CN205976473U - Aluminum -wood formwork support device - Google Patents

Aluminum -wood formwork support device Download PDF

Info

Publication number
CN205976473U
CN205976473U CN201620939190.8U CN201620939190U CN205976473U CN 205976473 U CN205976473 U CN 205976473U CN 201620939190 U CN201620939190 U CN 201620939190U CN 205976473 U CN205976473 U CN 205976473U
Authority
CN
China
Prior art keywords
pipe
support post
apical grafting
frame pipe
longitudinal direction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620939190.8U
Other languages
Chinese (zh)
Inventor
马海龙
张立波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN201620939190.8U priority Critical patent/CN205976473U/en
Application granted granted Critical
Publication of CN205976473U publication Critical patent/CN205976473U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model provides an aluminum -wood formwork support device belongs to the architectural engineering technology field, and its structure includes support post, flexible apical grafting sleeve pipe, early head and the top face mould board torn open, the vertical setting of support post, and the support post is the matrix and arranges on the same horizontal plane in space, the bottom mounting of support post is provided with the footing, bottom surface level on the same horizontal plane is transversely put up the pipe and is vertically put up tub horizontal framework in component bottom surface with the bottom surface level, top level on the same horizontal plane is transversely put up pipe and top level and is vertically put up and tub constitute a high -position water tie framework, the top of support post is upwards extended and is provided with flexible apical grafting sleeve pipe, and flexible apical grafting sheathed tube top is provided with the early head of tearing open. Aluminium frame wooden model template system that the device adopted forms based on current template system newly developed, is suitable for the construction of high residential building shear wall structure, has that the dismouting is nimble, the installation rate is fast, long service life, and construction precision is high, to mechanical degree of dependence low grade advantage.

