CN203247859U CN 201320264697 CN201320264697U CN203247859U CN 203247859 U CN203247859 U CN 203247859U CN 201320264697 CN201320264697 CN 201320264697 CN 201320264697 U CN201320264697 U CN 201320264697U CN 203247859 U CN203247859 U CN 203247859U
Authority
CN
China
Prior art keywords
steel column
bracket plate
alignment device
bracket board
board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201320264697
Other languages
Chinese (zh)
Inventor
倪淑梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN 201320264697 priority Critical patent/CN203247859U/en
Application granted granted Critical
Publication of CN203247859U publication Critical patent/CN203247859U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses an alignment device for the butt joint perpendicularity of large steel columns, and belongs to steel column installation auxiliary devices. The alignment device is characterized by mainly comprising four bracket boards and four jacks, each bracket board is mainly composed of an upper bracket board and a lower bracket board, the structure of each upper bracket board is the same as the structure of each lower bracket board, each upper bracket board and each lower bracket board are respectively formed by welding a rectangular horizontal board and a rectangular vertical board, each upper bracket board is in a reversed-T shape, each lower bracket board is in a T shape, the four bracket boards are correspondingly welded on the portion of a vertical central line of each of the left side face, the right side face, the front side face and the rear side face of the connector section of an upper steel column and a lower steel column, the upper bracket board and the lower bracket board of each bracket board are arranged symmetrically, and one jack is installed between the upper bracket board and the lower bracket board of each bracket board correspondingly. When the alignment device is used, the four jacks on the left side, the right side, the front side and the rear side are utilized to regulate the perpendicularity of the upper steel column, and the alignment device meets the requirements for the perpendicularity, and is convenient to use and efficient.

Description

The alignment device of Steel for Large Steel Column docking verticality
Technical field
The utility model belongs to the steel column installation auxiliary device, especially relates to a kind of alignment device of Steel for Large Steel Column docking.
Background technology
In metallurgy industry high-rise steel structure factory building was installed, the factory building steel column was sometimes up to hundred meters, and single steel column can weigh hundred tons, and the making of this steel column is finished in steel work factory usually, and for the ease of transportation, this steel column is minute two sections making, at the scene abutting joints usually; The hypomere steel column is installed first usually, and then the recycling crane is installed the epimere steel column in place junction plate and is tightened connecting bolt, at this mounting method, there is the steel column of foozle for docking port, just is difficult to eliminate foozle, be difficult to guarantee the verticality of epimere steel column butt joint.
Summary of the invention
The purpose of this utility model is the alignment device that proposes a kind of Steel for Large Steel Column docking verticality, and is not only simple and reasonable for structure, easy to operate, and guarantees the installation quality of Steel for Large Steel Column.
The purpose of this utility model is achieved like this: a kind of alignment device (abbreviation alignment device) of Steel for Large Steel Column docking verticality, comprise epimere steel column and hypomere steel column, this epimere steel column and hypomere steel column butt joint also are fixedly connected with junction plate and connecting bolt, the alignment device that it is characterized in that this Steel for Large Steel Column docking verticality mainly is comprised of four groups of bracket plates and four jack, every group of bracket plate is again mainly by upper bracket plate, lower bracket plate forms, bracket plate on this, the structure of lower bracket plate is identical, all mainly formed by the level board of rectangle and the vertical riser assembly welding of rectangle, and bracket plate is ⊥ shape and descends the bracket plate to be the shape of falling ⊥ on this, with these four groups of bracket plates corresponding being welded on the position of the vertical center line of the left-right and front-back side of upper-lower section steel column interface end section respectively, be about to respectively corresponding being welded on the position of the vertical center line of the left-right and front-back side of the lower end of epimere steel column section of these four upper bracket plates, and with these four lower bracket plates corresponding being welded on the position of the vertical center line of the left-right and front-back side of the upper end section of hypomere steel column respectively, and make each organize upper bracket plate, lower bracket plate all is and is symmetrical arranged, distinguishing corresponding installation jack, bracket plate on this between bracket plate and the lower bracket plate on each group, lower bracket plate all available thickness of slab is that the steel plate of 20-30mm is made.
During use, the hypomere steel column is installed first, the recycling crane is with the epimere steel column in place, then junction plate is installed and is tightened the connecting bolt Primary Location, according to the requirement of verticality of steel column, utilize four jack pair epimeres of left-right and front-back steel column to carry out the adjustment of verticality, after verticality meets the demands again, construction in line with the drawings is located the steel column welding is permanent again.
The Steel for Large Steel Column that the utility model proposes docks the alignment device of verticality, and is not only simple and reasonable for structure, easy to operate, and guaranteed the installation quality of Steel for Large Steel Column.
The alignment device that the Steel for Large Steel Column that now in conjunction with the accompanying drawings and embodiments the utility model is proposed docks verticality is described further.
Description of drawings
Fig. 1 is that the master of the alignment device of the Steel for Large Steel Column docking verticality that proposes of the utility model when using looks schematic diagram.
Among Fig. 1: 1, upper bracket plate 2, lower bracket plate 3, jack 4, epimere steel column 5, hypomere steel column 6, erection bolt 7, junction plate.
The specific embodiment
As can be seen from Figure 1: a kind of alignment device (abbreviation alignment device) of Steel for Large Steel Column docking verticality, comprise epimere steel column 4 and hypomere steel column 5, this epimere steel column 4 docks with hypomere steel column 5 and is fixedly connected with junction plate 7 and connecting bolt 6, the alignment device that it is characterized in that this Steel for Large Steel Column docking verticality mainly is comprised of four groups of bracket plates and four jack 4, every group of bracket plate is again mainly by upper bracket plate 1, lower bracket plate 2 forms, bracket plate 1 on this, the structure of lower bracket plate 2 is identical, all mainly formed by the level board of rectangle and the vertical riser assembly welding of rectangle, and bracket plate 1 is ⊥ shape and descends bracket plate 2 to be the shape of falling ⊥ on this, with these four groups of bracket plates corresponding being welded on the position of the vertical center line of the left-right and front-back side of upper-lower section steel column interface end section respectively, be about to respectively corresponding being welded on the position of the vertical center line of the left-right and front-back side of the lower end of epimere steel column 4 section of these four upper bracket plates 1, and with these four lower bracket plates 2 corresponding being welded on the position of the vertical center line of the left-right and front-back side of the upper end section of hypomere steel column 5 respectively, and make each organize upper bracket plate 1, lower bracket plate 2 all is and is symmetrical arranged, distinguishing corresponding installation jack 3, bracket plate 1 on this between bracket plate 1 and the lower bracket plate 2 on each group, lower bracket plate 2 all available thickness of slab is that the steel plate of 20-30mm is made.
During use, hypomere steel column 5 is installed first, the recycling crane is in place with epimere steel column 4, then junction plate 7 is installed and is tightened connecting bolt 6 Primary Location, according to the requirement of verticality of steel column, utilize 3 pairs of epimere steel columns of four jack of left-right and front-back 4 to carry out the adjustment of verticality, after verticality meets the demands again, construction in line with the drawings is located the steel column welding is permanent again.

Claims (2)

