CN204386197U - The horizontal protective platform of a kind of Super High alien invasion steel work - Google Patents
The horizontal protective platform of a kind of Super High alien invasion steel work Download PDFInfo
- Publication number
- CN204386197U CN204386197U CN201520003227.1U CN201520003227U CN204386197U CN 204386197 U CN204386197 U CN 204386197U CN 201520003227 U CN201520003227 U CN 201520003227U CN 204386197 U CN204386197 U CN 204386197U
- Authority
- CN
- China
- Prior art keywords
- iron
- steel
- super high
- alien invasion
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Emergency Lowering Means (AREA)
Abstract
The utility model relates to the horizontal protective platform of a kind of Super High alien invasion steel work, for the realm of building construction, comprise i iron, U-shaped reinforcing bar, angle steel, steel plate, guard rail, some i iron are fixed through horizontal corner steel by the U-shaped reinforcing bar be embedded on floor, every root i iron is encorbelmented floor certain length, i iron part top of encorbelmenting spreads some block plates, and every block plate two ends are welded with i iron, i iron welding edges guard rail.The utility model needs the situation inserting construction in advance can play the effect of isolating and protecting for Super High alien invasion curtain wall, bottom curtain wall construction personnel can be prevented to be subject to Superstructure Construction object to fall strike, ensure the construction safety of Super High alien invasion curtain wall; And safe and reliable, can accelerating construction progress, component can dismantle recycling simultaneously, cost-saving.
Description
Technical field
The utility model relates to the realm of building construction, particularly relates to the horizontal protective platform of a kind of Super High alien invasion steel work.
Background technology
Along with the continuous progress of society, super high rise structure is more and more general.The height of super high rise structure is large, the number of plies is many, and the general construction period is long.For shortening the integral construction duration, Super High alien invasion curtain wall needs segmentation to construct in advance, often superstructure is not finished complete bottom curtain wall and just inserts construction, the potential safety hazard of simultaneously constructing up and down is huge, must take measures to prevent bottom curtain wall construction personnel to be subject to Superstructure Construction object and to fall strike.
Utility model content
The purpose of this utility model is to solve the problems of the technologies described above, there is provided a kind of Super High alien invasion steel work horizontal protective platform, need the situation inserting construction in advance can play the effect of isolating and protecting for Super High alien invasion curtain wall, bottom curtain wall construction personnel can be prevented to be subject to Superstructure Construction object to fall strike, ensure the construction safety of Super High alien invasion curtain wall.
The technical solution of the utility model is as follows:
The horizontal protective platform of a kind of Super High alien invasion steel work, comprise i iron, U-shaped reinforcing bar, angle steel, steel plate, guard rail, some i iron are fixed through horizontal corner steel by the U-shaped reinforcing bar be embedded on floor, every root i iron is encorbelmented floor certain length, i iron part top of encorbelmenting spreads some block plates, every block plate two ends are welded with i iron, i iron welding edges guard rail.
Described angle steel is provided with two connecting holes.
Described guard rail adopts fastener to be formed by connecting by vertical steel pipe and horizontal steel tube, the close order safety net of outer side mounting.
The utility model beneficial effect is as follows: safe and reliable, and main bearing member is i iron and steel plate; Falling for Superstructure Construction object can effective isolating and protecting; Ensure that alien invasion curtain wall inserts construction safety in advance, accelerate integral construction progress; After finishing using, protective platform main member i iron, angle steel, steel plate, guard rail etc. all can remove recycling, cost-saving.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the fixing figure of i iron of the present utility model;
Fig. 3 is the utility model protection elevation;
Wherein: 1, i iron; 2, steel plate; 3, U-shaped reinforcing bar; 4, angle steel; 5, nut; 6, guard rail; 7, floor; 8, vertical steel pipe; 9, horizontal steel tube; 10, close order safety net.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is described further;
As depicted in figs. 1 and 2, the horizontal protective platform of described a kind of Super High alien invasion steel work, comprise i iron 1, U-shaped reinforcing bar 3, angle steel 4, steel plate 2, guard rail 6, some i iron 1 are fixed through horizontal corner steel 4 by the U-shaped reinforcing bar 3 be embedded on floor 7, every root i iron 1 is encorbelmented floor 7 certain length, i iron 1 part top of encorbelmenting spreads some block plates 2, and every block plate 2 two ends are welded with i iron 1, i iron 1 welding edges guard rail 6.
As shown in Figure 2, described angle steel 4 is provided with two connecting holes.
As shown in Figure 3, described guard rail 6 adopts fastener to be formed by connecting by vertical steel pipe 8 and horizontal steel tube 9, the close order safety net 10 of outer side mounting.
