CN210195199U - Assembled climbing frame for building - Google Patents

Assembled climbing frame for building Download PDF

Info

Publication number
CN210195199U
CN210195199U CN201921017717.1U CN201921017717U CN210195199U CN 210195199 U CN210195199 U CN 210195199U CN 201921017717 U CN201921017717 U CN 201921017717U CN 210195199 U CN210195199 U CN 210195199U
Authority
CN
China
Prior art keywords
frame
groove
main frame
steel scaffold
building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921017717.1U
Other languages
Chinese (zh)
Inventor
Xing Zhang
张星
Baopeng Qi
齐宝鹏
Qingsong Zhang
张青松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Changda Construction Supporting Engineering Co Ltd
Original Assignee
Shandong Changda Construction Supporting Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Changda Construction Supporting Engineering Co Ltd filed Critical Shandong Changda Construction Supporting Engineering Co Ltd
Priority to CN201921017717.1U priority Critical patent/CN210195199U/en
Application granted granted Critical
Publication of CN210195199U publication Critical patent/CN210195199U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model belongs to the technical field of the construction technique and specifically relates to an assembled frame of climbing for building. This kind of frame is climbed to assembled for building, the upper surface of two upper and lower connecting plates of main frame all is provided with the joint recess, the upper surface of two upper and lower connecting plates of grudging post also all is provided with the joint recess, the lower surface of the left and right ends of steel scaffold board is provided with all "U" type draw-in groove, the pull pole of steel scaffold board lower surface all is provided with first screw hole on the side that is located main frame and grudging post front end, the lower surface of the horizontal pole of steel scaffold board front side is provided with integrated into one piece's extension board, be provided with the second screw hole with the position one-to-one of first screw hole on the extension board, first screw hole and second screw hole pass through locking bolt fastening. The utility model discloses an assembled for building climbs frame, steel scaffold board can fix a position the installation fast, and the structure steadiness is strong, greatly improves and climbs the assembly speed of frame at the job site, the material resources of using manpower sparingly.

