CN211338598U - Ring rail hoisting device for installing high-rise curtain wall - Google Patents
Ring rail hoisting device for installing high-rise curtain wall Download PDFInfo
- Publication number
- CN211338598U CN211338598U CN201921911953.8U CN201921911953U CN211338598U CN 211338598 U CN211338598 U CN 211338598U CN 201921911953 U CN201921911953 U CN 201921911953U CN 211338598 U CN211338598 U CN 211338598U
- Authority
- CN
- China
- Prior art keywords
- transverse steel
- steel beam
- curtain wall
- rail
- wire rope
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 168
- 239000010959 steel Substances 0.000 claims abstract description 168
- 239000000463 material Substances 0.000 claims abstract description 20
- 230000009194 climbing Effects 0.000 claims abstract description 12
- 230000003014 reinforcing effect Effects 0.000 claims description 5
- 238000010276 construction Methods 0.000 abstract description 11
- 230000015572 biosynthetic process Effects 0.000 abstract description 2
- 238000009434 installation Methods 0.000 description 10
- 229910000746 Structural steel Inorganic materials 0.000 description 3
- 238000003466 welding Methods 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 2
- 238000005034 decoration Methods 0.000 description 2
- 238000013461 design Methods 0.000 description 2
- 238000011161 development Methods 0.000 description 2
- 239000011521 glass Substances 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 241001503987 Clematis vitalba Species 0.000 description 1
- 230000001174 ascending effect Effects 0.000 description 1
- 230000003111 delayed effect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000003203 everyday effect Effects 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 238000013508 migration Methods 0.000 description 1
- 230000005012 migration Effects 0.000 description 1
- 230000001681 protective effect Effects 0.000 description 1
- 230000003252 repetitive effect Effects 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
Images
Landscapes
- Load-Bearing And Curtain Walls (AREA)
Abstract
The utility model provides a circular rail hoist device for installing high-rise curtain, including hoist and mount body, vertical stand, wire rope, hoop track and climbing rail device, the hoist and mount body utilizes tower steel construction self structural shape, adopts the steelframe that its upper portion daylighting top set up, and at the atress system of vertical stand of steel shelf location and wire rope formation, set up the hoop track in the below of hoist and mount body, climbing rail device is used for hanging curtain material, and climbing rail device moves on the hoop track to drive the removal of curtain material. The utility model provides a circular rail hoisting device for installing high-rise curtain wall, the circular rail is installed on the steel structure at the top of the tower, and the steel structure is utilized to install the accessories of the circular rail hoisting device, thus saving the cost; the circumferential guide rail is used for conveying the curtain wall material, so that the operation is safer, more stable and more stable, the moving efficiency is improved, the labor cost is saved, the operation of workers is convenient, and the operation is safe and efficient.
Description
Technical Field
The utility model relates to a building technical field, in particular to a circular rail hoist device for installing high-rise curtain.
Background
With the development of the building industry and the requirement of urban development, super high-rise buildings are more and more popular, and building curtain walls are increasingly becoming one of the important components of high-rise buildings as the outer protective structures of the high-rise buildings. However, the lifting installation of the curtain wall belongs to high-altitude operation, and meanwhile, the cross operation of upper and lower different working surfaces is also considered, so that the requirement on safety protection is very strict, and particularly, a safer and more feasible curtain wall lifting device is needed for a busy section with dense building groups. Therefore, the curtain wall hoisting device is a key point for difficult control in high-altitude construction of the curtain wall.
In the prior art, a common hoisting construction method is to transport and hoist by using a small movable crane or a hoisting carriage, a hanging basket and the like. The conventional hanging baskets are of a counterweight type, namely the weight of a counterweight block is used for balancing the load of the hanging basket, and one counterweight support can only hang one hanging basket and is mostly installed on a roof. The working area of a basket can only relate to a vertical plane under the width, so that a plurality of baskets are needed for the full-scale decoration of the project. And when the decoration operation site needs to be replaced and the number of the hanging baskets is insufficient, the hanging baskets are horizontally transposed and re-erected. No matter a plurality of hanging baskets are installed simultaneously or the hanging baskets are repeatedly shifted and re-erected, the workload is very large, time and labor are wasted, resources are wasted, the construction period is delayed, and the engineering cost is high. Therefore, a hoisting device which is simple and convenient to install, occupies a small space and can guarantee stable and safe hoisting is needed.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a circular rail hoist device for installing high-rise curtain to solve the big problem of the super high-rise building curtain installation degree of difficulty that has now.
