CN105603884A - Safety protection platform for bridge cap beam construction - Google Patents
Safety protection platform for bridge cap beam construction Download PDFInfo
- Publication number
- CN105603884A CN105603884A CN201610129506.1A CN201610129506A CN105603884A CN 105603884 A CN105603884 A CN 105603884A CN 201610129506 A CN201610129506 A CN 201610129506A CN 105603884 A CN105603884 A CN 105603884A
- Authority
- CN
- China
- Prior art keywords
- protection platform
- safety protection
- channel
- steel
- section steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
The invention provides a safety protection platform for bridge cap beam construction. The safety protection platform comprises a front platform unit, a rear platform unit, a left platform unit and a right platform unit. The safety protection platform is mounted on a core-penetrating steel bar through platform hoisting ropes and arranged around a pier column. The safety protection platform has the advantages that the operation safety during the mounting (demounting) process of a support system when a bridge cap beam (tie beam) is poured through a steel bar method can be guaranteed, the safety protection platform can provide secondary protection during the whole construction process of the cap beam (tie beam) at the same time, and the safety protection platform is convenient and fast in machining, assembling, demounting and the like, safe and reliable to use and capable of being repeatedly recycled.
Description
Technical field
The invention belongs to technical field of bridge engineering, be specifically related to a kind of construction safety protection platform while adopting rod iron method to build bridge coping (binder).
Background technology
At present, while adopting rod iron method to build bridge coping (binder), main employing set up temporary steel pipe support or directly adopted lifting appliance that the mounting platform of cage as support system is set, after secondary beam is installed and is finished, then on secondary beam laying construction platform and safe protective railing. Temporary steel pipe support is set up in employing need carry out based process, and more time-consuming; Directly adopt lifting appliance that cage is set the larger security risk of support system existence is installed.
Summary of the invention
The object of this invention is to provide one and be convenient to dismounting, can reuse, when energy ensures to adopt rod iron method to build bridge coping (binder), support system is installed the protective platform of safety operation in (dismounting) process, plays the protective platform of second protective action in the overall process that simultaneously can construct at bent cap (binder) time.
Technical scheme of the present invention is: a kind of bridge coping construction safety protection platform is combined into security protection platform by front, rear, left and right four part unit platforms, described security protection platform is arranged on punching rod iron by platform lifting rope, and is arranged in pier stud around.
The structure of described front, rear, left and right four part unit platforms includes channel-section steel girder, channel-section steel secondary beam, expanded steel diamond mesh, standing screw, protect block inserted link, protect block, skirting board, close order safety net, channel-section steel Main Girder Welding becomes a rectangular outer frame, in rectangular outer frame, the multiple channel-section steel secondary beams of welding form multiple rectangle inside casings, in rectangle inner frame, expanded steel diamond mesh is installed, the outside of rectangular frame is installed to protect to block inserted link and protect and is blocked, and protects to block that skirting board and close order safety net being installed.
Advantage of the present invention is: can ensure to adopt rod iron method to build bridge coping (binder) time, support system is installed handling safety in (dismounting) process, plays second protective action in the overall process that simultaneously can construct at bent cap (binder) time. Its processing, assembling, dismounting etc. are convenient, fast, safe and reliable, can repeatedly recycle.
Brief description of the drawings
Fig. 1 is the structural representation of unit platforms of the present invention.
Fig. 2 is security protection platform structure schematic diagram of the present invention (plane).
Fig. 3 is security protection platform structure schematic diagram of the present invention (front view).
Fig. 4 is security protection platform structure schematic diagram of the present invention (side view).
In figure: 1-channel-section steel girder, 2-channel-section steel secondary beam, 3-expanded steel diamond mesh, 4-standing screw, 5-protects and blocks inserted link, and 6-protects and blocks, 7-skirting board, the close order safety net of 8-, 9-security protection platform, 10-platform lifting rope, 11-punching rod iron, 12-steel ox pin, 13-adjusting device, 14-bent cap (binder) support system, 15-pier stud, 16-bent cap (binder).
Detailed description of the invention
As shown in Figure 2,3, 4, bridge coping construction safety protection platform 9 of the present invention is combined by front, rear, left and right four part unit platforms, described security protection platform 9 is arranged on (punching rod iron, steel corbel belong to a part for support system) on punching rod iron 11 by platform lifting rope 10, and be arranged in pier stud 15 around, each one of two ends and both sides.
The structure of described front, rear, left and right four part unit platforms includes channel-section steel girder 1, channel-section steel secondary beam 2, expanded steel diamond mesh 3, standing screw 4, protect block inserted link 5, protect block 6, skirting board 7, close order safety net 8, channel-section steel girder 1 is welded into a rectangular frame, in rectangular frame, the multiple channel-section steel secondary beams 2 of welding form multiple rectangle inside casings, its effect is to reduce span, improve expanded steel diamond mesh bearing capacity, expanded steel diamond mesh 3 is installed in rectangular frame, the outside of rectangular frame is installed to protect and is blocked inserted link 5 and protect and block 6, protects to block that skirting board 7 and close order safety net 8 being installed.
