CN203361596U - Auxiliary support of integrated lifting operation platform - Google Patents

Auxiliary support of integrated lifting operation platform Download PDF

Info

Publication number
CN203361596U
CN203361596U CN 201320345163 CN201320345163U CN203361596U CN 203361596 U CN203361596 U CN 203361596U CN 201320345163 CN201320345163 CN 201320345163 CN 201320345163 U CN201320345163 U CN 201320345163U CN 203361596 U CN203361596 U CN 203361596U
Authority
CN
China
Prior art keywords
operation platform
lifting operation
concrete structure
steel
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320345163
Other languages
Chinese (zh)
Inventor
吴和坤
陈钟
马麟
杨璟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fifth Engineering Bureau Co Ltd
Original Assignee
China Construction Fifth Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fifth Engineering Bureau Co Ltd filed Critical China Construction Fifth Engineering Bureau Co Ltd
Priority to CN 201320345163 priority Critical patent/CN203361596U/en
Application granted granted Critical
Publication of CN203361596U publication Critical patent/CN203361596U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

一种集成式升降操作平台辅助支架An integrated lifting operation platform auxiliary support

技术领域 technical field

本实用新型涉及建筑施工脚手架技术领域,尤指一种集成式升降操作平台辅助支架。  The utility model relates to the technical field of building construction scaffolding, in particular to an auxiliary support for an integrated lifting operation platform. the

背景技术 Background technique

集成式升降操作平台是建筑工程中经常使用的一种外脚手架,用于高空作业及防护,其安全尤为重要。如何确保集成式升降操作平台与建筑物的稳定连接,并且简单易行,降低施工费用是一个很现实的问题。  The integrated lifting operation platform is a kind of external scaffolding often used in construction projects. It is used for high-altitude operations and protection, and its safety is particularly important. How to ensure the stable connection between the integrated lifting operation platform and the building, and how to reduce the construction cost is a very real problem. the

集成式升降操作平台包括竖立安装的导轨及操作平台,操作平台在电动葫芦(也可以是其它动力装置)的作用下能够上下升降以便于施工作业。导轨安装于导轨支座,还设置吊挂件以作为安装爬架的支点之一。现有技术中,导轨支座和吊挂件一般使用预埋套管于混凝土结构,再使用螺栓将导轨支座和吊挂件(通过预埋套管上的孔位)固定在混凝土结构上。采用这种方式的不足之处是对于局部使用钢结构梁、或者两层结构尺寸相差较大时(即两层结构尺寸存在转换层或错层时,该层高超出集成式升降操作平台设计的安全层高),难以满足导轨支座和吊挂件的受力要求,存在安全问题。  The integrated lifting operation platform includes vertically installed guide rails and an operating platform. The operating platform can be lifted up and down under the action of an electric hoist (or other power devices) to facilitate construction operations. The guide rail is installed on the guide rail support, and a hanging piece is also provided as one of the fulcrums for installing the climbing frame. In the prior art, the guide rail support and the hanger are generally embedded in the concrete structure with the embedded casing, and then the guide rail support and the hanger are fixed on the concrete structure (through the holes on the embedded sleeve) with bolts. The disadvantage of using this method is that when the steel structure beam is used locally, or the two-story structure has a large difference in size (that is, when there is a conversion layer or a staggered layer in the two-story structure size, the height of the floor exceeds the design of the integrated lifting operation platform. High safety floor), it is difficult to meet the force requirements of the guide rail support and hanging parts, and there are safety problems. the

因此需要采取外脚手架辅助支架,确保在集成式升降操作平台的使用中,平台与主体结构的连接符合安全及使用要求。  Therefore, it is necessary to adopt external scaffolding auxiliary brackets to ensure that the connection between the platform and the main structure meets the safety and use requirements during the use of the integrated lifting operation platform. the

