CN207453296U - A kind of gutter strut - Google Patents

A kind of gutter strut Download PDF

Info

Publication number
CN207453296U
CN207453296U CN201721263959.XU CN201721263959U CN207453296U CN 207453296 U CN207453296 U CN 207453296U CN 201721263959 U CN201721263959 U CN 201721263959U CN 207453296 U CN207453296 U CN 207453296U
Authority
CN
China
Prior art keywords
gutter
strut
flanging
rod
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721263959.XU
Other languages
Chinese (zh)
Inventor
李镇江
钟华
陈海勇
郑均
毛蓉萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JINGGONG INDUSTRIAL CONSTRUCTION SYSTEM Co Ltd
Original Assignee
JINGGONG INDUSTRIAL CONSTRUCTION SYSTEM Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JINGGONG INDUSTRIAL CONSTRUCTION SYSTEM Co Ltd filed Critical JINGGONG INDUSTRIAL CONSTRUCTION SYSTEM Co Ltd
Priority to CN201721263959.XU priority Critical patent/CN207453296U/en
Application granted granted Critical
Publication of CN207453296U publication Critical patent/CN207453296U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of gutter struts, including a body of rod and two flanging components for being symmetricly set on body of rod both ends, the body of rod section Wei " Shang " types, each flanging component include be sequentially connected first while, second while and the 3rd side, first side be fixedly connected with the body of rod wherein one end.Gutter flanging and the gap of gutter strut flanging are less than 1cm, when gutter ponding, can play the role of pulling up to gutter top flange, increase gutter and stablize.Gutter is separated with strut, gutter is allow to be superimposed placement, transport is more convenient, while reducing the transportation cost of gutter, makes gutter intact not easily damaged in transportational process.

Description

A kind of gutter strut
Technical field
The utility model is related to a kind of new gutter struts for steel construction gutter, are related to and steel construction gutter is changed Into belonging to technical field of civil engineering.
Background technology
With the large scale application of steel construction project, steel construction gutter has been very universal in architectural construction, and And steel gutter is routinely way, such as Fig. 1 in ginseng national building standard design atlas 06J925-2, the way is every among gutter 2 ' Every 1500 ~ 2000mm, one of L30*3 strut 1 ' is set, but can be direct with gutter because being equipped among gutter in actual mechanical process The strut of welding prevents gutter to be placed from being superimposed, seriously affects the transport of gutter, cause gutter transportation cost relatively high, and And gutter easily deforms in Transportation Engineering, the also different degrees of damage of gutter strut, such as bends, fracture etc. causes to return Work influences the duration.
In view of this, the present inventor studies this, specially develops a kind of gutter strut, thus this case generates.
The content of the invention
The purpose of this utility model is to provide a kind of detachable, strut that can be movably arranged at the scene on gutter.
In order to solve above-mentioned the problems of the prior art, the technical solution adopted in the utility model is as follows:
A kind of gutter strut 1, including a body of rod 11 and two flanging components for being symmetricly set on 11 both ends of the body of rod, the bar 11 section Wei " Shang of body " types, each flanging component include being sequentially connected first at 12, second 13 and the 3rd side 14, described the It 12 is fixedly connected on one side with the wherein one end of the body of rod 11.
Preferably, first side 12 and 11 plane perpendicular of the body of rod, second side 13 extend outwardly, the 3rd side 14 extend to along 11 bottom surface of the body of rod.
Preferably, described second when 13 are longer than gutter flanging the second 23.
Preferably, the gutter strut, it is characterised in that:Under installation condition, the second of the strut flanging component In 13, gutter flanging the second, 23 are fixedly connected on together on purlin 4.
Preferably, the first of the strut flanging component at 12 and second 13 angles and the gutter flanging first formed It is identical in the angle that 22 form with during gutter flanging the second 23.
Preferably, under installation condition, the described 3rd is less than 1cm while 14 with during gutter flanging the second 13 gap 3.The same day During ditch ponding, a upward pulling force can be provided for gutter top flange, increases gutter and stablizes.
Preferably, the second of the strut flanging component 23 is consolidated in 13, gutter flanging the second with purlin 4 with self threading pin Fixed connection.
Preferably, the body of rod 11 and flanging component use steel plate.
Preferably, described first between 12 and the body of rod 11, first while 12 and second while between 13, second while 13 and Welding manner is used between three sides 14.
The utility model can generate following advantageous effects:
1. being changed to self threading pin connection by original shop welded gutter strut, reduce welding engineering amount, simultaneously because day Ditch is separated with strut, gutter is allow to be superimposed placement, transport is more convenient, and adds the freight volume of per car, reduces gutter While transportation cost, make gutter intact not easily damaged in transportational process.
2. inner section Wei " Shang " the type bodies of rod, can increase the intensity of strut, play better supporting role.
3. new gutter strut after installation is complete, can not only ensure the requirement of gutter strut support, and can guarantee gutter Because of requirement of the ponding strut to gutter pulling force.
4. new gutter strut is easy to process, materials are also easier.
5. new gutter strut in-site installation is not only flexible effortless, but also is easily guaranteed that installation quality.
Description of the drawings
Fig. 1 is the schematic diagram that prior art gutter strut is set;
Fig. 2 is the present embodiment gutter strut stereogram;
Fig. 3 is the front view of the present embodiment gutter strut;
Fig. 4 is the top view of the present embodiment gutter strut;
Fig. 5 is the present embodiment gutter strut body of rod sectional view;
Fig. 6 is the view that the present embodiment gutter strut is mounted on gutter and purlin;
Fig. 7 is the partial enlarged view at 5 in Fig. 6.
Mark explanation:1 is strut, and 1 ' is strut of the prior art, and 2 be gutter, and 2 ' be gutter of the prior art, 11 It is gap for strut, 3,4 be purlin, and 5 be unilateral gutter, strut and purlin junction, and 11 be the body of rod, and 12 be the first side, and 13 are Second side, 14 be the 3rd side, and 22 be the first side of gutter, and 23 be the second side of gutter, and 6 be roofing, and 7 be downpipe.
Specific embodiment
The utility model provides one embodiment, is described in detail in conjunction with attached drawing:
Gutter strut 1 includes a body of rod 11 and two flanging components for being symmetricly set on 11 both ends of the body of rod, 11 section of the body of rod Wei " Shang " types, i.e., be made of two block length square plates, the longer sides of one of steel plate and another piece of steel plain vertical welding.
Each flanging component include being sequentially connected first at 12, second 13 and the 3rd side 14, the first side 12 and the body of rod 11 wherein one end are fixedly connected, and the present embodiment is using welding.First side 12 and 11 plane perpendicular of the body of rod, the second side 13 is to extension It stretches, the 3rd side 14 extends to along 11 bottom surface of the body of rod.Second when 13 are longer than gutter flanging the second 23, therefore, in the mounted state, Such as Fig. 6, the 3rd is less than 1cm, the 3rd side 14 of the present embodiment and gutter flanging second while 14 with during gutter flanging the second 13 gap 3 The gap 3 on side 13 is 5mm.This gap 3 can provide a upward pulling force in gutter ponding for the second side of gutter flanging, Increase gutter to stablize.
Such as Fig. 7, under installation condition, the second of strut flanging component is 23 solid together with purlin 4 in 13, gutter flanging the second Surely be connected on purlin 4, the present embodiment strut flanging component second in 13, gutter flanging the second 23 with purlin 4 pass through from Nail is attacked to be fixedly connected.Such as Fig. 6, strut global design is into the shape similar to gutter, the first side 12 of strut flanging component and Two angles formed while 13 are identical with the angle that during gutter flanging the first 22 and the second side of gutter flanging 23 are formed, and the two is being installed When, contact surface just agrees with, therefore strut overall structure is similar with gutter, and strut is rested on above gutter, from gutter bottom It is highly 70mm or so.The body of rod 11 and flanging component use steel plate.First between 12 and the body of rod 11, first while 12 and second While between 13, second while 13 and the 3rd welding manner is used between side 14.
Such as Fig. 1, national building standard designs strut in atlas 06J925-2 and uses L30*3 angle steel.The present embodiment strut Each plate uses thickness as the steel plate of 3mm, meets the support requirement to gutter, and 11 section " Shang of the body of rod " type design branch Intensity higher is supportted, stability is better.
Adjacent struts spacing is 1500 ~ 2000mm in national building standard design atlas 06J925-2, and the present embodiment is being pacified Under dress state between adjacent struts between 1500 ~ 2000mm of the former spacing of maintenance.
It the above is only the utility model preferred embodiment, not make limitation in any form to the utility model, it is right It is without departing from the concept of the premise utility, right for the utility model person of an ordinary skill in the technical field Any simple modification, equivalent variations or the replacement that above example is made, should all be considered as belonging to technical solutions of the utility model In the range of.

