform has the advantages that the operation safety during the mounting (demounting) process of a support system when a bridge cap beam (tie beam) is poured through a steel bar method can be guaranteed, the safety protection platform can provide secondary protection during the whole construction process of the cap beam (tie beam) at the same time, and the safety protection platform is convenient and fast in machining, assembling, demounting and the like, safe and reliable to use and capable of being repeatedly recycled.

Description

A kind of bridge coping construction safety protection platform
Technical field
The invention belongs to technical field of bridge engineering, be specifically related to a kind of construction safety protection platform while adopting rod iron method to build bridge coping (binder).
Background technology
At present, while adopting rod iron method to build bridge coping (binder), main employing set up temporary steel pipe support or directly adopted lifting appliance that the mounting platform of cage as support system is set, after secondary beam is installed and is finished, then on secondary beam laying construction platform and safe protective railing. Temporary steel pipe support is set up in employing need carry out based process, and more time-consuming; Directly adopt lifting appliance that cage is set the larger security risk of support system existence is installed.
Summary of the invention
The object of this invention is to provide one and be convenient to dismounting, can reuse, when energy ensures to adopt rod iron method to build bridge coping (binder), support system is installed the protective platform of safety operation in (dismounting) process, plays the protective platform of second protective action in the overall process that simultaneously can construct at bent cap (binder) time.
Technical scheme of the present invention is: a kind of bridge coping construction safety protection platform is combined into security protection platform by front, rear, left and right four part unit platforms, described security protection platform is arranged on punching rod iron by platform lifting rope, and is arranged in pier stud around.
The structure of described front, rear, left and right four part unit platforms includes channel-section steel girder, channel-section steel secondary beam, expanded steel diamond mesh, standing screw, protect block inserted link, protect block, skirting board, close order safety net, channel-section steel Main Girder Welding becomes a rectangular outer frame, in rectangular outer frame, the multiple channel-section steel secondary beams of welding form multiple rectangle inside casings, in rectangle inner frame, expanded steel diamond mesh is installed, the outside of rectangular frame is installed to protect to block inserted link and protect and is blocked, and protects to block that skirting board and close order safety net being installed.
Advantage of the present invention is: can ensure to adopt rod iron method to build bridge coping (binder) time, support system is installed handling safety in (dismounting) process, plays second protective action in the overall process that simultaneously can construct at bent cap (binder) time. Its processing, assembling, dismounting etc. are convenient, fast, safe and reliable, can repeatedly recycle.
Brief description of the drawings
Fig. 1 is the structural representation of unit platforms of the present invention.
Fig. 2 is security protection platform structure schematic diagram of the present invention (plane).
Fig. 3 is security protection platform structure schematic diagram of the present invention (front view).
Fig. 4 is security protection platform structure schematic diagram of the present invention (side view).
In figure: 1-channel-section steel girder, 2-channel-section steel secondary beam, 3-expanded steel diamond mesh, 4-standing screw, 5-protects and blocks inserted link, and 6-protects and blocks, 7-skirting board, the close order safety net of 8-, 9-security protection platform, 10-platform lifting rope, 11-punching rod iron, 12-steel ox pin, 13-adjusting device, 14-bent cap (binder) support system, 15-pier stud, 16-bent cap (binder).
Detailed description of the invention
As shown in Figure 2,3, 4, bridge coping construction safety protection platform 9 of the present invention is combined by front, rear, left and right four part unit platforms, described security protection platform 9 is arranged on (punching rod iron, steel corbel belong to a part for support system) on punching rod iron 11 by platform lifting rope 10, and be arranged in pier stud 15 around, each one of two ends and both sides.
The structure of described front, rear, left and right four part unit platforms includes channel-section steel girder 1, channel-section steel secondary beam 2, expanded steel diamond mesh 3, standing screw 4, protect block inserted link 5, protect block 6, skirting board 7, close order safety net 8, channel-section steel girder 1 is welded into a rectangular frame, in rectangular frame, the multiple channel-section steel secondary beams 2 of welding form multiple rectangle inside casings, its effect is to reduce span, improve expanded steel diamond mesh bearing capacity, expanded steel diamond mesh 3 is installed in rectangular frame, the outside of rectangular frame is installed to protect and is blocked inserted link 5 and protect and block 6, protects to block that skirting board 7 and close order safety net 8 being installed.
In after the assembling of security protection platform, sky is greater than the not little 10cm of 15 each sizes of pier stud, so that lifting. Channel-section steel girder 1 adopts that [16 channel-section steels processing, channel-section steel secondary beam 2 adopts the processing of ∠ 50 × 50mm angle steel, channel-section steel time case bay 100cm. Expanded steel diamond mesh 3 thickness of slab δ=0.4mm, mesh is 20 × 30mm. Standing screw 4 adopts M20 bolt, adjustable length 15cm. Guardrail inserted link 5 adopts Φ 28 steel bar weldings to be connected to channel-section steel girder 1 outer side edges, the 10cm that appears, installing space 150cm; Guardrail 6 adopts φ 48 steel-pipe welding processing, height 120cm, and steel pipe spacing 150cm, on guardrail 6, surrounding completely spreads and hangs close order safety net 8, and guardrail 6 inserts in guardrail inserted link 5 while installation. Skirting board 7 adopts plank or bamboo springboard to install, and height 30cm adopts galvanized wire colligation on guardrail 6.
Installation method:
Security protection platform 9 is with bolts to be assembled and is processed into four module unit platforms on ground, lift with truck crane, hang on punching rod 11 with steel wire rope 10, finally adopt standing screw 4 to be fixed on pier stud and prevent from moving, as the installation of bent cap (binder) support system, the security protection platform of dismounting. After use finishes, entirety is put on ground and removes, and is transported to next working face and uses.

