CN202882454U - Temporary safe protective barrier - Google Patents

Temporary safe protective barrier Download PDF

Info

Publication number
CN202882454U
CN202882454U CN 201220536087 CN201220536087U CN202882454U CN 202882454 U CN202882454 U CN 202882454U CN 201220536087 CN201220536087 CN 201220536087 CN 201220536087 U CN201220536087 U CN 201220536087U CN 202882454 U CN202882454 U CN 202882454U
Authority
CN
China
Prior art keywords
vertical rod
drag hook
vertical rods
rods
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220536087
Other languages
Chinese (zh)
Inventor
郭卫民
凡洪顺
雷远隆
程小坪
陈勇辉
侯尊议
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN 201220536087 priority Critical patent/CN202882454U/en
Application granted granted Critical
Publication of CN202882454U publication Critical patent/CN202882454U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a temporary safe protective barrier. The temporary safe protective barrier comprises a plurality of vertical rods and a plurality of horizontal rods, wherein the vertical rods are fixedly connected with the horizontal rods through drag hooks, the drag hook are distributed on the vertical rods at intervals, a base board is arranged at the bottoms of the vertical rods, a plurality of small holes corresponding to the drag hooks are formed in the vertical rods at intervals, first ends of the drag hooks penetrate through the small holes and are fixed with the vertical rods, second ends of the drag hooks are bent upwards to form hook bodies, the horizontal rods are arranged inside the hook bodies, threads are arranged at the first ends of the drag hooks, and bolts are matched with the threads so that the drag hooks are fixed on the vertical rods. According to the temporary safe protective barrier, the horizontal rods are fixed on the vertical rods by means of the drag hooks and the bolts, the operation is simple and convenient, the base board is welded to the bottoms of the vertical rods, the vertical rods are connected with a concrete structure through expansion bolts for revolution use, the horizontal rods are tightly fixed on the vertical rods by fastening the bolts, and the structure is stable.

Description

Interim safe protective railing
Technical field
The utility model relates to the security protection in the engineering construction, especially a kind of interim safe protective railing.
Background technology
Interim safety protection facility uses in Building Construction extensively, because interim safety protection facility is multimodal various, but substantially all is disposable guard rail, needs after the use to remove, and causes the very large wasting of resources.Turnover use how to guarantee a kind of guard rail can make again waste and scrap reuse, and from cost efficiency, the green construction angle is necessary to propose a kind of novel interim safety protection facility.
The utility model content
Technical problem to be solved in the utility model provides the interim safe protective railing that a kind of cost is low, construction is convenient, can have enough to meet the need use.
For realizing above-mentioned technique effect, the utility model discloses a kind of interim safe protective railing, comprise plural vertical rod and plural cross bar, be fixedly connected with by drag hook between described vertical rod and the described cross bar, described drag hook interval is laid in the described vertical rod, and the bottom of described vertical rod is installed with a base plate.
The utility model further improves and is, corresponding described drag hook is spaced apart in described vertical rod to be provided with plural aperture, and the first end of described drag hook passes described aperture, and fixes with described vertical rod, the second end of described drag hook upwards is bent to form a coupler body, and described cross bar is located in the described coupler body.
The utility model further improves and is that the first end of described drag hook is provided with screw thread, cooperates described screw thread that described drag hook is fixed in the described vertical rod by bolt.
The utility model further improves and is that in use, described base plate is fixed on the concrete structure by expansion bolt.
The utility model further improves and is that described vertical rod is fixedly connected on the described base plate by the mode of welding.
The utility model is owing to adopted above technical scheme, make it have following beneficial effect to be: utilize described drag hook and described bolt that cross bar is fixed in the vertical rod, easy and simple to handle, bottom of upright rod welding base plate, be connected with concrete structure by expansion bolt, can have enough to meet the need use, can be that cross bar is fixed in the vertical rod Stability Analysis of Structures tightly by fastening described bolt.
Description of drawings
Fig. 1 is the structural representation of the interim safe protective railing of the utility model.
Fig. 2 is the structural representation that the interim safe protective railing pull bar of the utility model is installed node.
The specific embodiment
Below in conjunction with the drawings and specific embodiments the utility model is described in further detail.
Consult shown in Figure 1ly, interim safe protective railing 1 summary of the present utility model is comprised of plural vertical rod 11 and plural cross bar 12, is fixedly connected with by drag hook 10 between vertical rod 11 and the cross bar 12.Drag hook 10 intervals are laid in the vertical rod 11, and the bottom of vertical rod 11 is fixed on the upper of a base plate 13 by the mode of welding, and base plate 13 is fixed on the concrete structure by expansion bolt 14.Corresponding drag hook 10 is spaced apart in vertical rod 11 to be provided with plural aperture, and the first end 101 of drag hook 10 passes aperture, is provided with screw thread at the first end 101 of drag hook 10, by bolt 15 screw threads drag hook 10 is fixed in the vertical rod 11.The second end 102 of drag hook 10 upwards is bent to form a coupler body, and cross bar 12 is located in this coupler body, as shown in Figure 2.
The Specific construction of the interim safe protective railing 1 of the utility model is as follows:
Waste and old steel pipe is processed processing, and aperture is offered at the interval on steel pipe, made vertical rod 11;
The vertical rod 11 that processing is handled well welds together with base plate 13;
Processing drag hook 10 arranges screw thread at the first end 101 of drag hook 10, and the second end 102 of drag hook 10 upwards is bent to form coupler body;
Measure at the construction field (site) unwrapping wire;
To weld good vertical rod 11 by expansion bolt 14 is fixed on the concrete structure with base plate 13;
Drag hook 10 is inserted in the aperture of vertical rod 11;
Cross bar 12 is placed horizontally in the coupler body of drag hook 10;
Screw thread with on bolt 15 drag hooks 10 first ends 101 utilizes drag hook 10 that cross bar 12 is fixed in the vertical rod 11, finishes whole guard rail 1 with same method.
Below embodiment has been described in detail the utility model by reference to the accompanying drawings, and those skilled in the art can make the many variations example to the utility model according to the above description.Thereby some details among the embodiment should not consist of restriction of the present utility model, and the scope that the utility model will define with appended claims is as protection domain of the present utility model.

