CN102174856A - Finalized rebar machining shed - Google Patents

Finalized rebar machining shed Download PDF

Info

Publication number
CN102174856A
CN102174856A CN2011100709353A CN201110070935A CN102174856A CN 102174856 A CN102174856 A CN 102174856A CN 2011100709353 A CN2011100709353 A CN 2011100709353A CN 201110070935 A CN201110070935 A CN 201110070935A CN 102174856 A CN102174856 A CN 102174856A
Authority
CN
China
Prior art keywords
girder
regularization
reinforcing bar
steel pipe
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011100709353A
Other languages
Chinese (zh)
Inventor
楼永良
卢国豪
蒋金生
姚晓东
纪学灵
皮朝阳
李雪锋
胡翔宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongtian Construction Group Co Ltd
Original Assignee
Zhongtian Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongtian Construction Group Co Ltd filed Critical Zhongtian Construction Group Co Ltd
Priority to CN2011100709353A priority Critical patent/CN102174856A/en
Publication of CN102174856A publication Critical patent/CN102174856A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention discloses a finalized rebar machining shed comprising vertical bracing members fixed on a concrete foundation, wherein the vertical bracing members encircle to form a circle, a circle of girder is fixed on the top of the circle of the vertical bracing members and is crossly provided with steel pipes, the steel pipes are fixed on the girder through fasteners, the intersection parts of the steel pipes are also fixed by the fasteners, and ceiling panels are paved on the steel pipes. In the invention, the dismountable and finalized rebar machining shed is adopted and is formed by assembling the vertical bracing members, the girder, the steel pipes, the fasteners and moso bamboo sheets, the advantages of simplicity and convenience for manufacturing, high erection speed, safety and reliability are achieved, and one-time investment is made useful in a turnover way.

Description

The regularization reinforcing bar adds builder's temporary shed
Technical field
The present invention relates to reinforcing bar and add builder's temporary shed.
Background technology
At present, it is varied that the reinforcing bar of job site adds the form that builder's temporary shed sets up, comparatively flexible, the employing shaped steel truss that has, the employing that has is brick, and the employing shaped steel that has adds the form of steel pipe, it more is the form that directly adopts steel pipe to set up, it is slower that these forms are set up speed, invests greatlyyer, and security performance is relatively poor.
Summary of the invention
Technical problem to be solved by this invention just provides a kind of detachable, regularization reinforcing bar and adds builder's temporary shed, makes that simple and convenient to set up speed fast, and one time investing can be had enough to meet the need use, and is safe and reliable.
For solving the problems of the technologies described above, the present invention adopts following technical scheme: the regularization reinforcing bar adds builder's temporary shed, it is characterized in that: comprise the vertical supporting member that is fixed on the concrete foundation, described vertical supporting member is encircled into a circle and a circle girder is fixed at the top, intersect on the described girder and be provided with steel pipe, described steel pipe is fixed on the described girder by fastener, and described steel pipe infall is also fixed by described fastener, lays the ceiling panel on the described steel pipe.
Preferably, described girder is square, and the steel pipe square crossing is provided with on the girder.
Preferably, described vertical supporting member is a box steel column, and the box steel column bottom is welded with base plate, and base plate is fixed on the concrete foundation by crab-bolt.
Preferably, the root of described steel column is provided with stiffening rib, and described crab-bolt adopts double nut to be fixed on the concrete foundation.
Preferably, described steel column comprises the corner post and the middle center pillar on four limits, and described steel column top is provided with abacus, is provided with stiffening rib between abacus and described steel column.
Preferably, four ends of described girder are welded with the junction plate of isosceles trapezoid, and junction plate is provided with bolt hole and is used for girder and is connected with the abacus bolt of corner post.
Preferably, the subordinate welds square connecting plate in the described girder, and junction plate is provided with bolt hole and is connected with the abacus bolt of center pillar,
Preferably, described girder is the U-lag steel.
Preferably, described fastener is " several " font structure, and described catch bottom face is welded on girder or the steel pipe.
Preferably, described ceiling panel is arranged by bamboo plate and is formed.Second layer protective frame is set up by steel pipe, fastener in described ceiling panel top, and the laying bamboo plate forms second overcoat on plane steel pipe on the protective frame.
That the present invention adopts is detachable, the regularization reinforcing bar adds builder's temporary shed, and by vertical supporting member, girder, steel pipe, fastener and bamboo plate assemble, and makes that simple and convenient to set up speed fast, and one time investing can be had enough to meet the need use, and is safe and reliable.
Description of drawings
Below in conjunction with the drawings and specific embodiments the present invention is further described:
Fig. 1 is a structural representation of the present invention;
Fig. 2 is that steel column is connected vertical view with the floor;
Fig. 3 is that steel column is connected front view with the floor;
Fig. 4 is that corner post is connected vertical view with girder;
Fig. 5 is that corner post is connected front view with girder;
Fig. 6 is that center pillar is connected vertical view with girder;
Fig. 7 is that center pillar is connected front view with girder;
Fig. 8 is fastener and girder syndeton schematic diagram;
Fig. 9 is the structural representation of ceiling.
The specific embodiment
Extremely shown in Figure 9 as Fig. 1, the embodiment that adds builder's temporary shed for regularization reinforcing bar of the present invention, comprise the vertical supporting member 1 that is fixed on the concrete foundation, described vertical supporting member is encircled into a circle and a circle girder 2 is fixed at the top, intersect on the described girder and be provided with steel pipe 3, described steel pipe is fixed on the described girder by fastener 4, and described steel pipe infall is also fixed by described fastener, lays ceiling panel 9 on the described steel pipe.Described girder 2 is square, steel pipe 3 square crossing settings on the girder.Described vertical supporting member 1 is a box steel column, and the box steel column bottom is welded with base plate 5, and base plate is fixed on the concrete foundation by crab-bolt.The root of described steel column is provided with stiffening rib 6, and described crab-bolt adopts double nut to fix.Described steel column comprises the corner post and the middle center pillar on four limits, and described steel column top is provided with abacus 7, is provided with stiffening rib 6 between abacus and described steel column.Four ends of described girder are welded with the junction plate 8 of isosceles trapezoid, and junction plate is provided with bolt hole and is used for girder and is connected with the abacus bolt of corner post.The subordinate welds square junction plate 8 in the described girder 2, and junction plate is provided with bolt hole and is connected with the abacus bolt of center pillar, and described girder 2 is the U-lag steel.Described fastener 4 is " several " font structure, and described catch bottom face is welded on girder or the steel pipe.Described ceiling panel 9 is arranged by bamboo plate and is formed.Second layer protective frame is set up by steel pipe, fastener in described ceiling panel top, and the laying bamboo plate forms second overcoat on plane steel pipe on the protective frame.
This patent adopts box column as vertical supporting member, channel-section steel is as girder, set up double-deck protection with steel pipe, fastener again, vertical box steel column and base plate welding, and be fixed on the concrete foundation by crab-bolt, crab-bolt adopts double nut to fix, and the root at steel column is provided with stiffening rib simultaneously, strengthens its rigidity.Bean column node adopts bolt to connect, and is convenient to dismounting, can reuse.For the situation of corner post, at column cap position welded post top board, and its down welding styletable put more energy into, open four bolts hole on the post item plate, be used for being connected of steel column and both direction girder.At junction plate of the end of channel-section steel girder welding, two bolts hole are opened in the end of junction plate, are used for being connected of steel channel beam and steel column, and the while junction plate is isosceles trapezoid, is convenient to the connection of girder on abacus of both direction.Every girder on abacus, for the situation of center pillar, is welded to connect plate with two bolt under girder, reserve four bolts hole on the plate, be used for girder steel and connect, and under junction plate four stiffening ribs of welding, strengthen nuclear capital rigidity, with bolt beam column is connected.After steel column and girder install, just can carry out the construction of horizontal protective layer.Set up the clip of spacing welding " several " font on long side direction channel-section steel girder by steel pipe, it is made up of two angle steel and a steel deck-plate, is used for fixing steel pipe, limits before and after it and both direction mobile up and down.When the reinforcing bar canopy is installed, earlier steel column and channel-section steel girder are installed, to pass " several " font clip on the long edge-beam again perpendicular to the steel pipe of long edge-beam direction, be shelved on the long edge-beam, with fastener that the steel pipe of other direction is fixed thereon at a certain distance then, fix two steel pipes that are parallel to the girder direction in long edge-beam both sides with fastener, so as to moving of restriction steel pipe left and right sides both direction, so just, limited moving of whole horizontal protective layer one way or another, simultaneously, also be beneficial to the dismounting of reinforcing bar canopy.Set up second layer protection with steel pipe, fastener simultaneously, and on steel pipe, lay bamboo plate.

Claims (10)

1. the regularization reinforcing bar adds builder's temporary shed, it is characterized in that: comprise the vertical supporting member (1) that is fixed on the concrete foundation, described vertical supporting member is encircled into a circle and a circle girder (2) is fixed at the top, intersect on the described girder and be provided with steel pipe (3), described steel pipe is fixed on the described girder by fastener (4), described steel pipe infall is also fixed by described fastener, lays ceiling panel (9) on the described steel pipe.
2. regularization reinforcing bar according to claim 1 adds builder's temporary shed, it is characterized in that: described girder (2) is square, steel pipe on the girder (3) square crossing setting.
3. regularization reinforcing bar according to claim 2 adds builder's temporary shed, it is characterized in that: described vertical supporting member (1) is a box steel column, and the box steel column bottom is welded with base plate (5), and base plate is fixed on the concrete foundation by crab-bolt.
4. regularization reinforcing bar according to claim 3 adds builder's temporary shed, it is characterized in that: the root of described steel column is provided with stiffening rib (6), and described crab-bolt adopts double nut to be fixed on the concrete foundation.
5. regularization reinforcing bar according to claim 4 adds builder's temporary shed, it is characterized in that: described steel column comprises the corner post and the middle center pillar on four limits, and described steel column top is provided with abacus (7), is provided with stiffening rib (6) between abacus and described steel column.
6. regularization reinforcing bar according to claim 5 adds builder's temporary shed, it is characterized in that: four ends of described girder are welded with the junction plate (8) of isosceles trapezoid, and junction plate is provided with bolt hole and is used for girder and is connected with the abacus bolt of corner post.
7. regularization reinforcing bar according to claim 6 adds builder's temporary shed, it is characterized in that: the subordinate welds square junction plate (8) in the described girder (2), and junction plate is provided with bolt hole and is connected with the abacus bolt of center pillar,
8. regularization reinforcing bar according to claim 1 adds builder's temporary shed, it is characterized in that: described fastener (4) is " several " font structure, and described catch bottom face is welded on girder or the steel pipe.
9. regularization reinforcing bar according to claim 1 adds builder's temporary shed, it is characterized in that: described ceiling panel (9) is arranged by bamboo plate and is formed.
10. regularization reinforcing bar according to claim 9 adds builder's temporary shed, it is characterized in that: second layer protective frame is set up by steel pipe, fastener in described ceiling panel (9) top, and the laying bamboo plate forms second overcoat on plane steel pipe on the protective frame.
CN2011100709353A 2011-03-23 2011-03-23 Finalized rebar machining shed Pending CN102174856A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011100709353A CN102174856A (en) 2011-03-23 2011-03-23 Finalized rebar machining shed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011100709353A CN102174856A (en) 2011-03-23 2011-03-23 Finalized rebar machining shed

Publications (1)

Publication Number Publication Date
CN102174856A true CN102174856A (en) 2011-09-07

Family

ID=44518077

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011100709353A Pending CN102174856A (en) 2011-03-23 2011-03-23 Finalized rebar machining shed

Country Status (1)

Country Link
CN (1) CN102174856A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103835512A (en) * 2014-02-28 2014-06-04 中天建设集团有限公司 Shaped splicable protective shed mounting method
CN103835518A (en) * 2014-02-28 2014-06-04 中天建设集团有限公司 Shaped splicable protective shed
CN109577198A (en) * 2018-11-07 2019-04-05 同济大学 Fastener Fabricated platform awning skeleton suitable for section assembling construction bridges

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103835512A (en) * 2014-02-28 2014-06-04 中天建设集团有限公司 Shaped splicable protective shed mounting method
CN103835518A (en) * 2014-02-28 2014-06-04 中天建设集团有限公司 Shaped splicable protective shed
CN103835512B (en) * 2014-02-28 2016-03-02 中天建设集团有限公司 Regularization assemble type protection canopy mounting method
CN109577198A (en) * 2018-11-07 2019-04-05 同济大学 Fastener Fabricated platform awning skeleton suitable for section assembling construction bridges
CN109577198B (en) * 2018-11-07 2021-05-11 同济大学 Fastener assembled canopy skeleton suitable for construction bridge is assembled to festival section

Similar Documents

Publication Publication Date Title
CN207160548U (en) A kind of anchor of overhanging scaffold
CN206220247U (en) A kind of novel fabricated cross support post
CN110306658B (en) Steel structure assembly system for assembly type building and construction method
CN102758493A (en) Steel plate built-in eccentric support type steel plate shear wall
CN102454218B (en) Tube-in-tube structure for reinforced concrete core tubes and integrally-assembled space steel grids
CN103276799B (en) A kind of industrialization assembling post through beam steel flanged beam steel structure frame eccentrical braces
CN204081538U (en) A kind of assembling turnover processing protection canopy
CN102174856A (en) Finalized rebar machining shed
CN204676773U (en) House roof truss structure
CN104775572A (en) Pre-stressed precast canopy plate for railway platform
CN203475310U (en) Formwork for concrete slabs of composite steel-concrete box girders
CN102312563A (en) Method for connecting external scaffold with wall for large-span and ultra-story-height structures
CN202039597U (en) Shaped reinforcing steel processing shed
CN203175092U (en) Processing shed capable of being assembled with hanging structure
CN215594498U (en) Wall surface shear-resistant module for cluster low-rise steel structure
CN206538900U (en) The bracing means of assembled wall
CN203066043U (en) Diversion tunnel top arch concrete lining steel formwork support
CN104763102A (en) House roof truss structure
CN204139337U (en) A kind of profile steel concrete column-T-shaped node of steel reinforced concrete cant beam
CN209958809U (en) Protective shed of box-type movable board house
CN209976088U (en) Assembled protection canopy
CN207032671U (en) Steel and concrete post and the attachment structure of steel and concrete post and Vierendeel girder
CN201777802U (en) Fixed tower crane strengthening device used when crane height exceeds standards
CN206360079U (en) A kind of frame structure
CN219033730U (en) Assembled building steel structure roof truss

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20110907