Specific implementation method of the present utility model is as follows: car threaded U-shaped reinforcing bar 3 in pre-buried two ends during floor 7 concreting, during protective platform construction, first just i iron 1 passes U-shaped reinforcing bar 3 and floor 7 certain length of encorbelmenting, to be provided with the threaded end of horizontal corner steel 4 through U-shaped reinforcing bar 3 of connecting hole, nut 5 screws in U-shaped reinforcing bar 3 threaded end and utilizes horizontal corner steel 4 and floor 7 to be fixedly clamped by i iron 1.To encorbelment the some block plates 2 in part upper berth at i iron 1, every block plate 2 two ends are welded with i iron 1, every root i iron 1 welding edges vertical steel pipe 8, horizontal steel tube 9 adopts fastener and vertical steel pipe 8 to connect into entirety, and the close order safety net 10 of side mounting outside, the horizontal protective platform of final formation Super High alien invasion steel work.This structure main bearing member is i iron 1 and steel plate 2, safe and reliable; Guard rail 6 falls for Superstructure Construction object can effective isolating and protecting; Ensure that alien invasion curtain wall inserts construction safety in advance, accelerate integral construction progress; After finishing using, the parts such as protective platform main member i iron 1, angle steel 4, steel plate 2, guard rail 6 all can remove recycling, cost-saving.
Although give detailed description and explanation to detailed description of the invention of the present utility model above; but what should indicate is; we can carry out various equivalence according to conception of the present utility model to above-mentioned embodiment and change and amendment; its function produced do not exceed that manual contains yet spiritual time, all should within protection domain of the present utility model.
Claims (3)
1. the horizontal protective platform of Super High alien invasion steel work, comprise i iron, U-shaped reinforcing bar, angle steel, steel plate, guard rail, it is characterized in that: some i iron are fixed through horizontal corner steel by the U-shaped reinforcing bar be embedded on floor, every root i iron is encorbelmented floor certain length, i iron part top of encorbelmenting spreads some block plates, every block plate two ends are welded with i iron, i iron welding edges guard rail.
2., according to the horizontal protective platform of a kind of Super High alien invasion steel work described in claim 1, it is characterized in that: described angle steel is provided with two connecting holes.
3. according to the horizontal protective platform of a kind of Super High alien invasion steel work described in claim 1, it is characterized in that: described guard rail adopts fastener to be formed by connecting by vertical steel pipe and horizontal steel tube, the close order safety net of outer side mounting.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520003227.1U CN204386197U (en) | 2015-01-05 | 2015-01-05 | The horizontal protective platform of a kind of Super High alien invasion steel work |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520003227.1U CN204386197U (en) | 2015-01-05 | 2015-01-05 | The horizontal protective platform of a kind of Super High alien invasion steel work |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204386197U true CN204386197U (en) | 2015-06-10 |
Family
ID=53358929
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520003227.1U Active CN204386197U (en) | 2015-01-05 | 2015-01-05 | The horizontal protective platform of a kind of Super High alien invasion steel work |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204386197U (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105113851A (en) * | 2015-09-14 | 2015-12-02 | 上海建工二建集团有限公司 | Multifunctional prefabricated assembled building construction fence and construction method thereof |
CN105603884A (en) * | 2016-03-08 | 2016-05-25 | 中国水利水电第十四工程局有限公司 | Safety protection platform for bridge cap beam construction |
CN106223630A (en) * | 2016-07-22 | 2016-12-14 | 中国建筑第八工程局有限公司 | The door-window opening guard system of high-rise building Core Walls Structure and construction method |
CN107313357A (en) * | 2017-08-30 | 2017-11-03 | 云南工程建设总承包公司 | A kind of bridge top construction safety protection column |
CN107326814A (en) * | 2017-08-30 | 2017-11-07 | 云南工程建设总承包公司 | A kind of bridge bottom construction safety protection column |
CN107461033A (en) * | 2017-09-08 | 2017-12-12 | 深圳前海特辰科技有限公司 | Construction protection canopy and its construction method |
CN111236672A (en) * | 2020-01-16 | 2020-06-05 | 中铁二局集团有限公司 | Ultra-high-rise concrete pouring movable protection device and construction method thereof |
CN111236671A (en) * | 2020-01-16 | 2020-06-05 | 中铁二局集团有限公司 | Horizontal protection platform of facade steel construction outside superelevation layer |
CN111794537A (en) * | 2020-07-03 | 2020-10-20 | 上海建工二建集团有限公司 | Isolation protection device |
CN114482589A (en) * | 2022-02-11 | 2022-05-13 | 上海万科企业有限公司 | Elevator shaft protection construction method, device and system |
-
2015
- 2015-01-05 CN CN201520003227.1U patent/CN204386197U/en active Active
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105113851B (en) * | 2015-09-14 | 2017-11-28 | 上海建工二建集团有限公司 | A kind of construction fence and its construction method of multifunctional precast assembled architecture |
CN105113851A (en) * | 2015-09-14 | 2015-12-02 | 上海建工二建集团有限公司 | Multifunctional prefabricated assembled building construction fence and construction method thereof |
CN105603884A (en) * | 2016-03-08 | 2016-05-25 | 中国水利水电第十四工程局有限公司 | Safety protection platform for bridge cap beam construction |
CN106223630B (en) * | 2016-07-22 | 2018-09-04 | 中国建筑第八工程局有限公司 | The door-window opening guard system and construction method of high-rise building Core Walls Structure |
CN106223630A (en) * | 2016-07-22 | 2016-12-14 | 中国建筑第八工程局有限公司 | The door-window opening guard system of high-rise building Core Walls Structure and construction method |
CN107313357A (en) * | 2017-08-30 | 2017-11-03 | 云南工程建设总承包公司 | A kind of bridge top construction safety protection column |
CN107326814A (en) * | 2017-08-30 | 2017-11-07 | 云南工程建设总承包公司 | A kind of bridge bottom construction safety protection column |
CN107461033A (en) * | 2017-09-08 | 2017-12-12 | 深圳前海特辰科技有限公司 | Construction protection canopy and its construction method |
CN111236672A (en) * | 2020-01-16 | 2020-06-05 | 中铁二局集团有限公司 | Ultra-high-rise concrete pouring movable protection device and construction method thereof |
CN111236671A (en) * | 2020-01-16 | 2020-06-05 | 中铁二局集团有限公司 | Horizontal protection platform of facade steel construction outside superelevation layer |
CN111236671B (en) * | 2020-01-16 | 2021-03-26 | 中铁二局集团有限公司 | Horizontal protection platform of facade steel construction outside superelevation layer |
CN111236672B (en) * | 2020-01-16 | 2021-09-10 | 中铁二局集团有限公司 | Ultra-high-rise concrete pouring movable protection device and construction method thereof |
CN111794537A (en) * | 2020-07-03 | 2020-10-20 | 上海建工二建集团有限公司 | Isolation protection device |
CN114482589A (en) * | 2022-02-11 | 2022-05-13 | 上海万科企业有限公司 | Elevator shaft protection construction method, device and system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204386197U (en) | The horizontal protective platform of a kind of Super High alien invasion steel work | |
CN109403456B (en) | Steel corbel embedded structure and construction method thereof | |
CN203487803U (en) | Safety protection structure for elevator shaft construction | |
CN103469735B (en) | The mounting method of curve ultrahigh hollow column plate type pier top solid section template | |
CN204040506U (en) | Hydraulic lifting protector | |
CN204728676U (en) | Bearing hanging rack for supporting variable cross-section wall | |
CN204938791U (en) | A kind of support connecting structure of tower crane support beam | |
CN205206284U (en) | Detachable assembly type elevator shaft operating platform | |
CN204960289U (en) | Builder's jack is encorbelmented whole combination of girder steel and can be had enough to meet need anchor assembly | |
CN104213707B (en) | All steel climbing frame inside contracts attached climbing device and the mounting method thereof at place in structure | |
CN204875788U (en) | Stride a foundation ditch supporting beam construction pile -supported platform device | |
CN203640257U (en) | Support of overhanging type scaffold | |
CN202031309U (en) | Suspending operation platform for structural concrete constructions | |
CN202882454U (en) | Temporary safe protective barrier | |
CN203603490U (en) | Supporting structure used for erecting formwork truss on prefabricated beam | |
CN204919567U (en) | Shoring of trench stand shock attenuation construction equipment | |
CN205444739U (en) | Fixed railing structure of detachable | |
CN205134921U (en) | Building outer wall concrete constructional column hangs construction platform | |
CN211229455U (en) | Support type external overhanging scaffold | |
CN203701878U (en) | Split-type bearing connection mechanism for vertical columns of platform screen door | |
CN103526698B (en) | Cast-in-cantilever construction 0# block concrete supporting system and construction method | |
CN204266111U (en) | Deep foundation ditch steel trestle | |
CN203583906U (en) | Disassembling-free floor edge guardrail in decoration stage | |
CN102605964B (en) | Separately mounted grille on elevator shaft opening and construction method of separately mounted grille | |
CN202227281U (en) | Triangular bracket for constructing zero block by box girder cantilever |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |