CN111764406A - An adjustable cable - Google Patents

An adjustable cable Download PDF

Info

Publication number
CN111764406A
CN111764406A CN202010836414.3A CN202010836414A CN111764406A CN 111764406 A CN111764406 A CN 111764406A CN 202010836414 A CN202010836414 A CN 202010836414A CN 111764406 A CN111764406 A CN 111764406A
Authority
CN
China
Prior art keywords
connecting piece
steel
fixing bolt
chain hoist
adjustable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010836414.3A
Other languages
Chinese (zh)
Inventor
张联博
文果
高峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC5 Group Corp Ltd
Original Assignee
China MCC5 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC5 Group Corp Ltd filed Critical China MCC5 Group Corp Ltd
Priority to CN202010836414.3A priority Critical patent/CN111764406A/en
Publication of CN111764406A publication Critical patent/CN111764406A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention relates to the technical field of machining, in particular to an adjustable inhaul cable which comprises a fixed bolt, a first connecting piece, a second connecting piece, a chain block and a lifting lug, wherein the lifting lug is welded on a steel support; the invention provides a stay cable with adjustable length and angle and suitable for a horizontal steel support of foundation pit support.

Description

一种可调式拉索An adjustable cable

技术领域technical field

本发明涉及机械加工技术领域,尤其涉及一种可调式拉索。The invention relates to the technical field of machining, in particular to an adjustable cable.

背景技术Background technique

在基坑支护的水平钢支撑施工过程中,水平钢支撑往往容易脱落,造成很大的伤亡事故。目前一般采用钢丝绳将水平钢支撑固定,其方法为,钢丝绳一端通过螺栓固定于基坑壁上,另一端固定于水平钢支撑上。During the construction of the horizontal steel support for foundation pit support, the horizontal steel support is often easy to fall off, causing a lot of casualties. At present, steel wire ropes are generally used to fix the horizontal steel supports. The method is as follows: one end of the steel wire rope is fixed on the foundation pit wall by bolts, and the other end is fixed on the horizontal steel support.

公开号为CN207176694U的中国专利,一种用于基坑钢支撑的悬挑支撑结构,公开了一种用于基坑钢支撑的悬挑支撑结构,其包括:竖直设置在基坑中并垂直于各并列设置的钢支撑的立柱桩;穿过所述立柱桩且其中部与立柱桩固定安装的钢连梁,其两端伸出于所述立柱桩并形成悬臂结构,且该钢连梁设置于各钢支撑下方并与各钢支撑横交,用以对各钢支撑进行支撑;以及多根拉索,各拉索的一端均与立柱桩上位于钢连梁上方的部位固定连接,另一端各自分别固定于钢连梁的两悬臂端上的不同位置,以此与钢连梁形成斜拉悬索方式实现对钢连梁的悬挑支撑。该实用新型的悬挑支撑结构利用多个拉锁将钢连梁与立柱桩上的格构柱连接固定,可以在不增加立柱桩的情况下实现大长度的悬挑,对更多的钢支撑形成稳定可靠支撑。The Chinese patent with publication number CN207176694U, a cantilever support structure for foundation pit steel support, discloses a cantilever support structure for foundation pit steel support, which includes: vertically arranged in the foundation pit and vertically Steel-supported column piles arranged side by side; steel connecting beams that pass through the column piles and are fixedly installed with the column piles in the middle, the two ends of which protrude from the column piles and form a cantilever structure, and the steel connecting beams It is arranged under each steel support and crosses with each steel support to support each steel support; and a plurality of stay cables, one end of each stay cable is fixedly connected with the part above the steel connecting beam on the column pile, and the other One end is respectively fixed at different positions on the two cantilever ends of the steel coupling beam, so as to form an oblique-stayed suspension cable with the steel coupling beam to realize the cantilever support for the steel coupling beam. The cantilever support structure of the utility model uses a plurality of zippers to connect and fix the steel connecting beam and the lattice columns on the column piles, which can realize a large-length cantilever without increasing the column piles, and form a large number of steel supports. Stable and reliable support.

但是,水平钢支撑被施加轴向预应力后,钢支撑初始长度增加;或者由于基坑变形、轴力损失,二次施加轴力后水平钢支撑长度也会发生变化。在此过程中,现有技术提供的方法,支撑结构相对固定,限制了水平钢支撑伸长,给水平钢支撑施工带来不便以及安全隐患。However, after the axial prestressing of the horizontal steel support is applied, the initial length of the steel support increases; or due to the deformation of the foundation pit and the loss of the axial force, the length of the horizontal steel support will also change after the secondary axial force is applied. During this process, in the method provided by the prior art, the support structure is relatively fixed, which limits the elongation of the horizontal steel support, which brings inconvenience and safety hazards to the construction of the horizontal steel support.

