CN201777802U - Fixed tower crane strengthening device used when crane height exceeds standards - Google Patents

Fixed tower crane strengthening device used when crane height exceeds standards Download PDF

Info

Publication number
CN201777802U
CN201777802U CN 201020297324 CN201020297324U CN201777802U CN 201777802 U CN201777802 U CN 201777802U CN 201020297324 CN201020297324 CN 201020297324 CN 201020297324 U CN201020297324 U CN 201020297324U CN 201777802 U CN201777802 U CN 201777802U
Authority
CN
China
Prior art keywords
tower
tower crane
crane body
strut bar
fixed type
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201020297324
Other languages
Chinese (zh)
Inventor
杨建伟
张贤峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Chemical Corp
Sinopec Ningbo Engineering Co Ltd
Sinopec Ningbo Technology Research Institute
Original Assignee
China Petroleum and Chemical Corp
Sinopec Ningbo Engineering Co Ltd
Sinopec Ningbo Technology Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Chemical Corp, Sinopec Ningbo Engineering Co Ltd, Sinopec Ningbo Technology Research Institute filed Critical China Petroleum and Chemical Corp
Priority to CN 201020297324 priority Critical patent/CN201777802U/en
Application granted granted Critical
Publication of CN201777802U publication Critical patent/CN201777802U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Jib Cranes (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to a fixed tower crane strengthening device used when crane height exceeds standards, which is characterized by comprising a plurality of supporting rods. The supporting rods are obliquely welded on a tower crane to be strengthened, and included angles among the supporting rods and the ground are identical. Preferably, the included angles among the eight supporting rods and the ground are 45 degrees to 60 degrees. Compared with the prior art, the fixed tower crane strengthening device used when crane height exceeds standards is simple and convenient in construction, safe in use and easy to obtain materials, and can be detached easily after construction.

Description

Fixed type tower crane body of the tower height exceeds standard and uses bracing means
Technical field
The utility model relates to the lifting field, refers to specifically that a kind of fixed type tower crane body of the tower height exceeds standard to use bracing means.
Background technology
In the installation process of some large-scale refinery ethylene cracker engineering cracking furnace, consider that cracking furnace steel structure, furnace body and matching construction installation workload are big, construction operation point is high, long construction period, and the construction operation face is concentrated, and therefore uses the tower capable lifting operation of lifting up into usually.In the operation zone, there are many tower cranes to work simultaneously, and when the operating area area is restricted, distance between the tower crane can not guarantee tower crane lifting operating mode and use the safety distance that need reach under the situation, need do certain tower crane body of the tower height and increase a standard knot and adjust.The height of one standard knot is 3.75 meters.Tower crane after increasing is above standard behind the installation requirement, according to the lifting requirements of tower crane, needs to carry out attaching frame to body of the tower within a certain height and reinforces, and plays the effect of firm body of the tower.But,, attaching frame need be reinforced on the cracking furnace steel structure if attaching frame is set because condition is placed restrictions in the operating area.Carry out pulling-rod frame admittedly and on the cracking furnace steel structure, add attaching frame, must check and approve through the calculating of cracking furnace structural steelwork design side, very trouble.Also having a kind of measure is exactly a joint that increases all to be mixed earth and former basis with reinforcing bar fuse and carry out consolidation process, but this way cost height, time duration are long, and the dismounting work in later stage has been increased certain difficulty.
Summary of the invention
Technical problem to be solved in the utility model is that the present situation at prior art provides a kind of consolidation effect is good and construction cost is low fixed type tower crane body of the tower height to exceed standard to use bracing means.
The utility model solves the problems of the technologies described above the technical scheme that is adopted: this fixed type tower crane body of the tower height exceeds standard and uses bracing means, it is characterized in that comprising many strut bars, each strut bar tilts to be welded on the tower crane body of the tower to be reinforced, and each strut bar is identical with ground-surface angle.
Described strut bar has eight, and the upper end of per two strut bars is welded on the hoop, on the described tower crane body of the tower of described hoop captive joint.
Also be provided with pipe link between the adjacent described hoop, and four planes, pipe link place and described tower crane body of the tower are perpendicular; The lower end of the described strut bar of adjacent each is equipped with the connection gusset, and each connects the plane parallel at plane and each pipe link place at gusset place.
The lower end of each described strut bar is welded on respectively accordingly on the connecting panel, and each connecting panel connects cooresponding supporting baseplate respectively.
Angle between described strut bar and the ground is 45~60 °, and the distance between described pipe link and the ground is 3~4 meters.)
Compared with prior art, that fixed type tower crane body of the tower height provided by the utility model exceeds standard is simple and convenient with bracing means construction, draw materials easily, safe in utilization, and the dismounting of construction after finishing also is easy to.
Description of drawings
Fig. 1 is the perspective view of the utility model embodiment;
Fig. 2 is the perspective view of embracing basket among the utility model embodiment.
The specific embodiment
Embodiment describes in further detail the utility model below in conjunction with accompanying drawing.
Fixed type tower crane body of the tower height in the present embodiment exceeds standard and is applied on the installation tower crane body of the tower of cracking furnace in certain large-scale ethylene cracker engineering with bracing means.Because cracking furnace steel structure, furnace body and matching construction installation workload are big, construction operation point is high, long construction period, and the construction operation face is concentrated, and therefore adopts the fixed type tower crane to carry out lifting operation.In this project installation region, 6 cracking bases of word order are arranged, tower crane is installed in the east side on cracking basis, adopts TC7035 type fixed type tower crane, to solve level and the vertical transport problem that the cracking furnace parts are installed.It is 64 meters height, 55 meters brachiums that operating mode is installed, and the lifting load is between 5.38~10.66 tons.Because two highly close tower cranes are also arranged in construction area in addition, according to the lifting operating mode and use the safety distance that need reach standard-required, this fixed type tower crane body of the tower height must be increased the height of 3.75 meter one joint, just can reach the safety requirements that three tower cranes use simultaneously.And the fixed type tower crane body of the tower after increasing needs to reinforce in the certain height scope, to play the effect of firm body of the tower.
As shown in Figure 1, this fixed type tower crane body of the tower height exceeds standard and comprises with bracing means:
Hoop 2, as shown in Figure 2, hoop 2 has four, is welded on respectively on the tower crane body of the tower 1 apart from 3.5 meters positions, ground;
Four pipe links 3, the two ends of each pipe link 3 are welded on respectively on two adjacent hoops 2; Pipe link 3 welding back forms the rectangle similar to the cross section of described tower crane body of the tower 1, and the plane at four pipe link 3 places and tower crane body of the tower 1 are perpendicular;
Eight strut bars 4, the upper end of per two strut bars 4 are welded on two sides of a hoop 2 after all connecting by No. 16 channel-section steels, and the lower end of each strut bar 4 is welded on respectively on its cooresponding connecting panel 5; Each strut bar 4 is 56 ° with ground-surface angle in the present embodiment, and connecting panel 5 welds mutually with supporting baseplate 7.The angle of inclination of strut bar, distributing position and radical need be determined according to the force analysis of tower crane.Strut bar 4 in the present embodiment adopts the pipe of φ 159 * 8 above specifications to manufacture.
Eight pipe links 6, each pipe link 6 welds mutually with supporting baseplate 7, and the position of each supporting baseplate 7 is determined according to the height of hoop 2 and the angle of inclination of strut bar 4.Pipe link 6 is provided with on the ground, and eight pipe links 6 are interconnected to constitute octagon, and the plane at this octagon place and tower crane body of the tower 1 are perpendicular.Supporting baseplate in the present embodiment adopts 300 * 200 * 20 steel plate, and the reinforcing bar of employing φ 20 * 300 is fixed on the mixed earth basis of former cement steel with the way of chemically-planted steel bar.
That this fixed type tower crane body of the tower height exceeds standard is simple and convenient with bracing means construction, it is convenient, safe in utilization to draw materials, and is particularly suitable for on-the-spot emergent the use.

Claims (5)

1. a fixed type tower crane body of the tower height exceeds standard and uses bracing means, it is characterized in that comprising many strut bars, and each strut bar tilts to be welded on the tower crane body of the tower to be reinforced, and each strut bar is identical with ground-surface angle.
2. fixed type tower crane body of the tower height according to claim 1 exceeds standard and uses bracing means, it is characterized in that described strut bar has eight, and the upper end of per two strut bars is welded on the hoop, on the described tower crane body of the tower of described hoop captive joint.
3. fixed type tower crane body of the tower height according to claim 2 exceeds standard and uses bracing means, it is characterized in that also being provided with pipe link between the adjacent described hoop, and four planes, pipe link place and described tower crane body of the tower is perpendicular; The lower end of the described strut bar of adjacent each is equipped with the connection gusset, and each connects the plane parallel at plane and each pipe link place at gusset place.
4. fixed type tower crane body of the tower height according to claim 3 exceeds standard and uses bracing means, and the lower end that it is characterized in that each described strut bar is welded on respectively accordingly on the connecting panel, and each connecting panel connects cooresponding supporting baseplate respectively.
5. exceed standard according to the described fixed type tower crane of the arbitrary claim of claim 1 to 4 body of the tower height and use bracing means, it is characterized in that the angle between described strut bar and the ground is 45-60 °, the distance between described pipe link and the ground is a 3-4 rice.
CN 201020297324 2010-08-17 2010-08-17 Fixed tower crane strengthening device used when crane height exceeds standards Expired - Lifetime CN201777802U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201020297324 CN201777802U (en) 2010-08-17 2010-08-17 Fixed tower crane strengthening device used when crane height exceeds standards

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201020297324 CN201777802U (en) 2010-08-17 2010-08-17 Fixed tower crane strengthening device used when crane height exceeds standards

Publications (1)

Publication Number Publication Date
CN201777802U true CN201777802U (en) 2011-03-30

Family

ID=43791023

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201020297324 Expired - Lifetime CN201777802U (en) 2010-08-17 2010-08-17 Fixed tower crane strengthening device used when crane height exceeds standards

Country Status (1)

Country Link
CN (1) CN201777802U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103043543A (en) * 2013-01-17 2013-04-17 浙江东欣建设集团有限公司 Device for reinforcing tower crane in coastal zone
CN109305619A (en) * 2018-12-12 2019-02-05 安徽丰海起重设备制造有限公司 A kind of building hoist guide rail bracket

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103043543A (en) * 2013-01-17 2013-04-17 浙江东欣建设集团有限公司 Device for reinforcing tower crane in coastal zone
CN103043543B (en) * 2013-01-17 2014-09-24 浙江东欣建设集团有限公司 Device for reinforcing tower crane in coastal zone
CN109305619A (en) * 2018-12-12 2019-02-05 安徽丰海起重设备制造有限公司 A kind of building hoist guide rail bracket

Similar Documents

Publication Publication Date Title
CN204252286U (en) A kind of rectangular steel-tube concrete column-steel beam connecting joint
CN205012629U (en) Assembled modularization platform of unloading of encorbelmenting
CN205775852U (en) A kind of active force conversion support for steel structure support moulding bed top
CN202090458U (en) Anti-vibration damper of shear perforated mild steel building structure
CN201809086U (en) Anchor ear connecting frame for construction of tower frame of tubular flare tower
CN201777802U (en) Fixed tower crane strengthening device used when crane height exceeds standards
CN201648943U (en) Temporary steel bridge supporting structure
CN202706508U (en) Overhanging strength bearing steel beam construction member of scaffold
CN203808094U (en) Adjustable tower crane steel platform foundation
CN102251666A (en) Overhanging type discharging platform
CN111809654A (en) Assembled tower crane foundation structure
CN104961058B (en) A kind of double Z shaped support steel beam and crane supporting member and preparation method containing it
CN203569485U (en) Steel truss beam elevation adjusting device
CN102589913A (en) Horizontal tunnel lining model test platform modularization loading machine frame
CN213297372U (en) Simple turnover telegraph pole anti-toppling protection device
CN205839601U (en) A kind of inverted U template of pier column of bridge
CN107587638A (en) Steel bar truss floor support plate and combined type floor support plate
CN209760050U (en) a split heads for depositing transport steel truss girder member
CN201952103U (en) Steel-bar lifting frame
CN201942968U (en) Railway rail retracting device
CN203113226U (en) Formwork support system with towering asymmetric concrete cantilever structure
CN203361165U (en) Supporting beam connection structure for building foundation pit support
CN102174856A (en) Finalized rebar machining shed
CN203066043U (en) Diversion tunnel top arch concrete lining steel formwork support
CN207063676U (en) Swing suspension column

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 100728 Beijing, Chaoyangmen, North Street, No. 22, No.

Patentee after: Sinopec Corp.

Patentee after: SINOPEC Ningbo Engineering Company Limited

Patentee after: SINOPEC Ningbo Technology Research Institute Co., Ltd.

Address before: 100728 Beijing, Chaoyangmen, North Street, No. 22, No.

Patentee before: Sinopec Corp.

Patentee before: Sinopec Ningbo Engineering Co., Ltd.

Patentee before: Sinopec Ningbo Institute of Technology

CX01 Expiry of patent term

Granted publication date: 20110330

CX01 Expiry of patent term