CN203782582U CN201420166730.4U CN201420166730U CN203782582U CN 203782582 U CN203782582 U CN 203782582U CN 201420166730 U CN201420166730 U CN 201420166730U CN 203782582 U CN203782582 U CN 203782582U
Authority
CN
China
Prior art keywords
hanging basket
steel frame
steelframe
universal wheels
universal wheel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420166730.4U
Other languages
Chinese (zh)
Inventor
徐国引
赵民华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG GUOSHENG STEEL STRUCTURE CO Ltd
Original Assignee
ZHEJIANG GUOSHENG STEEL STRUCTURE CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG GUOSHENG STEEL STRUCTURE CO Ltd filed Critical ZHEJIANG GUOSHENG STEEL STRUCTURE CO Ltd
Priority to CN201420166730.4U priority Critical patent/CN203782582U/en
Application granted granted Critical
Publication of CN203782582U publication Critical patent/CN203782582U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to a device used for mounting a bridge crash barrier. The existing device is easily clamped by a bridge surface, and the movement is inconvenient. The device comprises a steel frame, a hanging basket and balancing weights, wherein the hanging basket and the balancing weights are respectively arranged at two ends of the steel frame; the steel frame comprises cross beams, longitudinal beams and vertical beams which are mutually vertical and are welded; steel frame universal wheels are arranged on the bottom of the steel frame; the hanging basket comprises a bottom plate; hanging rods are vertically welded on four corners of the bottom plate; a guard bar is arranged between every two adjacent hanging rods; one end of each hanging rod is fixedly connected with the steel frame; hanging basket universal wheels are arranged on one side, facing the steel frame, of the hanging basket; the horizontal positions of the hanging basket universal wheels are lower than those of the steel frame universal wheels; braking devices are mounted on the hanging basket universal wheels and the steel frame universal wheels. In the construction process, the braking devices on the hanging basket universal wheels and the steel frame universal wheels are used for fixing the mounting device to a bridge surface, the braking devices are released when the movement is needed, the mounting device can be moved, the labor and the materials are saved, and the friction which is produced by the contact between a safety protection shed and a bridge body is eliminated.

Description

A kind of device that Collison fence for bridge is installed
Technical field
The utility model belongs to building field, is specifically related to a kind of device that Collison fence for bridge is installed.
Background technology
Along with the progress of economic technology, urban construction launches just on a large scale, such as bridge construction, housing construction etc.In work progress, need Build Security protection canopy, to ensure safety of workers operation.Install in the process of construction of protective guard at bridge, construction environment complexity, bridge floor often has the gradient, but existing safe guarding shed this problem of not considering, usually cause safe guarding shed same bridge floor to block, cause installing the wearing and tearing of supporting facility, need to expend a large amount of manpower and materials to safe guarding shed when mobile simultaneously, delay the progress of construction.
Summary of the invention
The utility model, for the deficiencies in the prior art, provides a kind of device that Collison fence for bridge is installed.
The utility model comprises steelframe, Hanging Basket and balancing weight, and Hanging Basket and balancing weight divide the two ends that are located at steelframe.
Described steelframe comprises crossbeam, longeron and the vertical beam of mutually vertical and welding, and many crossbeams be arranged in parallel, many longerons be arranged in parallel, many vertical beams be arranged in parallel, and the bottom of steelframe is provided with steelframe universal wheel.
Described Hanging Basket comprises base plate, on four angles of base plate, be vertically welded with peg, between adjacent peg, be provided with guardrail, one end of peg is fixedly connected with steelframe, Hanging Basket is provided with Hanging Basket universal wheel towards a side of steelframe, and the horizontal level of Hanging Basket universal wheel is lower than steelframe universal wheel.
Further, between described crossbeam and vertical beam, weld cant beam.
Further, on described Hanging Basket universal wheel and steelframe universal wheel, brake gear is all housed.
The beneficial effects of the utility model: the brake gear of Hanging Basket universal wheel and steelframe universal wheel is fixed on this erecting device on bridge floor in work progress, need to move time, decontrol brake gear, removable this erecting device, use manpower and material resources sparingly, can also exempt safe guarding shed same pontic and contact the friction occurring.
Brief description of the drawings
Fig. 1 is overall structure schematic diagram of the present utility model;
Fig. 2 is the utility model Construction State schematic diagram.
Detailed description of the invention
Below in conjunction with drawings and Examples, the utility model is further illustrated.
As illustrated in fig. 1 and 2, a kind of device that Collison fence for bridge is installed, comprises steelframe 1, Hanging Basket 2 and balancing weight 3, and 3 points of Hanging Basket 2 and balancing weights are located at the two ends of steelframe 1.
Steelframe 1 comprises crossbeam 1-1, longeron 1-2 and vertical beam 1-3 vertically mutual and welding, many crossbeam 1-1 be arranged in parallel, many longeron 1-2 be arranged in parallel, many vertical beam 1-3 be arranged in parallel, between crossbeam 1-1 and vertical beam 1-3, weld cant beam 1-4, the bottom of steelframe 1 is provided with steelframe universal wheel 1-5.
Hanging Basket 2 comprises base plate 2-1, on four angles of base plate 2-1, be vertically welded with peg 2-2, between adjacent peg 2-2, be provided with guardrail 2-3, one end of peg 2-2 is fixedly connected with steelframe 1, Hanging Basket 2 is provided with Hanging Basket universal wheel 2-4 towards a side of steelframe 1, the horizontal level of Hanging Basket universal wheel 2-4, lower than steelframe universal wheel 1-5, is all equipped with brake gear on Hanging Basket universal wheel 2-4 and steelframe universal wheel 1-5.
When use, first with mobile crane, this device is winched to bridge floor, put balancing weight well, balancing weight has increased the cradle construction of being allowed for access.The brake gear of straining Hanging Basket universal wheel 2-4 and steelframe universal wheel 1-5 in work progress is fixed on bridge floor this erecting device, need to move time, decontrol brake gear, removable this erecting device, uses manpower and material resources sparingly, and can also exempt safe guarding shed same pontic and contact the friction occurring.

Claims (3)

1. a device for Collison fence for bridge is installed, is comprised steelframe, Hanging Basket and balancing weight, Hanging Basket and balancing weight divide the two ends that are located at steelframe, it is characterized in that:
Described steelframe comprises crossbeam, longeron and the vertical beam of mutually vertical and welding, and many crossbeams be arranged in parallel, many longerons be arranged in parallel, many vertical beams be arranged in parallel, and the bottom of steelframe is provided with steelframe universal wheel;
Described Hanging Basket comprises base plate, on four angles of base plate, be vertically welded with peg, between adjacent peg, be provided with guardrail, one end of peg is fixedly connected with steelframe, Hanging Basket is provided with Hanging Basket universal wheel towards a side of steelframe, and the horizontal level of Hanging Basket universal wheel is lower than steelframe universal wheel.
2. a kind of device that Collison fence for bridge is installed as claimed in claim 1, is characterized in that: between described crossbeam and vertical beam, weld cant beam.
3. a kind of device that Collison fence for bridge is installed as claimed in claim 1, is characterized in that: on described Hanging Basket universal wheel and steelframe universal wheel, brake gear is all housed.
CN201420166730.4U 2014-04-08 2014-04-08 Device used for mounting bridge crash barrier Expired - Fee Related CN203782582U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420166730.4U CN203782582U (en) 2014-04-08 2014-04-08 Device used for mounting bridge crash barrier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420166730.4U CN203782582U (en) 2014-04-08 2014-04-08 Device used for mounting bridge crash barrier

Publications (1)

Publication Number Publication Date
CN203782582U true CN203782582U (en) 2014-08-20

Family

ID=51318785

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420166730.4U Expired - Fee Related CN203782582U (en) 2014-04-08 2014-04-08 Device used for mounting bridge crash barrier

Country Status (1)

Country Link
CN (1) CN203782582U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106760465A (en) * 2016-12-29 2017-05-31 上海中锦建设集团股份有限公司 A kind of steel-structure factory building installs auxiliary steel frame construction
CN108729361A (en) * 2018-08-14 2018-11-02 湖南金海集团有限公司 A kind of inverted U-shaped hanging basket device of bridge

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106760465A (en) * 2016-12-29 2017-05-31 上海中锦建设集团股份有限公司 A kind of steel-structure factory building installs auxiliary steel frame construction
CN108729361A (en) * 2018-08-14 2018-11-02 湖南金海集团有限公司 A kind of inverted U-shaped hanging basket device of bridge

Similar Documents

Publication Publication Date Title
CN205577381U (en) Can have enough to meet need spelling formula overload alarm platform of unloading of encorbelmenting
CN203782582U (en) Device used for mounting bridge crash barrier
CN203247031U (en) Hoisting device for curtain board transporting
CN204626252U (en) A kind of Bridge guardrail movable type assembling car nacelle device
CN103967263A (en) Novel hydraulic automatic climbing discharging platform
CN105133499A (en) Movable hanging basket trolley for bridge concrete anti-collision guardrail construction
CN203947758U (en) Novel hydraulic automatic climbing discharging platform
CN105603884A (en) Safety protection platform for bridge cap beam construction
CN104291222A (en) Rigid protection and crane integration system inside super high-rise building core tube
CN204081424U (en) A kind of for the removable steel inclined ladder in boat segmental construction
CN203806367U (en) Building prefabricated external wall panel transportation storage rack
CN204475182U (en) The mounting tool of a kind of Railway Bridges And Piers pier top hanging basket
CN204212065U (en) Bridge crossing anticollision barrier punching block erection equipment
CN203094107U (en) Easy moving in-place device of constructional element under construction of installation project
CN103287986A (en) Curtain board transport lifting device and method for mounting curtain board by using device
CN212532083U (en) Truss type combined arch bridge small component dismantling stabilizing device
CN208749068U (en) A kind of moveable exterior wall auxiliary finishing cage ladder of reversely hung Yong
CN204252022U (en) A kind of packaged type steel box-girder frange plate welding operation platform
CN203639839U (en) Counterweight device for combination type hanging basket working truck
CN203392657U (en) Machine maintenance platform
CN202726429U (en) Bracket for moving and mounting double-slipper mill cylinder body
CN207739607U (en) A kind of elevator well crosshead
CN205000691U (en) Novel steel construction factory building that takes precautions against earthquakes
CN204038909U (en) Mobile hoisting suspension bracket equipment
CN203740962U (en) Double layer hydraulic elevator platform

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140820