CN204266124U - The pre-assembled moulding bed of large sections steel box-girder - Google Patents
The pre-assembled moulding bed of large sections steel box-girder Download PDFInfo
- Publication number
- CN204266124U CN204266124U CN201420641804.5U CN201420641804U CN204266124U CN 204266124 U CN204266124 U CN 204266124U CN 201420641804 U CN201420641804 U CN 201420641804U CN 204266124 U CN204266124 U CN 204266124U
- Authority
- CN
- China
- Prior art keywords
- moulding bed
- girder
- steel box
- described moulding
- crossbeam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000000465 moulding Methods 0.000 title claims abstract description 66
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 33
- 239000010959 steel Substances 0.000 title claims abstract description 33
- 238000010276 construction Methods 0.000 abstract description 2
- 238000003466 welding Methods 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model discloses and provides the pre-assembled moulding bed of large sections steel box-girder that a kind of structure is simple, easy to use, conveniently can regulate steel box-girder camber.The utility model comprise some be fixedly connected on ground built-in fitting moulding bed column (1), be connected to the connection system (2) between two adjacent described moulding bed columns (1) and be fixedly installed on the moulding bed crossbeam (3) on described moulding bed column (1) top, described moulding bed crossbeam (3) is also fixedly installed and regulates steel plate (4), the position, rear and front end of described moulding bed crossbeam (3) below is all reserved with beam transporting passage (5).The utility model is applicable to bridge construction field.
Description
Technical field
The utility model relates to a kind of steel box girder assembling equipment, particularly relates to a kind of large pre-assembled moulding bed of sections steel box-girder.
Background technology
Steel box-girder is the form of structure that Large Span Bridges is conventional, is generally formed by connecting by all-welded mode by top board, base plate, back and diaphragm, midfeather and stiffening rib etc.Traditional erection method generally carries out in outdoor, each sections of steel box-girder is transported to job site, after carrying out welding assembly at the scene, then be arranged on bridge pier, but due to the size of steel box-girder general larger, welding job amount in erecting bed is very large, the impact that outdoor work keeps environmental factor and weather is also larger, and a large amount of welding job needs to complete in the air at height, there is high risk factor, there is no reliable positioning equipment when installing simultaneously, easily occur dislocation metaboly.
Utility model content
Technical problem to be solved in the utility model overcomes the deficiencies in the prior art exactly, provides the pre-assembled moulding bed of large sections steel box-girder that a kind of structure is simple, easy to use, conveniently can regulate steel box-girder camber.
The technical scheme that the utility model adopts is: the utility model comprise some be fixedly connected on ground built-in fitting moulding bed column, be connected to the connection system between two adjacent described moulding bed columns and be fixedly installed on the moulding bed crossbeam on described moulding bed column top, described moulding bed crossbeam is also fixedly installed adjustment steel plate, the position, rear and front end below described moulding bed crossbeam is all reserved with beam transporting passage.
Often be provided with two described connection systems between adjacent two described moulding bed columns, two described upper ends connecting system are all fixedly installed on described moulding bed crossbeam, and the other end is then fixed therein on a described moulding bed column.
Preferably, with bolts between described connection system and described moulding bed column.
The beneficial effects of the utility model are: due to the utility model comprise some be fixedly connected on ground built-in fitting moulding bed column, be connected to the connection system between two adjacent described moulding bed columns and be fixedly installed on the moulding bed crossbeam on described moulding bed column top, described moulding bed crossbeam is also fixedly installed adjustment steel plate, the position, rear and front end below described moulding bed crossbeam is all reserved with beam transporting passage.Compared with prior art, the utility model is by the moulding bed of described moulding bed column, described moulding bed crossbeam and described connection system composition, realize location during steel box girder assembling, and can be realized the adjustment of steel box-girder camber by described adjustment steel plate, arranging of described beam transporting passage can allow dolly enter and steel box-girder is transported out of the utility model.So the utility model structure is simple, easy to use, can conveniently regulate steel box-girder camber.
Due to bolts between described connection system and described moulding bed column.Formed almost by bolted mode between the utility model each several part, easy accessibility, existing with existing dress, effectively reduce the occupancy of job site.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Detailed description of the invention
As shown in Figure 1, the utility model comprise somely be fixedly connected on the moulding bed column 1 of ground built-in fitting, the connection be connected between two adjacent described moulding bed columns 1 is 2 and is fixedly installed on the moulding bed crossbeam 3 on described moulding bed column 1 top, described moulding bed crossbeam 3 is also fixedly installed and regulates steel plate 4, the position, rear and front end below described moulding bed crossbeam 3 is all reserved with beam transporting passage 5.
Often being provided with two described connections between adjacent two described moulding bed columns 1 is 2, two described connections be 2 upper end be all fixedly installed on described moulding bed crossbeam 3, the other end is then fixed therein on a described moulding bed column 1.Described connection is with bolts between 2 and described moulding bed column 1.
When large sections steel box-girder carries out assembled, first described moulding bed column 1 is welded on the ground built-in fitting burying in advance and put well, then is 2 moulding bed column 1 described in each to be coupled together by described connection, form a moulding bed similar to steel box-girder size.Then described moulding bed crossbeam 3 in the welded top of described moulding bed column 1, and described adjustment steel plate 4 is placed with on described moulding bed crossbeam 3, by the camber of described adjustment steel plate 4, realize the adjustment of steel box-girder camber.Position, described moulding bed rear and front end is also reserved with beam transporting passage 5, after steel box girder assembling terminates, remove the described moulding bed crossbeam 3 on described beam transporting passage 5 position, fortune beam dolly is after from then on position enters, remove the connection between this moulding bed and steel box-girder, utilize the jacking ability of fortune beam dolly self, steel box-girder top is transported after the utility model.Because the connection between described moulding bed column 1 is all with bolts, therefore moulding bed can be removed rapidly after using.
The utility model is applicable to bridge construction field.
Claims (3)
1. the pre-assembled moulding bed of large sections steel box-girder, it is characterized in that: the pre-assembled moulding bed of described large sections steel box-girder comprise some be fixedly connected on ground built-in fitting moulding bed column (1), be connected to the connection system (2) between two adjacent described moulding bed columns (1) and be fixedly installed on the moulding bed crossbeam (3) on described moulding bed column (1) top, described moulding bed crossbeam (3) is also fixedly installed and regulates steel plate (4), the position, rear and front end of described moulding bed crossbeam (3) below is all reserved with beam transporting passage (5).
2. the pre-assembled moulding bed of large sections steel box-girder according to claim 1, it is characterized in that: often between adjacent two described moulding bed columns (1), be provided with two described connections system (2), two described upper ends connecting system (2) are all fixedly installed on described moulding bed crossbeam (3), and the other end is then fixed therein on a described moulding bed column (1).
