CN203066043U - Diversion tunnel top arch concrete lining steel formwork support - Google Patents
Diversion tunnel top arch concrete lining steel formwork support Download PDFInfo
- Publication number
- CN203066043U CN203066043U CN2013200092095U CN201320009209U CN203066043U CN 203066043 U CN203066043 U CN 203066043U CN 2013200092095 U CN2013200092095 U CN 2013200092095U CN 201320009209 U CN201320009209 U CN 201320009209U CN 203066043 U CN203066043 U CN 203066043U
- Authority
- CN
- China
- Prior art keywords
- support
- crown
- diversion tunnel
- concrete lining
- characters
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
Abstract
The utility model discloses a diversion tunnel top arch concrete lining steel formwork support. The diversion tunnel top arch concrete lining steel formwork support is installed on the lower portion of a top arch support of a diversion tunnel top arch and is connected with the upper portions of a plurality of splayed supports. The lower portions of the plurality of splayed supports are connected with a plurality of formwork pulling bars which are fixedly installed on the lateral wall of a diversion tunnel. The upper half portions of the plurality of splayed supports are reinforced through at least one transverse support. The diversion tunnel top arch concrete lining steel formwork support can be recovered and used repeatedly and has the advantages that assembling and disassembling are convenient and fast, materials can be saved, construction quality is guaranteed, and construction safety is enhanced.
Description
Technical field
The utility model relates to a kind of falsework for the hydraulic engineering construction temporary construction and mounting method, especially a kind of Diversion Tunnel crown concrete lining cutting steel form support.
Background technology
In Hydraulic and Hydro-Power Engineering construction building field, the Diversion Tunnel in power station is an interim engineering construction, and engineering has very high requirement to compactness, planeness and the fineness of lining concrete, and often the duration very urgent, under the premise that security is guaranteed, should simplify the engineering of lining cutting as far as possible.The concrete lining cutting layering of Diversion Tunnel is divided into base plate, side wall, crown three parts, the concrete lining cutting most critical of crown wherein, be related to the duration can complete on schedule, can quality guarantee.And the key procedure of the concrete lining cutting of crown is exactly formwork erection, and it plays a part very important, so reasonably the design of falsework is particularly important.
China is the supporting way that adopt full hall falsework at present more, supporting form has full wood to support, also having steel wood to support to mix uses, but the problem that exists is that material usage is big, the dismounting difficulty is big, the formwork erection time is long, disposable input cost height, potential safety hazard is many etc., and can not guarantee concrete pouring quality.
Summary of the invention
Technical problem to be solved in the utility model provides a kind of Diversion Tunnel crown concrete lining cutting steel form support, has overcome the shortcoming that adopts full hall falsework, can have enough to meet the need use repeatedly, install and remove convenient and swift, and can save material, and guaranteed construction quality, strengthened the construction safety degree.
For solving the problems of the technologies described above, the technical scheme that the utility model adopts is: a kind of Diversion Tunnel crown concrete lining cutting steel form support, the bottom that is installed on the crown support of Diversion Tunnel crown is connected with many Eight characters support tops, and many Eight characters support bottoms are connected with many form braces that are fixedly installed in the Diversion Tunnel side wall.
The many Eight characters support first halves are reinforced by at least one stull.
The crown support is made up of a Pin support and the 2nd Pin support, locks by alignment pin between a Pin support and the 2nd Pin support, and fastens by cross, and the lateral surface of crown support is welded with steel plate.
The one Pin support and the 2nd Pin support adopt steel pipe and reinforcing bar welding to make.
The Eight characters supports into " eight " font, and the bottom of crown support is connected by perfect after-sales service with many Eight characters support tops.
Be connected by perfect after-sales service between Eight characters support and the stull.
The Diversion Tunnel crown concrete lining cutting steel form support that the utility model provides, beneficial effect is as follows:
1, formed by crown support and Eight characters support, and the steel form support of reinforcing by stull, the employing combined type connects, easy accessibility, simple in structure, overcome the shortcoming that adopts full hall falsework, below steel bracket, had enough spaces to be open to traffic, be conducive to side wall and crown lining cutting cross-operation simultaneously.
2, crown support, Eight characters support and stull adopt perfect after-sales service to connect, and adopt the cross card connection between the two Pin supports of crown support, have effectively guaranteed globality and the stability of steel bracket, have also made things convenient for the dismounting work in later stage.
3, making material model is few, making is simple, and can have enough to meet the need use repeatedly, has saved cost, has reduced input.
