CN102777037B - Simple and practical hoisting construction method of long-span steel girder - Google Patents

Simple and practical hoisting construction method of long-span steel girder Download PDF

Info

Publication number
CN102777037B
CN102777037B CN201110123463.3A CN201110123463A CN102777037B CN 102777037 B CN102777037 B CN 102777037B CN 201110123463 A CN201110123463 A CN 201110123463A CN 102777037 B CN102777037 B CN 102777037B
Authority
CN
China
Prior art keywords
cross bar
steel
girder
span
girder steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201110123463.3A
Other languages
Chinese (zh)
Other versions
CN102777037A (en
Inventor
孙晓阳
颜卫东
冯跃辉
王小波
黄丽娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201110123463.3A priority Critical patent/CN102777037B/en
Publication of CN102777037A publication Critical patent/CN102777037A/en
Application granted granted Critical
Publication of CN102777037B publication Critical patent/CN102777037B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a simple, practical and economic hoisting construction method of a long-span steel girder. The method comprises (1) dividing the long-span steel girder into several small sections according to construction requirements, using a tower crane or a winding engine to hoist each section of the steel girder to a close construction area, and adopting a steel tube and a crowbar to move steel girders in small sections in a matched mode on the outside of operation radius; (2) strengthening an original full frame and additionally installing a cross bar for placing a portable calabash hook position, respectively adding a slant upright bar and a small cross bar which are fixed through a fastener on two sides of cross bar provided with a portable calabash in a hanging mode, and fixing the bottom of the upright bar and the cross bar on the lower portion through the fastener; (3) lifting the steel girder in the small sections to a scheduled elevation through the portable calabash, enabling the end portion or an embedded part of a girder to be connected through a high-strength bolt, and additionally installing a cross bar on the bottom at the other end for bearing the girder; (4) adopting a spirit level to recheck the elevation on the two sides, adjusting a support position of the cross bar; and (5) adopting the same method to hoist and complete the steel girders in other sections in the span to complete assembly.

Description

A kind of simple and practical large-span steel girder construction method for hanging
Affiliated technical field
The invention belongs to technical field of buildings, be specifically related to the form of construction work of steel work crossbeam lifting.
Background technology
At present, along with China's rapid development of economy, improving constantly of people's living standard, for meeting the growing material and cultural needs of people, public building usually adopts the gimmick of large-span space structure, realize the requirement of using function, the Crane Beam of the conference room of public building, cinema, Zhongting, exhibition hall and industrial construction etc. has mostly adopted the steel beam structure of large span.For this steel beam structure, mostly adopt after installation on ground again with large tonnage crane integral hoisting or utilize that the mechanical loose mail such as tower crane, mobile crane, hoist engine lifts, the construction method of installation at high altitude, these construction methods, high and construction machinery dependence is strong to space site requirements, beyond machinery rotation radius, cannot implement, and cost is high.
Summary of the invention
The deficiency high to place space requirement for existing hanging method, construction machinery dependence is strong, cost is high, the invention provides a kind of large-span steel girder construction method for hanging of Simple And Practical economy.
Below the large-span steel girder construction method for hanging of introducing in detail a kind of Simple And Practical economy of the present invention, completes as follows:
1) large-span steel girder is divided into several segments, in the overlayable region of tower crane, first utilize tower crane by every segment steel beam lifting to the flooring region of constructing; 2), encryption needs the template framed bent in lifting region, and sets up the cross bar of laying portable cucurbit hook position; 3) at tower crane, can not in the scope of overwrite job, adopt steel pipe and crowbar to coordinate mobile segment girder steel; When segment girder steel moves to the end that one end of portable cucurbit is buckled in after preset range to little girder steel, the other end is buckled on the template framed bent in girder steel the place ahead on little cross bar, and 4) for convenience of little girder steel, move horizontally, the steel pipe that supports segment girder steel is vertical with little girder steel without exception; When segment girder steel is pulled in template framed bent behind relevant position by portable cucurbit, carry out the vertical movement of segment girder steel; 5) the vertical movement of girder steel, selects two portable cucurbits to be buckled in the back of little girder steel, and the other end of portable cucurbit is buckled on the little cross bar on girder steel top.For guaranteeing the stability of the little cross bar of moving process, little cross bar is reinforced, the both sides that hang portable cucurbit on little cross bar respectively increase an oblique vertical rod and little cross bar is fixed with fastener, and bottom of upright rod and lower crosspiece are fixed with fastener, form stable three-legged structure; Guarantee girder steel lifting process safety; 6) when portable cucurbit rises to segment girder steel after predetermined absolute altitude, end adopts high-strength bolt to be connected with the built-in fitting of structural column or beam, and other end bottom adds cross bar, carrying girder steel, and cross bar adopts fastener to be connected with both sides vertical rod, and insurance fastener is set up in bottom; Adopt levelling tube to check after the absolute altitude of both sides, adjust the Support Position of cross bar.7) adopt same method lift other section of girder steel in span, complete assembledly, in assembled process, employing levelling tube is checked outside whole section of level absolute altitude, and the horizontal range that also should adopt tape measure to check girder steel between each span meets design requirement.8) girder steel completes after installation, removes carrying cross bar and portable cucurbit lifting support body.
Advantage of the present invention is: adopt this method to carry out large-span steel girder construction, it is all artificial and simple portable cucurbit operation, in conditions permit situation, also can adopt tower crane less important work, simple, convenient, economical, reduce the dependence to large tonnage crane and tower crane, reduce the requirement to space, place, required framed bent only makes the appropriate adjustments on original template supporting row frame basis, greatly reduces construction cost.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the present invention is further described
Fig. 1 is steel lifting component drawing
Fig. 2 is that girder steel moves horizontally schematic diagram
Fig. 3 is that hoisting steel beam level is with regard to bitmap
Fig. 4 is that former full hall frame is set up lifting support body schematic diagram
Fig. 5 is the vertical mobile schematic diagram of girder steel
Fig. 6 is the vertical mobile elevation of girder steel
Fig. 7 is the vertical mobile sectional drawing of girder steel
Fig. 8 is reinforcing figure at the bottom of the girder perch back rest
1. tower cranes in figure, 2. suspension hook, 3. girder steel, 4. Chain block, 5. steel pipe, 6. girder steel back tie point, 7. reinforcing steel pipe
In Fig. 1, tower crane 1 utilizes 2 pairs of girder steels of suspension hook 3 to carry out upper air installing
In Fig. 2, girder steel 3 pads, on steel pipe 5, utilize manpower to pull Chain block 4, thereby girder steel 3 are moved horizontally
In Fig. 4, the both sides that hang portable cucurbit on little cross bar respectively increase an oblique vertical rod and little cross bar is fixed with fastener, and bottom of upright rod and lower crosspiece are fixed with fastener, form stable three-legged structure
In Fig. 5, Chain block 4 is buckled on two, the back tie point of girder steel 3, utilize manpower to pull Chain block 4, thereby girder steel 3 is vertically moved
In Fig. 7, when utilizing Chain block 4 that girder steel 3 is promoted to after predetermined absolute altitude, in the bottom of girder steel 3, adopt reinforcing steel pipe 7 to reinforce.

Claims (1)

1. a simple and practical large-span steel girder construction method for hanging, is characterized in that completing as follows:
1) according to construction requirement, large-span steel girder is divided into several segments, utilize tower crane or hoist engine by every section of steel beam lifting to closing on construction area, operating radius adopts steel pipe and crowbar to coordinate mobile segment girder steel outward;
2) add Guyuan full hall frame and set up the little cross bar of laying portable cucurbit hook position, the both sides that hang portable cucurbit on little cross bar respectively increase an oblique vertical rod and little cross bar is fixed with fastener, and bottom of upright rod and lower crosspiece are fixed with fastener;
3) with portable cucurbit, segment girder steel is risen to predetermined absolute altitude, end adopts high-strength bolt to be connected with the built-in fitting of structural column or beam, and other end bottom adds cross bar, and cross bar adopts fastener to be connected with both sides vertical rod, divides into two fasteners, carrying girder steel;
4) adopt levelling tube to check after the absolute altitude of girder steel both sides, adjust the Support Position of cross bar; With same method, lifted other section of girder steel in span, completed assembled;
5) adopt same method lift other span girder steels, and complete assembledly, between each span, girder steel employing invar tape is checked the horizontal range of girder steel, makes to meet designing requirement;
6) girder steel is assembled complete after, remove auxiliary little cross bar and vertical rod for lifting, set up template die, concreting.
CN201110123463.3A 2011-05-13 2011-05-13 Simple and practical hoisting construction method of long-span steel girder Active CN102777037B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110123463.3A CN102777037B (en) 2011-05-13 2011-05-13 Simple and practical hoisting construction method of long-span steel girder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110123463.3A CN102777037B (en) 2011-05-13 2011-05-13 Simple and practical hoisting construction method of long-span steel girder

Publications (2)

Publication Number Publication Date
CN102777037A CN102777037A (en) 2012-11-14
CN102777037B true CN102777037B (en) 2014-11-26

Family

ID=47122131

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110123463.3A Active CN102777037B (en) 2011-05-13 2011-05-13 Simple and practical hoisting construction method of long-span steel girder

Country Status (1)

Country Link
CN (1) CN102777037B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110342413B (en) * 2018-04-04 2021-01-15 中国二十冶集团有限公司 Simple traction method for prestressed beam
CN110040632A (en) * 2019-04-01 2019-07-23 杭州通达集团有限公司 A kind of segmental hoisting construction method of large span section steel beam
CN109989590B (en) * 2019-04-09 2024-01-23 中建一局集团建设发展有限公司 Auxiliary fixing device for mounting roof overlong steel beam and hoisting method of steel beam
CN110984611B (en) * 2019-11-29 2022-03-01 中国二十二冶集团有限公司 Narrow space steel column installation method
CN113090023B (en) * 2021-03-31 2023-03-17 德才装饰股份有限公司 Large-span steel beam hoisting construction method
CN115818418B (en) * 2022-11-28 2024-01-16 中建八局第三建设有限公司 Hoisting method for prefabricated stand board in limited space

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2216104Y (en) * 1994-12-14 1995-12-27 周忠 Hanging lift scaffold
CN101684638A (en) * 2008-09-23 2010-03-31 中交第三航务工程局有限公司 Assembly method of section box girder
CN101845848A (en) * 2010-06-22 2010-09-29 中国建筑第二工程局有限公司 Large-span steel connecting bridge and integral hoisting method thereof
CN101967887A (en) * 2009-07-28 2011-02-09 中冶成工上海五冶建设有限公司 Large-span light steel structure roof girder hoisting method
CN102030272A (en) * 2009-09-29 2011-04-27 中天建设集团有限公司 Building equipment hoisting device

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH074060A (en) * 1993-06-14 1995-01-10 Toyo Eng Corp Lift-up execution equipment for multistoried building

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2216104Y (en) * 1994-12-14 1995-12-27 周忠 Hanging lift scaffold
CN101684638A (en) * 2008-09-23 2010-03-31 中交第三航务工程局有限公司 Assembly method of section box girder
CN101967887A (en) * 2009-07-28 2011-02-09 中冶成工上海五冶建设有限公司 Large-span light steel structure roof girder hoisting method
CN102030272A (en) * 2009-09-29 2011-04-27 中天建设集团有限公司 Building equipment hoisting device
CN101845848A (en) * 2010-06-22 2010-09-29 中国建筑第二工程局有限公司 Large-span steel connecting bridge and integral hoisting method thereof

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
JP特开平7-4060A 1995.01.10 *

Also Published As

Publication number Publication date
CN102777037A (en) 2012-11-14

Similar Documents

Publication Publication Date Title
CN102777037B (en) Simple and practical hoisting construction method of long-span steel girder
CN201943007U (en) Constant amplitude frame beam crane capable of being used in combination with movable support frame
CN106013419B (en) Long-span Cantilever abnormity transfinites structural steel corridor construction engineering method
CN102080384B (en) Construction method for mounting lifter on top plate of underground parking garage
CN203296361U (en) Long-span steel structure cross assembling hoisting platform
CN104674665A (en) Installation method for corridor bridge of large space steel structure
CN103122691A (en) Tower crane standard knot bearing upper air supporting formwork steel platform structure and construction method
CN207998792U (en) A kind of Hanging Basket rack mounting structure
CN102943439A (en) Method for constructing large-span and self-anchored composite beam suspension bridge girder
CN103061514A (en) Long-span steel structure corridor construction method
CN102691267A (en) High pier construction method for external whole operation platform
CN203034799U (en) Tower hoist standard knot bearing overhead support formwork steel platform structure
CN108792963A (en) A kind of Steel Space Truss formula tower crane wall-attached supporting seat method for high-rise roof framework
CN204938802U (en) For the rail supported system of tower crane
CN105625732A (en) Supporting-free construction method of ultrahigh overhung steel-structure truss
CN207499196U (en) A kind of cladding node of assembled architecture outer wall and precast facade
CN208071235U (en) A kind of bearing and lifting system of steel truss frame integral hoisting
CN206319628U (en) One kind building assembled wallboard fitting machine
CN205444451U (en) H-shaped steel combined base for light house
CN206267519U (en) A kind of light engine position hydraulic climbing die block system
CN201128882Y (en) Lifting and supporting brackets integrated construction device for bridge arch rib
CN105220609B (en) Combined beam self-anchored suspension bridge and construction process thereof
CN102817467A (en) Operating platform for high-altitude installation of steel structure
CN211736432U (en) Building construction device
CN210658449U (en) Remove aluminum alloy template structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Sun Xiaoyang

Inventor after: Yan Weidong

Inventor after: Feng Yuehui

Inventor after: Wang Xiaobo

Inventor after: Huang Lijuan

Inventor before: Sun Xiaoyang

Inventor before: Yan Weidong

Inventor before: Wang Xiaobo

Inventor before: Huang Lijuan

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: SUN XIAOYANG YAN WEIDONG WANG XIAOBO HUANG LIJUAN TO: SUN XIAOYANG YAN WEIDONG FENG YUEHUI WANG XIAOBO HUANG LIJUAN

C14 Grant of patent or utility model
GR01 Patent grant