发明内容SUMMARY OF THE INVENTION

针对上述存在的问题,本发明公开了一种长度、角度可调的适用于基坑支护的水平钢支撑的拉索。该拉索包括固定栓、第一连接件、第二连接件、手拉葫芦和吊耳,所述吊耳焊接在钢支撑上,所述固定栓一端固定在基坑壁上,另一端连接所述第一连接件,所述第二连接件连接所述吊耳,所述手拉葫芦连接于所述第一连接件和所述第二连接件之间。In view of the above existing problems, the present invention discloses a horizontal steel support cable with adjustable length and angle suitable for foundation pit support. The cable includes a fixing bolt, a first connecting piece, a second connecting piece, a chain hoist and a lifting lug, the lifting lug is welded on the steel support, one end of the fixing bolt is fixed on the wall of the foundation pit, and the other end is connected to the The first connecting piece, the second connecting piece is connected to the lifting lug, and the chain hoist is connected between the first connecting piece and the second connecting piece.

本发明的手拉葫芦为现有技术常用的双挂钩倒链手拉葫芦。本发明采用手拉葫芦可以实现钢支撑长度改变时拉索手动调节,具体方法为:通过拉动手拉葫芦倒链可以调整可调式拉索的松紧度,支撑长度改变,拉索长度需要减少时,顺时针拽动手拉葫芦的手动链条、手链轮转动,拉索长度减少;拉索长度需要增加时,逆时针拽动手拉葫芦的手拉链条,制动座跟刹车片分离,棘轮在棘爪的作用下静止,五齿长轴带动起重链轮反方向运行,拉索长度增加。The chain hoist of the present invention is a double hook inverted chain chain hoist commonly used in the prior art. The present invention adopts the hand chain hoist to realize the manual adjustment of the cable when the length of the steel support is changed. Pull the manual chain and hand chain wheel of the chain hoist clockwise to rotate, and the length of the cable decreases; when the length of the cable needs to be increased, pull the hand chain of the chain hoist counterclockwise, the brake seat is separated from the brake pad, and the ratchet is in the position of the pawl. Under the action of static, the five-tooth long shaft drives the hoisting sprocket to run in the opposite direction, and the length of the cable increases.

优选的,所述固定栓与所述第一连接件、所述第一连接件与所述手拉葫芦、所述手拉葫芦与所述第二连接件、所述第二连接件与所述吊耳的连接方式均为勾连。Preferably, the fixing bolt and the first connecting piece, the first connecting piece and the chain hoist, the hand chain hoist and the second connecting piece, and the second connecting piece and the The connection method of the lifting lugs is hook connection.

本发明巧妙的利用勾连实现了钢支撑长度变化后拉索角度的改变。具体解释为,当拉索因钢支撑长度改变需要调整时,在调整手拉葫芦的过程中,拉索与水平面的角度可通过勾连的方式进行适应性变化。The invention cleverly utilizes the hook connection to realize the change of the angle of the stay cable after the length of the steel support changes. The specific explanation is that when the cable needs to be adjusted due to the change of the length of the steel support, in the process of adjusting the chain hoist, the angle between the cable and the horizontal plane can be adaptively changed by hooking up.

优选的,所述固定栓为“L”形,所述固定栓的一条边固定在基坑壁上,所述固定栓的另一条边上设有可供所述第一连接件连接的通孔。Preferably, the fixing bolt is "L" shaped, one side of the fixing bolt is fixed on the wall of the foundation pit, and the other side of the fixing bolt is provided with a through hole for connecting the first connecting piece .

优选的,所述第一连接件和所述第二连接件均为

Figure BDA0002639864360000031
形,两端分别为挂钩和挂环,第一连接件的所述挂钩勾连在所述固定栓的通孔上;第二连接件的所述挂钩勾连在所述吊耳上,所述手拉葫芦的上挂钩和下挂钩分别勾连在所述第一连接件和所述第二连接件的所述挂环上。Preferably, the first connector and the second connector are both
Figure BDA0002639864360000031
The two ends are hooks and hanging rings respectively. The hook of the first connector is hooked on the through hole of the fixing bolt; the hook of the second connector is hooked on the lifting lug, and the hand pull The upper hook and the lower hook of the hoist are respectively hooked on the hanging rings of the first connecting piece and the second connecting piece.