4, the saving of labor, save time, the material saving, easy construction, safe and reliable; Can freely assemble, flexible operation, of a tightly knit structure, firm; Install rapidly, improved workmanship and work efficiency, improved working environment.
5, the steel plate of crown support outer side edges welding makes the crown support firmly is placed on vertical channel-section steel of Diversion Tunnel side wall, and next step combination that is beneficial to the steel form support is installed.
6, the effect that strengthens stability and globality, increase rigidity and intensity has been played in stull to the steel form support.
7, adopt the alignment pin locking between a Pin support and the 2nd Pin support, and adopt cross to fasten, played the effect that strengthens crown support globality and stability.
Description of drawings
The utility model is described in further detail below in conjunction with drawings and Examples:
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the structural representation of the utility model crown support;
Fig. 3 is the enlarged drawing at Figure 1A place.
The specific embodiment
As Fig. 1, Fig. 2 and shown in Figure 3, a kind of Diversion Tunnel crown concrete lining cutting steel form support, the bottom that is installed on the crown support 2 of Diversion Tunnel crown 14 is supportted 3 tops with the many Eight characters and is connected, and the many Eight characters support 3 bottoms and are connected with the many form braces 8 that are fixedly installed in Diversion Tunnel side wall 15.
The many Eight characters support 3 first halves and reinforce by at least one stull 4.
Crown support 2 is made up of a Pin support 2-1 and the 2nd Pin support 2-2, adopt alignment pin 1 locking between the one Pin support 2-1 and the 2nd Pin support 2-2, and adopt cross card 7 fixing, to play globality and the stable effect that strengthens crown support 2, the lateral surface of crown support 2 is welded with steel plate 12, make the crown support firmly is placed on vertical channel-section steel of Diversion Tunnel side wall that next step combination that is beneficial to the steel form support is installed.
The one Pin support 2-1 and the 2nd Pin support 2-2 adopt steel pipe 10 and reinforcing bar 11 welding to make.
3 one-tenth " eight " fonts of Eight characters support, the bottom of crown support 2 is supportted 3 tops with the many Eight characters and is connected by perfect after-sales service 6.
Be connected by perfect after-sales service 6 between Eight characters support 3 and the stull 4.
The mounting method of above-mentioned Diversion Tunnel crown concrete lining cutting steel form support may further comprise the steps:
1) vertically squeezes into reinforcing bar 13 at Diversion Tunnel side wall 15 on the base of crown support 2 along Diversion Tunnel, be used for laying vertical channel-section steel 9 of crown support 2 again in reinforcing bar 13 welding;
2) assembling steel form support: the steel form support is made up of crown support 2, Eight characters support 3 and stull 4;
3) the several length according to the lining cutting of Diversion Tunnel crown concrete of the group of steel form support are determined, each spacing of organizing between the steel form support is rationally determined by checking computations.
In the step 1), vertically channel-section steel 9 adopts the spot welding mode to be connected with reinforcing bar 13, and channel-section steel 9 mainly is that crown support 2 is played the load-bearing effect, and is beneficial to the combination installation of steel form support.
Step 2) in, the bottom of crown support 2 is supportted 3 tops with the many Eight characters and is connected by perfect after-sales service 6, the bottom of Eight characters support 3 is connected with the many form braces 8 that are fixedly installed in Diversion Tunnel side wall 15, the bottom of Eight characters support 3 is directly packed on the form brace 8, the angle of form brace 8 is adjusted arbitrarily according to the angle of Eight characters support 3, the first half in Eight characters support 3 utilizes stull 4 to reinforce, adopt perfect after-sales service 6 to be connected between Eight characters support 3 and the stull 4, stull 4 mainly be steel form to be propped up to erect strengthen effect stable and globality, increase rigidity and intensity.
In the step 3), each is organized between the steel form support and vertically connects by steel pipe 5, and fixing by perfect after-sales service 6.
Claims (6)
1. Diversion Tunnel crown concrete lining cutting steel form support, it is characterized in that: the bottom that is installed on the crown support (2) of Diversion Tunnel crown (14) is supportted (3) top with the many Eight characters and is connected, and many Eight characters support (3) bottoms are connected with the many form braces (8) that are fixedly installed in Diversion Tunnel side wall (15).
2. stream hole crown concrete lining cutting steel form support according to claim 1 is characterized in that: many Eight characters support (3) first halves are reinforced by at least one stull (4).
3. stream hole crown concrete lining cutting steel form support according to claim 1 and 2, it is characterized in that: crown support (2) is made up of a Pin support (2-1) and the 2nd Pin support (2-2), lock by alignment pin (1) between the one Pin support (2-1) and the 2nd Pin support (2-2), and fixing by cross card (7), the lateral surface of crown support (2) is welded with steel plate (12).
4. stream hole crown concrete lining cutting steel form support according to claim 3 is characterized in that: a Pin support (2-1) and the 2nd Pin support (2-2) adopt steel pipe (10) and reinforcing bar (11) to weld and make.
5. stream hole crown concrete lining cutting steel form support according to claim 1 and 2 is characterized in that: Eight characters support (3) becomes " eight " font, and the bottom of crown support (2) is supportted (3) top with the many Eight characters and is connected by perfect after-sales service (6).
6. stream hole crown concrete lining cutting steel form support according to claim 2 is characterized in that: be connected by perfect after-sales service (6) between Eight characters support (3) and the stull (4).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013200092095U CN203066043U (en) | 2013-01-09 | 2013-01-09 | Diversion tunnel top arch concrete lining steel formwork support |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013200092095U CN203066043U (en) | 2013-01-09 | 2013-01-09 | Diversion tunnel top arch concrete lining steel formwork support |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203066043U true CN203066043U (en) | 2013-07-17 |
Family
ID=48764854
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2013200092095U Expired - Fee Related CN203066043U (en) | 2013-01-09 | 2013-01-09 | Diversion tunnel top arch concrete lining steel formwork support |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203066043U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103074874A (en) * | 2013-01-09 | 2013-05-01 | 葛洲坝集团第五工程有限公司 | Diversion tunnel arch concrete lining steel template support and installation method |
CN105178986A (en) * | 2015-10-30 | 2015-12-23 | 郑州大学 | Variable curve mold for lining positioning of earth-sheltered dwelling and construction technology of variable-curve mold |
-
2013
- 2013-01-09 CN CN2013200092095U patent/CN203066043U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103074874A (en) * | 2013-01-09 | 2013-05-01 | 葛洲坝集团第五工程有限公司 | Diversion tunnel arch concrete lining steel template support and installation method |
CN103074874B (en) * | 2013-01-09 | 2015-04-01 | 葛洲坝集团第五工程有限公司 | Diversion tunnel arch concrete lining steel template support and installation method |
CN105178986A (en) * | 2015-10-30 | 2015-12-23 | 郑州大学 | Variable curve mold for lining positioning of earth-sheltered dwelling and construction technology of variable-curve mold |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103452039B (en) | Cast-in-situs type Inverted T beam and bridge pier and Bridge Pier Construction technique thereof | |
CN203631067U (en) | Road traffic sign board | |
CN103362069B (en) | Steel and concrete combined box girder concrete wing plate formwork and construction method | |
CN203066043U (en) | Diversion tunnel top arch concrete lining steel formwork support | |
CN203475310U (en) | Formwork for concrete slabs of composite steel-concrete box girders | |
CN201730330U (en) | Beam formwork for building | |
CN203373751U (en) | Triangular surrounding purlin for inner supporting system for foundation pit supporting | |
CN102191858A (en) | Pillar template for building | |
CN201952899U (en) | Beam column connecting node of detachable board house | |
CN103397638A (en) | Tie bar for supporting system in high-rigidity integral prestressed fabricated foundation pit support | |
CN203361631U (en) | Variable-diameter fabricated sliding mode platform of sliding mode system | |
CN209685126U (en) | A kind of steel vestibule integrally promotes lifting lug device | |
CN203096729U (en) | Storage tank pile cap assembling type pouring platform | |
CN109441088B (en) | Steel structure operation platform for super high-rise building core tube construction | |
CN103074874B (en) | Diversion tunnel arch concrete lining steel template support and installation method | |
CN102268921A (en) | Beam template for construction | |
CN206846097U (en) | A kind of Men Gangyu frameworks separately-loaded pipeline support structure | |
CN102174856A (en) | Finalized rebar machining shed | |
CN201730321U (en) | Column formwork for buildings | |
CN206220472U (en) | A kind of bracing means for improving bracing members stability of strutting system | |
CN203334290U (en) | Supporting rod | |
CN213572371U (en) | Prefabricated cabin transformer substation pin-connected panel steel construction foundation butt-joint structural | |
CN203334291U (en) | High-rigidity monolithic pre-stressing assembled-type pull rod for foundation pit supporting inner-supporting system | |
CN205061427U (en) | Tower crane cushion cap | |
CN102191859A (en) | Beam template for building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130717 Termination date: 20190109 |