CN202031309U - Suspending operation platform for structural concrete constructions - Google Patents

Suspending operation platform for structural concrete constructions Download PDF

Info

Publication number
CN202031309U
CN202031309U CN2011201194773U CN201120119477U CN202031309U CN 202031309 U CN202031309 U CN 202031309U CN 2011201194773 U CN2011201194773 U CN 2011201194773U CN 201120119477 U CN201120119477 U CN 201120119477U CN 202031309 U CN202031309 U CN 202031309U
Authority
CN
China
Prior art keywords
fixed
fixed tripod
structural concrete
concrete structure
operation platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011201194773U
Other languages
Chinese (zh)
Inventor
潘福营
刘新星
戴良军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 11 Co Ltd
Sinohydro Bureau 5 Co Ltd
Original Assignee
Sinohydro Bureau 5 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 5 Co Ltd filed Critical Sinohydro Bureau 5 Co Ltd
Priority to CN2011201194773U priority Critical patent/CN202031309U/en
Application granted granted Critical
Publication of CN202031309U publication Critical patent/CN202031309U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a suspending operation platform for structural concrete constructions, which comprises a concrete structure, at least two fixed tripods, an upper tie bar and a lower tie bar. The fixed tripods are perpendicular to a plane of the concrete structure, screw threads at the upper ends of the fixed tripods are connected with the upper end of the concrete structure through the upper tie bar, and screw threads at the lower ends of the fixed tripods are connected with the lower end of the concrete structure through the lower tie bar. Vertical rods are arranged at the ends of the fixed tripods far away from the concrete structure, the vertical rods arranged on two adjacent fixed tripods are connected, and boards are laid between the two adjacent fixed tripods. The suspending operation platform for the structural concrete constructions can be processed and manufactured on site, thereby being simple in construction, convenient to transfer, capable of being reused for a long time and low in material input and construction cost and solving a problem that the structural concrete constructions, particularly the structural concrete constructions for walls are high in the material input and the construction cost.

Description

一种结构混凝土施工用悬空作业平台A suspended working platform for structural concrete construction

技术领域 technical field

本实用新型涉及高空作业平台技术领域,具体涉及一种结构混凝土施工用悬空作业平台。The utility model relates to the technical field of aerial work platforms, in particular to a suspended work platform for structural concrete construction.

背景技术 Background technique

目前,土建工程项目施工一般都会涉及结构混凝土施工,对于高度较大的结构混凝土,特别是墙体类混凝土施工,一般都随着结构混凝土的升高,采用钢管搭设脚手架,在脚手架上铺设木板,形成结构混凝土施工的作业平台,脚手架随着结构混凝土的升高不断升高,直至结构混凝土全部施工完成才能一次进行拆除。这样钢管等材料投入量较大,而且占的周期较长,施工成本较高。At present, the construction of civil engineering projects generally involves the construction of structural concrete. For the construction of structural concrete with a large height, especially the construction of wall concrete, steel pipes are generally used to build scaffolding as the structural concrete rises, and wooden boards are laid on the scaffolding. Forming a work platform for structural concrete construction, the scaffolding continues to rise with the rise of structural concrete, and can only be dismantled at one time until all structural concrete construction is completed. In this way, the input of materials such as steel pipes is relatively large, and the cycle time is relatively long, and the construction cost is relatively high.

实用新型内容 Utility model content

针对上述现有技术的不足之处,本实用新型的目的是提供一种施工简单、运输和使用方便而且可以长期重复使用的结构混凝土施工用悬空作业平台,解决结构混凝土施工中采用脚手架搭设作业平台材料投入较多,施工成本较高的问题,能有效的解决上述现有技术存在的问题。Aiming at the shortcomings of the above-mentioned prior art, the purpose of this utility model is to provide a suspended working platform for structural concrete construction that is simple in construction, convenient in transportation and use, and can be reused for a long time, so as to solve the problem of using scaffolding to set up the working platform in structural concrete construction. The problems of high material input and high construction cost can effectively solve the above-mentioned problems in the prior art.

为了实现上述目的,本实用新型采用的技术方案是:一种结构混凝土施工用悬空作业平台,包括砼结构和至少两个固定三脚架,固定三脚架与砼结构所在平面相垂直,还包括上拉筋和下拉筋,所述上拉筋将固定三脚架的上端螺纹连接在砼结构的上端,下拉筋将固定三脚架的下端螺纹连接在砼结构的下端;在固定三脚架远离砼结构的端设有立杆,相邻两固定三脚架上的立杆相互连接,相邻两固定三脚架之间铺设木板。In order to achieve the above purpose, the technical solution adopted by the utility model is: a suspended work platform for structural concrete construction, including a concrete structure and at least two fixed tripods, the fixed tripods are perpendicular to the plane where the concrete structure is located, and also include upper tie bars and Pull-down ribs, the upper tension ribs thread the upper end of the fixed tripod to the upper end of the concrete structure, and the lower ribs thread the lower end of the fixed tripod to the lower end of the concrete structure; the end of the fixed tripod away from the concrete structure is provided with a vertical rod, corresponding The vertical poles on the two adjacent fixed tripods are connected to each other, and planks are laid between the two adjacent fixed tripods.

作为一种优选方式,其中:在固定三脚架上设有横向连接孔,横向连接杆穿过横向连接孔连接相邻两固定三脚架。As a preferred manner, wherein: the fixed tripod is provided with a transverse connecting hole, and the transverse connecting rod passes through the transverse connecting hole to connect two adjacent fixed tripods.

作为一种优选方式,上拉筋和下拉筋的端部均设有紧固螺母。As a preferred manner, fastening nuts are provided at the ends of the upper and lower tension bars.

作为一种优选方式,立杆通过立杆固定孔固定到固定三脚架上。As a preferred manner, the pole is fixed to the fixed tripod through the pole fixing hole.

作为一种优选方式,上拉筋和下拉筋的端部均设有紧固螺母。As a preferred manner, fastening nuts are provided at the ends of the upper and lower tension bars.

作为一种优选方式,固定三脚架为由槽钢焊接而成的直角三角形;As a preferred method, the fixed tripod is a right triangle welded by channel steel;

更近一步地优选,固定三脚架的其中一边保持水平。Further preferably, one of the sides of the fixed tripod is kept level.

与现有技术相比,该实用新型带来的有益效果为:本实用新型的结构混凝土施工用悬空作业平台,现场可以加工制作、施工简单、转移方便、可以长期重复使用,而且材料投入少、施工成本低;解决了结构混凝土、特别是墙体类结构混凝土施工材料投入大、施工成本高的问题。Compared with the prior art, the beneficial effects brought by the utility model are: the suspended work platform for structural concrete construction of the utility model can be processed and manufactured on site, the construction is simple, the transfer is convenient, and it can be used repeatedly for a long time, and the material input is less, The construction cost is low; it solves the problems of large construction material investment and high construction cost of structural concrete, especially wall structural concrete.

附图说明 Description of drawings

由以下本实用新型中较佳具体实施例的细节描述,可以对本实用新型的目的、观点及优点有更清楚的理解,同时参考下列本实用新型的附图加以说明:From the following detailed description of preferred embodiments of the utility model, the purpose, viewpoint and advantages of the utility model can be understood more clearly, and the accompanying drawings of the utility model are explained with reference to the following:

图1为本实用新型的结构示意图。Fig. 1 is the structural representation of the utility model.

具体实施方式 Detailed ways

本实用新型的上述技术方案及其优点,不难从下述所选实施例的详细说明与附图中,获得深入了解。It is not difficult to obtain a deep understanding of the above-mentioned technical solutions and advantages of the utility model from the detailed description and accompanying drawings of the following selected embodiments.

参见图1,实施例,该结构混凝土施工用悬空作业平台包括砼结构1和至少两个固定三脚架8以及上拉筋2和下拉筋3,固定三脚架8与砼结构1所在平面相垂直,所述上拉筋2将固定三脚架8的上端螺纹连接在砼结构1的上端,下拉筋3将固定三脚架8的下端螺纹连接在砼结构1的下端,上拉筋2和下拉筋3的端部均设有紧固螺母4。在固定三脚架8远离砼结构1的端设有立杆7,立杆7通过立杆固定孔6固定到固定三脚架8上。相邻两固定三脚架8上的立杆7相互连接,相邻两固定三脚架8之间铺设木板9。在固定三脚架8上设有横向连接孔5,横向连接杆10穿过横向连接孔5连接相邻两固定三脚架8。固定三脚架8为由槽钢焊接而成的直角三角形,固定三脚架8的其中一边保持水平。Referring to Fig. 1, the embodiment, the suspended work platform for structural concrete construction includes a concrete structure 1 and at least two fixed tripods 8 and upper tie bars 2 and lower bars 3, the fixed tripod 8 is perpendicular to the plane where the concrete structure 1 is located, and the The upper tie bar 2 is threaded to connect the upper end of the fixed tripod 8 to the upper end of the concrete structure 1, and the lower bar 3 is threaded to connect the lower end of the fixed tripod 8 to the lower end of the concrete structure 1, and the ends of the upper tie bar 2 and the lower bar 3 are all provided with There are fastening nuts 4. The end of the fixed tripod 8 away from the concrete structure 1 is provided with a vertical rod 7 , and the vertical rod 7 is fixed to the fixed tripod 8 through the vertical rod fixing hole 6 . The vertical rods 7 on the adjacent two fixed tripods 8 are connected to each other, and planks 9 are laid between the adjacent two fixed tripods 8 . A transverse connecting hole 5 is provided on the fixed tripod 8 , and a transverse connecting rod 10 passes through the transverse connecting hole 5 to connect two adjacent fixed tripods 8 . The fixed tripod 8 is a right-angled triangle welded by channel steel, and one side of the fixed tripod 8 is kept horizontal.