3. the pre-assembled moulding bed of large sections steel box-girder according to claim 2, is characterized in that: with bolts between described connection system (2) and described moulding bed column (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420641804.5U CN204266124U (en) | 2014-10-31 | 2014-10-31 | The pre-assembled moulding bed of large sections steel box-girder |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420641804.5U CN204266124U (en) | 2014-10-31 | 2014-10-31 | The pre-assembled moulding bed of large sections steel box-girder |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204266124U true CN204266124U (en) | 2015-04-15 |
Family
ID=52800996
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420641804.5U Expired - Fee Related CN204266124U (en) | 2014-10-31 | 2014-10-31 | The pre-assembled moulding bed of large sections steel box-girder |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204266124U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105421211A (en) * | 2015-12-21 | 2016-03-23 | 中铁建大桥工程局集团第五工程有限公司 | Manufacturing method for large-span single-arch-rib steel box arch |
CN109972846A (en) * | 2018-08-19 | 2019-07-05 | 中建六局安装工程有限公司 | A kind of moulding bed and its construction method for steel cylinder upside-down mounting jack-up construction |
CN111188278A (en) * | 2020-02-18 | 2020-05-22 | 中交路桥建设有限公司 | Jig frame structure, jig frame assembly and construction method |
CN112323644A (en) * | 2020-10-30 | 2021-02-05 | 中铁一局集团有限公司 | Beam transporting vehicle, beam transporting system, steel box beam assembling system and steel box beam assembling method |
CN114790689A (en) * | 2022-04-06 | 2022-07-26 | 黎明钢构股份有限公司 | Overall assembly jig frame for steel structure bridge |
-
2014
- 2014-10-31 CN CN201420641804.5U patent/CN204266124U/en not_active Expired - Fee Related
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105421211A (en) * | 2015-12-21 | 2016-03-23 | 中铁建大桥工程局集团第五工程有限公司 | Manufacturing method for large-span single-arch-rib steel box arch |
CN109972846A (en) * | 2018-08-19 | 2019-07-05 | 中建六局安装工程有限公司 | A kind of moulding bed and its construction method for steel cylinder upside-down mounting jack-up construction |
CN111188278A (en) * | 2020-02-18 | 2020-05-22 | 中交路桥建设有限公司 | Jig frame structure, jig frame assembly and construction method |
CN112323644A (en) * | 2020-10-30 | 2021-02-05 | 中铁一局集团有限公司 | Beam transporting vehicle, beam transporting system, steel box beam assembling system and steel box beam assembling method |
CN112323644B (en) * | 2020-10-30 | 2022-04-08 | 中铁一局集团有限公司 | Beam transporting vehicle, beam transporting system, steel box beam assembling system and steel box beam assembling method |
CN114790689A (en) * | 2022-04-06 | 2022-07-26 | 黎明钢构股份有限公司 | Overall assembly jig frame for steel structure bridge |
CN114790689B (en) * | 2022-04-06 | 2024-03-19 | 黎明钢构股份有限公司 | Steel structure bridge overall assembly jig frame |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204266124U (en) | The pre-assembled moulding bed of large sections steel box-girder | |
CN203640309U (en) | Adjustable pipe carrier used on large-span steel structure roof primary truss general assembly jig frame | |
CN203594213U (en) | Flexible assembling and disassembling bearing truss | |
CN102733489A (en) | H-shaped steel beam and H-shaped steel column strong-axis variable-beam height fabricated node and construction method thereof | |
CN203247868U (en) | Large-span steel structure construction temporary supporting frame | |
CN102966032B (en) | A kind of structural member of aluminum alloy passenger foot-bridge | |
CN203960725U (en) | A kind of assembly type suspension bridge | |
CN203741690U (en) | Pedestrian overcrossing assembling type steel truss girder | |
CN204139631U (en) | The guard rail of building site fast demountable | |
CN204000620U (en) | Bridge girder erection machine carrying device | |
CN203330607U (en) | On-site butt joint connection and location device for construction steel structure box type section steel column | |
CN203238925U (en) | Net rack work platform erected by utilizing factory building crane | |
CN205222516U (en) | Stand and track crossbeam connection structure between assembled maintenance | |
CN205531410U (en) | A simply can dismantle construction canopy for steel construction job site | |
CN203361596U (en) | Auxiliary support of integrated lifting operation platform | |
CN209685126U (en) | A kind of steel vestibule integrally promotes lifting lug device | |
CN208023608U (en) | A kind of post-cast strip can have enough to meet the need steel channel formwork system | |
CN203320420U (en) | Temporary locking structure for corrugated steel webs of steel and concrete combined box girder | |
CN202540273U (en) | Support for inclined stay bar | |
CN207453296U (en) | A kind of gutter strut | |
CN204898504U (en) | BeiLei beam joins in marriage roof beam connecting device on with | |
CN202809843U (en) | Karma temporary connecting plate | |
CN109956395A (en) | A kind of steel vestibule integrally promotes shackle structure | |
CN202831699U (en) | Combined type tool house | |
CN203583774U (en) | Combined steel bar framework of slope roof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150415 |