发明内容 Contents of the invention

本实用新型需要解决的技术问题是克服由于局部使用钢结构梁、或者两层结构尺寸相差较大时、难以满足集成式升降操作平台的导轨支座和吊挂件的受力要求,导致存在安全问题的不足,提供一种集成式升降操作平台辅助支架。其能满足集成式升降操作平台与主体结构连接的受力要求,构件大小适宜,拆装和搬运方便,安装过程安全,材料耗费量少,能多次循环使用,成本较低,材料选用及加工方便,整体美观。  The technical problem to be solved by the utility model is to overcome the safety problems caused by the partial use of steel structure beams or the large difference in the size of the two-story structure, which makes it difficult to meet the force requirements of the guide rail support and hanging parts of the integrated lifting operation platform Insufficiency, provide an integrated lifting operation platform auxiliary support. It can meet the force requirements for the connection between the integrated lifting operation platform and the main structure, the size of the components is suitable, it is convenient to disassemble and transport, the installation process is safe, the material consumption is small, it can be recycled many times, the cost is low, and the material selection and processing Convenient and overall beautiful. the

本实用新型采用的技术方案是:  The technical scheme that the utility model adopts is:

一种集成式升降操作平台辅助支架,包括用工字钢制作的两根立柱,两根所述立柱与集成式升降操作平台一侧的两根竖立设置的导轨对应配置;立柱上端焊接带有安装孔的工字钢作为安装块,用于安装导轨支座及吊挂件;立柱下端焊接由槽钢焊接制作的底座,底座上制有与建筑体混凝土结构预埋螺栓连接的安装孔,将螺母与螺栓旋接使底座与建筑体混凝土结构固定;还包括水平设置的槽钢作为拉杆,拉杆的一端使用螺栓连接立柱,另一端留设安装孔与建筑体混凝土结构预埋螺栓连接;在拉杆与建筑体混凝土结构连接处焊接钢筋环,钢筋环与钢丝绳一端连接,钢丝绳的另一端连接至所述底座。 An auxiliary support for an integrated lifting operation platform, including two uprights made of I-shaped steel, the two uprights are arranged correspondingly to two vertical guide rails on one side of the integrated lifting operation platform; the upper end of the uprights is welded with mounting holes The I-beam is used as a mounting block for installing guide rail supports and hanging parts; the lower end of the column is welded with a base made of channel steel, and the base is provided with mounting holes connected with the pre-embedded bolts of the building's concrete structure. The screw connection fixes the base and the concrete structure of the building; it also includes a horizontal channel steel as a tie rod, one end of the tie rod is connected to the column with a bolt, and the other end is left with a mounting hole to connect with the pre-embedded bolt in the concrete structure of the building; A steel bar ring is welded at the joint of the concrete structure, the steel bar ring is connected to one end of the steel wire rope, and the other end of the steel wire rope is connected to the base.

对上述技术方案进行进一步阐述:  The above-mentioned technical scheme is further elaborated:

两根立柱通过连接架连接。 The two columns are connected by a connecting frame.

所述连接架包括在各立柱上焊接多根并彼此具有一定间距的短钢管,再使用拉接钢管将位于不同立柱上的相应短钢管连接起来。  The connecting frame includes a plurality of short steel pipes welded on each column with a certain distance from each other, and then the corresponding short steel pipes on different columns are connected by drawing steel pipes. the

本实用新型的有益效果是:  The beneficial effects of the utility model are:

其一,其能满足由于局部使用钢结构梁、或者两层结构尺寸相差较大时集成式升降操作平台与主体结构连接的受力要求,避免了安全问题。 First, it can meet the force requirements of the integrated lifting operation platform connected to the main structure due to the partial use of steel structure beams, or when the two-story structure has a large difference in size, and avoids safety problems.

其二,与集成式升降操作平台相适应,构件大小适宜。  Second, it is compatible with the integrated lifting operation platform, and the size of the components is appropriate. the

其三,通过螺栓连接,拆装和搬运方便。  Third, it is connected by bolts, which is convenient for disassembly and transportation. the

其四,安装过程安全;材料损耗量少、能多次循环利用、成本较低;材料选用及加工方便,整体美观。  Fourth, the installation process is safe; the material loss is small, can be recycled many times, and the cost is low; the material selection and processing are convenient, and the overall appearance is beautiful. the

附图说明 Description of drawings

图1为本实用新型主视示图;  Fig. 1 is a front view diagram of the utility model;

图2为本实用新型立柱主示图; Fig. 2 is the main view of the column of the utility model;

图3为本实用新型立柱侧示图。 Fig. 3 is a side view of the column of the utility model.