本实用新型的结构混凝土施工用悬空作业平台,不仅可以加工成成品后直接使用,还可现场制作加工。当现场制作加工时:首先,由槽钢进行组合焊接形成若干个固定三脚架8以备用,随着结构混凝土模板的拆除,利用上拉筋2和下拉筋3插入固定三脚架8上、下端的两个插孔内,再用紧固螺母4固定,将固定三脚架8与上拉筋2和下拉筋3形成一个整体固定在砼结构1上。根据工作面的需要,安装若干个固定三脚架8,通过在横向连接孔5中插入横向连接杆10将各个固定三脚架8进行连接。然后,铺设木板9,成片的木板9形成作业平台。将立杆7通过立杆固定孔6固定到三脚架8上,若干个立杆7之间可通过绳或杆进行连接,形成安全防护栏。这样悬空作业平台形成后,施工人员可以在平台上进行各种作业,随着结构混凝土的升高,悬空作业平台也跟着升高。The suspended work platform for structural concrete construction of the utility model can not only be used directly after being processed into finished products, but also can be fabricated and processed on site. When on-site production and processing: firstly, several fixed tripods 8 are formed by combined welding of channel steel for standby use. With the removal of the structural concrete formwork, the upper and lower ends of the tripod 8 are inserted into the upper and lower two In the socket, fix it with the fastening nut 4 again, and fix the fixed tripod 8, the upper tie bar 2 and the lower bar 3 as a whole and fix it on the concrete structure 1. According to the needs of the working surface, several fixed tripods 8 are installed, and each fixed tripod 8 is connected by inserting a transverse connecting rod 10 in the transverse connection hole 5 . Then, planks 9 are laid, and planks 9 in sheets form a working platform. The vertical rod 7 is fixed on the tripod 8 through the vertical rod fixing hole 6, and several vertical rods 7 can be connected by ropes or bars to form a safety fence. After the suspended work platform is formed in this way, construction personnel can perform various operations on the platform. As the structural concrete rises, the suspended work platform also rises.

因此,本实用新型悬空作业平台结构简单、转移方便、施工材料投入少,施工成本低,有效地解决了结构混凝土、特别是较高的墙体类结构混凝土施工材料投入多、施工成本高的问题,而且,该作业平台可以重复利用,能够有效降低工程成本。Therefore, the suspended work platform of the utility model has the advantages of simple structure, convenient transfer, less investment in construction materials, and low construction cost, which effectively solves the problems of large investment in construction materials and high construction cost of structural concrete, especially higher wall-like structural concrete. , Moreover, the operating platform can be reused, which can effectively reduce the engineering cost.

如熟悉此技术的人员所了解的,以上所述本实用新型的较佳实施例仅用于帮助了解本实用新型的实施,并非用以限定本实用新型的范围,而熟悉此领域的技术人员于领悟本实用新型后,凡其他未脱离本实用新型的实质范围下,所完成的些许更动润饰及等效的改变或修饰是允许的,其专利保护范围应当视为包含在本专利申请范围及其等同领域中。As understood by those familiar with this technology, the preferred embodiments of the utility model described above are only used to help understand the implementation of the utility model, and are not intended to limit the scope of the utility model. After comprehending the present utility model, under all other not departing from the essential scope of the present utility model, some changes and modifications and equivalent changes or modifications are allowed, and the scope of patent protection should be deemed to be included in the scope of this patent application and its equivalent field.

Claims (6)