1. a Steel for Large Steel Column docks the alignment device of verticality, comprise epimere steel column (4) and hypomere steel column (5), this epimere steel column (4) docks with hypomere steel column (5) and is fixedly connected with junction plate (7) and connecting bolt (6), it is characterized in that: the alignment device of this Steel for Large Steel Column docking verticality mainly is comprised of four groups of bracket plates and four jack (4), every group of bracket plate is again mainly by upper bracket plate (1), lower bracket plate (2) forms, bracket plate (1) on this, the structure of lower bracket plate (2) is identical, all mainly formed by the level board of rectangle and the vertical riser assembly welding of rectangle, and bracket plate (1) is ⊥ shape and descends bracket plate (2) to be the shape of falling ⊥ on this, with these four groups of bracket plates corresponding being welded on the position of the vertical center line of the left-right and front-back side of upper-lower section steel column interface end section respectively, be about to these four upper bracket plates (1) respectively correspondence be welded on the position of the vertical center line of the left-right and front-back side of the lower end section of epimere steel column (4), and with these four lower bracket plates (2) respectively correspondence be welded on the position of the vertical center line of the left-right and front-back side of the upper end section of hypomere steel column (5), and make each organize upper bracket plate (1), lower bracket plate (2) all is and is symmetrical arranged, and distinguishes corresponding installation jack (3) between bracket plate (1) on each group and lower bracket plate (2).
2. the alignment device of Steel for Large Steel Column according to claim 1 docking verticality is characterized in that bracket plate (1) on this, lower bracket plate (2) are that the steel plate of 20-30mm is made with thickness of slab all.
CN 201320264697 2013-05-16 2013-05-16 Alignment device for butt joint perpendicularity of large steel columns Expired - Lifetime CN203247859U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320264697 CN203247859U (en) 2013-05-16 2013-05-16 Alignment device for butt joint perpendicularity of large steel columns

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320264697 CN203247859U (en) 2013-05-16 2013-05-16 Alignment device for butt joint perpendicularity of large steel columns

Publications (1)

Publication Number Publication Date
CN203247859U true CN203247859U (en) 2013-10-23

Family

ID=49374306

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320264697 Expired - Lifetime CN203247859U (en) 2013-05-16 2013-05-16 Alignment device for butt joint perpendicularity of large steel columns

Country Status (1)

Country Link
CN (1) CN203247859U (en)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103982048A (en) * 2014-05-04 2014-08-13 安徽富煌钢构股份有限公司 Overhead correction adjuster for box-shaped steel columns in ultrahigh layer steel structure
CN104100009A (en) * 2014-08-05 2014-10-15 山东莱钢建设有限公司 Connection device for steel column butt connection and steel column butt connecting method
CN105604197A (en) * 2016-03-23 2016-05-25 中冶建工集团有限公司 Steel pipe column barrel structure of beam column
CN105735474A (en) * 2016-03-23 2016-07-06 中冶建工集团有限公司 Single-layer steel pipe column construction method for core tube beam column
CN105935852A (en) * 2016-06-08 2016-09-14 无锡华光锅炉股份有限公司 Box-column abutting locating device and locating method
CN106150105A (en) * 2015-03-26 2016-11-23 五冶集团上海有限公司 A kind of stiffened column installation method
CN108343163A (en) * 2018-05-08 2018-07-31 中国二十二冶集团有限公司 Steel column butt joint adjusts fixing device and method
CN108590205A (en) * 2018-06-13 2018-09-28 南通四建集团有限公司 A kind of steel construction rigid steel pile installation site regulating device and adjusting method
CN108756064A (en) * 2018-08-24 2018-11-06 浙江远大钢构实业有限公司 A kind of square tube column docking auxiliary construction structure
CN109138459A (en) * 2018-09-19 2019-01-04 中国十七冶集团有限公司 A kind of steel column butt welding degree control device
CN110359722A (en) * 2019-06-28 2019-10-22 五冶集团上海有限公司 A kind of steel column correction jacking bracket and its application method
CN113463929A (en) * 2021-07-29 2021-10-01 中冶建工集团重庆钢结构有限公司 Construction method for improving installation accuracy of steel column
CN113818700A (en) * 2021-09-30 2021-12-21 中冶(上海)钢结构科技有限公司 Leveling device and method for quickly mounting and positioning columnar member
CN114951993A (en) * 2022-05-23 2022-08-30 甘肃建投建设有限公司 Laser-assisted welding positioning device for reinforcement cage and construction method of laser-assisted welding positioning device

