CN202809843U - Karma temporary connecting plate - Google Patents

Karma temporary connecting plate Download PDF

Info

Publication number
CN202809843U
CN202809843U CN 201220343194 CN201220343194U CN202809843U CN 202809843 U CN202809843 U CN 202809843U CN 201220343194 CN201220343194 CN 201220343194 CN 201220343194 U CN201220343194 U CN 201220343194U CN 202809843 U CN202809843 U CN 202809843U
Authority
CN
China
Prior art keywords
karma
connecting plate
junction plate
temporary connection
utility
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220343194
Other languages
Chinese (zh)
Inventor
周光毅
毛立贤
唐家如
陈超
张斐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
China Construction Eighth Engineering Division Co Ltd Dalian Branch
Original Assignee
China Construction Eighth Engineering Division Co Ltd
China Construction Eighth Engineering Division Co Ltd Dalian Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd, China Construction Eighth Engineering Division Co Ltd Dalian Branch filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN 201220343194 priority Critical patent/CN202809843U/en
Application granted granted Critical
Publication of CN202809843U publication Critical patent/CN202809843U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses a Karma temporary connecting plate which comprises at least one connecting plate (6). One end of the bottom surface of each connecting plate (6) is fixedly welded with an H-section beam mounting end (9), and the other end of the bottom surface of each connecting plate (6) is temporarily fixedly welded with an H-section beam fixing end (8). By the Karma temporary connecting plate, an original connection joint is reduced to two connecting plates, a simple and effective connecting mode is adopted to enable the construction process to be faster and more convenient, mounting errors can be eliminated, and safety is high.

Description

The Karma temporary connection plate
Technical field:
The utility model relates to structural steel design, installing area.
Background technology:
In steel work, horizontal member is in installation process, and connected member (between the member) generally adopts erection bolt and junction plate to fix, until member connect finish after, again with erection bolt, junction plate and connect otic placode and remove (see figure 1).
Adopt erection bolt and junction plate connecting elements, need at member the connection otic placode to be set, and stay and establish the erection bolt hole, member connects by junction plate temporarily, and after bolton to be installed was finished, loop wheel machine can loose hook, operation is comparatively complicated, time-consuming, and because alignment error, the connection otic placode is difficult for the (see figure 2) of aliging with the bolt hole of junction plate.
The utility model content:
In order to overcome the problem of above-mentioned prior art, the utility model provides a kind of Karma temporary connection plate, and is simple in structure, easy to connect, safe and reliable.
In order to achieve the above object, the technical scheme that the utility model adopts for achieving the above object is: the Karma temporary connection plate, comprise at least one junction plate 6, bottom surface one end and the H section steel beam installation end 9 of described junction plate 6 are welded and fixed, and the other end of bottom surface and H section steel beam fixed end 8 are welded and fixed temporarily.
Described junction plate 6 is 2.
Described junction plate 6 is strip structure.
Centre position, described junction plate 6 bottom surface is provided with semicircle gap (crossing welding hole) 11.
Beneficial effect: the utility model is reduced to two junction plates with original connected node, adopts simple and effective connected mode, makes work progress more efficient and convenient, and can eliminate alignment error, and safe.
Description of drawings:
Fig. 1 prior art temporary connection plate structure chart.
Fig. 2 prior art temporary connecting joint schematic diagram.
Fig. 3 the utility model Karma temporary connection plate structure chart.
Fig. 4 the utility model Karma temporary connection plate connected node schematic diagram.
Fig. 5 is the lateral view of Fig. 4.
Accompanying drawing sign: 1, temporary connection plate; 2, connect otic placode; 3, bolt hole; 4, H section steel beam; 5, erection bolt; 6, junction plate; 7, factory's welding; 8, H section steel beam fixed end; 9, H section steel beam installation end; 10, Site Welding; 11, semicircle gap.
The specific embodiment:
Below in conjunction with drawings and Examples the utility model is elaborated.
With reference to Fig. 3 to Fig. 5, in the present embodiment, the Karma temporary connection plate comprises 2 junction plates 6, and bottom surface one end and the H section steel beam installation end 9 of described junction plate 6 are welded and fixed, and the other end of bottom surface and H section steel beam fixed end 8 are welded and fixed temporarily.Described junction plate 6 is strip structure.Centre position, described junction plate 6 bottom surface is provided with semicircle gap (crossing welding hole) 11.
The utility model is by reforming original temporary connection plate, original connected node is reduced to two junction plates, it is the Karma temporary connection plate, two junction plates are welded on the member installation end in factory in advance, and in hoisting process, the Karma junction plate can directly be stuck in the fixed end of member, and then junction plate and member fixed end be welded and fixed temporarily, convenient to operation, until member connect finish after, junction plate cut off get final product.In addition, the commissure is set up semicircle gap (cross welding hole) and is avoided junction plate to affect between the member welding between the junction plate member.
Above content is the further description of the utility model being done in conjunction with optimal technical scheme, can not assert that the implementation of utility model only limits to these explanations.Concerning the utility model person of an ordinary skill in the technical field, under the prerequisite that does not break away from design of the present utility model, can also make simple deduction and replacement, all should be considered as protection domain of the present utility model.

Claims (4)

1. Karma temporary connection plate, it is characterized in that, described Karma temporary connection plate comprises at least one junction plate (6), and bottom surface one end and the H section steel beam installation end (9) of described junction plate (6) are welded and fixed, and the other end of bottom surface and H section steel beam fixed end (8) are welded and fixed temporarily.
2. Karma temporary connection plate according to claim 1 is characterized in that, described junction plate (6) is 2.
3. Karma temporary connection plate according to claim 1 is characterized in that, described junction plate (6) is strip structure.
4. Karma temporary connection plate according to claim 1 is characterized in that, described junction plate (6) centre position, bottom surface is provided with semicircle gap (11).
CN 201220343194 2012-07-17 2012-07-17 Karma temporary connecting plate Expired - Fee Related CN202809843U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220343194 CN202809843U (en) 2012-07-17 2012-07-17 Karma temporary connecting plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220343194 CN202809843U (en) 2012-07-17 2012-07-17 Karma temporary connecting plate

Publications (1)

Publication Number Publication Date
CN202809843U true CN202809843U (en) 2013-03-20

Family

ID=47868750

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220343194 Expired - Fee Related CN202809843U (en) 2012-07-17 2012-07-17 Karma temporary connecting plate

Country Status (1)

Country Link
CN (1) CN202809843U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114310100A (en) * 2021-11-29 2022-04-12 上海江南长兴造船有限责任公司 Device and method for controlling butt welding deformation of section steel

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114310100A (en) * 2021-11-29 2022-04-12 上海江南长兴造船有限责任公司 Device and method for controlling butt welding deformation of section steel
CN114310100B (en) * 2021-11-29 2024-05-17 上海江南长兴造船有限责任公司 Device and method for controlling deformation of section steel butt welding

Similar Documents

Publication Publication Date Title
CN203654299U (en) Steel support loose end
CN202658532U (en) Bridge wet joint construction template
CN201310072Y (en) Supporting bracket of bridge construction
CN203271096U (en) Operating platform
CN201713946U (en) H-shaped steel beam and H-shaped steel column web direction connection node structure
CN202809843U (en) Karma temporary connecting plate
CN202706508U (en) Overhanging strength bearing steel beam construction member of scaffold
CN203361170U (en) Supporting upright column pile for building foundation pit support
CN203188612U (en) Beam frame type building template system
CN202990407U (en) Quick-release scaffold
CN202925883U (en) Large size wooden formwork surrounding purlin device
CN201882737U (en) Elevator guide rail bracket
CN102383613B (en) Hoisting construction method for steel roof truss of main power house of power plant and special hoisting device
CN202544399U (en) Supporting frame for overhang floor slab with steel structure
CN201817919U (en) Connecting part for steel structure beam hanger
CN202181614U (en) Steel pipe fixing device for joist steel
CN205224143U (en) Electronic hydraulic shovel power consumption reel mounting bracket
CN204238443U (en) A kind of detachable suspension column fastening devices
CN204152239U (en) A kind of assembled lattice support H profile steel support
CN204139334U (en) Girder steel and steel column weld temporary connecting structure entirely
CN203100853U (en) Foundation-free trunk scale
CN203430929U (en) Bridge frame connecting piece
CN202467221U (en) Power plant main workshop steel roof truss hoisting lifting device
CN203320420U (en) Temporary locking structure for corrugated steel webs of steel and concrete combined box girder
CN202689560U (en) Fixing device and vertical template system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130320

Termination date: 20190717

CF01 Termination of patent right due to non-payment of annual fee