In after the assembling of security protection platform, sky is greater than the not little 10cm of 15 each sizes of pier stud, so that lifting. Channel-section steel girder 1 adopts that [16 channel-section steels processing, channel-section steel secondary beam 2 adopts the processing of ∠ 50 × 50mm angle steel, channel-section steel time case bay 100cm. Expanded steel diamond mesh 3 thickness of slab δ=0.4mm, mesh is 20 × 30mm. Standing screw 4 adopts M20 bolt, adjustable length 15cm. Guardrail inserted link 5 adopts Φ 28 steel bar weldings to be connected to channel-section steel girder 1 outer side edges, the 10cm that appears, installing space 150cm; Guardrail 6 adopts φ 48 steel-pipe welding processing, height 120cm, and steel pipe spacing 150cm, on guardrail 6, surrounding completely spreads and hangs close order safety net 8, and guardrail 6 inserts in guardrail inserted link 5 while installation. Skirting board 7 adopts plank or bamboo springboard to install, and height 30cm adopts galvanized wire colligation on guardrail 6.
Installation method:
Security protection platform 9 is with bolts to be assembled and is processed into four module unit platforms on ground, lift with truck crane, hang on punching rod 11 with steel wire rope 10, finally adopt standing screw 4 to be fixed on pier stud and prevent from moving, as the installation of bent cap (binder) support system, the security protection platform of dismounting. After use finishes, entirety is put on ground and removes, and is transported to next working face and uses.
Claims (8)
1. a bridge coping construction safety protection platform, it is characterized in that this security protection platform is combined into security protection platform by front, rear, left and right four part unit platforms, described security protection platform is arranged on punching rod iron by platform lifting rope, and is arranged in pier stud around.
2. bridge coping construction safety protection platform according to claim 1, the structure that it is characterized in that described front, rear, left and right four part unit platforms includes channel-section steel girder, channel-section steel secondary beam, expanded steel diamond mesh, standing screw, protect block inserted link, protect block, skirting board, close order safety net, channel-section steel Main Girder Welding becomes a rectangular frame, in rectangular frame, the multiple channel-section steel secondary beams of welding form multiple rectangle inside casings, expanded steel diamond mesh is installed in rectangle inside casing, the outside of rectangular frame is installed to protect to block inserted link and protect and is blocked, and protects to block that skirting board and close order safety net being installed.
3. bridge coping construction safety protection platform according to claim 1, is characterized in that the rear interior sky of security protection platform assembling is greater than each not little 10cm of size of pier stud, so that lifting.
4. bridge coping construction safety protection platform according to claim 2, is characterized in that [16 channel-section steels process the employing of channel-section steel girder.
5. bridge coping construction safety protection platform according to claim 2, is characterized in that channel-section steel secondary beam adopts ∠ 50 × 50mm angle steel to process, channel-section steel time case bay 100cm.
6. bridge coping construction safety protection platform according to claim 2, is characterized in that expanded steel diamond mesh thickness of slab δ=0.4mm, and mesh is 20 × 30mm.
7. bridge coping construction safety protection platform according to claim 2, is characterized in that guardrail inserted link adopts Φ 28 steel bar weldings to be connected to channel-section steel girder outer side edges, the 10cm that appears, installing space 150cm.
8. bridge coping construction safety protection platform according to claim 2, is characterized in that guardrail adopts φ 48 steel-pipe welding processing, height 120cm, steel pipe spacing 150cm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610129506.1A CN105603884A (en) | 2016-03-08 | 2016-03-08 | Safety protection platform for bridge cap beam construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610129506.1A CN105603884A (en) | 2016-03-08 | 2016-03-08 | Safety protection platform for bridge cap beam construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105603884A true CN105603884A (en) | 2016-05-25 |
Family
ID=55984194
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610129506.1A Pending CN105603884A (en) | 2016-03-08 | 2016-03-08 | Safety protection platform for bridge cap beam construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105603884A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106522099A (en) * | 2016-11-10 | 2017-03-22 | 上海市基础工程集团有限公司 | Non-foundation simple steel platform structure for bridge shallow water area operation |
CN107326814A (en) * | 2017-08-30 | 2017-11-07 | 云南工程建设总承包公司 | A kind of bridge bottom construction safety protection column |
CN109356039A (en) * | 2018-12-06 | 2019-02-19 | 广东腾盛模架科技有限公司 | A kind of safe construction assembled bent cap job platform |
CN111535199A (en) * | 2020-05-27 | 2020-08-14 | 中交路桥建设有限公司 | Integral type edge-facing protection device and structure for pier column, middle tie beam and bent cap construction |
CN112112073A (en) * | 2020-05-28 | 2020-12-22 | 广州工程总承包集团有限公司 | Piercing steel bar type supporting system and mounting method |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103088756A (en) * | 2013-02-01 | 2013-05-08 | 葛洲坝集团第二工程有限公司 | Steel bar bearing constructing method of bent cap construction platform |
CN203441073U (en) * | 2013-08-23 | 2014-02-19 | 广州建筑股份有限公司 | Hoop-type high-altitude guard platform suitable for super high-rise building outline boarder structural column |
CN204040505U (en) * | 2014-07-10 | 2014-12-24 | 中国建筑第二工程局有限公司 | Building side column protective platform |
CN204386197U (en) * | 2015-01-05 | 2015-06-10 | 中建三局第二建设工程有限责任公司 | The horizontal protective platform of a kind of Super High alien invasion steel work |
JP2015224514A (en) * | 2014-05-29 | 2015-12-14 | 株式会社杉孝 | Scaffold device for handrail |
CN205474859U (en) * | 2016-03-08 | 2016-08-17 | 中国水利水电第十四工程局有限公司 | Bridge bent cap construction safety protection platform |
-
2016
- 2016-03-08 CN CN201610129506.1A patent/CN105603884A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103088756A (en) * | 2013-02-01 | 2013-05-08 | 葛洲坝集团第二工程有限公司 | Steel bar bearing constructing method of bent cap construction platform |
CN203441073U (en) * | 2013-08-23 | 2014-02-19 | 广州建筑股份有限公司 | Hoop-type high-altitude guard platform suitable for super high-rise building outline boarder structural column |
JP2015224514A (en) * | 2014-05-29 | 2015-12-14 | 株式会社杉孝 | Scaffold device for handrail |
CN204040505U (en) * | 2014-07-10 | 2014-12-24 | 中国建筑第二工程局有限公司 | Building side column protective platform |
CN204386197U (en) * | 2015-01-05 | 2015-06-10 | 中建三局第二建设工程有限责任公司 | The horizontal protective platform of a kind of Super High alien invasion steel work |
CN205474859U (en) * | 2016-03-08 | 2016-08-17 | 中国水利水电第十四工程局有限公司 | Bridge bent cap construction safety protection platform |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106522099A (en) * | 2016-11-10 | 2017-03-22 | 上海市基础工程集团有限公司 | Non-foundation simple steel platform structure for bridge shallow water area operation |
CN106522099B (en) * | 2016-11-10 | 2021-05-28 | 上海市基础工程集团有限公司 | Foundation-free simple steel platform structure for operation in bridge shallow water area |
CN107326814A (en) * | 2017-08-30 | 2017-11-07 | 云南工程建设总承包公司 | A kind of bridge bottom construction safety protection column |
CN109356039A (en) * | 2018-12-06 | 2019-02-19 | 广东腾盛模架科技有限公司 | A kind of safe construction assembled bent cap job platform |
CN111535199A (en) * | 2020-05-27 | 2020-08-14 | 中交路桥建设有限公司 | Integral type edge-facing protection device and structure for pier column, middle tie beam and bent cap construction |
CN112112073A (en) * | 2020-05-28 | 2020-12-22 | 广州工程总承包集团有限公司 | Piercing steel bar type supporting system and mounting method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105603884A (en) | Safety protection platform for bridge cap beam construction | |
CN204781887U (en) | Prefabricated assembly type structure's no outrigger construction platform | |
CN105257009B (en) | Device for anti-falling partition in elevator shaft | |
CN205474859U (en) | Bridge bent cap construction safety protection platform | |
CN206722368U (en) | One kind is used to protect frame system outside the working regularization of assembled architecture | |
CN105178615A (en) | Discharging platform | |
CN202785351U (en) | Tower cranes attached operating platform | |
CN103967263A (en) | Novel hydraulic automatic climbing discharging platform | |
CN102425123B (en) | Combined type protection shed frame and construction method thereof | |
CN203947758U (en) | Novel hydraulic automatic climbing discharging platform | |
CN101876209A (en) | Supertall building core tube construction safety fire protection system and device | |
CN201778479U (en) | Detachable high-altitude working platform | |
CN103321438B (en) | A kind of modular protection marguise of large cantilever being applicable to high-building construction | |
KR100944458B1 (en) | Apparatus preventing separation of cage for construction | |
CN202809494U (en) | Bracket for pouring 0# block to rigid continuous girder bridge | |
CN112727147A (en) | Outdoor suspended step dismantling method | |
CN103132640A (en) | Detachable steel-concrete composite floor | |
CN207878299U (en) | Advanced composite material (ACM) helicopter platform | |
CN105484509A (en) | Tool type horizontal safety net and implementation method thereof | |
CN205840289U (en) | A kind of suspension type vertical operating platform | |
CN211338598U (en) | Ring rail hoisting device for installing high-rise curtain wall | |
CN204402001U (en) | For the mobile operating platform system that structure for steel structure roof inner slab is installed | |
JP6534938B2 (en) | Lining plate installation and rain curing jig and lining plate installation method using the jig | |
CN205243058U (en) | Horizontal safety device of elevartor shaft | |
CN203782582U (en) | Device used for mounting bridge crash barrier |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160525 |