CN203096729U - Storage tank pile cap assembling type pouring platform - Google Patents

Storage tank pile cap assembling type pouring platform Download PDF

Info

Publication number
CN203096729U
CN203096729U CN 201220736386 CN201220736386U CN203096729U CN 203096729 U CN203096729 U CN 203096729U CN 201220736386 CN201220736386 CN 201220736386 CN 201220736386 U CN201220736386 U CN 201220736386U CN 203096729 U CN203096729 U CN 203096729U
Authority
CN
China
Prior art keywords
storage tank
pile cover
platform
steel
tank pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220736386
Other languages
Chinese (zh)
Inventor
闫增良
李晓娟
陈亚军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Nuclear Industry Huaxing Construction Co Ltd
Original Assignee
China Nuclear Industry Huaxing Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Nuclear Industry Huaxing Construction Co Ltd filed Critical China Nuclear Industry Huaxing Construction Co Ltd
Priority to CN 201220736386 priority Critical patent/CN203096729U/en
Application granted granted Critical
Publication of CN203096729U publication Critical patent/CN203096729U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to a storage tank pile cap assembling type pouring platform. The storage tank pile cap assembling type pouring platform comprises a set of hanging lug plates installed on a pile cap steel molding plate, wherein the hanging lug plates are provided with triangular supports, wooden platform access boards which are located through baffles are arranged at the top ends of the triangular supports, and rails are arranged on the periphery of the wooden platform access boards and are arranged at the top ends of the triangular supports. The storage tank pile cap assembling type pouring platform has the advantages that the design is reasonable, a pouring platform system which is composed of the triangular supports, the trapezoid wooden platform access boards and the rails is convenient to assemble and disassemble, efficient in assembly and disassembly, and safe and reliable in construction, the input of materials is reduced, cost is reduced, and efficiency of construction is improved.

Description

Storage tank pile cover assembly type casting platform
Technical field
The utility model relates to building in a kind of pile cover construction and uses the assembly type operation platform, and especially a kind of storage tank pile cover assembly type casting platform belongs to the civil engineering technical field.
Background technology
Along with expanding economy, the whole world increases fast to the demand of clean energy resource in recent years, China has built up a plurality of liquefied natural gas receiving station up to now, the large-scale liquefied natural gas low-temperature storage tank design single tube reserves of now building are 16 myriametres, and its outer jar is designed to the post tensioning prestressed reinforced concrete structure.Storage tank integral body supports by the cast-in-situ steel reinforced concrete pile foundation is built on stilts, built on stilts highly being generally between 750~1750mm, and the stake number is 369~556 not to be waited.During the storage tank construction, after pile foundation construction is finished, need carry out pile extension work, i.e. pile cover construction need provide casting platform in the pile cover work progress.Common casting platform is a full hall scaffold of laying wooden springboard, but overlong time is torn in taking of scaffold open, and the material input amount is big, and the amount of having bad luck is big, the safety requirements height.
The utility model content
The purpose of this utility model is: at the problem that above-mentioned prior art exists, proposes a kind of can accelerating construction progress, the saving input cost directly is installed to the storage tank pile cover assembly type casting platform on the pile cover steel form.
The purpose of this utility model realizes by following technical solution:
A kind of storage tank pile cover assembly type casting platform, comprise the one group of earphone plate that is installed on the pile cover steel form, described earphone plate is provided with A-frame, the top of described A-frame is provided with the wooden platform springboard by the baffle plate location, and the periphery that is positioned at wooden platform springboard on the top of described A-frame is provided with railing.
The purpose of this utility model can also further realize by following technical measures:
Aforesaid storage tank pile cover assembly type casting platform, the cross section of wherein said earphone plate is the L type.
Aforesaid storage tank pile cover assembly type casting platform has the slip-off preventing hole on the wherein said earphone plate.
Aforesaid storage tank pile cover assembly type casting platform, wherein said A-frame is welded by two channel-section steels and a steel pipe, and the top channel-section steel is provided with steel plate, is shaped on the groove that can be connected with earphone plate at an end of top channel-section steel, and the other end is provided with two vertical round steel.
Aforesaid storage tank pile cover assembly type casting platform, wherein said round steel is connected with railing.
Aforesaid storage tank pile cover assembly type casting platform, wherein said steel plate is provided with the baffle plate that is connected with wooden platform springboard, and the cross section of described wooden platform springboard is trapezoidal.
Advantage of the present utility model is: storage tank pile cover assembly type casting platform of the present utility model is reasonable in design, the casting platform system that adopts A-frame, trapezoidal wooden platform springboard and railing to form, assembly and disassembly is convenient and swift, construction safety is reliable, reduced the input amount of material, provide cost savings, improved efficiency of construction.
Description of drawings
Below in conjunction with accompanying drawing the utility model is further described.
Fig. 1 is the structural representation of the utility model embodiment one.
Fig. 2 is the vertical view of Fig. 1.
Fig. 3 is the utility model intermediate cam supporting structure schematic diagram.
Fig. 4 is an earphone plate structural representation in the utility model.
Fig. 5 is a railing structural representation in the utility model.
Fig. 6 is a trapezoidal wooden platform springboard structural representation in the utility model.
The specific embodiment
Embodiment one
The storage tank pile cover assembly type casting platform of present embodiment, its structure comprise the one group of earphone plate 2 that is installed on the pile cover steel form as depicted in figs. 1 and 2, and the cross section of earphone plate 2 is the L type, has slip-off preventing hole (see figure 4) on it; Earphone plate 2 is provided with A-frame 1, and the top of A-frame 1 is provided with the wooden platform springboard 3 by the baffle plate location, and the cross section of wooden platform springboard 3 is trapezoidal (see figure 6), and the periphery that is positioned at wooden platform springboard 3 on the top of A-frame 1 is provided with railing 4.Wherein, A-frame 1 is by two channel-section steels and triangular in shape being welded of steel pipe, wherein the top of A-frame 1 is a channel-section steel with hypotenuse on one side, vertical is steel pipe on one side, the top channel-section steel is provided with steel plate, welding baffle plate in the middle of the steel plate, have groove at an end of top channel-section steel or the middle part of a contiguous end, A-frame 1 directly is suspended on the earphone plate 2 by this groove, the other end is provided with two vertical round steel (see figure 3)s, be inserted with railing 4(railing structure on each round steel as shown in Figure 5), this teeming stage is fenced up.
During construction, at first according to on-the-spot needs, design, drawing up a plan, adopt cat ladder that four earphone plates 2 are installed on the steel form of pile cover again, A-frame 1 is hanging on each earphone plate 2, railing 4 and wooden platform springboard 3 is installed then successively, after installing on A-frame 1, operating personnel's formation casting platform that respectively four wooden platform springboards 3 and four railings 4 is connected as a single entity, and reinforce.After construction on the casting platform was finished, operating personnel were according to the orderly release casting platform opposite with installation.
In addition to the implementation, the utility model also can have other embodiments.All employings are equal to the technical scheme of replacement or equivalent transformation formation, drop on the protection domain of the utility model requirement.

Claims (6)

1. storage tank pile cover assembly type casting platform, it is characterized in that: comprise the one group of earphone plate that is installed on the pile cover steel form, described earphone plate is provided with A-frame, the top of described A-frame is provided with the wooden platform springboard by the baffle plate location, and the periphery that is positioned at wooden platform springboard on the top of described A-frame is provided with railing.
2. storage tank pile cover assembly type casting platform according to claim 1, it is characterized in that: the cross section of described earphone plate is the L type.
3. storage tank pile cover assembly type casting platform according to claim 2 is characterized in that: have the slip-off preventing hole on the described earphone plate.
4. storage tank pile cover assembly type casting platform according to claim 1, it is characterized in that: described A-frame is welded by two channel-section steels and a steel pipe, wherein the top channel-section steel is provided with steel plate, end at the top channel-section steel is shaped on the groove that can be connected with earphone plate, and the other end is provided with two vertical round steel.
5. storage tank pile cover assembly type casting platform according to claim 4, it is characterized in that: described round steel is connected with railing.
6. storage tank pile cover assembly type casting platform according to claim 4, it is characterized in that: described steel plate is provided with the baffle plate that is connected with wooden platform springboard, and the cross section of described wooden platform springboard is trapezoidal.
CN 201220736386 2012-12-28 2012-12-28 Storage tank pile cap assembling type pouring platform Expired - Fee Related CN203096729U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220736386 CN203096729U (en) 2012-12-28 2012-12-28 Storage tank pile cap assembling type pouring platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220736386 CN203096729U (en) 2012-12-28 2012-12-28 Storage tank pile cap assembling type pouring platform

Publications (1)

Publication Number Publication Date
CN203096729U true CN203096729U (en) 2013-07-31

Family

ID=48848146

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220736386 Expired - Fee Related CN203096729U (en) 2012-12-28 2012-12-28 Storage tank pile cap assembling type pouring platform

Country Status (1)

Country Link
CN (1) CN203096729U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103526918A (en) * 2013-10-18 2014-01-22 中国建筑第八工程局有限公司 Adjustable steel pipe operation platform
CN112013270A (en) * 2020-07-07 2020-12-01 海洋石油工程股份有限公司 Be applied to bearing structure of large-scale LNG storage tank pressure ring

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103526918A (en) * 2013-10-18 2014-01-22 中国建筑第八工程局有限公司 Adjustable steel pipe operation platform
CN112013270A (en) * 2020-07-07 2020-12-01 海洋石油工程股份有限公司 Be applied to bearing structure of large-scale LNG storage tank pressure ring

Similar Documents

Publication Publication Date Title
CN102080384B (en) Construction method for mounting lifter on top plate of underground parking garage
CN103452039A (en) Cast-in-situ inverted-T-shaped bent cap and pier and pier construction process
CN102912981B (en) Gate type high-rise building connected structure construction device
CN203096729U (en) Storage tank pile cap assembling type pouring platform
CN102777050A (en) Assembly type jig frame for longspan pipe truss roof girder
CN202000265U (en) Concrete construction formwork for high pier of bridge
CN206873307U (en) Movable type bridge justifies pier stud work high above the ground operating platform
CN202220435U (en) Formwork decreasing device of top-down underground concrete structure
CN208309620U (en) A kind of upper anchor slab tooling of bolt assembly
CN202718126U (en) Deep foundation pit earthwork excavation conversion platform
CN202324646U (en) Pipeline check device for concrete pumping and jacking construction in steel-pipe concrete column pipe
CN214993171U (en) Bridge bent cap construction is with assembled sectional shelf-unit platform
CN203066043U (en) Diversion tunnel top arch concrete lining steel formwork support
CN202611250U (en) Concreting platform for concrete filled steel tube column
CN103397638A (en) Tie bar for supporting system in high-rigidity integral prestressed fabricated foundation pit support
CN203393721U (en) Inner support main purlin component
CN109441088B (en) Steel structure operation platform for super high-rise building core tube construction
CN208235587U (en) A kind of large-span deep foundation pit underground power house rack assembling construction platform
CN205840142U (en) Reinforced concrete column is not landed in a kind of Super High Core Walls Structure
CN203238658U (en) Detachable tower crane foundation
CN203334290U (en) Supporting rod
CN205776322U (en) A kind of steel tower with novel foundation structure
CN103388336A (en) Main purline part for inner support
CN202181722U (en) Prefabricated die plate of top plate laminate
CN204898708U (en) Assembled steel construction conversion layer of tower crane

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130731

Termination date: 20211228