CN102080384B - Construction method for mounting lifter on top plate of underground parking garage - Google Patents

Construction method for mounting lifter on top plate of underground parking garage Download PDF

Info

Publication number
CN102080384B
CN102080384B CN2010106083777A CN201010608377A CN102080384B CN 102080384 B CN102080384 B CN 102080384B CN 2010106083777 A CN2010106083777 A CN 2010106083777A CN 201010608377 A CN201010608377 A CN 201010608377A CN 102080384 B CN102080384 B CN 102080384B
Authority
CN
China
Prior art keywords
hoist
mounting
underground garage
lifter
construction
Prior art date
Application number
CN2010106083777A
Other languages
Chinese (zh)
Other versions
CN102080384A (en
Inventor
贾华远
张�林
周焕哲
胡浩
Original Assignee
山东万鑫建设有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 山东万鑫建设有限公司 filed Critical 山东万鑫建设有限公司
Priority to CN2010106083777A priority Critical patent/CN102080384B/en
Publication of CN102080384A publication Critical patent/CN102080384A/en
Application granted granted Critical
Publication of CN102080384B publication Critical patent/CN102080384B/en

Links

Abstract

The invention relates to a construction method for mounting a lifter on a top plate of an underground parking garage, belonging to the building technology. The method comprises the following steps: 1) designing a hanging basic support system of the lifter; 2) locating and staking out a vertical rod; 3) mounting the vertical rod and a level rod; 4) mounting main edges; 5) mounting auxiliary edges; 6) mounting a double bridging; mounting the vertical and continuous double bridging at the periphery and longitudinal and transverse middle parts of the support system; 7) mounting a beam slab mould of the top plate of the underground parking garage; 8) binding steel bars; 9) mounting ground bolts of the lifter; 10) pouring concrete to the top plate of the underground parking garage; and 11) mounting the lifter. The method is safe and reliable in stress performance, convenient in construction, and capable of solving the technical problem that the top plate of the underground parking garage cannot bear the lifter; compared with the traditional construction method for mounting the lifter on a foundation slab of the underground parking garage, the construction method in the invention can levelly transport in one step, can reduce the comprehensive cost for constructing and transporting, and can ensure that the constructing and transporting are not blocked.