Description

Assembled climbing frame for building
Technical Field
The utility model belongs to the technical field of the construction technique and specifically relates to an assembled frame of climbing for building.
Background
The climbing frame is also called a lifting frame, and can be classified into hydraulic, electric, manual and hand-pulling types according to its power source. The scaffold is a novel scaffold system developed in recent years and is mainly applied to high-rise shear wall type floors. It can climb up or down along the building. This system makes the scaffold technology completely improved: firstly, the frame does not need to be turned over; and secondly, the scaffold is free from the dismounting and mounting procedures (the scaffold is used until the construction is finished after one-time assembly), and is not limited by the height of a building, so that the manpower and the materials are greatly saved. And also has a great improvement on the traditional scaffold in the safety angle. Has great development advantages in high-rise buildings.
The frame of climbing commonly used comprises a plurality of support body subassemblies that are fixed through bolt and nut locking usually, and the support body subassembly includes main frame, grudging post, horizontal pole and steel scaffold board, and this type of frame of climbing is assembled behind transporting the job site with each component usually again, in the installation, at first places main frame and grudging post parallel subaerial, installs the horizontal pole, then installs steel scaffold board, can continue to install down tube and net piece etc. after the installation of steel scaffold board is accomplished. In the installation of climbing the frame, current steel scaffold board sets up a plurality of screw holes all around usually, also is provided with a plurality of screw holes on the horizontal pole of its contact and on the main frame of contact and the connecting plate of founding the frame, and reuse bolt and nut are fixed after the screw hole on the scaffold board on the horizontal pole and the screw hole one-to-one on horizontal pole and the connecting plate during the installation, and this is the one step that the comparison expends time in climbing the frame installation.
Therefore, how to provide a frame is climbed to assembled for building, steel scaffold board can fix a position the installation fast, and the structural stability is strong, greatly improves the assembly speed of climbing the frame at the job site, uses manpower sparingly material resources, is the technical problem that technical staff in the field awaits a urgent need to solve.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a frame is climbed to assembled for building overcomes the not enough of aforementioned prior art existence, and the installation can fix a position fast to the steel scaffold board, and the structure steadiness is strong, greatly improves the assembly speed of climbing the frame at the job site, the material resources of using manpower sparingly.
The utility model provides a technical scheme that its technical problem adopted is:
the utility model provides a frame is climbed to assembled for building, includes a plurality of fixed support body subassemblies of bolt and nut locking that pass through, support body subassembly all includes vertical direction parallel arrangement's main frame and grudging post, sets up the horizontal pole between main frame and grudging post and sets up respectively in upper end and two steel scaffold boards of lower extreme between main frame and grudging post, the upper surface of two upper and lower connecting plates of main frame all is provided with the joint recess, and the upper surface of two upper and lower connecting plates of grudging post also all is provided with the joint recess, the lower surface of the left and right-hand member of steel scaffold board is provided with all "U" type draw-in groove, and the right side groove along the joint of the joint recess on the steel scaffold board passes through "U" type draw-in groove of left end and its left side grudging post/main frame, the pull pole of steel scaffold board lower surface all is provided with first spiral shell screw on the side that is located main frame and grudging post front end The line hole, the lower surface of the horizontal pole of steel scaffold board front side is provided with integrated into one piece's extension board, be provided with the second screw hole with the position one-to-one of first screw hole on the extension board, first screw hole and second screw hole pass through locking bolt fixed.
Further, the width of joint recess equals the twice of the groove edge width of "U" type draw-in groove, and the length of joint recess equals the groove edge length of "U" type draw-in groove, and the height of joint recess equals the groove edge height of "U" type draw-in groove.
Furthermore, the depth of the clamping groove is 0.5-0.65 time of the thickness of the connecting plate of the main frame/the vertical frame.
Furthermore, one end of the drawing rod on the lower surface of the steel scaffold plate, which is provided with the first threaded hole, is a starting end, and the thickness of the plate at the starting end is 1-2 cm.
The utility model has the advantages that: compared with the prior art, the assembled climbing frame for the building of the utility model has the advantages that the steel scaffold plate is quickly positioned by matching the U-shaped clamping grooves with the main frames on the left side and the right side of the steel scaffold plate and the clamping grooves on the vertical frame, the groove edges of the U-shaped clamping grooves, which are contacted with the two adjacent steel scaffold plates, are positioned in the same clamping groove, the structural stability is enhanced, the first threaded hole on the steel scaffold plate is quickly aligned with the second threaded hole on the cross bar on one side of the steel scaffold plate, the first threaded hole and the second threaded hole are fixed by bolts, the quick installation is completed, and the manpower and material resources in the installation process are saved; through the optimized setting between the size to the joint recess, the degree of depth of "U" type draw-in groove, joint recess and the connecting plate thickness relation isoparametric of main frame/founding the frame, ensured the whole security and the steadiness of climbing the frame.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
fig. 2 is another schematic view of the angle structure of fig. 1 according to the present invention;
FIG. 3 is a schematic structural view of the main frame and the stand frame of the present invention;
FIG. 4 is a schematic structural view of the steel scaffold board of the present invention;
FIG. 5 is a schematic structural view of the cross bar at the front side of the steel scaffold
Wherein, 1 main frame, 2 grudging posts, 3 horizontal poles, 4 steel scaffold boards, 5 joint recesses, 6 "U" type draw-in groove, 7 first screw holes, 8 extension boards, 9 second screw holes.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the drawings in the embodiments of the present invention are combined below to clearly and completely describe the technical solutions in the embodiments of the present invention.
In the embodiment shown in fig. 1-5, an assembled climbing frame for building, as shown in fig. 1 and 2, comprises a plurality of frame assemblies fastened and fixed by bolts and nuts, each frame assembly comprises a main frame 1 and a vertical frame 2 arranged in parallel in the vertical direction, a cross rod 3 arranged between the main frame 1 and the vertical frame 2, and two steel scaffold plates 4 respectively arranged at the upper end and the lower end between the main frame 1 and the vertical frame 2. As shown in fig. 3, the upper surfaces of the upper and lower connecting plates of the main frame 1 are provided with clamping grooves 5, and the upper surfaces of the upper and lower connecting plates of the vertical frame 2 are also provided with clamping grooves 5. As shown in fig. 4, the lower surface of the left end and the right end of the steel scaffold board 4 is provided with a U-shaped clamping groove 6, the steel scaffold board 4 is clamped with the right groove edge of the clamping groove 5 on the main frame 1/the upright frame 2 on the left side through the U-shaped clamping groove 6 on the left end, and the steel scaffold board 4 is clamped with the left groove edge of the clamping groove 5 on the upright frame 2/the main frame 1 on the right side through the U-shaped clamping groove 6 on the right end. As shown in fig. 5, the drawing rod on the lower surface of the steel scaffold board is provided with first threaded holes 7 on the side surfaces of the front side ends of the main frame 1 and the upright frame 2, the lower surface of the cross rod 3 on the front side of the steel scaffold board 4 is provided with an integrally formed extension board 8, the extension board 8 is provided with second threaded holes 9 corresponding to the first threaded holes 7 in position one to one, and the first threaded holes 7 and the second threaded holes 9 are fixed through locking bolts.
In this embodiment, the width of joint recess 5 equals the twice of the groove edge width of "U" type draw-in groove 6, and the length of joint recess 5 equals the groove edge length of "U" type draw-in groove 6, and the height of joint recess 5 equals the groove edge height of "U" type draw-in groove 6.
In this embodiment, the depth of the clamping groove 5 is 0.5-0.65 times of the thickness of the connecting plate of the main frame 1/the vertical frame 2.
In this embodiment, the end of the pulling rod on the lower surface of the steel scaffold board, where the first threaded hole is formed, is a starting end, and the thickness of the board at the starting end is 1-2 cm.
The working principle is as follows: the utility model discloses an assembled for building climbs frame, in the installation, when installation steel scaffold board 4, steel scaffold board 4 is followed the main frame 1 rather than the left and right sides through the groove of "U" type draw-in groove 6 and is fixed a position fast with the card cooperation of the joint recess 5 on the grudging post 2, the groove of "U" type draw-in groove 6 that two adjacent steel scaffold boards 4 contacted is followed and is located same joint recess 5 inslot, can make the second screw hole 9 on first screw hole 7 on the steel scaffold board 4 rather than one side horizontal pole 3 aim at fast when strengthening structural stability, through bolt fastening first screw hole 7 and second screw hole 9, accomplish quick installation, manpower and materials in the installation have been practiced thrift.
The above embodiments are only specific cases of the present invention, and the protection scope of the present invention includes but is not limited to the forms and styles of the above embodiments, and any suitable changes or modifications made thereto by those skilled in the art according to the claims of the present invention shall fall within the protection scope of the present invention.

Claims (4)

1. The utility model provides a frame is climbed to assembled for building, includes a plurality of fixed support body subassemblies of bolt and nut locking that pass through, the support body subassembly all includes vertical direction parallel arrangement's main frame and grudging post, sets up the horizontal pole between main frame and grudging post and sets up two steel scaffold boards of upper end and lower extreme between main frame and grudging post respectively, its characterized in that: the upper surfaces of the upper and lower connecting plates of the main frame are provided with clamping grooves, the upper surfaces of the upper and lower connecting plates of the vertical frame are also provided with clamping grooves, the lower surfaces of the left end and the right end of the steel scaffold board are respectively provided with a U-shaped clamping groove, the steel scaffold board is clamped with the right groove edge of the clamping groove on the left side main frame/upright frame through the U-shaped clamping groove at the left end, the steel scaffold board is clamped with the left groove edge of the clamping groove on the right side upright frame/main frame through the U-shaped clamping groove at the right end, the side surfaces of the drawing and pulling rods on the lower surface of the steel scaffold board, which are positioned at the front side ends of the main frame and the vertical frame, are provided with first threaded holes, the lower surface of the cross rod on the front side of the steel scaffold board is provided with an integrally formed extension board, second threaded holes in one-to-one correspondence with the positions of the first threaded holes are formed in the extension board, and the first threaded holes and the second threaded holes are fixed through locking bolts.
2. The assembled climbing frame for building of claim 1, wherein: the width of joint recess equals the twice of the groove edge width of "U" type draw-in groove, and the length of joint recess equals the groove edge length of "U" type draw-in groove, and the height of joint recess equals the groove edge height of "U" type draw-in groove.
3. The assembled climbing frame for building of claim 1, wherein: the depth of the clamping groove is 0.5-0.65 time of the thickness of the connecting plate of the main frame/the vertical frame.
4. The assembled climbing frame for building of claim 1, wherein: the end of the drawing rod on the lower surface of the steel scaffold board, which is provided with the first threaded hole, is a starting end, and the thickness of the board at the starting end is 1-2 cm.
CN201921017717.1U 2019-07-02 2019-07-02 Assembled climbing frame for building Active CN210195199U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921017717.1U CN210195199U (en) 2019-07-02 2019-07-02 Assembled climbing frame for building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921017717.1U CN210195199U (en) 2019-07-02 2019-07-02 Assembled climbing frame for building

Publications (1)

Publication Number Publication Date
CN210195199U true CN210195199U (en) 2020-03-27

Family

ID=69870123

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921017717.1U Active CN210195199U (en) 2019-07-02 2019-07-02 Assembled climbing frame for building

Country Status (1)

Country Link
CN (1) CN210195199U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112267661A (en) * 2020-11-23 2021-01-26 厦门安科科技有限公司 Climbing frame convenient to adjust for construction industry
CN112942791A (en) * 2021-04-13 2021-06-11 北京天润建设有限公司 Small-space lifting scaffold and construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112267661A (en) * 2020-11-23 2021-01-26 厦门安科科技有限公司 Climbing frame convenient to adjust for construction industry
CN112942791A (en) * 2021-04-13 2021-06-11 北京天润建设有限公司 Small-space lifting scaffold and construction method

Similar Documents

Publication Publication Date Title
CN210195199U (en) Assembled climbing frame for building
CN210947661U (en) Installation device of socket type overhanging scaffold
CN214246573U (en) Can dismantle fast and climb a net
CN211923448U (en) Construction equipment of steel construction
CN210396108U (en) Supporting mechanism for quickly mounting and dismounting concrete formwork
CN210013444U (en) Closed cantilever scaffold system
CN113152876A (en) Wall connecting piece for scaffold and mounting method thereof
CN205976473U (en) Aluminum -wood formwork support device
CN217128894U (en) Scaffold connecting structure special for building installation engineering
CN210459952U (en) Scaffold frame that building engineering construction operation was used
CN216380492U (en) Scaffold frame for building engineering of easy dismounting
CN221053295U (en) Convenient construction stair
CN213952944U (en) Steel structure scaffold for building
CN220469334U (en) Scaffold convenient to splice
CN218843699U (en) Box type adjustable wall-attached support for climbing frame
CN215717117U (en) Novel detachable external scaffolding is wall spare even
CN215631411U (en) Quick assembly disassembly scaffold frame is used in construction in room
CN211775980U (en) Building construction faces limit protective structure
CN218563257U (en) Detachable guardrail
CN211201306U (en) Steel construction that transformer substation used
CN112282343B (en) Dual self-lifting type external climbing frame for super high-rise building
CN212105058U (en) Assembled structure roofing cantilever frame device
CN218541472U (en) I-steel fixing device suitable for scaffold
CN113931354B (en) Cantilever scaffold and curtain wall integrated structure and construction method
CN212176643U (en) Building construction safety device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant