CN213952944U - Steel structure scaffold for building - Google Patents
Steel structure scaffold for building Download PDFInfo
- Publication number
- CN213952944U CN213952944U CN202022215012.XU CN202022215012U CN213952944U CN 213952944 U CN213952944 U CN 213952944U CN 202022215012 U CN202022215012 U CN 202022215012U CN 213952944 U CN213952944 U CN 213952944U
- Authority
- CN
- China
- Prior art keywords
- butt joint
- sleeve
- pole setting
- climbing ladder
- pole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 24
- 239000010959 steel Substances 0.000 title claims abstract description 24
- 210000001503 joint Anatomy 0.000 claims abstract description 56
- 230000009194 climbing Effects 0.000 claims abstract description 38
- 229910001220 stainless steel Inorganic materials 0.000 claims description 6
- 239000010935 stainless steel Substances 0.000 claims description 6
- 239000000463 material Substances 0.000 claims description 4
- 238000010276 construction Methods 0.000 abstract description 7
- 238000009434 installation Methods 0.000 abstract description 5
- 238000000034 method Methods 0.000 description 6
- 230000000149 penetrating effect Effects 0.000 description 4
- 230000009471 action Effects 0.000 description 3
- 230000008569 process Effects 0.000 description 3
- 235000017166 Bambusa arundinacea Nutrition 0.000 description 1
- 235000017491 Bambusa tulda Nutrition 0.000 description 1
- 241001330002 Bambuseae Species 0.000 description 1
- 235000015334 Phyllostachys viridis Nutrition 0.000 description 1
- 230000004075 alteration Effects 0.000 description 1
- 239000011425 bamboo Substances 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005034 decoration Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000003032 molecular docking Methods 0.000 description 1
- 230000002093 peripheral effect Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 229920002994 synthetic fiber Polymers 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Images
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
The utility model relates to a scaffold technical field just discloses steel structure scaffold for building, including the pole setting, the inside movable mounting of pole setting has the connection sill bar, spacing draw-in groove has been seted up on the surface of pole setting, the movable mounting of surface of spacing draw-in groove has spacing sleeve, spacing telescopic inner wall fixed mounting has spacing fixture block, the surface of connecting the sill bar just is located spacing telescopic right side movable mounting and has fastening nut. This steel construction scaffold for building, through connecting the sill bar and through butt joint cover installation middle level pole in pole setting surface mounting, installation climbing ladder between connecting sill bar and middle level pole, the top sleeve board cup joints at middle level pole surface and utilizes screw rod threaded connection to consolidate through the top of two 'U' fonts at the climbing ladder top, guarantee the fixity of climbing ladder, and simultaneously, two lower cover fork joint have been installed in the bottom of climbing ladder and have been connected the sill bar surface, it is convenient to install, climbing ladder has replaced the ladder of traditional complex structure, a large amount of spaces have been saved.
Description
Technical Field
The utility model relates to a scaffold technical field specifically is a steel structure scaffold for building.
Background
The scaffold frame is the construction site and operates and solve perpendicular and horizontal transportation and a temporary building tool who sets up for the workman, its mainly used is at the outer wall, interior decoration or the higher unable direct construction's of layer height place, mainly dry living or peripheral safety net maintenance and high altitude installation component etc. from top to bottom for the constructor, its preparation material usually has bamboo, wood, steel pipe or synthetic material etc. the device mostly need put up the ladder that the structure is complicated about current steel construction scaffold frame, the ladder can occupy a large amount of inner spaces of scaffold frame simultaneously, therefore the utility model provides a temporary building tool.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a steel structure scaffold for building possesses simple structure, saves advantages such as space, has solved the problem that current scaffold exists.
(II) technical scheme
For realizing above-mentioned simple structure, the purpose of saving space, the utility model provides a following technical scheme: a steel structure scaffold for buildings comprises a vertical rod, wherein a connecting bottom rod is movably mounted inside the vertical rod, a limiting clamping groove is formed in the surface of the vertical rod, a limiting sleeve is movably mounted on the surface of the limiting clamping groove, a limiting clamping block is fixedly mounted on the inner wall of the limiting sleeve, a fastening nut is movably mounted on the surface of the connecting bottom rod and positioned on the right side of the limiting sleeve, a connecting cylinder is movably mounted on the surface of the vertical rod and positioned on the top of the connecting bottom rod, a fastening screw penetrating through the vertical rod is movably mounted inside the connecting cylinder, a butt joint sleeve is fixedly mounted on the lateral side of the connecting cylinder, a butt joint hole is formed in the butt joint sleeve, a butt joint screw penetrating through the butt joint sleeve is movably mounted on the surface of the butt joint sleeve and positioned inside the butt joint hole, a middle-layer rod is movably mounted inside the butt joint sleeve, a climbing ladder is movably, the top of the climbing ladder is fixedly provided with a top sleeve plate movably connected with the middle-layer rod, and the bottom of the climbing ladder is fixedly provided with a lower sleeve fork movably connected with the bottom connecting rod.
Preferably, the pole setting is the steel pipe, and the diameter of pole setting is four centimetres, and the quantity of pole setting is not less than four, and per two pole settings are a set of, right side the spacing groove that corresponds with spacing sleeve is seted up on the surface of pole setting, the left side the inner slot that corresponds with connecting the sill bar is seted up in the left side of pole setting, and the screw hole is installed to the surperficial equidistance of pole setting.
Preferably, the shape of the limiting sleeve is 'U' -shaped, the limiting sleeve is made of stainless steel, four rectangular limiting clamping blocks are arranged on the inner wall of the limiting sleeve at equal intervals, and a through hole corresponding to the connecting bottom rod is formed in the right side wall of the limiting sleeve.
Preferably, the connecting cylinder is shaped like 'Contraband', the inner wall of the connecting cylinder is arc-shaped, and fastening screw holes corresponding to the fastening screws are formed in the front surface and the back surface of the connecting cylinder.
Preferably, the butt joint sleeve is internally provided with a clamping groove corresponding to the middle layer rod, the butt joint holes are located on the inner wall of the clamping groove, the number of the butt joint holes is two, the butt joint holes are threaded holes, the butt joint screw penetrates through the butt joint sleeve and the middle layer rod, and the butt joint screw is in threaded connection with the butt joint sleeve.
Preferably, the material of climbing ladder is stainless steel, and the height of climbing ladder is not less than three meters, and two top lagging fixed mounting of climbing ladder have, and top lagging is the 'U' font, and top lagging cup connects on the surface of middle level pole, and through bolt and middle level pole threaded connection, and the bottom fixed mounting of climbing ladder has two and is connected the lower box fork of sill bar joint.
(III) advantageous effects
Compared with the prior art, the utility model provides a steel structure scaffold for building possesses following beneficial effect:
this steel structure scaffold for building, through connecting the sill bar and through butt joint cover installation middle level pole in pole setting surface mounting, install the climbing ladder between connecting sill bar and middle level pole, the top cover sleeve board cup joints at middle level pole surface and utilizes screw rod threaded connection to consolidate at the middle level pole surface through two 'U' fonts at the climbing ladder top, guarantee the fixity of climbing ladder, and simultaneously, two lower cover fork joint have been installed in the bottom of climbing ladder and have been connected the sill bar surface, it is convenient to install, the climbing ladder has replaced the ladder of traditional complex structure, a large amount of spaces have been saved, so the utility model provides a steel structure scaffold for building.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic top sectional view of the connecting cylinder of the present invention;
FIG. 3 is a schematic top sectional view of the spacing sleeve of the present invention;
fig. 4 is a schematic side view of the docking sleeve.
In the figure: the device comprises a vertical rod 1, a connecting bottom rod 2, a limiting clamping groove 3, a limiting sleeve 4, a limiting clamping block 41, a fastening nut 5, a connecting cylinder 6, a fastening screw rod 61, a butting sleeve 7, a butting hole 71, a middle-layer rod 8, a climbing ladder 9, a top sleeve plate 10 and a lower sleeve fork 11.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, a steel structure scaffold for construction comprises upright posts 1, a connecting bottom rod 2 is movably installed inside the upright posts 1, a limiting clamping groove 3 is formed on the surface of the upright posts 1, a limiting sleeve 4 is movably installed on the surface of the limiting clamping groove 3, the upright posts 1 are steel pipes, the diameter of the upright posts 1 is four centimeters, the number of the upright posts 1 is not less than four, every two upright posts 1 are in one group, a limiting groove corresponding to the limiting sleeve 4 is formed on the surface of the right upright post 1, an inner inserting groove corresponding to the connecting bottom rod 2 is formed on the left side of the left upright post 1, threaded holes are equidistantly formed on the surface of the upright post 1, a limiting clamping block 41 is fixedly installed on the inner wall of the limiting sleeve 4, the limiting sleeve 4 is U-shaped, the limiting sleeve 4 is made of stainless steel, four rectangular limiting clamping blocks 41 are equidistantly installed on the inner wall of the limiting sleeve 4, through holes corresponding to the connecting bottom rod 2 are formed on the right side wall of the limiting sleeve 4, a fastening screw cap 5 is movably mounted on the right side of the limiting sleeve 4 and connected with the surface of the bottom rod 2, a connecting cylinder 6 is movably mounted on the surface of the upright rod 1 and positioned at the top of the bottom rod 2, a fastening screw 61 penetrating through the upright rod 1 is movably mounted inside the connecting cylinder 6, the connecting cylinder 6 is shaped like a Chinese character 'Contraband', the inner wall of the connecting cylinder 6 is arc-shaped, fastening screw holes corresponding to the fastening screw 61 are respectively formed in the front and the back of the connecting cylinder 6, a butt joint sleeve 7 is fixedly mounted on the lateral side of the connecting cylinder 6, a butt joint hole 71 is formed inside the butt joint sleeve 7, a butt joint screw 72 penetrating through the butt joint sleeve 7 is movably mounted on the surface of the butt joint sleeve 7 and positioned inside the butt joint hole 71, a middle rod 8 is movably mounted inside the butt joint sleeve 7, a clamping groove corresponding to the middle rod 8 is formed inside the butt joint sleeve 7, the butt joint hole 71 is positioned on the inner wall of the clamping groove, and the number of the butt joint holes 71 is two, the butt joint hole 71 is a threaded hole, the butt joint screw 72 penetrates through the butt joint sleeve 7 and the middle-layer rod 8, the butt joint screw 72 is in threaded connection with the butt joint sleeve 7, the top of the connecting bottom rod 2 is movably provided with a climbing ladder 9, the top of the climbing ladder 9 is fixedly provided with a top sleeve plate 10 which is movably connected with the middle-layer rod 8, the bottom of the climbing ladder 9 is fixedly provided with a lower sleeve fork 11 which is movably connected with the connecting bottom rod 2, the climbing ladder 9 is made of stainless steel, the height of the climbing ladder 9 is not lower than three meters, the top of the climbing ladder 9 is fixedly provided with two top sleeve plates 10, the top sleeve plates 10 are U-shaped, the top sleeve plates 10 are sleeved on the surface of the middle-layer rod 8 and are in threaded connection with the middle-layer rod 8 through bolts, and the bottom of the climbing ladder 9 is fixedly provided with two lower sleeve forks 11 which are connected with the connecting bottom rod 2 in a clamping connection.
To sum up, this steel construction scaffold for building, through connecting sill bar 2 and through 7 installation middle level poles 8 of butt joint cover at pole setting 1 surface mounting, install climbing ladder 9 between connecting sill bar 2 and middle level pole 8, climbing ladder 9 top cup joints on middle level pole 8 surface and utilizes screw rod threaded connection to consolidate through the top lagging 10 of two 'U' fonts, guarantee climbing ladder 9's fixity, and simultaneously, 11 joints of two lower set forks have been installed in climbing ladder 9's bottom and have been connecting the sill bar surface, it is convenient to install, climbing ladder 9 has replaced the ladder of traditional complex structure, a large amount of spaces have been saved, so the utility model provides a steel construction scaffold for building.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising an … …" does not exclude the presence of other identical elements in a process, method, article, or apparatus that comprises the element.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. The utility model provides a steel structure scaffold for building, includes pole setting (1), its characterized in that: the utility model discloses a pole setting, including pole setting (1), inner movable mounting, connecting bottom rod (2), limiting clamping groove (3) have been seted up on the surface of pole setting (1), the surface movable mounting of limiting clamping groove (3) has spacing sleeve (4), the inner wall fixed mounting of spacing sleeve (4) has spacing fixture block (41), the surface of connecting bottom rod (2) and the right side movable mounting who is located spacing sleeve (4) have fastening nut (5), the surface of pole setting (1) and the top movable mounting who is located connecting bottom rod (2) have connecting cylinder (6), the inside movable mounting of connecting cylinder (6) has fastening screw (61) that run through pole setting (1), the avris fixed mounting of connecting cylinder (6) has butt joint cover (7), butt joint hole (71) has been seted up to the inside of butt joint cover (7), butt joint cover (7) the surface and the inside movable mounting that is located butt joint hole (71) have butt joint screw (72) that run through butt joint cover (7), the novel climbing device is characterized in that a middle-layer rod (8) is movably mounted inside the butt joint sleeve (7), a climbing ladder (9) is movably mounted at the top of the connecting bottom rod (2), a top sleeve plate (10) movably connected with the middle-layer rod (8) is fixedly mounted at the top of the climbing ladder (9), and a lower sleeve fork (11) movably mounted with the connecting bottom rod (2) is fixedly mounted at the bottom of the climbing ladder (9).
2. The constructional steel structural scaffold as set forth in claim 1, wherein: pole setting (1) is the steel pipe, and the diameter of pole setting (1) is four centimetres, and the quantity of pole setting (1) is not less than four, and per two pole settings (1) are a set of, right side the spacing groove that corresponds with spacing sleeve (4) is seted up on the surface of pole setting (1), the left side the inner slot that corresponds with connecting sill bar (2) is seted up in the left side of pole setting (1), and the screw hole is installed to the surperficial equidistance of pole setting (1).
3. The constructional steel structural scaffold as set forth in claim 1, wherein: the shape of limiting sleeve (4) is 'U' font, and the material of limiting sleeve (4) is the stainless steel, and limiting fixture block (41) of four rectangles are installed to the inner wall equidistance of limiting sleeve (4), and the through-hole that corresponds with connection sill bar (2) is seted up to the right side wall of limiting sleeve (4).
4. The constructional steel structural scaffold as set forth in claim 1, wherein: the shape of connecting cylinder (6) is the 'Contraband' font, and the inner wall of connecting cylinder (6) is the arc, and the front and the back of connecting cylinder (6) all offer the fastening screw that corresponds with fastening screw (61).
5. The constructional steel structural scaffold as set forth in claim 1, wherein: the butt joint device is characterized in that a clamping groove corresponding to the middle layer rod (8) is formed in the butt joint sleeve (7), the butt joint holes (71) are located on the inner wall of the clamping groove, the number of the butt joint holes (71) is two, the butt joint holes (71) are threaded holes, the butt joint screw rod (72) penetrates through the butt joint sleeve (7) and the middle layer rod (8), and the butt joint screw rod (72) is in threaded connection with the butt joint sleeve (7).
6. The constructional steel structural scaffold as set forth in claim 1, wherein: the material of climbing ladder (9) is the stainless steel, and the height of climbing ladder (9) is not less than three meters, and the top fixed mounting of climbing ladder (9) has two top lagging (10), and top lagging (10) are 'U' font, and top lagging (10) cup joint on the surface of middle level pole (8), and pass through bolt and middle level pole (8) threaded connection, and the bottom fixed mounting of climbing ladder (9) has two and lower fork (11) of being connected sill bar (2) joint.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022215012.XU CN213952944U (en) | 2020-10-09 | 2020-10-09 | Steel structure scaffold for building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022215012.XU CN213952944U (en) | 2020-10-09 | 2020-10-09 | Steel structure scaffold for building |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213952944U true CN213952944U (en) | 2021-08-13 |
Family
ID=77203026
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202022215012.XU Expired - Fee Related CN213952944U (en) | 2020-10-09 | 2020-10-09 | Steel structure scaffold for building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213952944U (en) |
-
2020
- 2020-10-09 CN CN202022215012.XU patent/CN213952944U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108756241B (en) | Device is established to shear force wall outside floor template of encorbelmenting | |
CN213329955U (en) | Flower basket diagonal rod type overhanging scaffold | |
CN210195199U (en) | Assembled climbing frame for building | |
CN210369345U (en) | Novel light outer wall bracket based on steel construction | |
CN210439783U (en) | Warning rail for building safety protection | |
CN213952944U (en) | Steel structure scaffold for building | |
CN219528334U (en) | Scaffold for building construction | |
CN112065013A (en) | Outer wall scaffold reinforcing mechanism for construction | |
CN212453544U (en) | Outer wall scaffold reinforcing mechanism for construction | |
CN214739832U (en) | Scaffold connecting and reinforcing structure | |
CN220469346U (en) | Building scaffold component | |
CN209874424U (en) | Building assembled safety scaffold | |
CN214615560U (en) | Protective cover plate device for horizontal opening of high-rise building floor | |
CN213806472U (en) | Scaffold structure for constructional engineering | |
CN221031673U (en) | Stable steel tube supporting frame | |
CN220080936U (en) | Safety ladder cage with adjustable protective guard | |
CN221919935U (en) | Reinforced connection composite seat body for aluminum-clad wood curtain wall upright post | |
CN215369664U (en) | Special reinforcing apparatus of aluminum alloy side's pipe cat ladder | |
CN211229484U (en) | Scaffold for building convenient to installation | |
CN219931708U (en) | Module assembly type outer elevation protection structure | |
CN218668406U (en) | Scaffold with safety protection net | |
CN212053671U (en) | Aluminum scaffold | |
CN219411757U (en) | Attached lifting scaffold | |
CN221372994U (en) | Platform safe edge fixing device | |
CN213868438U (en) | Quartzy brick wall structure of resistance to compression |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210813 |
|
CF01 | Termination of patent right due to non-payment of annual fee |