1. a structural concrete is constructed and is used the hanging operation platform, comprise concrete structure (1) and at least two fixed tripod (8), fixed tripod (8) is perpendicular with concrete structure (1) plane, place, it is characterized in that: also comprise lacing wire (2) and following lacing wire (3), describedly go up lacing wire (2) upper end of fixed tripod (8) is threaded in the upper end of concrete structure (1), following lacing wire (3) is threaded in the lower end of fixed tripod (8) lower end of concrete structure (1); Be provided with vertical rod (7) in fixed tripod (8) away from the end of concrete structure (1), the vertical rod (7) on adjacent two fixed tripod (8) interconnects, and lays plank (9) between adjacent two fixed tripod (8).
2. a kind of structural concrete construction hanging operation platform according to claim 1, it is characterized in that: be provided with horizontal connecting hole (5) on fixed tripod (8), laterally connecting rod (10) passes horizontal connecting hole (5) connection adjacent two fixed tripod (8).
3. the hanging operation platform is used in a kind of structural concrete construction according to claim 1, and it is characterized in that: the end of going up lacing wire (2) and following lacing wire (3) is equipped with clamp nut (4).
4. the hanging operation platform is used in a kind of structural concrete construction according to claim 1, and it is characterized in that: vertical rod (7) is fixed on the fixed tripod (8) by vertical rod fixing hole (6).
5. the hanging operation platform is used in a kind of structural concrete construction according to claim 1, it is characterized in that: the right-angled triangle of fixed tripod (8) for being welded by channel-section steel.
6. the hanging operation platform is used in a kind of structural concrete construction according to claim 5, it is characterized in that: the wherein maintenance on one side level of fixed tripod (8).
CN2011201194773U 2011-04-21 2011-04-21 Suspending operation platform for structural concrete constructions Expired - Fee Related CN202031309U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011201194773U CN202031309U (en) 2011-04-21 2011-04-21 Suspending operation platform for structural concrete constructions

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011201194773U CN202031309U (en) 2011-04-21 2011-04-21 Suspending operation platform for structural concrete constructions

Publications (1)

Publication Number Publication Date
CN202031309U true CN202031309U (en) 2011-11-09

Family

ID=44893611

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011201194773U Expired - Fee Related CN202031309U (en) 2011-04-21 2011-04-21 Suspending operation platform for structural concrete constructions

Country Status (1)

Country Link
CN (1) CN202031309U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104712134A (en) * 2013-12-16 2015-06-17 五冶集团上海有限公司 Movable platform for installing devices on mill housing machine and application
CN107060307A (en) * 2017-05-15 2017-08-18 葛加君 Construction simplification triangle operating platform makes and construction method of installation
CN109403609A (en) * 2018-12-19 2019-03-01 北京城建北方集团有限公司 Buttress type triangular support bracket

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104712134A (en) * 2013-12-16 2015-06-17 五冶集团上海有限公司 Movable platform for installing devices on mill housing machine and application
CN107060307A (en) * 2017-05-15 2017-08-18 葛加君 Construction simplification triangle operating platform makes and construction method of installation
CN109403609A (en) * 2018-12-19 2019-03-01 北京城建北方集团有限公司 Buttress type triangular support bracket
CN109403609B (en) * 2018-12-19 2024-04-02 北京城建北方集团有限公司 Wall-supporting type triangular support frame

Similar Documents

Publication Publication Date Title
CN105926916B (en) Overhang combined type support system and construction method based on intelligent monitoring oblique pull
CN103452311B (en) A kind of erection method of shaped steel suspended structural support frame
CN202416184U (en) Construction device for formwork for longitudinal wet joint of box girder
CN203808484U (en) Integrated cantilevered and attached external scaffolding
CN206971689U (en) Support operating platform that is detachable and recycling
CN209780193U (en) Suspension type scaffold
CN206352391U (en) Socket joint type key slot type Quick Release support system
CN202031309U (en) Suspending operation platform for structural concrete constructions
CN205259592U (en) Template structure of steel construction floor
CN206554500U (en) Steel structure concrete, which is poured, uses adjustable transverse support bar
CN204040515U (en) Cat ladder
CN206928642U (en) A kind of safety and environmental protection movable formwork support
CN104018655B (en) A kind of assembly type monomer bracing frame
CN203878779U (en) Rectangular concrete-filled steel tube column and I-steel beam rebar penetrating type joint
CN203531381U (en) Temporary hanging and supporting device used for steel bar truss formworks
CN203200719U (en) Hanging type slope pouring template device
CN106351429A (en) Heavy support system and construction method thereof
CN205134921U (en) Building outer wall concrete constructional column hangs construction platform
CN204386139U (en) Detachable structural steel anchor device
CN203867164U (en) Cantilever type scaffold structure with positioning steel pipe
CN205502013U (en) Stock static pile counterforce device
CN203022327U (en) Elevator shaft high-altitude construction platform device
CN205063312U (en) Cantilever beam fixing device
CN203361596U (en) Auxiliary support of integrated lifting operation platform
CN203961092U (en) The anti-braced structures of a kind of suspension rod

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: SINOHYDRO BUREAU 11 CO., LTD.

Effective date: 20140324

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20140324

Address after: 610000, No. 8, East Fourth Ring Road, Jinjiang District, Sichuan, Chengdu

Patentee after: Sinohydro Bureau 5 Co., Ltd.

Patentee after: SINOHYDRO Bureau 11 Co., Ltd.

Address before: 610000, No. 8, East Fourth Ring Road, Jinjiang District, Sichuan, Chengdu

Patentee before: Sinohydro Bureau 5 Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111109

Termination date: 20200421

CF01 Termination of patent right due to non-payment of annual fee