Claims (5)

1. interim safe protective railing, it is characterized in that: described guard rail comprises plural vertical rod and plural cross bar, be fixedly connected with by drag hook between described vertical rod and the described cross bar, described drag hook interval is laid in the described vertical rod, and the bottom of described vertical rod is installed with a base plate.
2. guard rail as claimed in claim 1, it is characterized in that: corresponding described drag hook is spaced apart in described vertical rod to be provided with plural aperture, the first end of described drag hook passes described aperture, and fix with described vertical rod, the second end of described drag hook upwards is bent to form a coupler body, and described cross bar is located in the described coupler body.
3. guard rail as claimed in claim 2, it is characterized in that: the first end of described drag hook is provided with screw thread, cooperates described screw thread that described drag hook is fixed in the described vertical rod by bolt.
4. guard rail as claimed in claim 1, it is characterized in that: in use, described base plate is fixed on the concrete structure by expansion bolt.
5. guard rail as claimed in claim 1 is characterized in that: described vertical rod is fixedly connected on the described base plate by the mode of welding.
CN 201220536087 2012-10-18 2012-10-18 Temporary safe protective barrier Expired - Fee Related CN202882454U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220536087 CN202882454U (en) 2012-10-18 2012-10-18 Temporary safe protective barrier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220536087 CN202882454U (en) 2012-10-18 2012-10-18 Temporary safe protective barrier

Publications (1)

Publication Number Publication Date
CN202882454U true CN202882454U (en) 2013-04-17

Family

ID=48073895

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220536087 Expired - Fee Related CN202882454U (en) 2012-10-18 2012-10-18 Temporary safe protective barrier

Country Status (1)

Country Link
CN (1) CN202882454U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106460403A (en) * 2013-12-04 2017-02-22 诺德利尔私人有限公司 Handrail assembly, system and method of installation
CN110081056A (en) * 2018-01-26 2019-08-02 费希尔厂有限责任两合公司 Fixator, fixed device with hook and the method for being fixed using the fixator
CN113756591A (en) * 2021-09-10 2021-12-07 上海建工集团股份有限公司 Composite discharging platform and construction method thereof

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106460403A (en) * 2013-12-04 2017-02-22 诺德利尔私人有限公司 Handrail assembly, system and method of installation
US10480211B2 (en) 2013-12-04 2019-11-19 Nondrill Pty Ltd Handrail assembly, system and method of installation
CN106460403B (en) * 2013-12-04 2020-02-18 诺德利尔私人有限公司 Armrest kit, armrest system and installation method
CN110081056A (en) * 2018-01-26 2019-08-02 费希尔厂有限责任两合公司 Fixator, fixed device with hook and the method for being fixed using the fixator
CN113756591A (en) * 2021-09-10 2021-12-07 上海建工集团股份有限公司 Composite discharging platform and construction method thereof

Similar Documents

Publication Publication Date Title
CN103993735A (en) Support system of roof inclined beam and slab cantilever structure and construction method of support system
CN203755630U (en) Simple support and construction platform thereof
CN202882454U (en) Temporary safe protective barrier
CN204299145U (en) For the operating platform that external climbing tower crane support frame is installed
CN104612057A (en) Assembled rack and use method thereof
CN102661035A (en) Tool type wall connecting piece for exterior wall scaffold
CN203271096U (en) Operating platform
CN204139631U (en) The guard rail of building site fast demountable
CN103615103A (en) Hanging type assembled movable platform
CN204311457U (en) A kind of Metro station excavation excavation construction composite retaining structure system
CN203022328U (en) Climbing operation platform
CN203430009U (en) Construction hanging basket
CN203640257U (en) Support of overhanging type scaffold
CN203499259U (en) Tool type cantilevered unloading platform
CN203159027U (en) A prefabricated iron tower foundation spreader
CN202055509U (en) Upright rod installation structure of directly-inserted scaffold
CN204754177U (en) Detachable flier
CN202745208U (en) Joint connection of re-combined bamboo timber frame structure
CN201722937U (en) Sliding platform for installation of net rack
CN205990773U (en) A kind of construction discharging platform
CN204059589U (en) A kind of shaped steel combination formula supporting and the cantilevered structure of going along with sb. to guard him
CN204062152U (en) High-pressure service pump pipe fixing device
CN203846494U (en) Breast beam soil anchor rod segmented connection structure
CN203783106U (en) Hanging assembling moving platform
CN202530734U (en) Outside-overhanging scaffold

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130417

Termination date: 20181018

CF01 Termination of patent right due to non-payment of annual fee