In order to achieve the purpose, the utility model provides a circular rail hoisting device for installing a high-rise curtain wall, which is fixed on the tower top of a building main body structure and comprises a hoisting body, a plurality of vertical stand columns, a plurality of transverse steel wire ropes and a circular rail;
the hoisting body is close to the edge of the tower top and is fixed on the tower top in an annular mode, and the hoisting body comprises a plurality of transverse steel beams and at least one longitudinal steel beam, the transverse steel beams are arranged at intervals and are perpendicular to the edge of the building main body structure, the first end portion of each transverse steel beam is located on the tower top, the second end portion of each transverse steel beam extends out of the edge of the tower top and is located outside the building main body structure, the longitudinal steel beams are parallel to the edge of the tower top, and the plurality of transverse steel beams and the longitudinal steel beams are fixed in an intersecting mode;
each vertical upright column is perpendicular to the hoisting body and is positioned above the tower top, the downward end of each vertical upright column is a fixed end, the fixed end is fixedly connected with one transverse steel beam, and the upward end is a supporting end;
one end of each transverse steel wire rope is fixedly connected with the first end of each transverse steel beam, the body of each transverse steel wire rope is fixed at the supporting end of each vertical upright and forms an included angle with the vertical upright, the other end of each transverse steel wire rope is fixedly connected with the second end of each transverse steel beam, and each vertical upright and each transverse steel wire rope are fixed on the same transverse steel beam;
the fixed setting is in a plurality of horizontal girder steel second tip the hoop track is located the below on the top of the tower, and the hoop set up in building subject structure's outside, be equipped with at least one rail climbing device on the hoop track, the rail climbing device is used for hanging the curtain material.
Optionally, the support structure further comprises a plurality of circumferential steel wire ropes, and two ends of each circumferential steel wire rope are respectively fixed to the support ends of the two adjacent vertical columns.
Optionally, the horizontal girder steel includes first horizontal girder steel and the horizontal girder steel of second, first horizontal girder steel with the horizontal girder steel interval of second sets up, the length that the second end of first horizontal girder steel stretches out the edge at the top of the tower is greater than the length that the second end of the horizontal girder steel of second stretches out, the fixed setting of hoop track is in the second tip of first horizontal girder steel.
Optionally, still include a plurality of high-strength bolt, high-strength bolt connects the hoop track with first horizontal girder steel.
Optionally, one end of each horizontal steel wire rope is fixedly connected with the first end of the first horizontal steel beam, the body of the horizontal steel wire rope is fixed to the supporting end of the vertical column and forms an included angle with the vertical column, the other end of the horizontal steel wire rope is fixedly connected with the second end of the first horizontal steel beam, and the vertical column and the horizontal steel wire rope are fixed to the same horizontal steel beam.
Optionally, the circumferential rail comprises an i-beam, and the rail climbing device can move along a flange of the i-beam.
Optionally, still include the U type shackle, U type shackle and bolt cooperation fixed connection vertical column with horizontal girder steel.
Optionally, the steel wire rope support further comprises a plurality of lug plates, wherein the lug plates are fixedly welded at the supporting ends of the vertical stand columns and used for connecting and supporting the transverse steel wire rope and/or the circumferential steel wire rope.
Optionally, the upright post comprises a plurality of ear plate reinforcing ribs welded between the ear plate and the supporting end of the vertical upright post.
Optionally, the steel wire rope and the transverse steel beam are connected by a plurality of lock bolts.
Compared with the prior art, the circular rail hoisting device for installing the high-rise curtain wall, provided by the utility model, has the advantages that the hoisting body adopts the structural shape of the tower steel structure, so that the cost is saved, and the installation period is shortened; furthermore, the vertical upright post, the horizontal steel wire rope, the annular steel wire rope and the hoisting body form a horizontal and annular stress system, so that the hoisting operation is safer and more stable. The annular track is arranged on the lower portion of the hoisting body, and moving efficiency is improved. The beneficial effects are as follows:
the installation is simple and convenient, the repeated utilization is realized, the construction speed is improved, the cost is greatly reduced, only one lifting point is needed, and the curtain wall material does not need to be transferred into a floor, which is 50 percent of the lifting cost of the traditional gun carriage;
and secondly, the problems of high-altitude vertical transportation and horizontal movement of manual multiple high-altitude assembling and disassembling and moving hoisting curtain wall materials are solved, the operation is safe, and the quality and the construction period are guaranteed.
And thirdly, the problems of high-altitude vertical transportation and horizontal movement of the curtain wall material are solved, the operation is safe, and the quality and the construction period are guaranteed.
Drawings
Fig. 1 is a schematic overall overhead structure view of a circular rail hoisting device for installing a high-rise curtain wall according to an embodiment of the present invention;
FIG. 2 is an enlarged view of a portion of the structure of FIG. 1;
FIG. 3 is a front enlarged view of the partial structure A1-1 of FIG. 2;
FIG. 4 is an enlarged top view of the partial structure A1-2 of FIG. 2;
fig. 5 is an enlarged view of the first node J100 of fig. 3;
fig. 6 is an enlarged view of the second node J200 of fig. 3;
fig. 7 is an enlarged schematic structural view of the third node J300 of fig. 3;
fig. 8 is an enlarged view of the fourth node J400 of fig. 3;
wherein the reference numbers are as follows:
100-a hoisting body, 110-a transverse steel beam, 110 a-a first end, 110 b-a second end, 111-a first transverse steel beam, 112-a second transverse steel beam, 120-a longitudinal steel beam, 200-a vertical upright, 200 a-a fixed end, 200 b-a supporting end, 300-a transverse steel wire rope, 400-a circumferential rail, 500-a circumferential steel wire rope and 600-a rail climbing device;
700 a-lock bolt buckle, 700 b-U-shaped shackle, 700 c-high-strength bolt, 700 d-track connecting plate, 700 e-lug plate and 700 f-lug plate reinforcing rib;
j100-first node, J200-second node, J300-third node, J400-fourth node;
800-building a main body structure;
900-curtain wall material.
Detailed Description
To make the objects, advantages and features of the present invention clearer, the name of the present invention will be described in further detail with reference to the accompanying drawings. It should be noted that the drawings are in simplified form and are not to precise scale, and are provided for convenience and clarity in order to facilitate the description of the embodiments of the present invention. It should be understood that the drawings are not necessarily to scale, showing the particular construction of the invention, and that the illustrative features in the drawings, which are used to illustrate certain principles of the invention, are also somewhat simplified. Specific design features of the invention disclosed herein, including, for example, specific dimensions, orientations, locations, and configurations, will be determined in part by the particular intended application and environment of use. In the embodiments described below, the same reference numerals are used in common between different drawings to denote the same portions or portions having the same functions, and a repetitive description thereof will be omitted. In this specification, like reference numerals and letters are used to designate like items, and therefore, once an item is defined in one drawing, further discussion thereof is not required in subsequent drawings.
In this embodiment, a circular rail hoisting device for installing a high-rise curtain wall is provided, as shown in fig. 1, fig. 2, fig. 3, and fig. 4, it can be seen that the circular rail hoisting device for installing a high-rise curtain wall provided in this embodiment is fixed on the tower top of a building main body structure 800, and the circular rail hoisting device includes a hoisting body 100, a plurality of vertical pillars 200, a plurality of horizontal steel wire ropes 300, and a circular rail 400.
Specifically, the hoisting body 100 is close to the edge of the tower top and fixed on the tower top in an annular manner, and includes a plurality of transverse steel beams 110 and at least one longitudinal steel beam 120 arranged at intervals, the transverse steel beam 110 is perpendicular to the edge of the building main body structure 800, a first end portion 110a is located on the tower top, a second end portion 110b extends out of the edge of the tower top and is located outside the building main body structure 800, the longitudinal steel beam 120 is parallel to the edge of the tower top, and the plurality of transverse steel beams 110 and the longitudinal steel beam 120 are fixed in an intersecting manner. Preferably, the longitudinal steel beams 120 are perpendicular to the transverse steel beams 110. In one embodiment, the longitudinal steel beams are I-shaped steel with the model number of HN200mm multiplied by 100 mm.
Each vertical upright 200 is perpendicular to the hoisting body 100 and is located above the tower top 500, a downward end of the vertical upright 200 is a fixed end 200a, the fixed end 200a is fixedly connected with one of the transverse steel beams 110 to form a second joint J200, and a downward end of the vertical upright 200 is a supporting end 200 b. In one embodiment, the vertical column uses 60mm x 80mm x 5mm square steel.
One end of each transverse steel wire rope 300 is fixedly connected with the first end of the transverse steel beam 110 to form a first joint J100; the body of the transverse steel wire rope 300 is fixed at the supporting end 200b of the vertical upright post 200 and forms an included angle with the vertical upright post 200 to form a fourth joint J400; the other end of the transverse steel cable 300 is fixedly connected to the second end 110b of the transverse steel beam 110. The vertical column 200 and the horizontal steel wire rope 300 are fixed on the same horizontal steel beam 110. In one embodiment, the transverse steel cord has a dimension of phi 16 mm.
Preferably, with continued reference to fig. 1, the transverse steel beams 110 include a first transverse steel beam 111 and a second transverse steel beam 112, the first transverse steel beam 111 and the second transverse steel beam 112 are spaced apart from each other, a length of the second end portion 110b of the first transverse steel beam 111 protruding out of the tower top is greater than a length of the second end portion 110b of the second transverse steel beam 112 protruding out, and the circumferential rail 400 is fixedly disposed at the second end portion of the first transverse steel beam 111. In one embodiment, the transverse steel beams are square steel, wherein the second transverse steel beam 112 has a size of 120mm × 80mm × 5mm, and in order to facilitate installation of the circumferential rail, the length of the first transverse steel beam 111 is increased by 500mm based on the length of the second transverse steel beam 112, that is, the length of the edge of the second end 110b of the first transverse steel beam 111 protruding out of the tower top is 500mm more than the length of the second end 110b of the second transverse steel beam 112. The first transverse steel beam 111 and the second transverse steel beam 112 which are arranged at intervals are beneficial to the entrance and exit of the curtain wall material 900 with a large area.
One end of each horizontal steel wire rope 300 is fixedly connected with the first end portion 110a of the first horizontal steel beam 111, the body of the horizontal steel wire rope 300 is fixed at the supporting end 200b of the vertical upright column 200 and forms an included angle with the vertical upright column 200, the other end of the horizontal steel wire rope 300 is fixedly connected with the second end portion 110b of the first horizontal steel beam 111, wherein the vertical upright column 200 and the horizontal steel wire rope 300 are fixed on the same first horizontal steel beam 111. At this time, the first, third and fourth nodes J100, J300 and J400 form a stable force-bearing triangular structure. The structure of the ring rail hoisting device for installing the high-rise curtain wall is more stable and firm, the transverse steel beam 110 is the bottom edge of the stressed triangular structure, and the transverse steel wire rope 300 takes the fourth joint J400 as a boundary point to serve as two sides of the stressed triangle bearing pulling force, so that a more reasonable stress system is formed. Specifically, the third node J300 includes a connection of the other end of the transverse wire rope 300 and the second end 110b of the transverse steel beam 110, and a connection of the circumferential rail 400 and the second end of the first transverse steel beam 111.
The ring rail hoisting device for installing the high-rise curtain wall further comprises a plurality of ring steel wire ropes 500, wherein two ends of each ring steel wire rope are respectively fixed to the two adjacent supporting ends 200b of the vertical upright posts 200, so that a ring stress system is formed. In one embodiment, the circumferential wire rope has a dimension of phi 16 mm.
As shown in fig. 5, which is an enlarged schematic view of the structure of the first joint J100, the ring rail hoisting device for installing a high-rise curtain wall provided in this embodiment further includes a plurality of lock bolt buckles 700a, and the lock bolt buckles 700a are used for connecting the transverse steel wire rope 300 and the first transverse steel beam 111.
As shown in fig. 6, which is an enlarged schematic view of the structure of the second joint J200, the ring rail hoisting device for installing a high-rise curtain wall provided in this embodiment further includes a U-shaped shackle 700b, and the U-shaped shackle 700b is fixedly connected to the vertical column 200 and the first transverse steel beam 111 by being matched with a bolt.