Description

A kind of aluminum wood mould plate supporting device
Technical field
This utility model is related to construction engineering technical field, specifically a kind of aluminum wood mould plate supporting device.
Background technology
General, as one of concrete structure engineering partitioned project, its importance increasingly highlights form work engineering, In whole concrete structure engineering, form work engineering expense accounts for the 30% about of total cost, and the amount of labour accounts for the 35% of total amount of labour Left and right, the duration accounts for the 60% about of total lever factor, how the relatively advanced template system of R and D, for accelerating construction speed Degree, raises labour productivity, and reduces form work engineering expense, improves engineering construction quality, realizes green construction and be respectively provided with important meaning Justice.
Content of the invention
Technical assignment of the present utility model is to solve the deficiencies in the prior art, provides a kind of aluminum wood mould plate supporting device.
The technical solution of the utility model is realized in the following manner, a kind of this aluminum wood mould plate supporting device, its structure Including support post, flexible apical grafting sleeve pipe, early dismantling head and top surface template,
Support post is vertically arranged, and support post is in matrix arrangement in the same level of space;
The bottom of support post is fixedly installed footing;
The bottom of support post is connected with bottom surface horizontal cross frame pipe and bottom surface level longitudinal direction frame pipe;In same level Bottom surface horizontal cross frame pipe and bottom surface level longitudinal direction frame pipe constitute bottom surface horizontal strut;
The top of support post is connected with top horizontal transverse strands pipe and top horizontal longitudinal direction frame pipe;In same level Top horizontal transverse strands pipe and top horizontal longitudinal direction frame pipe constitute high-order horizontal strut;
The top of support post upwardly extends and is provided with flexible apical grafting sleeve pipe,
The top of flexible apical grafting sleeve pipe is provided with early dismantling head,
Early dismantling head is provided with apical grafting head, and before and after the bottom of apical grafting head, both sides are respectively arranged with the collet stretching out, It is respectively arranged with bottom bracket above the collet of both sides in front and back, between the bottom bracket of both sides, pass through pre-and post perforative bottom bracket spiral shell in front and back Bolt, bottom bracket nut are fastenedly connected clamping apical grafting head;
It is respectively arranged with jacking frame above the bottom bracket of both sides in front and back, pass through between the jacking frame of both sides in front and back to run through in front and back Top bracket bolt, jacking frame nut be fastenedly connected clamping apical grafting head;
Jacking frame is crisscross to constitute top surface template, and the top of early dismantling head apical grafting head and top surface template upper surface flush And be in same level;Aluminum wood template is equipped with top surface template.
The bottom of support post, bottom surface horizontal cross frame pipe, bottom surface level longitudinal direction frame pipe between and bottom surface horizontal cross Pass through scaffold clasp or bolt connection between frame pipe and bottom surface level longitudinal direction frame pipe;
The bottom of support post, top horizontal transverse strands pipe, top horizontal longitudinal direction frame pipe between and top horizontal horizontal Pass through scaffold clasp or bolt connection between frame pipe and top horizontal longitudinal direction frame pipe.
Pass through bearing pin between flexible apical grafting sleeve pipe and support post and pin-and-hole adjusts the stroke that stretches up and down.
Compared with prior art produced beneficial effect is this utility model:
The aluminum frame wooden model template system that a kind of this aluminum wood mould plate supporting device is adopted is newly to be opened based on existing template system Send out and form, be suitable for Shear-wall of High-rise House construction, have dismounting flexibly, installation rate is fast, long service life, construction essence Degree is high, the low advantage to mechanical degree of dependence.It is designed according to set design drawing and processes, site operation can be met and enter Degree and prescription, reduce project management cost, and quick, high-quality, safety can complete construction task.
Aluminum wood template adopts plank sheathing and aluminium alloy extrusions to make, and template stress condition is good, and bearing capacity is high, is unlikely to deform Lose shape.
Fixed using the pin of sizing between template and template, install convenient.Splicing accuracy is high, and speed of application is fast.
After aluminum wood form removable, concrete surface quality is good, and concrete solid perception and every measurement data are good.
Because mode system design adopts early removing system, reduce horizontal member template input quantity;Aluminum alloy mould plate is overall just Degree is high, and corner has aluminum frame to protect, not cracky, and the number of turnover is many, can significantly reduce engineering template expense.
Form board frame, secondary joist back cord are done using aluminum alloy mould plate, is attached using bolt or pin, using plank sheathing As concrete surface, both ensure that the integral rigidity of template system, piece were tight, in turn ensure that the light of concrete surface Cleanliness.
Scene does not need to put into flitch equal loss's material, improves operative's efficiency, reduces labor strength, reduces wood Material consumes, beneficial to environmental protection construction.
A kind of aluminum wood mould plate supporting device is reasonable in design, structure is simple for this, safe and reliable, easy to use, easy to maintain, tool There is good popularizing value.
Brief description
Accompanying drawing 1 is perspective view of the present utility model;
Accompanying drawing 2 is the partial structural diagram of early dismantling head of the present utility model;
Accompanying drawing 3 is the side structure schematic diagram of accompanying drawing 2.
Labelling in accompanying drawing represents respectively:
1st, support post, 2, footing,
3rd, bottom surface horizontal cross frame pipe, 4, bottom surface level longitudinal direction frame pipe, 5, bottom surface horizontal strut,
6th, top horizontal transverse strands pipe, 7, top horizontal longitudinal direction frame pipe, 8, high-order horizontal strut,
9th, stretch apical grafting sleeve pipe, and 10, early dismantling head,
11st, apical grafting head, 12, collet,
13rd, bottom bracket, 14, bottom bracket bolt, 15, bottom bracket nut,
16th, jacking frame, 17, top bracket bolt, 18, jacking frame nut,
19th, top surface template, 20, aluminum wood template, 21, bearing pin, 22, pin-and-hole.
Specific embodiment
Below in conjunction with the accompanying drawings a kind of aluminum wood mould plate supporting device of the present utility model is described in detail below.
As shown in drawings, a kind of aluminum wood mould plate supporting device of the present utility model, its structure includes support post, flexible top Female connector pipe, early dismantling head and top surface template,
Support post 1 is vertically arranged, and support post is in matrix arrangement in the same level of space;
The bottom of support post 1 is fixedly installed footing 2;
The bottom of support post 1 is connected with bottom surface horizontal cross frame pipe 3 and bottom surface level longitudinal direction frame pipe 4;Same level On bottom surface horizontal cross frame pipe 3 and bottom surface level longitudinal direction frame pipe 4 constitute bottom surface horizontal strut 5;
The top of support post 1 is connected with top horizontal transverse strands pipe 6 and top horizontal longitudinal direction frame pipe 7;Same level On top horizontal transverse strands pipe 6 and top horizontal longitudinal direction frame pipe 7 constitute high-order horizontal strut 8;
The top of support post 1 upwardly extends and is provided with flexible apical grafting sleeve pipe 9,
The top of flexible apical grafting sleeve pipe 9 is provided with early dismantling head 10,
Early dismantling head 10 is provided with apical grafting head 11, and before and after the bottom of apical grafting head 11, both sides are respectively arranged with and stretch out Collet 12, is respectively arranged with bottom bracket 13 above the collet 12 of both sides in front and back, passes through in front and back to pass through in front and back between the bottom bracket of both sides The bottom bracket bolt 14 worn, bottom bracket nut 15 are fastenedly connected clamping apical grafting head;
The bottom bracket 13 of both sides is respectively arranged with jacking frame 16 above in front and back, passes through front in front and back between the jacking frame 16 of both sides The top bracket bolt 17 running through afterwards, jacking frame nut 18 are fastenedly connected clamping apical grafting head;
Jacking frame 16 is crisscross to constitute top surface template 19, the top of early dismantling head apical grafting head and top surface template upper surface phase Flush and be in same level;Aluminum wood template 20 is equipped with top surface template 19.
The bottom of support post 1, bottom surface horizontal cross frame pipe 3, between bottom surface level longitudinal direction frame pipe 4 and bottom surface level is horizontal Pass through scaffold clasp or bolt connection between frame pipe and bottom surface level longitudinal direction frame pipe;
The bottom of support post 1, top horizontal transverse strands pipe 6, between top horizontal longitudinal direction frame pipe 7 and top horizontal is horizontal Pass through scaffold clasp or bolt connection between frame pipe and top horizontal longitudinal direction frame pipe.
Pass through bearing pin 21 between flexible apical grafting sleeve pipe and support post and pin-and-hole 22 adjusts the stroke that stretches up and down.
Construction stage directly can first remove bottom bracket and jacking frame for early dismantling head, retains support post and early dismantling head apical grafting Upper layer concrete, removes support post and early dismantling head after upper strata concrete strength meets condition again.

