CN202031309U - Suspending operation platform for structural concrete constructions - Google Patents

Suspending operation platform for structural concrete constructions Download PDF

Info

Publication number
CN202031309U
CN202031309U CN2011201194773U CN201120119477U CN202031309U CN 202031309 U CN202031309 U CN 202031309U CN 2011201194773 U CN2011201194773 U CN 2011201194773U CN 201120119477 U CN201120119477 U CN 201120119477U CN 202031309 U CN202031309 U CN 202031309U
Authority
CN
China
Prior art keywords
fixed tripod
operation platform
concrete structure
fixed
structural concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011201194773U
Other languages
Chinese (zh)
Inventor
潘福营
刘新星
戴良军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 11 Co Ltd
Sinohydro Bureau 5 Co Ltd
Original Assignee
Sinohydro Bureau 5 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 5 Co Ltd filed Critical Sinohydro Bureau 5 Co Ltd
Priority to CN2011201194773U priority Critical patent/CN202031309U/en
Application granted granted Critical
Publication of CN202031309U publication Critical patent/CN202031309U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a suspending operation platform for structural concrete constructions, which comprises a concrete structure, at least two fixed tripods, an upper tie bar and a lower tie bar. The fixed tripods are perpendicular to a plane of the concrete structure, screw threads at the upper ends of the fixed tripods are connected with the upper end of the concrete structure through the upper tie bar, and screw threads at the lower ends of the fixed tripods are connected with the lower end of the concrete structure through the lower tie bar. Vertical rods are arranged at the ends of the fixed tripods far away from the concrete structure, the vertical rods arranged on two adjacent fixed tripods are connected, and boards are laid between the two adjacent fixed tripods. The suspending operation platform for the structural concrete constructions can be processed and manufactured on site, thereby being simple in construction, convenient to transfer, capable of being reused for a long time and low in material input and construction cost and solving a problem that the structural concrete constructions, particularly the structural concrete constructions for walls are high in the material input and the construction cost.

Description

A kind of structural concrete construction hanging operation platform
Technical field
The utility model relates to the aerial work platform technical field, is specifically related to a kind of structural concrete construction hanging operation platform.
Background technology
At present, the civil works project construction generally all can relate to the structural concrete construction, for highly bigger structural concrete, particularly body of wall class concrete construction, general all along with the rising of structural concrete, adopt steel pipe to set up scaffold, on scaffold, lay plank, form the job platform of structural concrete construction, scaffold is finished and could once be removed until the whole constructions of structural concrete along with the rising of structural concrete constantly raises.Material input amount such as steel pipe is bigger like this, and the cycle that accounts for is longer, and construction cost is higher.
The utility model content
At above-mentioned the deficiencies in the prior art part, the purpose of this utility model provides that a kind of construction is simple, transportation and easy to use and can long-term reusable structural concrete construction hanging operation platform, solve and adopt scaffold building job platform material to drop into more in the structural concrete construction, the construction cost problem of higher can effectively solve the problem that above-mentioned prior art exists.
To achieve these goals, the technical solution adopted in the utility model is: a kind of structural concrete construction hanging operation platform, comprise concrete structure and at least two fixed tripod, fixed tripod and plane, concrete structure place are perpendicular, also comprise lacing wire and following lacing wire, describedly go up lacing wire the upper end of fixed tripod is threaded in the upper end of concrete structure, following lacing wire is threaded in the lower end of fixed tripod the lower end of concrete structure; Be provided with vertical rod in fixed tripod away from the end of concrete structure, the vertical rod on adjacent two fixed tripod interconnects, and lays plank between adjacent two fixed tripod.
As a kind of optimal way, wherein: be provided with horizontal connecting hole on fixed tripod, horizontal connecting rod passes horizontal connecting hole and connects adjacent two fixed tripod.
As a kind of optimal way, the end of last lacing wire and following lacing wire is equipped with clamp nut.
As a kind of optimal way, vertical rod is fixed on the fixed tripod by the vertical rod fixing hole.
As a kind of optimal way, the end of last lacing wire and following lacing wire is equipped with clamp nut.
As a kind of optimal way, the right-angled triangle of fixed tripod for being welded by channel-section steel;
A nearlyer step ground is preferred, the wherein maintenance on one side level of fixed tripod.
Compared with prior art, the beneficial effect that this utility model is brought is: structural concrete construction hanging operation platform of the present utility model, the scene can processing and fabricating, construction is simple, convenient transfer, can reuse for a long time, and material less investment, construction cost are low; Structural concrete, particularly body of wall class formation concrete construction material has high input, construction cost is high problem have been solved.
Description of drawings
Details by preferred embodiment in following the utility model is described, and can clearer understanding be arranged to the purpose of this utility model, viewpoint and advantage, is illustrated with reference to following accompanying drawing of the present utility model simultaneously:
Fig. 1 is a structural representation of the present utility model.
The specific embodiment
Technique scheme of the present utility model and advantage thereof are not difficult to obtain to understand in depth from the detailed description and accompanying drawing of following selected embodiment.
Referring to Fig. 1, embodiment, this structural concrete construction comprises concrete structure 1 and at least two fixed tripod 8 and goes up lacing wire 2 and following lacing wire 3 with the hanging operation platform, fixed tripod 8 is perpendicular with plane, concrete structure 1 place, described upward lacing wire 2 is threaded in the upper end of fixed tripod 8 upper end of concrete structure 1, following lacing wire 3 is threaded in the lower end of concrete structure 1 with the lower end of fixed tripod 8, and the end of last lacing wire 2 and following lacing wire 3 is equipped with clamp nut 4.Be provided with vertical rod 7 in fixed tripod 8 away from the end of concrete structure 1, vertical rod 7 is fixed on the fixed tripod 8 by vertical rod fixing hole 6.Vertical rod 7 on adjacent two fixed tripod 8 interconnects, and lays plank 9 between adjacent two fixed tripod 8.Be provided with horizontal connecting hole 5 on fixed tripod 8, laterally connecting rod 10 passes adjacent two fixed tripod 8 of horizontal connecting hole 5 connections.The right-angled triangle of fixed tripod 8 for being welded by channel-section steel, the wherein maintenance on one side level of fixed tripod 8.
The hanging operation platform use in structural concrete of the present utility model construction, directly use after not only can being processed into finished product, but also field fabrication is processed.When field fabrication adds man-hour: at first, carry out Combination Welding by channel-section steel and form several fixed tripod 8 with standby, dismounting along with the structural concrete template, lacing wire 2 and following lacing wire 3 are inserted in two jacks of fixed tripod 8 upper and lower ends in the utilization, fixing with clamp nut 4 again, fixed tripod 8 and last lacing wire 2 and following lacing wire 3 are formed an overall fixed on concrete structure 1.According to the needs of work plane, several fixed tripod 8 are installed, by in horizontal connecting hole 5, inserting horizontal connecting rod 10 each fixed tripod 8 is connected.Then, lay plank 9, plank 9 in blocks forms job platform.Vertical rod 7 is fixed on the tripod 8 by vertical rod fixing hole 6, can connects by rope or bar between several vertical rods 7, form safety guide rail.After the hanging operation platform formed like this, the constructor can carry out various operations on platform, and along with the rising of structural concrete, the hanging operation platform also and then raises.
Therefore, the utility model hanging operation platform structure is simple, convenient transfer, construction material less investment, construction cost is low, structural concrete, particularly higher problem that body of wall class formation concrete construction material input is many, construction cost is high have been solved effectively, and, this job platform can reuse, and can effectively reduce engineering cost.
Understand as the person skilled in the art; the above preferred embodiment of the present utility model only is used for helping to understand enforcement of the present utility model; be not in order to limit scope of the present utility model; and the technician who is familiar with this field is behind comprehension the utility model; all other do not break away under the essential scope of the present utility model; the a little change retouching of being finished and the change or the modification of equivalence allow, its scope of patent protection should be considered as being included in the present patent application scope and etc. in the same domain.

Claims (6)

1. a structural concrete is constructed and is used the hanging operation platform, comprise concrete structure (1) and at least two fixed tripod (8), fixed tripod (8) is perpendicular with concrete structure (1) plane, place, it is characterized in that: also comprise lacing wire (2) and following lacing wire (3), describedly go up lacing wire (2) upper end of fixed tripod (8) is threaded in the upper end of concrete structure (1), following lacing wire (3) is threaded in the lower end of fixed tripod (8) lower end of concrete structure (1); Be provided with vertical rod (7) in fixed tripod (8) away from the end of concrete structure (1), the vertical rod (7) on adjacent two fixed tripod (8) interconnects, and lays plank (9) between adjacent two fixed tripod (8).
2. a kind of structural concrete construction hanging operation platform according to claim 1, it is characterized in that: be provided with horizontal connecting hole (5) on fixed tripod (8), laterally connecting rod (10) passes horizontal connecting hole (5) connection adjacent two fixed tripod (8).
3. the hanging operation platform is used in a kind of structural concrete construction according to claim 1, and it is characterized in that: the end of going up lacing wire (2) and following lacing wire (3) is equipped with clamp nut (4).
4. the hanging operation platform is used in a kind of structural concrete construction according to claim 1, and it is characterized in that: vertical rod (7) is fixed on the fixed tripod (8) by vertical rod fixing hole (6).
5. the hanging operation platform is used in a kind of structural concrete construction according to claim 1, it is characterized in that: the right-angled triangle of fixed tripod (8) for being welded by channel-section steel.
6. the hanging operation platform is used in a kind of structural concrete construction according to claim 5, it is characterized in that: the wherein maintenance on one side level of fixed tripod (8).
CN2011201194773U 2011-04-21 2011-04-21 Suspending operation platform for structural concrete constructions Expired - Fee Related CN202031309U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011201194773U CN202031309U (en) 2011-04-21 2011-04-21 Suspending operation platform for structural concrete constructions

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011201194773U CN202031309U (en) 2011-04-21 2011-04-21 Suspending operation platform for structural concrete constructions

Publications (1)

Publication Number Publication Date
CN202031309U true CN202031309U (en) 2011-11-09

Family

ID=44893611

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011201194773U Expired - Fee Related CN202031309U (en) 2011-04-21 2011-04-21 Suspending operation platform for structural concrete constructions

Country Status (1)

Country Link
CN (1) CN202031309U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104712134A (en) * 2013-12-16 2015-06-17 五冶集团上海有限公司 Movable platform for installing devices on mill housing machine and application
CN107060307A (en) * 2017-05-15 2017-08-18 葛加君 Construction simplification triangle operating platform makes and construction method of installation
CN109403609A (en) * 2018-12-19 2019-03-01 北京城建北方集团有限公司 Buttress type triangular support bracket

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104712134A (en) * 2013-12-16 2015-06-17 五冶集团上海有限公司 Movable platform for installing devices on mill housing machine and application
CN107060307A (en) * 2017-05-15 2017-08-18 葛加君 Construction simplification triangle operating platform makes and construction method of installation
CN109403609A (en) * 2018-12-19 2019-03-01 北京城建北方集团有限公司 Buttress type triangular support bracket
CN109403609B (en) * 2018-12-19 2024-04-02 北京城建北方集团有限公司 Wall-supporting type triangular support frame

Similar Documents

Publication Publication Date Title
CN203247859U (en) Alignment device for butt joint perpendicularity of large steel columns
CN204152217U (en) The assembled moulding bed of the assembling that a kind of Construction of Steel Structure is general
CN104975719A (en) Novel material distribution device and construction method for pouring floor concrete by using same
CN202031309U (en) Suspending operation platform for structural concrete constructions
CN202925896U (en) A hole reservation device for constructional engineering
CN206971689U (en) Support operating platform that is detachable and recycling
CN204040515U (en) Cat ladder
CN203097253U (en) Elevator shaft triangular support type formwork platform
CN205153515U (en) Overhanging bearing frame makes up positioner
CN203497150U (en) Scaffold for hatch coaming of ship
CN203200719U (en) Hanging type slope pouring template device
CN103195079B (en) Installing type template, installing type template group and complete installing type plate device
CN204960324U (en) Suspension type floor formwork support device
CN204626951U (en) A kind of shrinkage joint place shear wall formwork
CN204343647U (en) A kind of the shaped steel suspension scaffolding bracing frame
CN203795824U (en) Suspension type fastener scaffold erecting device
CN103397779B (en) A kind of method for supporting of large height shear wall formwork
CN210947661U (en) Installation device of socket type overhanging scaffold
CN203361596U (en) Auxiliary support of integrated lifting operation platform
CN206800975U (en) A kind of foot guard plate of scaffold sets up system
CN203257080U (en) Adjustable overhang supporting device for building construction
CN206987415U (en) Folding is gone along with sb. to guard him temporarily
CN205976473U (en) Aluminum -wood formwork support device
CN203113763U (en) Jacking support with fixing device
CN204728709U (en) wall construction system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: SINOHYDRO BUREAU 11 CO., LTD.

Effective date: 20140324

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20140324

Address after: 610000, No. 8, East Fourth Ring Road, Jinjiang District, Sichuan, Chengdu

Patentee after: Sinohydro Bureau 5 Co., Ltd.

Patentee after: SINOHYDRO Bureau 11 Co., Ltd.

Address before: 610000, No. 8, East Fourth Ring Road, Jinjiang District, Sichuan, Chengdu

Patentee before: Sinohydro Bureau 5 Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111109

Termination date: 20200421