As shown in fig. 7, which is an enlarged schematic view of the structure of the second end portion 110b, the circular rail hoisting device for installing a high-rise curtain wall provided in this embodiment further includes a plurality of high-strength bolts 700c, where the high-strength bolts 700c are fixedly connected to the circular rail 400 and the first transverse steel beam 111, and in one embodiment, the third node J300 is located right above a connection position of the circular rail 400 and the first transverse steel beam 111. Preferably, the circular rail hoisting device for installing the high-rise curtain wall further comprises a rail connection plate 700d for more firmly welding the circular rail 400 to the second end 110b of the first transverse steel beam 111.
As shown in fig. 8, which is an enlarged schematic view of the structure of the fourth node J400, the ring rail hoisting device for installing a high-rise curtain wall provided in this embodiment further includes a plurality of ear plates 700e, and the ear plates 700e are fixedly welded to the support ends 200b of the vertical pillars 200, and are used for connecting and supporting the transverse steel wire rope 300 and the circumferential steel wire rope 500. Further, the upright post comprises a plurality of lug plate reinforcing ribs 700f, and the lug plate reinforcing ribs 700f are welded between the lug plate 700e and the supporting end 200b of the vertical upright post 200.
In the application of the utility model discloses an in the embodiment of a certain project, a material and specification suggestion table one that are used for installing each part of high-rise curtain wall's circular rail hoist device: the material and specification used for installing each part of the ring rail hoisting device of the high-rise curtain wall.
Table one: material and specification for each part of circular rail hoisting device for installing high-rise curtain wall
Obviously, the model specification of each component in table one is not the limitation of the present invention, and those skilled in the art can specifically set up the specification according to the actual working condition, but all fall within the protection scope of the present invention.
The utility model provides a circular rail hoist device application scope for installing high-rise curtain wall includes but not limited to the installation of super high-rise upper portion curtain plate, is particularly useful for glass curtain wall's installation. The hoisting body 100 is formed by installing and deploying the first joint J100, the second joint J200, the third joint J300 and the fourth joint J400 on a structural steel column by utilizing the structural shape of a tower steel structure and adopting the structural steel column arranged on a daylighting top at the upper part of the tower steel structure, so as to form a stress system, the annular track 400 is installed at the lower part of the structural steel column, and the rail climber 600 (motor) drives curtain wall materials (glass plates) to horizontally run on the annular track 400, so that the operation is simple and convenient, and the annular track hoists the curtain wall materials, so that the time is saved and the use is safe; furthermore, the connection of the heading steel wire rope 300, the circumferential steel wire rope 500 and the vertical upright post 200 with the first transverse steel beam is respectively provided with a lock bolt port 700a, an ear plate 700e and a U-shaped shackle, so that the steel wire rope is convenient to disassemble and high in repeated utilization rate.
Compared with the prior art, the circular rail hoisting device for installing the high-rise curtain wall provided by the utility model has the advantages that when the curtain wall is installed, the circular rail hoisting plate is safe and firm, and an operator can move and install curtain wall materials by using the circular rail, so that the circular rail hoisting plate is firm and firm; the circular track is simple and convenient to mount and more firm to fix; the annular rail is arranged on a tower top steel structure, and the annular rail is arranged by utilizing the steel structure; the moving efficiency is improved, and the labor cost is saved; the circular rail is used for ascending, translating and installing the plate, so that the construction speed is high, and the labor cost is saved; the curtain wall material has the advantages of good use effect, stable movement of the curtain wall material, convenient operation of workers, safety, high efficiency and higher safety.
The utility model provides an implement flow for installing ring rail hoist device of high-rise curtain wall roughly includes following step: drawing design, component node manufacture, node field installation, welding, stress system formation, circumferential track installation, motor installation, test hanging, inspection acceptance and use. Taking the above embodiment as an example, wherein the component node fabrication includes.
Particularly, when specifically implementing the utility model provides a ring rail hoist device for installing high-rise curtain wall, should obey following construction control requirement:
firstly, strictly implementing relevant regulations of national high-altitude operation;
secondly, after the ring rail hoisting device is installed, the assembling and welding quality is strictly checked, and the use safety is ensured;
before using the circular rail hoisting device, the operating personnel must be educated through safety technology, and full-time security personnel make and record safe delivery every day, and the delivery is targeted and effective;
and fourthly, operating personnel strictly operate according to the operating rules, and carrying out illegal operation and rough construction.
Fifth, the safety belt must be tied for high-altitude operation.
It should be noted that, in the description of the present invention, the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", "axial", "radial", "circumferential", etc. indicate the orientation or positional relationship indicated based on the orientation or positional relationship shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus should not be construed as limiting the present invention.
Furthermore, the terms "first", "second" and "first" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include at least one such feature. In the description of the present invention, "a plurality" means at least two, e.g., two, three, etc., unless specifically limited otherwise.
In summary, the above embodiments have described the present invention in detail for different configurations of the circular rail hoisting device for installing high-rise curtain wall, and certainly, the present invention includes but is not limited to the configurations listed in the above embodiments, and any content that is transformed based on the configurations provided by the above embodiments all belongs to the protection scope of the present invention, and those skilled in the art can do three things according to the content of the above embodiments. However, any modification and modification made by those skilled in the art based on the above disclosure are within the scope of the claims.
Claims (10)
1. A circular rail hoisting device for installing a high-rise curtain wall is characterized by being fixed on the top of a building main body structure, and comprising a hoisting body, a plurality of vertical stand columns, a plurality of transverse steel wire ropes and a circular rail;
the hoisting body is close to the edge of the tower top and is fixed on the tower top in an annular mode, and the hoisting body comprises a plurality of transverse steel beams and at least one longitudinal steel beam, the transverse steel beams are arranged at intervals and are perpendicular to the edge of the building main body structure, the first end portion of each transverse steel beam is located on the tower top, the second end portion of each transverse steel beam extends out of the edge of the tower top and is located outside the building main body structure, the longitudinal steel beams are parallel to the edge of the tower top, and the plurality of transverse steel beams and the longitudinal steel beams are fixed in an intersecting mode;
each vertical upright column is perpendicular to the hoisting body and is positioned above the tower top, the downward end of each vertical upright column is a fixed end, the fixed end is fixedly connected with one transverse steel beam, and the upward end is a supporting end;
one end of each transverse steel wire rope is fixedly connected with the first end of each transverse steel beam, the body of each transverse steel wire rope is fixed at the supporting end of each vertical upright and forms an included angle with the vertical upright, the other end of each transverse steel wire rope is fixedly connected with the second end of each transverse steel beam, and each vertical upright and each transverse steel wire rope are fixed on the same transverse steel beam;
the fixed setting is in a plurality of horizontal girder steel second tip the hoop track is located the below on the top of the tower, and the hoop set up in building subject structure's outside, be equipped with at least one rail climbing device on the hoop track, the rail climbing device is used for hanging the curtain material.
2. The ring rail hoisting device for installing the high-rise curtain wall as claimed in claim 1, further comprising a plurality of ring steel wire ropes, wherein two ends of each ring steel wire rope are respectively fixed at the supporting ends of two adjacent vertical columns.
3. The ring rail hoisting device for installing the high-rise curtain wall as claimed in claim 2, further comprising a plurality of ear plates fixedly welded to the support ends of the vertical posts for connecting and supporting the transverse steel wire ropes and/or the circumferential steel wire ropes.
4. The ring rail hoisting device for installing the high-rise curtain wall as claimed in claim 3, further comprising a plurality of ear plate reinforcing ribs welded between the ear plates and the supporting ends of the vertical posts.
5. The circular rail hoisting device for installing the high-rise curtain wall as claimed in claim 1, wherein the transverse steel beams comprise a first transverse steel beam and a second transverse steel beam, the first transverse steel beam and the second transverse steel beam are arranged at intervals, the length of the edge of the second end of the first transverse steel beam extending out of the tower top is greater than the length of the second end of the second transverse steel beam extending out, and the circular rail is fixedly arranged at the second end of the first transverse steel beam.
6. The circular rail hoisting device for installing the high-rise curtain wall as claimed in claim 5, further comprising a plurality of high-strength bolts, wherein the high-strength bolts connect the circular rail and the first transverse steel beam.