Claims (3)

1. a kind of aluminum wood mould plate supporting device is it is characterised in that include support post, flexible apical grafting sleeve pipe, early dismantling head and top surface mould Plate,
Support post is vertically arranged, and support post is in matrix arrangement in the same level of space;
The bottom of support post is fixedly installed footing;
The bottom of support post is connected with bottom surface horizontal cross frame pipe and bottom surface level longitudinal direction frame pipe;Bottom surface in same level Horizontal cross frame pipe and bottom surface level longitudinal direction frame pipe constitute bottom surface horizontal strut;
The top of support post is connected with top horizontal transverse strands pipe and top horizontal longitudinal direction frame pipe;Top in same level Horizontal cross frame pipe and top horizontal longitudinal direction frame pipe constitute high-order horizontal strut;
The top of support post upwardly extends and is provided with flexible apical grafting sleeve pipe,
The top of flexible apical grafting sleeve pipe is provided with early dismantling head,
Early dismantling head is provided with apical grafting head, and before and after the bottom of apical grafting head, both sides are respectively arranged with the collet stretching out, in front and back Be respectively arranged with bottom bracket above the collet of both sides, in front and back between the bottom bracket of both sides pass through pre-and post perforative bottom bracket bolt, Bottom bracket nut is fastenedly connected clamping apical grafting head;
It is respectively arranged with jacking frame above the bottom bracket of both sides in front and back, between the jacking frame of both sides, pass through pre-and post perforative top in front and back Bracket bolt, jacking frame nut are fastenedly connected clamping apical grafting head;
Jacking frame is crisscross to constitute top surface template, and the top of early dismantling head apical grafting head and top surface template upper surface flush and locate In same level;Aluminum wood template is equipped with top surface template.
2. a kind of aluminum wood mould plate supporting device according to claim 1 it is characterised in that:
The bottom of support post, bottom surface horizontal cross frame pipe, bottom surface level longitudinal direction frame pipe between and bottom surface horizontal cross frame pipe Pass through scaffold clasp or bolt connection and bottom surface level longitudinal direction frame pipe between;
The bottom of support post, top horizontal transverse strands pipe, top horizontal longitudinal direction frame pipe between and top horizontal transverse strands pipe Pass through scaffold clasp or bolt connection and top horizontal longitudinal direction frame pipe between.
3. a kind of aluminum wood mould plate supporting device according to claim 1 it is characterised in that:Flexible apical grafting sleeve pipe and support are vertical Pass through bearing pin between post and pin-and-hole adjusts the stroke that stretches up and down.
CN201620939190.8U 2016-08-25 2016-08-25 Aluminum -wood formwork support device Active CN205976473U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620939190.8U CN205976473U (en) 2016-08-25 2016-08-25 Aluminum -wood formwork support device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620939190.8U CN205976473U (en) 2016-08-25 2016-08-25 Aluminum -wood formwork support device

Publications (1)

Publication Number Publication Date
CN205976473U true CN205976473U (en) 2017-02-22

Family

ID=58034931

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620939190.8U Active CN205976473U (en) 2016-08-25 2016-08-25 Aluminum -wood formwork support device

Country Status (1)

Country Link
CN (1) CN205976473U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107642232A (en) * 2017-09-28 2018-01-30 中国建筑股份有限公司 The horizontal connection structure and system and construction method of a kind of shuttering supporting

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107642232A (en) * 2017-09-28 2018-01-30 中国建筑股份有限公司 The horizontal connection structure and system and construction method of a kind of shuttering supporting
CN107642232B (en) * 2017-09-28 2022-11-22 中国建筑股份有限公司 Horizontal connecting structure and system for formwork support and construction method

Similar Documents

Publication Publication Date Title
CN101368444B (en) Novel profiled bar and wood combination type door, window shaping template and its installation method
CN208792737U (en) For hanging the detachable connecting part of external platform hanging girder steel
CN206917265U (en) A kind of adjustable small bore beam side reinforcement tools
CN203878995U (en) Side wall stair formwork
CN105155836A (en) Aluminum alloy formwork for buildings and method for applying aluminum alloy formwork
CN205976473U (en) Aluminum -wood formwork support device
CN104818844A (en) Normalized support system and construction method of weather-proof PVC (polyvinyl chloride) composite plastic template
CN203626261U (en) Construction structure of concrete spreader in aluminum alloy formwork system
CN210195199U (en) Assembled climbing frame for building
CN205063248U (en) Prefabricated exterior wall board and precast beam hang connection structure futilely
CN202031309U (en) Suspending operation platform for structural concrete constructions
CN203403669U (en) Horizontally-structural formwork system
CN210194906U (en) Concrete formwork for fabricated building
CN206616765U (en) Large span is without depending on huge bandy truss pull bar
CN201447862U (en) Instrumental operating platform used for elevator shaft shear wall shuttering erection
CN210947661U (en) Installation device of socket type overhanging scaffold
CN205711761U (en) A kind of Novel hanging basket of convenience and safety
CN108222503A (en) A kind of combined large pier stud steel form
CN108193874A (en) A kind of stairway steel formwork for building
CN204645608U (en) Weather-proof PVC composite plastic template normalization support system
CN105275198A (en) A shear wall formwork reinforcing construction method
CN209163831U (en) A kind of vcehicular tunnel gutter liner tool-typed formwork
CN102767280A (en) Quick-dismounting system and installation method for top plate
CN111535581A (en) Convenient and fast mounting and dismounting type combined prefabricated formwork applicable to building floor lowering position
CN203603461U (en) Floor aluminum shuttering splicing formwork structure system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant