CN202809843U - Karma temporary connecting plate - Google Patents
Karma temporary connecting plate Download PDFInfo
- Publication number
- CN202809843U CN202809843U CN 201220343194 CN201220343194U CN202809843U CN 202809843 U CN202809843 U CN 202809843U CN 201220343194 CN201220343194 CN 201220343194 CN 201220343194 U CN201220343194 U CN 201220343194U CN 202809843 U CN202809843 U CN 202809843U
- Authority
- CN
- China
- Prior art keywords
- karma
- connecting plate
- junction plate
- temporary connection
- utility
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 claims description 10
- 239000010959 steel Substances 0.000 claims description 10
- 238000009434 installation Methods 0.000 claims description 5
- 238000000034 method Methods 0.000 abstract description 2
- 238000010276 construction Methods 0.000 abstract 1
- 238000003466 welding Methods 0.000 description 6
- 238000010586 diagram Methods 0.000 description 2
- 229910000746 Structural steel Inorganic materials 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000012467 final product Substances 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 238000002407 reforming Methods 0.000 description 1
Images
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
The utility model discloses a Karma temporary connecting plate which comprises at least one connecting plate (6). One end of the bottom surface of each connecting plate (6) is fixedly welded with an H-section beam mounting end (9), and the other end of the bottom surface of each connecting plate (6) is temporarily fixedly welded with an H-section beam fixing end (8). By the Karma temporary connecting plate, an original connection joint is reduced to two connecting plates, a simple and effective connecting mode is adopted to enable the construction process to be faster and more convenient, mounting errors can be eliminated, and safety is high.
Description
Technical field:
The utility model relates to structural steel design, installing area.
Background technology:
In steel work, horizontal member is in installation process, and connected member (between the member) generally adopts erection bolt and junction plate to fix, until member connect finish after, again with erection bolt, junction plate and connect otic placode and remove (see figure 1).
Adopt erection bolt and junction plate connecting elements, need at member the connection otic placode to be set, and stay and establish the erection bolt hole, member connects by junction plate temporarily, and after bolton to be installed was finished, loop wheel machine can loose hook, operation is comparatively complicated, time-consuming, and because alignment error, the connection otic placode is difficult for the (see figure 2) of aliging with the bolt hole of junction plate.
The utility model content:
In order to overcome the problem of above-mentioned prior art, the utility model provides a kind of Karma temporary connection plate, and is simple in structure, easy to connect, safe and reliable.
In order to achieve the above object, the technical scheme that the utility model adopts for achieving the above object is: the Karma temporary connection plate, comprise at least one junction plate 6, bottom surface one end and the H section steel beam installation end 9 of described junction plate 6 are welded and fixed, and the other end of bottom surface and H section steel beam fixed end 8 are welded and fixed temporarily.
Described junction plate 6 is 2.
Described junction plate 6 is strip structure.
Centre position, described junction plate 6 bottom surface is provided with semicircle gap (crossing welding hole) 11.
Beneficial effect: the utility model is reduced to two junction plates with original connected node, adopts simple and effective connected mode, makes work progress more efficient and convenient, and can eliminate alignment error, and safe.
Description of drawings:
Fig. 1 prior art temporary connection plate structure chart.
Fig. 2 prior art temporary connecting joint schematic diagram.
Fig. 3 the utility model Karma temporary connection plate structure chart.
Fig. 4 the utility model Karma temporary connection plate connected node schematic diagram.
Fig. 5 is the lateral view of Fig. 4.
Accompanying drawing sign: 1, temporary connection plate; 2, connect otic placode; 3, bolt hole; 4, H section steel beam; 5, erection bolt; 6, junction plate; 7, factory's welding; 8, H section steel beam fixed end; 9, H section steel beam installation end; 10, Site Welding; 11, semicircle gap.
The specific embodiment:
Below in conjunction with drawings and Examples the utility model is elaborated.
With reference to Fig. 3 to Fig. 5, in the present embodiment, the Karma temporary connection plate comprises 2 junction plates 6, and bottom surface one end and the H section steel beam installation end 9 of described junction plate 6 are welded and fixed, and the other end of bottom surface and H section steel beam fixed end 8 are welded and fixed temporarily.Described junction plate 6 is strip structure.Centre position, described junction plate 6 bottom surface is provided with semicircle gap (crossing welding hole) 11.
The utility model is by reforming original temporary connection plate, original connected node is reduced to two junction plates, it is the Karma temporary connection plate, two junction plates are welded on the member installation end in factory in advance, and in hoisting process, the Karma junction plate can directly be stuck in the fixed end of member, and then junction plate and member fixed end be welded and fixed temporarily, convenient to operation, until member connect finish after, junction plate cut off get final product.In addition, the commissure is set up semicircle gap (cross welding hole) and is avoided junction plate to affect between the member welding between the junction plate member.
Above content is the further description of the utility model being done in conjunction with optimal technical scheme, can not assert that the implementation of utility model only limits to these explanations.Concerning the utility model person of an ordinary skill in the technical field, under the prerequisite that does not break away from design of the present utility model, can also make simple deduction and replacement, all should be considered as protection domain of the present utility model.
Claims (4)
1. Karma temporary connection plate, it is characterized in that, described Karma temporary connection plate comprises at least one junction plate (6), and bottom surface one end and the H section steel beam installation end (9) of described junction plate (6) are welded and fixed, and the other end of bottom surface and H section steel beam fixed end (8) are welded and fixed temporarily.
2. Karma temporary connection plate according to claim 1 is characterized in that, described junction plate (6) is 2.
3. Karma temporary connection plate according to claim 1 is characterized in that, described junction plate (6) is strip structure.
4. Karma temporary connection plate according to claim 1 is characterized in that, described junction plate (6) centre position, bottom surface is provided with semicircle gap (11).
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 201220343194 CN202809843U (en) | 2012-07-17 | 2012-07-17 | Karma temporary connecting plate |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 201220343194 CN202809843U (en) | 2012-07-17 | 2012-07-17 | Karma temporary connecting plate |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN202809843U true CN202809843U (en) | 2013-03-20 |
Family
ID=47868750
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN 201220343194 Expired - Fee Related CN202809843U (en) | 2012-07-17 | 2012-07-17 | Karma temporary connecting plate |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN202809843U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN114310100A (en) * | 2021-11-29 | 2022-04-12 | 上海江南长兴造船有限责任公司 | Device and method for controlling butt welding deformation of section steel |
-
2012
- 2012-07-17 CN CN 201220343194 patent/CN202809843U/en not_active Expired - Fee Related
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN114310100A (en) * | 2021-11-29 | 2022-04-12 | 上海江南长兴造船有限责任公司 | Device and method for controlling butt welding deformation of section steel |
| CN114310100B (en) * | 2021-11-29 | 2024-05-17 | 上海江南长兴造船有限责任公司 | Device and method for controlling deformation of section steel butt welding |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN203654299U (en) | Steel support loose end | |
| CN202658532U (en) | Bridge wet joint construction template | |
| CN201310072Y (en) | Supporting bracket of bridge construction | |
| CN203271096U (en) | Operating platform | |
| CN201713946U (en) | H-shaped steel beam and H-shaped steel column web direction connection node structure | |
| CN202809843U (en) | Karma temporary connecting plate | |
| CN202706508U (en) | Overhanging strength bearing steel beam construction member of scaffold | |
| CN203361170U (en) | Supporting upright column pile for building foundation pit support | |
| CN203188612U (en) | Beam frame type building template system | |
| CN202990407U (en) | Quick-release scaffold | |
| CN202925883U (en) | Large size wooden formwork surrounding purlin device | |
| CN201882737U (en) | Elevator guide rail bracket | |
| CN102383613B (en) | Hoisting construction method for steel roof truss of main power house of power plant and special hoisting device | |
| CN202544399U (en) | Supporting frame for overhang floor slab with steel structure | |
| CN201817919U (en) | Connecting part for steel structure beam hanger | |
| CN202181614U (en) | Steel pipe fixing device for joist steel | |
| CN205224143U (en) | Electronic hydraulic shovel power consumption reel mounting bracket | |
| CN204238443U (en) | A kind of detachable suspension column fastening devices | |
| CN204152239U (en) | A kind of assembled lattice support H profile steel support | |
| CN204139334U (en) | Girder steel and steel column weld temporary connecting structure entirely | |
| CN203100853U (en) | Foundation-free trunk scale | |
| CN203430929U (en) | Bridge frame connecting piece | |
| CN202467221U (en) | Power plant main workshop steel roof truss hoisting lifting device | |
| CN203320420U (en) | Temporary locking structure for corrugated steel webs of steel and concrete combined box girder | |
| CN202689560U (en) | Fixing device and vertical template system |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130320 Termination date: 20190717 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |