CN206873307U CN201720781924.9U CN201720781924U CN206873307U CN 206873307 U CN206873307 U CN 206873307U CN 201720781924 U CN201720781924 U CN 201720781924U CN 206873307 U CN206873307 U CN 206873307U
Authority
CN
China
Prior art keywords
skeleton
operating platform
pier stud
welded
support frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720781924.9U
Other languages
Chinese (zh)
Inventor
宋书东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Harbor Engineering Co Ltd
No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Original Assignee
CCCC First Harbor Engineering Co Ltd
No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Harbor Engineering Co Ltd, No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd filed Critical CCCC First Harbor Engineering Co Ltd
Priority to CN201720781924.9U priority Critical patent/CN206873307U/en
Application granted granted Critical
Publication of CN206873307U publication Critical patent/CN206873307U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本实用新型公开移动式桥梁圆墩柱高空作业操作平台,属于高速公路桥梁工程施工领域,包括可固定在墩柱模板上的平台支架,所述平台支架呈环形,平台支架包括围栏骨架、栏杆、立柱、支撑架、脚踏网板和挂梯;围栏骨架包括内层骨架和外层骨架,内层骨架通过螺栓一固定在墩柱模板的上端,脚踏网板安装在内层骨架和外层骨架之间,脚踏网板底部设有所述支撑架,支撑架通过螺栓二固定在墩柱模板的侧面,脚踏网板上开有两缺口,两缺口下方设有挂梯,立柱垂直焊接在外层骨架上,所述栏杆呈环形焊接在立柱上。该操作平台克服传统的脚手架搭设费工、费时的弊端,加快施工效率,同时也保证高空作业条件下的安全。

The utility model discloses a mobile bridge round pier column high-altitude operation platform, which belongs to the field of expressway bridge engineering construction, and includes a platform support that can be fixed on the pier column formwork. Uprights, support frames, foot mesh boards and hanging ladders; the fence skeleton includes an inner skeleton and an outer skeleton, the inner skeleton is fixed on the upper end of the pier formwork by bolt one, and the foot mesh board is installed on the inner skeleton and the outer skeleton Between the skeletons, the bottom of the step screen is provided with the support frame, and the support frame is fixed on the side of the pier formwork through the second bolt. On the outer skeleton, the railings are welded to the columns in a ring shape. The operating platform overcomes the labor-intensive and time-consuming drawbacks of traditional scaffolding, speeds up construction efficiency, and at the same time ensures safety under high-altitude operating conditions.

Description

移动式桥梁圆墩柱高空作业操作平台Mobile bridge round pier column aerial work platform

技术领域technical field

本实用新型涉及移动式桥梁圆墩柱高空作业操作平台,属于高速公路桥梁工程施工领域。The utility model relates to a mobile bridge round pier column high-altitude operation operation platform, which belongs to the field of expressway bridge engineering construction.

背景技术Background technique

在高速公路桥梁工程施工中,对于现浇钢筋混凝土圆柱形桥墩柱高空作业时,传统的操作平台一般采用搭设脚手架的方式,来为操作人员提供作业面。In the construction of expressway bridge engineering, when the cast-in-place reinforced concrete cylindrical pier columns are operated at high altitude, the traditional operation platform generally adopts the method of erecting scaffolding to provide the operator with a working surface.

脚手架的主要缺点就是搭设和拆除需要耗费大量的人工和时间,严重影响了施工效率。对此,有的施工单位为了节省时间,不设置操作平台,人员站在没有任何防护设施的模板顶部进行操作,存在较大的安全隐患。The main disadvantage of scaffolding is that it takes a lot of labor and time to set up and dismantle it, which seriously affects the construction efficiency. In this regard, in order to save time, some construction units do not set up an operating platform, and personnel operate on the top of the formwork without any protective facilities, which poses a great safety hazard.

发明内容Contents of the invention

针对上述现有技术存在的问题,本实用新型提供一种移动式桥梁圆墩柱高空作业操作平台,克服传统的脚手架搭设费工、费时的弊端,加快施工效率,同时也保证高空作业条件下的安全。Aiming at the problems existing in the above-mentioned prior art, the utility model provides a mobile bridge round pier column high-altitude operation operation platform, which overcomes the disadvantages of labor-intensive and time-consuming traditional scaffolding, speeds up the construction efficiency, and at the same time ensures high-altitude operation. Safety.

为了实现上述目的,本实用新型采用的种移动式桥梁圆墩柱高空作业操作平台,包括可固定在墩柱模板上的平台支架,所述平台支架呈环形,平台支架包括围栏骨架、栏杆、立柱、支撑架、脚踏网板和挂梯;In order to achieve the above purpose, the utility model adopts a mobile bridge round pier column aerial work operation platform, which includes a platform support that can be fixed on the pier column formwork. , support frame, pedal mesh board and hanging ladder;

所述围栏骨架包括内层骨架和外层骨架,所述内层骨架通过螺栓一固定在墩柱模板的上端,所述脚踏网板安装在内层骨架和外层骨架之间,脚踏网板底部设有所述支撑架,支撑架通过螺栓二固定在墩柱模板的侧面,脚踏网板上开有两缺口,两缺口下方设有挂梯,所述立柱垂直焊接在外层骨架上,所述栏杆呈环形焊接在立柱上。The fence frame includes an inner layer frame and an outer layer frame, the inner layer frame is fixed on the upper end of the pier formwork by bolt one, the foot step net board is installed between the inner layer frame and the outer layer frame, and the foot step net The support frame is provided at the bottom of the board, and the support frame is fixed on the side of the pier formwork by bolts 2. There are two gaps on the pedal net plate, and a hanging ladder is provided below the two gaps. The column is vertically welded on the outer frame. The railing is annularly welded on the column.

作为改进,所述内层骨架和外层骨架分别采用50×30×3矩形管焊接而成。As an improvement, the inner frame and the outer frame are respectively welded by 50×30×3 rectangular tubes.

作为改进,所述挂梯有两个,对称布置在平台支架的两端。As an improvement, there are two hanging ladders, which are symmetrically arranged at both ends of the platform support.

作为改进,所述支撑架具有8组,规则布置在脚踏网板的底部,支撑架呈三角形,采用50×30×3矩形管焊接而成。As an improvement, there are 8 sets of support frames, which are regularly arranged at the bottom of the pedal net plate. The support frames are triangular in shape and welded by 50×30×3 rectangular pipes.

作为改进,所述支撑架的一顶角与内层骨架焊接,另一顶角与外层骨架焊接,第三顶角通过螺栓二固定在墩柱模板侧面。As an improvement, one top corner of the support frame is welded to the inner layer skeleton, the other top corner is welded to the outer layer skeleton, and the third top corner is fixed to the side of the pier formwork by the second bolt.

作为改进,所述立柱与外层骨架连接处焊接有加强钢板。As an improvement, reinforced steel plates are welded at the connection between the column and the outer frame.

作为改进,所述立柱采用40×30×3矩形管,所述栏杆采用50×30×3矩形管焊接而成。As an improvement, the column is made of a 40×30×3 rectangular tube, and the railing is welded by a 50×30×3 rectangular tube.

与现有技术相比,本实用新型具有以下有益效果:Compared with the prior art, the utility model has the following beneficial effects:

1、采用整体可移动式操作平台,取代传统的散拼式脚手架,节省大量的安装拆卸时间。1. The overall movable operation platform is adopted to replace the traditional scattered scaffolding, saving a lot of time for installation and disassembly.

2、围栏骨架采用螺栓与模板顶端连接固定,具有良好的可靠性。2. The frame of the fence is connected and fixed with the top of the formwork by bolts, which has good reliability.

3、支撑架采用螺栓与模板侧面连接固定,操作方便快捷,可靠性良好。3. The support frame is connected and fixed with the side of the formwork by bolts, which is convenient and quick to operate and has good reliability.

附图说明Description of drawings

图1为本实用新型的结构示意图;Fig. 1 is the structural representation of the utility model;

图2为本实用新型的俯视图;Fig. 2 is the top view of the utility model;

图3为本实用新型中平台支架的结构示意图。Fig. 3 is a structural schematic diagram of the platform support in the utility model.

图中:1、栏杆,2、立柱,3、围栏骨架,4、支撑架,5、螺栓一,6、螺栓二,7、墩柱模板,8、脚踏网板,9、挂梯。In the figure: 1. Railing, 2. Column, 3. Fence skeleton, 4. Support frame, 5. Bolt 1, 6. Bolt 2, 7. Pier formwork, 8. Pedal net plate, 9. Hanging ladder.

具体实施方式detailed description

为使本实用新型的目的、技术方案和优点更加清楚明了,下面通过附图及实施例,对本实用新型进行进一步详细说明。但是应该理解,此处所描述的具体实施例仅仅用以解释本实用新型,并不用于限制本实用新型的范围。In order to make the purpose, technical solutions and advantages of the utility model clearer, the utility model will be further described in detail through the accompanying drawings and embodiments below. However, it should be understood that the specific embodiments described here are only used to explain the utility model, and are not intended to limit the scope of the utility model.

除非另有定义,本文所使用的所有的技术术语和科学术语与属于本实用新型的技术领域的技术人员通常理解的含义相同,本文中在本实用新型的说明书中所使用的术语只是为了描述具体的实施例的目的,不是旨在于限制本实用新型。Unless otherwise defined, all technical terms and scientific terms used herein have the same meaning as commonly understood by those skilled in the technical field of the utility model, and the terms used in the description of the utility model herein are only for describing specific The purpose of the embodiments is not intended to limit the utility model.

如图1、图2和图3所示,一种移动式桥梁圆墩柱高空作业操作平台,包括可固定在墩柱模板7上的平台支架,所述平台支架呈环形,平台支架包括围栏骨架3、栏杆1、立柱2、支撑架4、脚踏网板8和挂梯9;As shown in Figure 1, Figure 2 and Figure 3, a mobile bridge round pier column aerial work operation platform includes a platform support that can be fixed on the pier column template 7, the platform support is ring-shaped, and the platform support includes a fence skeleton 3. Railing 1, column 2, support frame 4, pedal net plate 8 and hanging ladder 9;

所述围栏骨架3包括内层骨架和外层骨架,所述内层骨架通过螺栓一5固定在墩柱模板7的上端,所述脚踏网板8安装在内层骨架和外层骨架之间,脚踏网板8底部设有所述支撑架4,支撑架4通过螺栓二6固定在墩柱模板7的侧面,脚踏网板8上开有两缺口,两缺口下方设有挂梯9,所述立柱2垂直焊接在外层骨架上,所述栏杆1呈环形焊接在立柱2上。The fence frame 3 includes an inner layer frame and an outer layer frame, the inner layer frame is fixed on the upper end of the pier formwork 7 by bolt one 5, and the foot step net board 8 is installed between the inner layer frame and the outer layer frame , the bottom of the pedal screen 8 is provided with the support frame 4, the support frame 4 is fixed on the side of the pier formwork 7 by bolts 26, two gaps are provided on the pedal screen 8, and a hanging ladder 9 is provided below the two gaps. , the column 2 is vertically welded on the outer skeleton, and the railing 1 is welded on the column 2 in a circular shape.

作为实施例的改进,所述内层骨架和外层骨架分别采用50×30×3矩形管焊接而成,操作方便,稳固性高。As an improvement of the embodiment, the inner frame and the outer frame are respectively welded by 50×30×3 rectangular tubes, which are easy to operate and have high stability.

作为实施例的改进,所述挂梯9有两个,对称布置在平台支架的两端,便于施工人员爬升进入平台,操作过程更方便。挂梯9安装在墩柱模板7上且与脚踏网板8上的缺口对应。As an improvement of the embodiment, there are two hanging ladders 9, which are arranged symmetrically at both ends of the platform support, which is convenient for construction personnel to climb into the platform, and the operation process is more convenient. Hanging ladder 9 is installed on the pier column formwork 7 and corresponds to the breach on the pedal net plate 8 .

作为实施例的改进,所述支撑架4具有8组,规则布置在脚踏网板8的底部,支撑架4呈三角形,采用50×30×3矩形管焊接而成,通过支撑架4对平台支架提供稳固的支撑。As an improvement of the embodiment, the support frame 4 has 8 groups, which are regularly arranged at the bottom of the pedal net plate 8. The support frame 4 is triangular in shape and welded by 50×30×3 rectangular tubes. The support frame 4 pairs of platforms The stand provides firm support.

作为实施例的改进,所述支撑架4的一顶角与内层骨架焊接,另一顶角与外层骨架焊接,第三顶角通过螺栓二6固定在墩柱模板7侧面,结构设计合理,操作使用方便,且操作平台整体结构稳固性高。As an improvement of the embodiment, one top corner of the support frame 4 is welded to the inner layer skeleton, the other top corner is welded to the outer layer skeleton, and the third top corner is fixed to the side of the pier formwork 7 by bolts 26, the structural design is reasonable , easy to operate and use, and the overall structure of the operating platform is highly stable.

作为实施例的改进,所述立柱2与外层骨架连接处焊接有加强钢板,使整体结构更稳固。As an improvement of the embodiment, a reinforced steel plate is welded at the joint between the upright column 2 and the outer skeleton, so that the overall structure is more stable.

作为实施例的改进,所述立柱2采用40×30×3矩形管,所述栏杆1采用50×30×3矩形管焊接而成,加工方便、成本低。As an improvement of the embodiment, the column 2 is made of a 40×30×3 rectangular tube, and the railing 1 is welded by a 50×30×3 rectangular tube, which is easy to process and low in cost.

此操作平台在墩柱模板7上安装完成后再进行浇筑施工。安装时,人员站在墩柱模板7外侧的挂梯9上,配合吊车将该操作平台起吊就位,然后施工人员上紧螺栓一5和螺栓二6。操作平台设置两个人行缺口,施工人员沿着挂梯9从下面攀爬至操作平台下方,由缺口进入操作平台的脚踏网板8上,在此操作平台上进行混凝土浇注和钢筋帮扎作业。完成混凝土浇筑和钢筋绑扎工序后,继续向上安装模板之前,拆除操作平台,安装模板之后再次进行操作平台安装,重复上述动作。与传统的脚手架相比,大幅度提高了施工效率,而且造价低廉。对于同一直径、不同高度的墩柱可作为通用操作平台。After this operation platform is installed on the pier formwork 7, pouring construction is carried out. During installation, the personnel stand on the hanging ladder 9 outside the pier formwork 7, cooperate with the crane to lift the operating platform into place, and then the construction personnel tighten the first bolt 5 and the second bolt 6. The operation platform is provided with two pedestrian gaps, and the construction personnel climb from below to the bottom of the operation platform along the hanging ladder 9, and enter the foot mesh plate 8 of the operation platform through the gap, and perform concrete pouring and steel bar binding operations on this operation platform . After completing the concrete pouring and steel bar binding process, before continuing to install the formwork upwards, remove the operating platform, install the operating platform again after installing the formwork, and repeat the above actions. Compared with traditional scaffolding, the construction efficiency is greatly improved, and the cost is low. It can be used as a general operating platform for piers with the same diameter and different heights.

以上所述仅为本实用新型的较佳实施例而已,并不用以限制本实用新型,凡在本实用新型的精神和原则之内所作的任何修改、等同替换或改进等,均应包含在本实用新型的保护范围之内。The above descriptions are only preferred embodiments of the present utility model, and are not intended to limit the present utility model. Any modification, equivalent replacement or improvement made within the spirit and principles of the present utility model shall be included in this utility model. within the scope of protection of utility models.

Claims (7)

1. a kind of movable type bridge justifies pier stud work high above the ground operating platform, it is characterised in that including that can be fixed on Pier Formwork(7) On platform support, in a ring, platform support includes fence skeleton to the platform support(3), railing(1), column(2), support Frame(4), foot-operated web plate(8)And hanging ladder(9);
The fence skeleton(3)Including inner framework and outer layer skeleton, the inner framework passes through bolt one(5)It is fixed on pier stud Template(7)Upper end, the foot-operated web plate(8)Between inner framework and outer layer skeleton, web plate is ridden(8)Bottom is provided with Support frame as described above(4), support frame(4)Pass through bolt two(6)It is fixed on Pier Formwork(7)Side, ride web plate(8)On be provided with Two breach, two breach lower section are provided with hanging ladder(9), the column(2)It is vertically welded on outer layer skeleton, the railing(1)In ring Shape is welded on column(2)On.
2. a kind of movable type bridge circle pier stud work high above the ground operating platform according to claim 1, it is characterised in that described Inner framework and outer layer skeleton are respectively adopted 50 × 30 × 3 rectangular tubes and are welded.
3. a kind of movable type bridge circle pier stud work high above the ground operating platform according to claim 1, it is characterised in that described Hanging ladder(9)There are two, be arranged symmetrically in the both ends of platform support.
4. a kind of movable type bridge circle pier stud work high above the ground operating platform according to claim 1, it is characterised in that described Support frame(4)With 8 groups, foot-operated web plate is regularly arranged on(8)Bottom, support frame(4)It is triangular in shape, using 50 × 30 × 3 Rectangular tube is welded.
5. a kind of movable type bridge circle pier stud work high above the ground operating platform according to claim 4, it is characterised in that described Support frame(4)A drift angle and inner framework weld, another drift angle welds with outer layer skeleton, and the 3rd drift angle passes through bolt two(6) It is fixed on Pier Formwork(7)Side.
6. a kind of movable type bridge circle pier stud work high above the ground operating platform according to claim 1, it is characterised in that described Column(2)Reinforcement steel plate is welded with outer layer skeleton junction.
7. a kind of movable type bridge circle pier stud work high above the ground operating platform according to claim 1, it is characterised in that described Column(2)Using 40 × 30 × 3 rectangular tubes, the railing(1)It is welded using 50 × 30 × 3 rectangular tubes.
CN201720781924.9U 2017-06-30 2017-06-30 Movable type bridge justifies pier stud work high above the ground operating platform Expired - Fee Related CN206873307U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720781924.9U CN206873307U (en) 2017-06-30 2017-06-30 Movable type bridge justifies pier stud work high above the ground operating platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720781924.9U CN206873307U (en) 2017-06-30 2017-06-30 Movable type bridge justifies pier stud work high above the ground operating platform

Publications (1)

Publication Number Publication Date
CN206873307U true CN206873307U (en) 2018-01-12

Family

ID=61331671

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720781924.9U Expired - Fee Related CN206873307U (en) 2017-06-30 2017-06-30 Movable type bridge justifies pier stud work high above the ground operating platform

Country Status (1)

Country Link
CN (1) CN206873307U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110158477A (en) * 2019-05-24 2019-08-23 中建铁路投资建设集团有限公司 Double embrace hoop method Coping Construction hanging basket and construction method
CN110242941A (en) * 2019-06-05 2019-09-17 五冶集团上海有限公司 A kind of dysprosium lamp frame being used in turn
CN110685233A (en) * 2019-09-27 2020-01-14 中宥(平原)科技有限公司 Overhead bridge connection part maintenance guardrail
CN111794106A (en) * 2020-07-06 2020-10-20 浙江省衢州市交通建设集团有限公司 Annular platform for bridge pier column construction and construction method
CN112252197A (en) * 2020-11-10 2021-01-22 新疆北新路桥集团股份有限公司 Pier column template and pier column construction method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110158477A (en) * 2019-05-24 2019-08-23 中建铁路投资建设集团有限公司 Double embrace hoop method Coping Construction hanging basket and construction method
CN110242941A (en) * 2019-06-05 2019-09-17 五冶集团上海有限公司 A kind of dysprosium lamp frame being used in turn
CN110685233A (en) * 2019-09-27 2020-01-14 中宥(平原)科技有限公司 Overhead bridge connection part maintenance guardrail
CN111794106A (en) * 2020-07-06 2020-10-20 浙江省衢州市交通建设集团有限公司 Annular platform for bridge pier column construction and construction method
CN112252197A (en) * 2020-11-10 2021-01-22 新疆北新路桥集团股份有限公司 Pier column template and pier column construction method

Similar Documents

Publication Publication Date Title
CN206873307U (en) Movable type bridge justifies pier stud work high above the ground operating platform
CN106939707B (en) A kind of restricted clearance large-scale steel structure supporting platform from method for improving
CN201158933Y (en) High-rise maintaining scaffold device with extruding structure
CN104088467B (en) A kind of large Steel Cantilever truss structure high-altitude construction Deformation monitoring method
CN206328678U (en) Steel box-girder chooses arm and steel guard rail installs dual-purpose type Mobile operating platform
CN205476401U (en) Elevator well type steel protection construction platform
CN212002170U (en) Adjustable support for elevator shaft operating platform
CN103643800A (en) Lifting installation system for buckling restrained supporting member and construction method thereof
CN103147582A (en) Overhead cantilever formwork construction method
CN206428986U (en) A kind of detachable turnover type support jig
CN111809528B (en) A pier column vertical cage platform channel construction method and cage platform channel device
CN102767282B (en) Prefabricated high formwork construction method for cantilever beam of oversized special-shaped conversion layer
CN212561215U (en) A back cage platform channel device
CN104989092A (en) Construction method of high-altitude overhang superposition type steel truss bearing platform
CN104831928A (en) Construction method for high-altitude large-span concrete connected structure formwork supporting steel platform
CN204662929U (en) A kind of cross-line walking fence operation device
CN204475183U (en) A kind of hoop platform for bridge pier column construction
CN204282803U (en) To encorbelment formwork structure for mounting platform
CN211815605U (en) Construction device for pile column type pier tie beam and capping beam
CN211689948U (en) A suspension operation platform device for the construction of a cable-stayed bridge tower
CN219342890U (en) Bridge high pier column prestress tensioning construction platform
CN203626212U (en) Pier stud construction operation platform quick to disassemble and assemble
CN101435270A (en) High layer post subsection butt-joint operating method
CN204225503U (en) Large span steel truss high altitude bulk conversion beam moulding bed
CN206220534U (en) The pump line support meanss of concrete pumping equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180112

CF01 Termination of patent right due to non-payment of annual fee