CN206616765U - Large span is without depending on huge bandy truss pull bar - Google Patents
Large span is without depending on huge bandy truss pull bar Download PDFInfo
- Publication number
- CN206616765U CN206616765U CN201620541663.9U CN201620541663U CN206616765U CN 206616765 U CN206616765 U CN 206616765U CN 201620541663 U CN201620541663 U CN 201620541663U CN 206616765 U CN206616765 U CN 206616765U
- Authority
- CN
- China
- Prior art keywords
- truss
- bandy
- pull rod
- huge
- colossal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 22
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 10
- 239000010959 steel Substances 0.000 claims abstract description 10
- 238000010276 construction Methods 0.000 abstract description 10
- 238000009434 installation Methods 0.000 abstract description 7
- 238000003466 welding Methods 0.000 description 3
- 230000011218 segmentation Effects 0.000 description 2
- 230000006978 adaptation Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000003032 molecular docking Methods 0.000 description 1
- 230000001737 promoting effect Effects 0.000 description 1
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a kind of large span without huge bandy truss pull bar, including the bandy truss being connected between two colossal columns is depended on, reinforcing pull rod is respectively equipped between bandy truss and two colossal columns.Reinforcing pull rod is drawn between the colossal column above the lower edge and bandy truss of bandy truss.Reinforcing pull rod uses section for Φ 203*12 steel pipe, and connection otic placode is set respectively in the node location of colossal column and bandy truss, and reinforcing pull rod is connected with connection otic placode using bearing pin.Set by designing reinforcing pull rod drawing, it is possible to achieve large span solves below heavy steel member without support installation problem without huge bandy truss Fast Installation is depended on, while reducing setting up for a large amount of support jigs, reduces engineering time and construction cost.
Description
Technical field
The utility model is related to a kind of huge bandy truss, more particularly to a kind of large span is drawn without huge bandy truss is depended on
Bar.
Background technology
Huge bandy truss planar dimension is huge, and internal cavity division numbers are more and butt weld quantity is more, construction segmentation
Mainly consider following factor:
(1) the lifting weight of segmenting unit, if on-site hoisting requirement can be met;
(2) weight and three-dimensional dimension of segmenting unit, if meet highway transportation requirement;
(3) the splicing welding joint position between segmenting unit, if facilitate Site Welding.
Consider and the live concatenation unit of huge bandy truss is divided after various factors, it is considered to installation process
The influence constructed to construction segmentation.
As shown in figure 1, without the nearly 40m of huge truss bottom headroom height is depended on, if setting up scaffold or tire when installing truss
Frame, in the prior art, the truss high-altitude dissipate spelling order and are:First by two sections of lower booms overhead connection install, by web member with it is upper
Chord member, into " K " font, proceeds by " K " font type lifting component, lifting sequence is in installation on ground after the completion of lower boom docking
Close up successively from truss two ends to centre.
The shortcoming of above-mentioned prior art is:
Because free height is higher below bandy truss, the method for setting up support frame from the first floor is comparatively laborious, and need to expend big
The support frame of amount, it is necessary to measure cost it is higher, and the relatively cumbersome and duration of constructing is longer.
The content of the invention
The purpose of this utility model is to provide a kind of large span without depending on huge bandy truss pull bar.
The purpose of this utility model is achieved through the following technical solutions:
Large span of the present utility model is without depending on huge bandy truss pull bar, including the band being connected between two colossal columns
Shape truss, reinforcing pull rod is respectively equipped between the bandy truss and two colossal columns.
It can be seen from the technical scheme that above-mentioned the utility model is provided the utility model embodiment provide large span without
Huge bandy truss pull bar is depended on, quick-assembling, economy expense can be achieved, and with good security, it is adaptable to it is super
It is being segmented of long, super-heavy component, fixed and weld, and to particularly useful without huge bandy truss construction is depended on below large span,
Equally there is good reference value to other similar Construction of Steel Structure, the efficiency of installation can be not only improved, moreover it is possible to for construction
The abundant time is won, standardization can be also realized, the purpose of cost efficiency is reached.
Brief description of the drawings
Fig. 1 is large span of the prior art without the structural representation for depending on huge bandy truss.
Fig. 2 a show for the large span that the utility model embodiment is provided without the plan structure for depending on huge bandy truss pull bar
It is intended to.
Fig. 2 b locally tie for the large span that the utility model embodiment is provided without the facade for depending on huge bandy truss pull bar
Structure schematic diagram.
Fig. 3 a, Fig. 3 b are respectively the structural representation of two sides of reinforcing pull rod in the utility model embodiment.
In figure:
1st, bandy truss, 2, colossal column, 3, huge diagonal brace, 4, truss top time post, 5, truss bottom hung column, 6, building
Layer Vierendeel girder, 7, reinforcing pull rod.
Embodiment
The utility model embodiment will be described in further detail below.
Large span of the present utility model is without depending on huge bandy truss pull bar, and its preferably embodiment is:
Including the bandy truss being connected between two colossal columns, set respectively between the bandy truss and two colossal columns
There is reinforcing pull rod.
The reinforcing pull rod is drawn between the colossal column above the lower edge and bandy truss of the bandy truss.
The drawing of the firm pull bar sets lower edge and web member connecting node position of the position as bandy truss.
The reinforcing pull rod uses section for Φ 203*12 steel pipe, in the node position of the colossal column and the bandy truss
Put and connection otic placode is set respectively, the reinforcing pull rod is connected with the connection otic placode using bearing pin.
Specific embodiment:
As shown in Fig. 2 a, Fig. 2 b, large span of the present utility model is without depending on huge bandy truss pull bar, with reinforcing pull rod by purlin
Frame lower edge oblique pull is on the colossal column of both sides.To avoid reinforcing pull rod from influenceing the lifting construction of truss web and upper cord member, reinforcing pull rod
Draw and be located at the truss lower edge left and right sides, when the lifting of truss lower edge is in place, is drawn and carried out on the colossal column at two ends using pull bar
It is fixed, it is because a level post and girder steel are arranged at truss bottom, secondary post and girder steel and the truss lower edge of bottom is laggard in installation on ground
Row lifting, both sides truss lower edge lifting is completed and the truss lower edge lifting of interlude is carried out after the completion of being fixed with pull bar, and pull bar is drawn
If position is truss lower edge and web member connecting node position.
Reinforcing pull rod section form and joint form:
As shown in Figure 3 a, 3 b, reinforcing pull rod uses section for Φ 203*12 steel pipe, in colossal column and panel point position
Connection otic placode is set, and pull bar is connected with truss and colossal column using bearing pin.
Large span of the present utility model is set by designing reinforcing pull rod drawing, realized big without huge bandy truss pull bar is depended on
Span has won the initiative of construction without huge bandy truss Fast Installation is depended on, and solves highway transportation and welding side
The problem in face, saves working measure expense, and is provided convenience condition for site operation.Also in installation rate, construction coordination
Unprecedented perfect adaptation has been reached, and good practicality effect is served to Promoting Standardized construction.Solve large-scale
Problem is installed without support below steel member, while reducing setting up for a large amount of support jigs, reduces the engineering time and is constructed into
This.
It is described above, only the utility model preferably embodiment, but protection domain of the present utility model is not
This is confined to, any one skilled in the art can readily occur in the technical scope that the utility model is disclosed
Change or replacement, should all cover within protection domain of the present utility model.Therefore, protection domain of the present utility model should
It is defined by the protection domain of claims.
Claims (3)
1. a kind of large span is without depending on huge bandy truss pull bar, including the bandy truss being connected between two colossal columns, its
It is characterised by, reinforcing pull rod is respectively equipped between the bandy truss and two colossal columns;
The reinforcing pull rod is drawn between the colossal column above the lower edge and bandy truss of the bandy truss.
2. large span according to claim 1 is without depending on huge bandy truss pull bar, it is characterised in that the reinforcing pull rod
Draw the lower edge for setting position as bandy truss and web member connecting node position.
3. large span according to claim 1 or 2 is without depending on huge bandy truss pull bar, it is characterised in that the steel is drawn
Bar uses section for Φ 203*12 steel pipe, and engaging lug is set respectively in the node location of the colossal column and the bandy truss
Plate, the reinforcing pull rod is connected with the connection otic placode using bearing pin.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620541663.9U CN206616765U (en) | 2016-06-06 | 2016-06-06 | Large span is without depending on huge bandy truss pull bar |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620541663.9U CN206616765U (en) | 2016-06-06 | 2016-06-06 | Large span is without depending on huge bandy truss pull bar |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206616765U true CN206616765U (en) | 2017-11-07 |
Family
ID=60228611
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620541663.9U Active CN206616765U (en) | 2016-06-06 | 2016-06-06 | Large span is without depending on huge bandy truss pull bar |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206616765U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111764406A (en) * | 2020-08-19 | 2020-10-13 | 中国五冶集团有限公司 | Adjustable inhaul cable |
CN114673366A (en) * | 2022-05-10 | 2022-06-28 | 陕西建工机械施工集团有限公司 | Sectional steel beam high-altitude bracket-free sectional butt joint installation method |
CN115262986A (en) * | 2022-07-22 | 2022-11-01 | 中国建筑第八工程局有限公司 | Installation method of large-span steel truss |
-
2016
- 2016-06-06 CN CN201620541663.9U patent/CN206616765U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111764406A (en) * | 2020-08-19 | 2020-10-13 | 中国五冶集团有限公司 | Adjustable inhaul cable |
CN114673366A (en) * | 2022-05-10 | 2022-06-28 | 陕西建工机械施工集团有限公司 | Sectional steel beam high-altitude bracket-free sectional butt joint installation method |
CN115262986A (en) * | 2022-07-22 | 2022-11-01 | 中国建筑第八工程局有限公司 | Installation method of large-span steel truss |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204040435U (en) | High-altitude steel structure welding Hanging Basket | |
CN204040464U (en) | A kind of slab form supporting construction | |
CN206903022U (en) | A kind of steel bar truss floor support plate | |
CN204960296U (en) | Adjustable shaped steel stencil assembly | |
CN109487912A (en) | A kind of construction method of super-span truss-string-structure | |
CN206616765U (en) | Large span is without depending on huge bandy truss pull bar | |
CN203684526U (en) | PBL stiffened rectangular steel tube concrete space truss | |
CN204418510U (en) | Floor support plate steel bar girder structure | |
CN202000265U (en) | Concrete construction formwork for high pier of bridge | |
CN201634347U (en) | Ultra-large tower crane and lower support assembly thereof | |
CN202913338U (en) | Steel truss full-welded truss piece | |
CN103397638A (en) | Tie bar for supporting system in high-rigidity integral prestressed fabricated foundation pit support | |
CN201865206U (en) | Connection node structure of edge beam and reinforced concrete prefabricated column bracket | |
CN208792806U (en) | A kind of floor of steel structure transformation node | |
CN203393721U (en) | Inner support main purlin component | |
CN209685126U (en) | A kind of steel vestibule integrally promotes lifting lug device | |
CN204919363U (en) | High mound pin -connected panel strength nature skeleton of anti high wind | |
CN203361631U (en) | Variable-diameter fabricated sliding mode platform of sliding mode system | |
CN203188612U (en) | Beam frame type building template system | |
CN208280636U (en) | A kind of elevator well safety device | |
CN203066043U (en) | Diversion tunnel top arch concrete lining steel formwork support | |
CN203334291U (en) | High-rigidity monolithic pre-stressing assembled-type pull rod for foundation pit supporting inner-supporting system | |
CN203394079U (en) | Large overweight box-type beam mounting assisting parallel truss | |
CN206034905U (en) | Board combination design mould falls in bathroom | |
CN203334290U (en) | Supporting rod |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address | ||
CP03 | Change of name, title or address |
Address after: 3801, 38 / F, Zhongjian science and engineering building, No. 3331, Weilan Coast Community Center Road, Yuehai street, Nanshan District, Shenzhen City, Guangdong Province Patentee after: China Construction Science And Industry Co.,Ltd. Address before: 518040 Guangdong city of Shenzhen province Futian District Che Kung Temple tipping building 17 layer Patentee before: China Construction Steel Structure Corp.,Ltd. |