图中:1、集成式升降操作平台;2、立柱;3、安装块;4、底座;5、拉杆;6、钢丝绳;7、短钢管;8、拉接钢管;9、导轨支座;10、建筑体混凝土结构。  In the figure: 1. Integrated lifting operation platform; 2. Upright column; 3. Installation block; 4. Base; 5. Pull rod; 6. Steel wire rope; 7. Short steel pipe; , Building concrete structure. the

具体实施方式 Detailed ways

下面结合附图介绍本实用新型的具体实施方式。  Introduce the specific embodiment of the present utility model below in conjunction with accompanying drawing. the

如图1、图2及图3所示,一种集成式升降操作平台辅助支架,包括用工字钢制作的两根立柱2,两根所述立柱2与集成式升降操作平台1一侧的两根竖立设置的导轨对应配置,立柱2上端焊接带有安装孔的工字钢作为安装块3,用于安装导轨支座9及吊挂件;立柱2下端焊接由槽钢焊接制作的底座4,底座4上制有与建筑体混凝土结构10预埋螺栓连接的安装孔,将螺母与螺栓旋接使底座4与建筑体混凝土结构10固定;还包括水平设置的槽钢作为拉杆5,拉杆5的一端使用螺栓连接立柱2,另一端留设安装孔与建筑体混凝土结构10预埋螺栓连接;在拉杆5与建筑体混凝土结构10连接处焊接钢筋环,钢筋环与钢丝绳6一端连接,钢丝绳6的另一端连接至所述底座4。  As shown in Figure 1, Figure 2 and Figure 3, an integrated lifting operation platform auxiliary support includes two columns 2 made of I-shaped steel, the two columns 2 and the two sides of the integrated lifting operation platform 1. The guide rails set up vertically are correspondingly configured. The upper end of the column 2 is welded with an I-beam with mounting holes as the installation block 3, which is used to install the guide rail support 9 and the hanging piece; the lower end of the column 2 is welded with a base 4 made by channel steel welding, and 4 is formed with mounting holes connected with the building concrete structure 10 pre-embedded bolts, and the nuts and bolts are screwed together to fix the base 4 and the building concrete structure 10; a horizontally arranged channel steel is also included as the pull rod 5, and one end of the pull rod 5 Use bolts to connect the column 2, and leave an installation hole at the other end to connect with the building concrete structure 10 pre-embedded bolts; weld the steel bar ring at the joint between the pull rod 5 and the building body concrete structure 10, and the steel bar ring is connected to one end of the steel wire rope 6, and the other end of the steel wire rope 6 One end is connected to the base 4 . the

两根立柱2通过连接架连接。  The two columns 2 are connected by a connecting frame. the

所述连接架包括在各立柱2上焊接多根并彼此具有一定间距的短钢管7,再使用拉接钢管8将位于不同立柱2上的相应短钢管7连接起来。  The connecting frame includes a plurality of short steel pipes 7 welded on each column 2 with a certain distance from each other, and then the corresponding short steel pipes 7 on different columns 2 are connected by tensioned steel pipes 8 . the

本实用新型的实施例只是说明其具体实施方式,不在于限制其技术方案。本行业的技术人员在本实施例的启发下可以作出某些修改,故凡依照本实用新型专利范围所做的等效变化或修饰,均属于本实用新型专利权利要求范围内。  The embodiment of the utility model is only to illustrate its specific implementation, not to limit its technical solution. Those skilled in the industry can make some modifications under the inspiration of this embodiment, so all equivalent changes or modifications made according to the patent scope of the utility model all belong to the scope of the patent claims of the utility model. the

Claims (3)