7. The looped rail hoisting device for installing the high-rise curtain wall as claimed in claim 5, wherein one end of each of the transverse steel wire ropes is fixedly connected with the first end of the first transverse steel beam, the body of the transverse steel wire rope is fixed at the supporting end of the vertical upright and forms an included angle with the vertical upright, the other end of the transverse steel wire rope is fixedly connected with the second end of the first transverse steel beam, and the vertical upright and the transverse steel wire rope are fixed on the same first transverse steel beam.
8. The circular rail hoisting device for installing the high-rise curtain wall as claimed in claim 1, wherein the circular rail comprises an I-shaped steel, and the rail climbing device can move along the flange of the I-shaped steel.
9. The ring rail hoisting device for installing the high-rise curtain wall as claimed in claim 1, further comprising a U-shaped shackle, wherein the U-shaped shackle and a bolt are matched and fixedly connected with the vertical upright and the transverse steel beam.
10. The ring rail hoisting device for installing the high-rise curtain wall as claimed in any one of claims 1 to 9, further comprising a plurality of lock bolt buckles for connecting the transverse steel wire rope and the transverse steel beam.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201921911953.8U CN211338598U (en) | 2019-11-07 | 2019-11-07 | Ring rail hoisting device for installing high-rise curtain wall |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201921911953.8U CN211338598U (en) | 2019-11-07 | 2019-11-07 | Ring rail hoisting device for installing high-rise curtain wall |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN211338598U true CN211338598U (en) | 2020-08-25 |
Family
ID=72136434
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201921911953.8U Active CN211338598U (en) | 2019-11-07 | 2019-11-07 | Ring rail hoisting device for installing high-rise curtain wall |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN211338598U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN113911927A (en) * | 2021-11-05 | 2022-01-11 | 山东国建工程集团有限公司 | A glass curtain wall hoisting protection device |
-
2019
- 2019-11-07 CN CN201921911953.8U patent/CN211338598U/en active Active
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN113911927A (en) * | 2021-11-05 | 2022-01-11 | 山东国建工程集团有限公司 | A glass curtain wall hoisting protection device |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN101476410B (en) | Mounting and demounting method for roof plate formwork support platform of concrete silo | |
| CN103061506B (en) | Construction method of steel structure dome | |
| CN102864936B (en) | Combination lifting construction method for large-scale high hollow building roof of steel structure | |
| JP3716316B2 (en) | Demolition and removal method of arch bridge | |
| CN206328678U (en) | Steel box-girder chooses arm and steel guard rail installs dual-purpose type Mobile operating platform | |
| CN211143305U (en) | Steel structure building | |
| CN105888230A (en) | Lifting device for building curtain wall construction and construction method thereof | |
| CN102912996B (en) | Steel tube concrete column high-altitude construction safety protection system | |
| CN103669815A (en) | Method for constructing hanging rope and pipe combined all-round scaffold construction platform and protective system | |
| CN212477450U (en) | 0# piece assembled bracket based on BIM | |
| CN212561215U (en) | A back cage platform channel device | |
| CN211338598U (en) | Ring rail hoisting device for installing high-rise curtain wall | |
| CN204571823U (en) | The vertical cat ladder of a kind of assembly type | |
| CN105586832A (en) | Suspension type catwalk surface net mounting system | |
| CN211689948U (en) | A suspension operation platform device for the construction of a cable-stayed bridge tower | |
| CN203022328U (en) | Climbing operation platform | |
| CN214885399U (en) | Adjustable operation construction equipment of steel column | |
| CN101435270A (en) | High layer post subsection butt-joint operating method | |
| CN217205335U (en) | High-altitude large-cantilever support die carrier | |
| CN215717067U (en) | Construction platform suitable for concrete composite shear wall structure | |
| CN205369948U (en) | Lifting device for daylighting top is used for installing | |
| CN215167862U (en) | A non-counterweight hanging basket for parapet | |
| CN213927412U (en) | Folding support operating platform | |
| CN213231168U (en) | Lifting appliance for hoisting large-span bent cap reinforcement cage | |
| CN205591115U (en) | Suspension type catwalk veil installing the system |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||