Claims (9)

1. a kind of gutter strut(1), it is characterised in that:Including a body of rod(11)Be symmetricly set on the body of rod(11)Two of both ends Flanging component, the body of rod(11)Section Wei " Shang " types, each flanging component include the first side being sequentially connected(12), the second side (13)With the 3rd side(14), first side(12)With the body of rod(11)Wherein one end is fixedly connected.
2. gutter strut as described in claim 1, it is characterised in that:First side(12)With the body of rod(11)Plane perpendicular, Second side(13)Extend outwardly, the 3rd side(14)To along the body of rod(11)Bottom surface extends.
3. gutter strut as described in claim 1, it is characterised in that:Second side(13)It is longer than the second side of gutter flanging (23).
4. gutter strut as described in claim 1, it is characterised in that:Under installation condition, the second of the strut flanging component Side(13), the second side of gutter flanging(23)Purlin is fixedly connected on together(4)On.
5. gutter strut as described in claim 1, it is characterised in that:First side of the strut flanging component(12)With second Side(13)The angle of formation and the first side of gutter flanging(22)With the second side of gutter flanging(23)The angle of formation is identical.
6. gutter strut as described in claim 1, it is characterised in that:Under installation condition, the 3rd side(14)It is rolled over gutter At second(13)Gap(3)Less than 1cm.
7. gutter strut as claimed in claim 5, it is characterised in that:Second side of the strut flanging component(13), gutter The second side of flanging(23)With purlin(4)It is fixedly connected by self threading pin.
8. gutter strut as described in claim 1, it is characterised in that:The body of rod(11)Steel plate is used with flanging component.
9. gutter strut as described in claim 1, it is characterised in that:First side(12)With the body of rod(11)Between, first Side(12)With the second side(13)Between, the second side(13)With the 3rd side(14)Between use welding manner.
CN201721263959.XU 2017-09-29 2017-09-29 A kind of gutter strut Active CN207453296U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721263959.XU CN207453296U (en) 2017-09-29 2017-09-29 A kind of gutter strut

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721263959.XU CN207453296U (en) 2017-09-29 2017-09-29 A kind of gutter strut

Publications (1)

Publication Number Publication Date
CN207453296U true CN207453296U (en) 2018-06-05

Family

ID=62249677

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721263959.XU Active CN207453296U (en) 2017-09-29 2017-09-29 A kind of gutter strut

Country Status (1)

Country Link
CN (1) CN207453296U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107503476A (en) * 2017-09-29 2017-12-22 精工工业建筑系统有限公司 A kind of gutter strut

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107503476A (en) * 2017-09-29 2017-12-22 精工工业建筑系统有限公司 A kind of gutter strut

Similar Documents

Publication Publication Date Title
CN203247859U (en) Alignment device for butt joint perpendicularity of large steel columns
CN204940312U (en) A kind of integral lifting lowering system of steel cofferdam
CN203559594U (en) Combined type protection shed
CN204126230U (en) Assembly scaffold unit
CN204475846U (en) A kind of conversion support system for socket joint dish button steel tube frame
CN104563494A (en) Transformation supporting system for socket disc-lock steel tube support and construction method
CN201762663U (en) Reinforced concrete superposed beam wing board support
CN106382007A (en) Template supporting system for construction
CN105275203B (en) Extensible canopy and the adjustable die system and the construction method of the mould bases using its making
CN206307232U (en) A kind of supporting construction for watercraft engine room
CN207453296U (en) A kind of gutter strut
CN108532968A (en) A kind of assembled support device of steel bar truss floor support plate composite floor system
CN204266124U (en) The pre-assembled moulding bed of large sections steel box-girder
CN205735475U (en) Web steel bar binding clamping fixture at the bottom of a kind of prefabricated case beam
CN206052554U (en) A kind of Construction Supporting System for square twin columns great cantilever bent cap
CN204311776U (en) A kind of integrated lightweight steel construction room of antidetonation
CN204456809U (en) A kind of steel supporting structure
CN206144153U (en) Moulding board supporting system for building
CN107503476A (en) A kind of gutter strut
CN205637282U (en) Wave metal sheet furred ceiling
CN210316538U (en) Aluminum mold supporting system for floor lower extension lintel
CN205046843U (en) Reinforcing apparatus's stair template of marking time in middle of installation
CN206503377U (en) A kind of movable railing of steel trestle
CN207295475U (en) The box girder formwork of track traffic