优选的,还包括摩擦垫块,所述摩擦垫块设置于所述固定栓与所述第一连接件,和/或所述第一连接件与所述手拉葫芦,和/或所述手拉葫芦与所述第二连接件,和/或所述第二连接件与所述吊耳的连接处。Preferably, a friction pad is also included, and the friction pad is arranged between the fixing bolt and the first connecting piece, and/or the first connecting piece and the chain hoist, and/or the hand the connection between the hoist and the second connecting piece, and/or the second connecting piece and the lifting lug.

本发明的摩擦垫块可以增加各连接部位的摩擦力,避免在调整长度过程中产生不必要的滑动。The friction pad of the present invention can increase the frictional force of each connection part and avoid unnecessary sliding during the length adjustment process.

优选的,所述摩擦垫块包括从内到外的合金层、硅胶层和磨砂层。Preferably, the friction pad includes an alloy layer, a silica gel layer and a frosted layer from the inside to the outside.

采用本发明提供的摩擦垫块,一方面能够增加各连接部位摩擦力的;另一方面可以避免连接部件的磨损。By using the friction pad provided by the present invention, on the one hand, the friction force of each connecting part can be increased; on the other hand, the wear of the connecting parts can be avoided.

优选的,所述合金层的合金包括铝合金、锰铁合金、铁碳合金、硅铁合金中的一种或几种。Preferably, the alloy of the alloy layer includes one or more of aluminum alloy, ferromanganese alloy, iron carbon alloy, and ferrosilicon alloy.

优选的,所述磨砂层的砂目Ra为2.5~6.1μm;磨砂层的砂目过小,伸缩拉索时容易滑动;磨砂层的砂目过大,伸缩拉索时费力。Preferably, the grit Ra of the frosted layer is 2.5-6.1 μm; if the grit of the frosted layer is too small, it is easy to slide when the cable is stretched;

优选的,还包括钢牛腿,所述钢牛腿连接基坑壁,钢支撑可置于所述钢牛腿上。Preferably, the steel corbel is also included, the steel corbel is connected to the wall of the foundation pit, and the steel support can be placed on the steel corbel.

优选的,还包括钢围檩,所述钢围檩设置于所述钢牛腿上。Preferably, the steel purlin is also included, and the steel purlin is arranged on the steel corbel.

与现有技术相比,上述发明具有如下优点或者有益效果:本发明提供了一种基坑支护的水平钢支撑用的可调式拉索,拉索可以随着钢支撑的长度变化而变化,还能重复施工,即安全又经济。Compared with the prior art, the above invention has the following advantages or beneficial effects: the present invention provides an adjustable cable for horizontal steel support for foundation pit support, and the cable can change with the length of the steel support, It can also repeat construction, which is safe and economical.

附图说明Description of drawings

通过阅读参照以下附图对非限制性实施例所作的详细描述,本发明及其特征、外形和优点将会变得更加明显。在全部附图中相同的标记指示相同的部分。并未可以按照比例绘制附图,重点在于示出本发明的主旨。The present invention and its features, features, and advantages will become more apparent upon reading the detailed description of non-limiting embodiments with reference to the following drawings. Like numbers refer to like parts throughout the drawings. The drawings may not be drawn to scale, emphasis instead being placed upon illustrating the subject matter of the present invention.

图1为本发明中可调式拉索结构示意图;Fig. 1 is the structure schematic diagram of adjustable cable in the present invention;

图2为本发明中可调式拉索的手拉葫芦的结构示意图;Fig. 2 is the structure schematic diagram of the chain hoist of the adjustable cable in the present invention;

图3为本发明可调式拉索安装示意图。FIG. 3 is a schematic diagram of the installation of the adjustable cable according to the present invention.

附图标记:1、螺栓,2、固定栓,3、第一连接件,4、手拉葫芦,5、第二连接件,6、吊耳,7、基坑壁,8、钢支撑,9、钢围檩,10、钢牛腿。Reference numerals: 1, bolt, 2, fixing bolt, 3, first connecting piece, 4, chain hoist, 5, second connecting piece, 6, lifting lug, 7, foundation pit wall, 8, steel support, 9 , Steel purlin, 10, steel corbel.

具体实施方式Detailed ways

本领域技术人员应该理解,本领域技术人员在结合现有技术以及上述实施例可以实现变化例,在此不做赘述。这样的变化例并不影响本发明的实质内容,在此不予赘述。It should be understood by those skilled in the art that those skilled in the art can implement variations in combination with the prior art and the above-mentioned embodiments, which will not be repeated here. Such variations do not affect the essential content of the present invention, and will not be repeated here.