Claims (8)

1. a bridge coping construction safety protection platform, it is characterized in that this security protection platform is combined into security protection platform by front, rear, left and right four part unit platforms, described security protection platform is arranged on punching rod iron by platform lifting rope, and is arranged in pier stud around.
2. bridge coping construction safety protection platform according to claim 1, the structure that it is characterized in that described front, rear, left and right four part unit platforms includes channel-section steel girder, channel-section steel secondary beam, expanded steel diamond mesh, standing screw, protect block inserted link, protect block, skirting board, close order safety net, channel-section steel Main Girder Welding becomes a rectangular frame, in rectangular frame, the multiple channel-section steel secondary beams of welding form multiple rectangle inside casings, expanded steel diamond mesh is installed in rectangle inside casing, the outside of rectangular frame is installed to protect to block inserted link and protect and is blocked, and protects to block that skirting board and close order safety net being installed.
3. bridge coping construction safety protection platform according to claim 1, is characterized in that the rear interior sky of security protection platform assembling is greater than each not little 10cm of size of pier stud, so that lifting.
4. bridge coping construction safety protection platform according to claim 2, is characterized in that [16 channel-section steels process the employing of channel-section steel girder.
5. bridge coping construction safety protection platform according to claim 2, is characterized in that channel-section steel secondary beam adopts ∠ 50 × 50mm angle steel to process, channel-section steel time case bay 100cm.
6. bridge coping construction safety protection platform according to claim 2, is characterized in that expanded steel diamond mesh thickness of slab δ=0.4mm, and mesh is 20 × 30mm.
7. bridge coping construction safety protection platform according to claim 2, is characterized in that guardrail inserted link adopts Φ 28 steel bar weldings to be connected to channel-section steel girder outer side edges, the 10cm that appears, installing space 150cm.
8. bridge coping construction safety protection platform according to claim 2, is characterized in that guardrail adopts φ 48 steel-pipe welding processing, height 120cm, steel pipe spacing 150cm.
CN201610129506.1A 2016-03-08 2016-03-08 Safety protection platform for bridge cap beam construction Pending CN105603884A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610129506.1A CN105603884A (en) 2016-03-08 2016-03-08 Safety protection platform for bridge cap beam construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610129506.1A CN105603884A (en) 2016-03-08 2016-03-08 Safety protection platform for bridge cap beam construction

Publications (1)

Publication Number Publication Date
CN105603884A true CN105603884A (en) 2016-05-25

Family

ID=55984194

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610129506.1A Pending CN105603884A (en) 2016-03-08 2016-03-08 Safety protection platform for bridge cap beam construction

Country Status (1)

Country Link
CN (1) CN105603884A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106522099A (en) * 2016-11-10 2017-03-22 上海市基础工程集团有限公司 Non-foundation simple steel platform structure for bridge shallow water area operation
CN107326814A (en) * 2017-08-30 2017-11-07 云南工程建设总承包公司 A kind of bridge bottom construction safety protection column
CN109356039A (en) * 2018-12-06 2019-02-19 广东腾盛模架科技有限公司 A kind of safe construction assembled bent cap job platform
CN111535199A (en) * 2020-05-27 2020-08-14 中交路桥建设有限公司 Integral type edge-facing protection device and structure for pier column, middle tie beam and bent cap construction
CN112112073A (en) * 2020-05-28 2020-12-22 广州工程总承包集团有限公司 Piercing steel bar type supporting system and mounting method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103088756A (en) * 2013-02-01 2013-05-08 葛洲坝集团第二工程有限公司 Steel bar bearing constructing method of bent cap construction platform
CN203441073U (en) * 2013-08-23 2014-02-19 广州建筑股份有限公司 Hoop-type high-altitude guard platform suitable for super high-rise building outline boarder structural column
CN204040505U (en) * 2014-07-10 2014-12-24 中国建筑第二工程局有限公司 Building side column protective platform
CN204386197U (en) * 2015-01-05 2015-06-10 中建三局第二建设工程有限责任公司 The horizontal protective platform of a kind of Super High alien invasion steel work
JP2015224514A (en) * 2014-05-29 2015-12-14 株式会社杉孝 Scaffold device for handrail
CN205474859U (en) * 2016-03-08 2016-08-17 中国水利水电第十四工程局有限公司 Bridge bent cap construction safety protection platform

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103088756A (en) * 2013-02-01 2013-05-08 葛洲坝集团第二工程有限公司 Steel bar bearing constructing method of bent cap construction platform
CN203441073U (en) * 2013-08-23 2014-02-19 广州建筑股份有限公司 Hoop-type high-altitude guard platform suitable for super high-rise building outline boarder structural column
JP2015224514A (en) * 2014-05-29 2015-12-14 株式会社杉孝 Scaffold device for handrail
CN204040505U (en) * 2014-07-10 2014-12-24 中国建筑第二工程局有限公司 Building side column protective platform
CN204386197U (en) * 2015-01-05 2015-06-10 中建三局第二建设工程有限责任公司 The horizontal protective platform of a kind of Super High alien invasion steel work
CN205474859U (en) * 2016-03-08 2016-08-17 中国水利水电第十四工程局有限公司 Bridge bent cap construction safety protection platform

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106522099A (en) * 2016-11-10 2017-03-22 上海市基础工程集团有限公司 Non-foundation simple steel platform structure for bridge shallow water area operation
CN106522099B (en) * 2016-11-10 2021-05-28 上海市基础工程集团有限公司 Foundation-free simple steel platform structure for operation in bridge shallow water area
CN107326814A (en) * 2017-08-30 2017-11-07 云南工程建设总承包公司 A kind of bridge bottom construction safety protection column
CN109356039A (en) * 2018-12-06 2019-02-19 广东腾盛模架科技有限公司 A kind of safe construction assembled bent cap job platform
CN111535199A (en) * 2020-05-27 2020-08-14 中交路桥建设有限公司 Integral type edge-facing protection device and structure for pier column, middle tie beam and bent cap construction
CN112112073A (en) * 2020-05-28 2020-12-22 广州工程总承包集团有限公司 Piercing steel bar type supporting system and mounting method

Similar Documents

Publication Publication Date Title
CN105603884A (en) Safety protection platform for bridge cap beam construction
CN204781887U (en) Prefabricated assembly type structure's no outrigger construction platform
CN105257009B (en) Device for anti-falling partition in elevator shaft
CN205474859U (en) Bridge bent cap construction safety protection platform
CN206722368U (en) One kind is used to protect frame system outside the working regularization of assembled architecture
CN105178615A (en) Discharging platform
CN202785351U (en) Tower cranes attached operating platform
CN103967263A (en) Novel hydraulic automatic climbing discharging platform
CN102425123B (en) Combined type protection shed frame and construction method thereof
CN203947758U (en) Novel hydraulic automatic climbing discharging platform
CN101876209A (en) Supertall building core tube construction safety fire protection system and device
CN201778479U (en) Detachable high-altitude working platform
CN103321438B (en) A kind of modular protection marguise of large cantilever being applicable to high-building construction
KR100944458B1 (en) Apparatus preventing separation of cage for construction
CN202809494U (en) Bracket for pouring 0# block to rigid continuous girder bridge
CN112727147A (en) Outdoor suspended step dismantling method
CN103132640A (en) Detachable steel-concrete composite floor
CN207878299U (en) Advanced composite material (ACM) helicopter platform
CN105484509A (en) Tool type horizontal safety net and implementation method thereof
CN205840289U (en) A kind of suspension type vertical operating platform
CN211338598U (en) Ring rail hoisting device for installing high-rise curtain wall
CN204402001U (en) For the mobile operating platform system that structure for steel structure roof inner slab is installed
JP6534938B2 (en) Lining plate installation and rain curing jig and lining plate installation method using the jig
CN205243058U (en) Horizontal safety device of elevartor shaft
CN203782582U (en) Device used for mounting bridge crash barrier

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160525