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103982048A (en) * 2014-05-04 2014-08-13 安徽富煌钢构股份有限公司 Overhead correction adjuster for box-shaped steel columns in ultrahigh layer steel structure
CN104100009A (en) * 2014-08-05 2014-10-15 山东莱钢建设有限公司 Connection device for steel column butt connection and steel column butt connecting method
CN106150105A (en) * 2015-03-26 2016-11-23 五冶集团上海有限公司 A kind of stiffened column installation method
CN105604197A (en) * 2016-03-23 2016-05-25 中冶建工集团有限公司 Steel pipe column barrel structure of beam column
CN105735474A (en) * 2016-03-23 2016-07-06 中冶建工集团有限公司 Single-layer steel pipe column construction method for core tube beam column
CN105604197B (en) * 2016-03-23 2018-01-16 中冶建工集团有限公司 A kind of beam column steel pipe column barrel structure
CN105935852A (en) * 2016-06-08 2016-09-14 无锡华光锅炉股份有限公司 Box-column abutting locating device and locating method
CN108343163A (en) * 2018-05-08 2018-07-31 中国二十二冶集团有限公司 Steel column butt joint adjusts fixing device and method
CN108590205A (en) * 2018-06-13 2018-09-28 南通四建集团有限公司 A kind of steel construction rigid steel pile installation site regulating device and adjusting method
CN108590205B (en) * 2018-06-13 2024-02-20 南通四建集团有限公司 Device and method for adjusting installation position of steel structure stiff steel column
CN108756064A (en) * 2018-08-24 2018-11-06 浙江远大钢构实业有限公司 A kind of square tube column docking auxiliary construction structure
CN109138459A (en) * 2018-09-19 2019-01-04 中国十七冶集团有限公司 A kind of steel column butt welding degree control device
CN109138459B (en) * 2018-09-19 2020-04-14 中国十七冶集团有限公司 Section steel post welding butt joint straightness controller that hangs down
CN110359722A (en) * 2019-06-28 2019-10-22 五冶集团上海有限公司 A kind of steel column correction jacking bracket and its application method
CN113463929A (en) * 2021-07-29 2021-10-01 中冶建工集团重庆钢结构有限公司 Construction method for improving installation accuracy of steel column
CN113818700A (en) * 2021-09-30 2021-12-21 中冶(上海)钢结构科技有限公司 Leveling device and method for quickly mounting and positioning columnar member
CN114951993A (en) * 2022-05-23 2022-08-30 甘肃建投建设有限公司 Laser-assisted welding positioning device for reinforcement cage and construction method of laser-assisted welding positioning device
CN114951993B (en) * 2022-05-23 2024-01-19 甘肃建投建设有限公司 Steel reinforcement cage laser-assisted welding positioning device and construction method thereof

Similar Documents

Publication Publication Date Title
CN203247859U (en) Alignment device for butt joint perpendicularity of large steel columns
CN103291066B (en) A kind of construction elevator wall-attached frame servicing unit reinforcement means
CN204282540U (en) A kind of steel concrete connector
CN204266124U (en) The pre-assembled moulding bed of large sections steel box-girder
CN209195005U (en) Aluminium frame wooden formwork structure at beam slab and column joint
CN104358405A (en) Heavy load full formwork support system
CN209293241U (en) A kind of assembled architecture wallboard intermediate connecting body
CN204983248U (en) Assembled wallboard connecting piece
CN205000631U (en) Reinforcing apparatus of outer shear force wall aluminum mould toe riser
CN202031309U (en) Suspending operation platform for structural concrete constructions
CN104480959A (en) General tower crane supporting base
CN204727481U (en) A kind of connection structure of crane cab
CN203257080U (en) Adjustable overhang supporting device for building construction
CN203160251U (en) Connecting device for joints of steel and wood templates
CN208950305U (en) A kind of assembly concrete beam forms structure and its support system
CN104359539A (en) Reinforced concrete double-T-beam weighing platform
CN203247718U (en) Steel column butt-joint mounting device
CN201661076U (en) Combined type corner template
CN209585591U (en) A kind of novel climbing frame scaffold board
CN205206049U (en) Steel construction cantilever beam connecting piece
CN205134556U (en) Improved connecting piece for steel -structure beam columns
CN205291221U (en) Prefabricated mould of concrete guardrail
CN205206314U (en) Stair design steel wood built -up plate
CN203603319U (en) High-strength corner connector for curtain wall
CN204940551U (en) A kind of floor corbel connecting piece

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20131023