Description

The hoist job practices is installed on the underground garage top board
Technical field
The present invention relates to the hoist job practices is installed on a kind of underground garage top board, belong to technical field of buildings.
Technical background
In recent years, the underground garage form that connects the place is set in high stored building group, throughout the country extensive use in the design.Highrise building is in the main body construction stage, for the convenient construction personnel go up downstairs the vertical transport with material, necessary installation hoist; But because the underground garage area is huge; Its outward flange is far apart from main building, so the main building construction elevator can only install near the basic raft plate it, and on the underground garage top board, reserves hole is installed; Construction material can carry out vertical transport after adopting manual work to be transported to underground garage hoist position; Cause last speed downstairs of constructor and transport of materials efficient seriously to reduce, greatly influenced construction speed and economic benefit, become a national generality technical barrier that urgency is to be solved.
Summary of the invention
The object of the present invention is to provide the hoist job practices is installed on a kind of underground garage top board, safe and reliable, can significantly improve the construction conevying efficiency.
The hoist job practices is installed on the underground garage top board of the present invention, takes following steps:
1, the hoist job practices is installed on a kind of underground garage top board, it is characterized in that taking following steps:
1) the unsettled base support System Design of construction elevator: multiply by 1.5 the coefficient of impact according to the whole load of construction elevator, the unsettled base support system of design hoist;
2) location unwrapping wire: on the raft plate of underground garage basis, emit hoist base support system vertical rod position coordinates net;
3) set up vertical rod and horizon bar: after the form bracing system vertical rod was accurately in place, the adjustable rest of the formula of putting more energy into of diameter>=Φ 30 was inserted in its top, forms the axle center power transmission, sets up the support system horizon bar by step pitch≤1.8m then;
4) the stupefied installation of supporter owner: the i iron master who in the U-shaped supporting plate of adjustable rest, places designing requirement is stupefied;
5) support system time stupefied installation: it is inferior stupefied above the i iron master is stupefied, to place the lumps of wood by spacing;
6) set up bridging: set up vertical bridging continuously with middle part in length and breadth is two-way in that support system is peripheral, the angle of bridging and 45 °~60 ° of ground formation;
7) underground garage top board beam-slab template is installed: template adopts the thick bamboo plywood of >=15 ㎜, and form joint place adopts both sides' wood arranged side by side fixing;
8) assembling reinforcement: underground garage top board beam reinforced steel bar colligation;
9) the hoist stone bolt is installed: snap the line is confirmed hoist stone bolt position on template, foot bolt regularly on beam reinforced steel bar;
10) concreting: the beam slab concrete monobloc cast of underground garage top board and hoist basis drop shadow spread;
11) hoist is installed: treat to install when underground garage concrete roof intensity reaches C20 at least hoist.
The support system steel pipe all adopts the Q235 shape steel tube of Φ 48mm * 3.0mm among the present invention.
Compared with prior art, the present invention has following beneficial effect:
(1) the present invention installs hoist on the underground garage top board, can utilize open underground garage top board as horizontal shipping platform, makes the construction level transportation unblocked, settles at one go, significantly improves the construction conevying efficiency.
(2) the present invention utilizes the underground garage top board as the hoist basis, saves concrete 5 * 5 * 0.5=12.5m 3, and save hoist basis arrangement of reinforcement.
(3) the underground garage top board beam slab template supporting system of hoist basis drop shadow spread and other scopes is constructed synchronously, and only vertical pole ' s span, main stupefied different does not increase the support system expense basically, and cost is low.
(4) the support system simple structure of hoist basis drop shadow spread is safe and reliable, workable, is convenient to guarantee construction quality.
Description of drawings
Fig. 1, one embodiment of the invention hoist support system structural representation.
Among the figure: 1, time stupefied 8, vertical bridging 9, underground garage top board beam forms 10, underground garage top plate template 11, underground garage beam reinforced steel bar 12, hoist stone bolt 13, hoist base concrete 14, hoist continuously of stupefied 7, the lumps of wood of underground garage raft plate 2, vertical rod position coordinates net 3, support system vertical rod 4, support system horizon bar 5, the formula of putting more energy into is adjustable rest 6, i iron master.
The specific embodiment
Below in conjunction with embodiment the present invention is described further.
The hoist job practices is installed on the underground garage top board of the present invention, takes following steps:
1) the unsettled base support System Design of construction elevator: multiply by 1.5 the coefficient of impact according to the whole load of construction elevator, the unsettled base support system of design hoist;
2) location unwrapping wire: on underground garage basis raft plate 1, emit hoist base support system vertical rod position coordinates net 2;
3) set up vertical rod and horizon bar: form bracing system vertical rod 3 is after vertical rod position coordinates net 2 is accurately in place, and the adjustable rest 5 of the formula of putting more energy into of diameter>=Φ 30 is inserted in its top, forms the axle center power transmission, sets up support system horizon bar 4 by step pitch≤1.8m then;
4) the stupefied installation of supporter owner: the i iron master stupefied 6 who on the adjustable rest 5 of the formula of putting more energy into, places designing requirement;
5) support system time stupefied installation: above i iron master stupefied 6, place the lumps of wood inferior stupefied 7 by design pitch;
6) set up bridging: set up vertical bridging 8 continuously at the peripheral vertical rod 3 two-way in length and breadth middle part vertical rod of hoist base support system 3 positions, vertical bridging 8 continuously forms 45 °~60 ° angle with ground;
7) underground garage top board beam forms 9, underground garage top plate template 10 are installed: beam forms 9 adopts the thick bamboo plywood of >=15 ㎜ with template die plate 10;
8) assembling reinforcement: underground garage beam reinforced steel bar 11 colligations;
9) the hoist stone bolt is installed: snap the line is confirmed hoist stone bolt 12 positions on underground garage top board beam forms 9, fixed elevated machine stone bolt 12 on underground garage beam reinforced steel bar 11;
10) concreting: underground garage top board and hoist base concrete 13 monobloc casts;
11) hoist is installed: treat that underground garage concrete roof intensity reaches C20 and hoist 14 is installed when above.

Claims (1)

1. on a underground garage top board hoist job practices is installed, it is characterized in that taking following steps:
1) the unsettled base support System Design of construction elevator: multiply by 1.5 the coefficient of impact according to the whole load of construction elevator, the unsettled base support system of design hoist;
2) location unwrapping wire: on the raft plate of underground garage basis, emit hoist base support system vertical rod position coordinates net;
3) set up vertical rod and horizon bar: after the form bracing system vertical rod was accurately in place, the adjustable rest of the formula of putting more energy into of diameter>=Φ 30 was inserted in its top, forms the axle center power transmission, sets up the support system horizon bar by step pitch≤1.8m then;
4) the stupefied installation of supporter owner: the i iron master who in the U-shaped supporting plate of adjustable rest, places designing requirement is stupefied;
5) support system time stupefied installation: it is inferior stupefied above the i iron master is stupefied, to place the lumps of wood by spacing;
6) set up bridging: set up vertical bridging continuously with middle part in length and breadth is two-way in that support system is peripheral, the angle of bridging and 45 °~60 ° of ground formation;
7) underground garage top board beam-slab template is installed: template adopts the thick bamboo plywood of >=15 ㎜, and form joint place adopts both sides' wood arranged side by side fixing;
8) assembling reinforcement: underground garage top board beam reinforced steel bar colligation;
9) the hoist stone bolt is installed: snap the line is confirmed hoist stone bolt position on template, foot bolt regularly on beam reinforced steel bar;
10) concreting: the beam slab concrete monobloc cast of underground garage top board and hoist basis drop shadow spread;
11) hoist is installed: treat to install when underground garage concrete roof intensity reaches C20 at least hoist.
CN2010106083777A 2010-12-28 2010-12-28 Construction method for mounting lifter on top plate of underground parking garage CN102080384B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010106083777A CN102080384B (en) 2010-12-28 2010-12-28 Construction method for mounting lifter on top plate of underground parking garage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010106083777A CN102080384B (en) 2010-12-28 2010-12-28 Construction method for mounting lifter on top plate of underground parking garage

Publications (2)

Publication Number Publication Date
CN102080384A CN102080384A (en) 2011-06-01
CN102080384B true CN102080384B (en) 2012-02-01

Family

ID=44086555

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010106083777A CN102080384B (en) 2010-12-28 2010-12-28 Construction method for mounting lifter on top plate of underground parking garage

Country Status (1)

Country Link
CN (1) CN102080384B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103184742A (en) * 2011-12-27 2013-07-03 上海市第七建筑有限公司 Support structure used for reinforcing lift foundation basement and support method thereof
CN103556826B (en) * 2013-11-18 2015-08-26 山东万鑫建设有限公司 The superstructure region supports system construction method of region, ater-casting and both sides thereof
CN104196055B (en) * 2014-08-08 2015-12-09 山东万鑫建设有限公司 Outer wall of basement lower die board construction method
CN106121230B (en) * 2016-06-08 2018-08-10 叶香雄 The high beam construction method such as concrete of basement
CN107818223B (en) * 2017-11-02 2020-09-01 金瀚建设有限公司 Bearing capacity checking calculation and construction method for mounting lifter on underground garage roof
CN111042594A (en) * 2019-12-28 2020-04-21 山东天齐置业集团股份有限公司 Construction process of elevator foundation at post-cast strip position of garage top plate settlement

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101434358A (en) * 2008-11-20 2009-05-20 上海建工(集团)总公司 Elevator for deep foundation pit excavation by inverse construction method, and excavation system and method

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0827903A (en) * 1994-07-12 1996-01-30 Tokyu Koken Kk All weather type building method

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101434358A (en) * 2008-11-20 2009-05-20 上海建工(集团)总公司 Elevator for deep foundation pit excavation by inverse construction method, and excavation system and method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
顾新洪.施工升降机基础与地下车库顶板连体施工技术.《建筑施工》.2010,第32卷(第2期),148-149. *

Also Published As

Publication number Publication date
CN102080384A (en) 2011-06-01

Similar Documents

Publication Publication Date Title
CN101672102B (en) Steel structural overhead ceiling construction platform
CN103422672A (en) Construction method for reinforced concrete prefabricated house
CN203049832U (en) Assembling type shear wall structure
CN103572873B (en) Assembled integral floor and construction method thereof
CN201217898Y (en) Concrete prefabricated stairs
CN202245617U (en) Elevator well wall assembled by adopting combined type derricks
CN102953546B (en) Construction method for mounting deformation joint template at double walls
CN103290952B (en) Assembled integral concrete frame-shear wall syndeton and construction method thereof
CN203188121U (en) Cast-in-place bridge floor suspending mold of half-through or through arch bridge
CN103352563B (en) The board-like bar frame gang form of self-supporting and construction method thereof
CN102392536B (en) Construction method for long-span hanging vestibule type template support system
CN102587286A (en) Simply supported-continuous construction method for bridge superstructure
WO2013185277A1 (en) Constructing method for concrete cylinder of construction steel bar of high-rise steel structure
CN101538831B (en) Post-poured hidden coping construction method for converting simply supported beams into continuous beams
KR20140084107A (en) Self-Launching Movable Scaffolding System
CN104790676A (en) Rapid leveling and alignment device and method for installation of prefabricated wallboards
CN101691191B (en) Self-climbing tower crane
CN206873730U (en) A kind of steel bar truss floor structure
CN102493647B (en) Construction method for high-rise concrete structure
CN202658536U (en) Device for synchronous construction of continuous girder bridge cantilever side span cast-in-situ section and folding section
CN103243640B (en) Cap beam efficient, convenient and quick to construct and construction method thereof
CN103009477A (en) Construction method for prefabricated components for prefabricated component factory
CN103266720A (en) Composite beam comprising steel beam with concrete at abdomen
CN102900024A (en) Overturning die plate for large-scale concrete structure and using method for overturning die plate
CN204040464U (en) A kind of slab form supporting construction

Legal Events

Date Code Title Description
PB01 Publication
C06 Publication
SE01 Entry into force of request for substantive examination
C10 Entry into substantive examination
GR01 Patent grant
C14 Grant of patent or utility model
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120201

Termination date: 20131228

C17 Cessation of patent right