在本申请的描述中,需要理解的是,术语“上”、“下”、“外”、“内”、“前”、“后”、“垂直”、“水平”基于附图所示的方位或位置关系,仅是为了便于描述本申请和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本申请的限制。In the description of this application, it should be understood that the terms "upper", "lower", "outer", "inner", "front", "rear", "vertical", "horizontal" are based on the The orientation or positional relationship is only for the convenience of describing the present application and simplifying the description, rather than indicating or implying that the indicated device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be construed as a limitation on the present application.

在本申请的描述中,术语“第一”、“第二”、“第三”等仅用于描述目的,而不能理解为指示或暗示相对重要性或者隐含指明所指示的技术特征的数量。In the description of this application, the terms "first", "second", "third", etc. are only used for the purpose of description, and should not be understood as indicating or implying relative importance or implying the number of indicated technical features .

如图1所示,示出了一种可调式拉索,包括螺栓1、固定栓2、第一连接件3、手拉葫芦4、第二连接件5、吊耳6、基坑壁7、钢支撑8、钢围檩9、钢牛腿10。吊耳6焊接在钢支撑8上,固定栓2一端通过螺栓1固定在基坑壁7上,另一端连接第一连接件3,第二连接件5连接吊耳6,手拉葫芦4连接于第一连接件3和第二连接件5之间。螺栓1为M20膨胀螺栓,用螺栓1可以将固定栓2稳定固定于基坑壁7上。固定栓2与第一连接件3、第一连接件3与手拉葫芦4、手拉葫芦4与第二连接件5、第二连接件5与吊耳6的连接方式均为勾连。钢牛腿10连接基坑壁7,钢支撑8可置于钢牛腿10上。钢围檩9设置于钢牛腿10上。As shown in Figure 1, an adjustable cable is shown, including bolts 1, fixing bolts 2, first connecting pieces 3, chain hoists 4, second connecting pieces 5, lifting lugs 6, foundation pit walls 7, Steel support 8, steel purlin 9, steel corbel 10. The lifting lug 6 is welded on the steel support 8, one end of the fixing bolt 2 is fixed on the foundation pit wall 7 by the bolt 1, the other end is connected to the first connecting piece 3, the second connecting piece 5 is connected to the lifting lug 6, and the chain hoist 4 is connected to the foundation pit wall 7. between the first connector 3 and the second connector 5 . The bolt 1 is an M20 expansion bolt, and the bolt 1 can be used to stably fix the fixing bolt 2 on the foundation pit wall 7 . The connection modes of the fixing bolt 2 and the first connecting piece 3, the first connecting piece 3 and the chain hoist 4, the hand chain hoist 4 and the second connecting piece 5, and the second connecting piece 5 and the lifting lug 6 are all hook connections. The steel corbel 10 is connected to the foundation pit wall 7 , and the steel support 8 can be placed on the steel corbel 10 . The steel purlin 9 is arranged on the steel corbel 10 .

在本实施例中,固定栓2为L100×100×10mm等边角钢,分别在角钢两条边上设置与螺栓1、第一连接件3连接用的孔洞,孔洞对称设置,设置在每条边几何中心处,每边设置1处,一条边与螺栓1连接、另一条边与第一连接件3连接,连接处孔洞略大于需连接的杆件外径。In this embodiment, the fixing bolt 2 is an equilateral angle steel of L100×100×10 mm, and holes for connecting with the bolt 1 and the first connecting piece 3 are respectively provided on the two sides of the angle steel. The holes are symmetrically arranged, and are arranged on each side. At the geometric center, each side is set at one point, one side is connected with the bolt 1, and the other side is connected with the first connecting piece 3, and the hole at the connecting point is slightly larger than the outer diameter of the rod to be connected.

在本实施例中,第一连接件3采用未经冷拉的直径18mm三级圆钢加工而成,形状成

Figure BDA0002639864360000061
形,长度为700mm,一端弯曲成180°挂钩,弯曲直径为钢筋直径的5倍,弯钩平直段长度80mm,另一端弯曲后成挂环,与钢筋平直段焊接,挂环内径为80mm。In this embodiment, the first connecting piece 3 is made of grade 3 round steel with a diameter of 18 mm that has not been cold drawn, and has a shape of
Figure BDA0002639864360000061
The length of the hook is 700mm. One end is bent into a 180° hook. The bending diameter is 5 times the diameter of the steel bar. The length of the straight section of the hook is 80mm. .

在本实施例中,第二连接件5采用未经冷拉的直径18mm三级圆钢加工而成,形状成

Figure BDA0002639864360000062
形,长度为700mm,一端弯曲成180°挂钩,弯曲直径为钢筋直径的5倍,弯钩平直段长度80mm,另一端弯曲后成挂环,与钢筋平直段焊接,挂环内径为80mm。其一端与手拉葫芦4连接,另一端与吊耳6连接。In this embodiment, the second connecting piece 5 is made of grade 3 round steel with a diameter of 18 mm without cold drawing, and the shape is
Figure BDA0002639864360000062
The length of the hook is 700mm. One end is bent into a 180° hook. The bending diameter is 5 times the diameter of the steel bar. The length of the straight section of the hook is 80mm. . One end is connected with the chain hoist 4 , and the other end is connected with the lifting lug 6 .

在本实施例中,吊耳6采用Q235B钢板,厚度8mm,长度120mm,高度120mm,在钢板上开圆孔,圆孔位于钢板中间,圆孔直径50mm。In this embodiment, the lifting lugs 6 are made of Q235B steel plate, with a thickness of 8 mm, a length of 120 mm and a height of 120 mm.

本实施例中,可调式拉索还包括附图中未显示的磨擦垫块,摩擦垫块设置于固定栓2与第一连接件3、第一连接件3与手拉葫芦4、手拉葫芦4与第二连接件5、第二连接件5与吊耳6的连接处。具体是指,摩擦垫套接在固定栓2、第一连接件3、手拉葫芦4、第二连接件5、吊耳6上。摩擦垫块包括从内到外的铝合金层、硅胶层和磨砂层。磨砂层的砂目Ra为3.5μm。摩擦垫块具有以下有点:1、可以增加各连接部位的摩擦力,避免在调整长度过程中产生不必要的滑;2、可以避免连接部件的磨损;3、保证摩擦力的同时,伸缩拉索时节省力气。In this embodiment, the adjustable cable further includes friction pads not shown in the drawings. The friction pads are arranged on the fixing bolt 2 and the first connecting piece 3 , the first connecting piece 3 and the chain hoist 4 , and the hand chain hoist. 4 is connected to the second connecting piece 5, and the second connecting piece 5 and the lifting lug 6. Specifically, the friction pad is sleeved on the fixing bolt 2 , the first connecting piece 3 , the chain hoist 4 , the second connecting piece 5 , and the lifting lug 6 . The friction pad includes aluminum alloy layer, silicone layer and frosted layer from the inside to the outside. The grit Ra of the frosted layer was 3.5 μm. The friction pad has the following advantages: 1. It can increase the friction of each connecting part to avoid unnecessary slippage in the process of adjusting the length; 2. It can avoid the wear of the connecting parts; 3. While ensuring the friction force, the retractable cable save energy.

如图2所示,示出了可调式拉索的手拉葫芦,手拉葫芦4为双挂钩倒链圆形手拉葫芦,两端与第一连接件3和第二连接件5连接,通过拉动手拉葫芦倒链可以调整可调式拉索的松紧度。As shown in Figure 2, it shows the chain hoist of the adjustable cable. The chain hoist 4 is a double-hook inverted chain circular chain hoist, and the two ends are connected with the first connecting piece 3 and the second connecting piece 5. Pull the chain hoist upside down to adjust the tension of the adjustable cable.

下面将结合本发明的可调式拉索的用途,对本发明做进一步说明。The present invention will be further described below in conjunction with the application of the adjustable cable of the present invention.

如图3所示,示出了可调式拉索安装示意图,在水平钢支撑的左右两边均安装一个本发明提供的可调式拉索。As shown in FIG. 3 , a schematic diagram of the installation of the adjustable stay cable is shown, and an adjustable stay cable provided by the present invention is installed on the left and right sides of the horizontal steel support.

首次安装时,顺时针拽动手拉葫芦的手动链条、手链轮转动,拉索拉紧,水平钢支撑稳定在左、右两个拉索之间。同时,由于固定栓与第一连接件、第一连接件与手拉葫芦、手拉葫芦与第二连接件、第二连接件与吊耳的连接方式均为勾连,在调整手拉葫芦时各连接部位也可以顺势进行角度的微调,使整个拉索处于直线状态。另外,摩擦垫片可有效避免第一连接件、手拉葫芦、第二连接件调整幅度,增加拉索的稳定性。When installing for the first time, pull the manual chain and hand chain wheel of the chain hoist clockwise to rotate, the cable is tightened, and the horizontal steel support is stable between the left and right cables. At the same time, since the connection methods of the fixing bolt and the first connecting piece, the first connecting piece and the chain hoist, the hand chain hoist and the second connecting piece, and the second connecting piece and the lifting lug are all hooked, when adjusting the chain hoist, each The connection part can also be fine-tuned for the angle, so that the entire cable is in a straight state. In addition, the friction pad can effectively avoid the adjustment range of the first connecting piece, the chain hoist and the second connecting piece, and increase the stability of the cable.

当水平钢支撑被施加轴向预应力后,钢支撑初始长度增加。操作者逆时针拽动手拉葫芦的手拉链条,制动座跟刹车片分离,棘轮在棘爪的作用下静止,五齿长轴带动起重链轮反方向运行,拉索长度增加。同时,由于固定栓与第一连接件、第一连接件与手拉葫芦、手拉葫芦与第二连接件、第二连接件与吊耳的连接方式均为勾连,在调整手拉葫芦时各连接部位也可以顺势进行角度的微调,使整个拉索处于直线状态。另外,摩擦垫片可有效避免第一连接件、手拉葫芦、第二连接件调整幅度,增加拉索的稳定性。When the horizontal steel support is axially prestressed, the initial length of the steel support increases. The operator pulls the hand chain of the chain hoist counterclockwise, the brake seat is separated from the brake pad, the ratchet is stationary under the action of the pawl, and the five-tooth long shaft drives the hoisting sprocket to run in the opposite direction, and the length of the cable increases. At the same time, since the connection methods of the fixing bolt and the first connecting piece, the first connecting piece and the chain hoist, the hand chain hoist and the second connecting piece, and the second connecting piece and the lifting lug are all hooked, when adjusting the chain hoist, each The connection part can also be fine-tuned for the angle, so that the entire cable is in a straight state. In addition, the friction pad can effectively avoid the adjustment range of the first connecting piece, the chain hoist and the second connecting piece, and increase the stability of the cable.

以上对本发明的较佳实施例进行了描述。需要理解的是,本发明并不局限于上述特定实施方式,其中未尽详细描述的设备和结构应该理解为用本领域中的普通方式予以实施;任何熟悉本领域的技术人员,在不脱离本发明技术方案范围情况下,都可利用上述揭示的方法和技术内容对本发明技术方案做出许多可能的变动和修饰,或修改为等同变化的等效实施例,这并不影响本发明的实质内容。因此,凡是未脱离本发明技术方案的内容,依据本发明的技术实质对以上实施例所做的任何简单修改、等同变化及修饰,均仍属于本发明技术方案保护的范围内。The preferred embodiments of the present invention have been described above. It should be understood that the present invention is not limited to the above-mentioned specific embodiments, and the devices and structures that are not described in detail should be understood to be implemented in ordinary ways in the art; any person skilled in the art, without departing from the present invention Within the scope of the technical solution of the invention, many possible changes and modifications can be made to the technical solution of the present invention by using the methods and technical contents disclosed above, or modified into equivalent embodiments with equivalent changes, which does not affect the essence of the present invention. . Therefore, any simple modifications, equivalent changes and modifications made to the above embodiments according to the technical essence of the present invention without departing from the content of the technical solutions of the present invention still fall within the protection scope of the technical solutions of the present invention.

Claims (10)