1. an integrated form lifting operation platform auxiliary stand is characterized in that: comprise two root posts of doing with the I-shaped steel, two corresponding configurations of guide rail of erectting settings of two described columns and integrated form lifting operation platform one side; Column upper end welding with the i iron of installing hole as mounting blocks, for mounting guide rail bearing and suspender member; Column lower end welding, by the base of channel-section steel welding production, is shaped with the installing hole be connected with building body concrete structure pre-embedded bolt on base, nut and bolt are spun base and building body concrete structure are fixed; Also comprise that horizontally disposed channel-section steel is as pull bar, an end of pull bar is used bolt to connect column, and the other end stays to be established installing hole and be connected with building body concrete structure pre-embedded bolt; At pull bar and building body concrete structure junction welded reinforcement ring, reinforced steel bar ring is connected with wire rope one end, and the other end of wire rope is connected to described base.
2. a kind of integrated form lifting operation platform auxiliary stand according to claim 1, it is characterized in that: two root posts connect by link.
3. a kind of integrated form lifting operation platform auxiliary stand according to claim 2, it is characterized in that: described link is included on each column many of welding tool short steel pipes at regular intervals each other, re-uses to socket the corresponding short steel pipes that steel pipe will be positioned on different columns and couple together.
CN 201320345163 2013-06-17 2013-06-17 Auxiliary support of integrated lifting operation platform Expired - Fee Related CN203361596U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320345163 CN203361596U (en) 2013-06-17 2013-06-17 Auxiliary support of integrated lifting operation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320345163 CN203361596U (en) 2013-06-17 2013-06-17 Auxiliary support of integrated lifting operation platform

Publications (1)

Publication Number Publication Date
CN203361596U true CN203361596U (en) 2013-12-25

Family

ID=49809382

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320345163 Expired - Fee Related CN203361596U (en) 2013-06-17 2013-06-17 Auxiliary support of integrated lifting operation platform

Country Status (1)

Country Link
CN (1) CN203361596U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104295083A (en) * 2014-10-11 2015-01-21 中建八局大连建设工程有限公司 Guidance and hanging separated cantilever beam composite structure of integrated climbing frame
CN108005373A (en) * 2018-01-09 2018-05-08 中国建筑第二工程局有限公司 An integrated lifting platform system and its assembly method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104295083A (en) * 2014-10-11 2015-01-21 中建八局大连建设工程有限公司 Guidance and hanging separated cantilever beam composite structure of integrated climbing frame
CN108005373A (en) * 2018-01-09 2018-05-08 中国建筑第二工程局有限公司 An integrated lifting platform system and its assembly method

Similar Documents

Publication Publication Date Title
CN203867216U (en) Detachable steel frame supporting structure for ultra-high-rise building cantilevered plate
CN203808484U (en) Integrated cantilevered and attached external scaffolding
CN101225706A (en) Attached self-elevating aerial work platform
CN103291066B (en) A kind of construction elevator wall-attached frame servicing unit reinforcement means
CN109577650B (en) Assembled steel hanger for auxiliary prefabrication of large-scale steel reinforcement framework on construction site and construction method for auxiliary prefabrication of large-scale steel reinforcement framework
CN203756015U (en) Aerial work platform for power transmission iron tower
CN203361596U (en) Auxiliary support of integrated lifting operation platform
CN204753397U (en) Temporary mounting hanger for steel box bridge
CN203487767U (en) Cross plate scaffold
CN207878284U (en) Bailey beam cable saddle hoisting bracket
CN202967874U (en) Overall girder transporting vehicle lifting spreader
CN206457187U (en) A kind of pole of mounting steel chimney
CN203867198U (en) Slip equipment for high-rise steel structure transfer layer truss
CN103056649A (en) Super-large-scale multi-functional pressing machine frame installing method
CN105366559A (en) Small hoisting machine fixed on channel steel framework
CN213174742U (en) Top bracing steel stand structure
CN204850068U (en) Connection structure of side column and crane beam tip in steel construction
CN204552051U (en) The cradle structure of high-altitude crossbeam soffit monitoring point layout
CN204326490U (en) A kind of construction of lift well operating platform
CN102957113B (en) Decoration construction temporary power construction system
CN202754740U (en) Hoisting combination tool
CN204645590U (en) A kind of tool-type builder's jack diagonal supporting member
CN205151577U (en) Fix small -size hoisting machine on steel support of groove
CN103452302B (en) Safe pre-lapping method for cantilever outer frame
CN204535833U (en) A kind of single-unit split truck scale of belt lacing case

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131225

Termination date: 20160617

CF01 Termination of patent right due to non-payment of annual fee