1.一种可调式拉索,适用于基坑支护的水平钢支撑,其特征在于,包括固定栓、第一连接件、第二连接件、手拉葫芦和吊耳,所述吊耳焊接在钢支撑上,所述固定栓一端固定在基坑壁上,另一端连接所述第一连接件,所述第二连接件连接所述吊耳,所述手拉葫芦连接于所述第一连接件和所述第二连接件之间。1. An adjustable cable, suitable for the horizontal steel support of foundation pit support, is characterized in that, comprises a fixing bolt, a first connecting piece, a second connecting piece, a chain hoist and a lifting lug, and the lifting lug is welded On the steel support, one end of the fixing bolt is fixed on the wall of the foundation pit, the other end is connected to the first connecting piece, the second connecting piece is connected to the lifting lug, and the chain hoist is connected to the first connecting piece. between the connector and the second connector. 2.如权利要求1所述的可调式拉索,其特征在于,所述固定栓与所述第一连接件、所述第一连接件与所述手拉葫芦、所述手拉葫芦与所述第二连接件、所述第二连接件与所述吊耳的连接方式均为勾连。2 . The adjustable stay cable according to claim 1 , wherein the fixing bolt and the first connecting piece, the first connecting piece and the chain hoist, and the hand chain hoist and the The second connecting piece and the connecting manner of the second connecting piece and the lifting lug are all hook connections. 3.如权利要求1所述的可调式拉索,其特征在于,所述固定栓为“L”形,所述固定栓的一条边固定在基坑壁上,所述固定栓的另一条边上设有可供所述第一连接件连接的通孔。3 . The adjustable stay cable according to claim 1 , wherein the fixing bolt is in an “L” shape, one side of the fixing bolt is fixed on the wall of the foundation pit, and the other side of the fixing bolt is fixed on the wall of the foundation pit. 4 . There is a through hole for connecting the first connecting piece. 4.如权利要求3所述的可调式拉索,其特征在于,所述第一连接件和所述第二连接件两端分别为挂钩和挂环,第一连接件的所述挂钩勾连在所述固定栓的通孔上;第二连接件的所述挂钩勾连在所述吊耳上,所述手拉葫芦的上挂钩和下挂钩分别勾连在所述第一连接件和所述第二连接件的所述挂环上。4 . The adjustable cable according to claim 3 , wherein the two ends of the first connecting piece and the second connecting piece are hooks and hanging rings, respectively, and the hooks of the first connecting piece are hooked on the hooks. 5 . on the through hole of the fixing bolt; the hook of the second connector is hooked on the lifting lug, and the upper hook and the lower hook of the chain hoist are hooked on the first connector and the second hook respectively on the hanging ring of the connector. 5.如权利要求2-4任意一项所述的可调式拉索,其特征在于,还包括摩擦垫块,所述摩擦垫块设置于所述固定栓与所述第一连接件,和/或所述第一连接件与所述手拉葫芦,和/或所述手拉葫芦与所述第二连接件,和/或所述第二连接件与所述吊耳的连接处。5. The adjustable cable according to any one of claims 2-4, further comprising a friction pad, the friction pad is provided on the fixing bolt and the first connecting member, and/ Or the connection between the first connection piece and the chain hoist, and/or the chain hoist and the second connection piece, and/or the connection between the second connection piece and the lifting lug. 6.如权利要求5所述的可调式拉索,其特征在于,所述摩擦垫块包括从内到外的合金层、硅胶层和磨砂层。6 . The adjustable cable according to claim 5 , wherein the friction pad comprises an alloy layer, a silica gel layer and a frosted layer from the inside to the outside. 7 . 7.如权利要求5所述的可调式拉索,其特征在于,所述合金层的合金包括铝合金、锰铁合金、铁碳合金、硅铁合金中的一种或几种。7 . The adjustable cable according to claim 5 , wherein the alloy of the alloy layer comprises one or more of aluminum alloys, ferromanganese alloys, iron carbon alloys, and ferrosilicon alloys. 8 . 8.如权利要求5所述的可调式拉索,其特征在于,所述磨砂层的砂目Ra为2.5~6.1μm。8 . The adjustable cable according to claim 5 , wherein the grit Ra of the frosted layer is 2.5-6.1 μm. 9 . 9.如权利要求1所述的可调式拉索,其特征在于,还包括钢牛腿,所述钢牛腿连接基坑壁,钢支撑可置于所述钢牛腿上。9 . The adjustable stay cable according to claim 1 , further comprising a steel corbel, the steel corbel is connected to the wall of the foundation pit, and a steel support can be placed on the steel corbel. 10 . 10.如权利要求9所述的可调式拉索,其特征在于,还包括钢围檩,所述钢围檩设置于所述钢牛腿上。10 . The adjustable stay cable according to claim 9 , further comprising steel purlins, the steel purlins being arranged on the steel corbels. 11 .
CN202010836414.3A 2020-08-19 2020-08-19 An adjustable cable Pending CN111764406A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010836414.3A CN111764406A (en) 2020-08-19 2020-08-19 An adjustable cable

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010836414.3A CN111764406A (en) 2020-08-19 2020-08-19 An adjustable cable

Publications (1)

Publication Number Publication Date
CN111764406A true CN111764406A (en) 2020-10-13

Family

ID=72729794

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010836414.3A Pending CN111764406A (en) 2020-08-19 2020-08-19 An adjustable cable

Country Status (1)

Country Link
CN (1) CN111764406A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114673366A (en) * 2022-05-10 2022-06-28 陕西建工机械施工集团有限公司 Sectional steel beam high-altitude bracket-free sectional butt joint installation method

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000226850A (en) * 1998-12-01 2000-08-15 Taisei Corp Mountain retaining beam and its construction method
CN102407223A (en) * 2011-10-27 2012-04-11 于波涛 Material stone washing and screening device
CN203594036U (en) * 2013-10-21 2014-05-14 中铁十局集团青岛工程有限公司 Sand cylinder type combined enclosing purlin supporting device
CN206616765U (en) * 2016-06-06 2017-11-07 中建钢构有限公司 Large span is without depending on huge bandy truss pull bar
CN107354946A (en) * 2017-08-16 2017-11-17 中铁第四勘察设计院集团有限公司 A kind of supporting construction of encorbelmenting for foundation pit steel support
CN107724693A (en) * 2017-11-07 2018-02-23 中建局集团建设发展有限公司 Vertical construction protector and its construction method climbed in Core Walls Structure under tower crane
CN207919563U (en) * 2018-02-05 2018-09-28 建研地基基础工程有限责任公司 A kind of repeatable foundation pit steel support fall protection equipment utilized
CN208023592U (en) * 2018-03-29 2018-10-30 黄河勘测规划设计有限公司 Foundation pit diaphram wall supporting steel support structure
CN209891746U (en) * 2019-03-06 2020-01-03 中国建筑股份有限公司海拓工程分公司 Large-span construction camouflage device
CN216471740U (en) * 2021-11-26 2022-05-10 中国建筑第四工程局有限公司 Interim fixing device during welding of outer hanging tower crane foundation girder steel

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000226850A (en) * 1998-12-01 2000-08-15 Taisei Corp Mountain retaining beam and its construction method
CN102407223A (en) * 2011-10-27 2012-04-11 于波涛 Material stone washing and screening device
CN203594036U (en) * 2013-10-21 2014-05-14 中铁十局集团青岛工程有限公司 Sand cylinder type combined enclosing purlin supporting device
CN206616765U (en) * 2016-06-06 2017-11-07 中建钢构有限公司 Large span is without depending on huge bandy truss pull bar
CN107354946A (en) * 2017-08-16 2017-11-17 中铁第四勘察设计院集团有限公司 A kind of supporting construction of encorbelmenting for foundation pit steel support
CN107724693A (en) * 2017-11-07 2018-02-23 中建局集团建设发展有限公司 Vertical construction protector and its construction method climbed in Core Walls Structure under tower crane
CN207919563U (en) * 2018-02-05 2018-09-28 建研地基基础工程有限责任公司 A kind of repeatable foundation pit steel support fall protection equipment utilized
CN208023592U (en) * 2018-03-29 2018-10-30 黄河勘测规划设计有限公司 Foundation pit diaphram wall supporting steel support structure
CN209891746U (en) * 2019-03-06 2020-01-03 中国建筑股份有限公司海拓工程分公司 Large-span construction camouflage device
CN216471740U (en) * 2021-11-26 2022-05-10 中国建筑第四工程局有限公司 Interim fixing device during welding of outer hanging tower crane foundation girder steel

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
王琨等: "公路工程施工技术", 30 June 2015, 中国矿业大学出版社, pages: 340 *
郭林虎: "起重基础知识 试用本", 30 April 1983, 水利电力出版社, pages: 141 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114673366A (en) * 2022-05-10 2022-06-28 陕西建工机械施工集团有限公司 Sectional steel beam high-altitude bracket-free sectional butt joint installation method

Similar Documents

Publication Publication Date Title
CN201713215U (en) Flange pipe hanger
CN206580481U (en) A kind of indoor horizontal lifting pipeline erecting device
CN101705660B (en) Reaction frame prestress anchoring system and method for vertical rotating steel pipe arch on concrete bridge
CN111891894A (en) A hoisting device and hoisting method for slenderness ratio flexible equipment
CN114368672A (en) A method for self-aligning and hoisting without lifting lugs in an inclined straight flue of a steel-making system
CN111764406A (en) An adjustable cable
CN205114923U (en) Wire riser
CN220618104U (en) Municipal pipeline hoist device
CN215208019U (en) Deformed steel bar hoisting device
CN218579421U (en) A prefabricated component balance device for prefabricated buildings
CN201587793U (en) A New Type of Soft Cable Compression Rod Type Box Girder Spreader
CN215439394U (en) Embrace pole subassembly with dynamometry monitored control system
CN212893587U (en) A light single armed dolly for shaped steel spare hoist and mount
CN117627379A (en) A buckling restraint support auxiliary installation device and construction method
CN214167178U (en) Tower crane strutting arrangement
CN212924079U (en) Efficient and safe lifting device for concrete round pipe culvert
CN207920108U (en) A kind of hanger structure of roof color steel plate lifting
CN224131253U (en) Anchoring device and anchoring system for floating structure
CN109914223B (en) Hoisting system suitable for suspension bridge steel structure bridge deck system and operation method thereof
CN219839353U (en) Pipeline hoisting device
CN112520590A (en) Self-adaptive cable wind system of cable crane and using method thereof
CN221663452U (en) C-shaped hook for front pivot guy rope hanging basket
CN107777538B (en) Roughing mill frame hoisting device and using method thereof
CN2872689Y (en) Suspended cable sling
CN223280455U (en) Rear box girder hoisting structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20201013

RJ01 Rejection of invention patent application after publication