CN206722368U - One kind is used to protect frame system outside the working regularization of assembled architecture - Google Patents
One kind is used to protect frame system outside the working regularization of assembled architecture Download PDFInfo
- Publication number
- CN206722368U CN206722368U CN201720131277.7U CN201720131277U CN206722368U CN 206722368 U CN206722368 U CN 206722368U CN 201720131277 U CN201720131277 U CN 201720131277U CN 206722368 U CN206722368 U CN 206722368U
- Authority
- CN
- China
- Prior art keywords
- support body
- square steel
- scaffold board
- regularization
- working
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
It is used to protect frame system outside the working regularization of assembled architecture the utility model discloses one kind, including horizontal protective device, the support meanss being supported on below horizontal protective device and the vertical protector located at horizontal protective device side, the horizontal protective device includes the scaffold board support body being welded by square steel and the scaffold board being laid on scaffold board support body, row's square steel sleeve pipe is welded with the outside of the scaffold board support body, skirting board is fixed between the square steel sleeve pipe, the vertical protector includes the protection network support body being welded by square steel and the protection network being fixed on protection network support body, in vertical square steel bottom insertion square steel sleeve pipe in the protection network support body.The outer protective frame structure design of regularization of the present utility model is reliable, and material is few, and install convenient, use cost is low, constructs in ground or indoor progress, and safety coefficient is high, and is not take up operation side, is advantageous to save the duration.
Description
Technical field
It the utility model is related to building construction technology.
Background technology
The assembled architecture that building exterior finish and prefabricated components are processed and formed at one time, in construction, if outer protective frame is still
Using the mode of traditional form, i.e. floor scaffolding or builder's jack, there can be problems with:1st, floor scaffolding is applied
Work uses limited height system;2nd, the I-steel of builder's jack will set hole to be provided, hole to be provided opening in prefabricated components such as exterior walls
Greatly, later stage repair procedure is complicated, it is difficult to meets the quality requirements such as insulation and seepage;3rd, conventional steel scaffold is more using material,
Taken time and effort when setting up, be unfavorable for cost and duration control, and potential safety hazard is more;When the 4th, setting up steel pipe scaffold, destructible is pre-
The exterior finish that exterior wall processed processes, cause the patch work that the later stage is extra.
Utility model content
Technical problem to be solved in the utility model is just to provide one kind and is used for the working regularization of assembled architecture
Outer protection frame system, assembling is convenient and conveniently dismantles.
In order to solve the above technical problems, the utility model adopts the following technical scheme that:One kind is used for assembled architecture and constructed
Protect frame system outside regularization, including horizontal protective device, the support meanss that are supported on below horizontal protective device and
Vertical protector located at horizontal protective device side, the horizontal protective device include the scaffold board being welded by square steel
Support body and the scaffold board being laid on scaffold board support body, row's square steel sleeve pipe, institute are welded with the outside of the scaffold board support body
State and skirting board is fixed between square steel sleeve pipe, the vertical protector includes the protection network support body being welded by square steel and solid
The protection network being scheduled on protection network support body, in the vertical square steel bottom insertion square steel sleeve pipe in the protection network support body.
Preferably, the support meanss include supportting and be welded on two right-angle sides of right angle support with the right angle that precast facade is fixed
Between diagonal brace, the upper right-angle side of right angle support fixed with scaffold board support body using bolt, the side right-angle side that the right angle supports
It is connected with precast facade using screw rod, and rubber cushion blocks is provided between side right-angle side and precast facade.
Preferably, the support meanss include with prefabricated bay window fix builder's jack, the builder's jack include respectively with it is prefabricated
The medial surface of bay window two uses the square steel that screw rod is fixed together, and the square steel is fixed with scaffold board support body using bolt.
Preferably, the support meanss include the sheer pole being fixed on prefabricated balcony and are supported in scaffold board support body
The cross tube of lower section, montant and diagonal brace are provided between the cross tube and sheer pole and is supported, the scaffold board support body and upper
Cross bar is joined with bolts, and screw shell is embedded with the prefabricated balcony, screw rod, the screw rod are passed through in the sheer pole
It is threadedly coupled with screw shell, nut is combined with the screw rod, the screw nut pressing is on sheer pole.
Preferably, being ridden on the outside of the sheer pole on the anti-bank of prefabricated balcony, the lumps of wood is used on the inside of the sheer pole
Pad is extremely with anti-bank the same as high.
Preferably, square steel cushion block is fastened by bolts between the diagonal brace and montant.
Preferably, angle steel diagonal brace is welded between the montant and scaffold board support body.
Preferably, the bottom of the scaffold board support body is provided with the channel-section steel used as backing plate, channel-section steel and the pin hand
The square steel of grillage body uses inverted U fixture conjunction, and is fixed inverted U fixture using bolt.
Preferably, the siffener angle plate of reinforcement is welded between the square steel sleeve pipe and scaffold board support body.
Preferably, the protection network support body includes some unit frameworks for being arranged side by side, between the adjacent framework of Unit two
It is fixed with bolts.
Protection frame system of the present utility model, it is divided into the outer protective frame of standard, the outer protective frame of bay window, the outer class of protective frame three of balcony
Support body, it is made up of support meanss, horizontal protective device, vertical protector three parts.The outer protective frame of three classes shares identical water
Flat, vertical protector, horizontal, vertical protector are customized using modulus in factory, entered for various sizes of prefabricated components
Row combination, is assembled into the support body for meeting to go along with sb. to guard him range size, and design corresponding support meanss.The support of the outer protective frame of three classes
Device and corresponding prefabricated components are attached using screw rod, and support meanss are connected with horizontal protective device and horizontal protective dress
Put and be connected by screw bolts with vertical protector.
The support body and other prefabricated components protection support body can form closing protector, be provided for whole operation side
Reliable building enclosure, while the protective frame can also use as construction operation platform.Compared to traditional floor scaffolding and hang
Outrigger scaffold, the utility model and other prefabricated components pylons have obvious cost advantage and technology excellent when being used in combination
Gesture:
1st, two stock body circulations use during the outer protective frame construction of regularization of the present utility model, without using height limitation;2、
The hole to be provided very little set to install outer protective frame on corresponding prefabricated components, later stage repairing is convenient, and quality is guaranteed;3rd, originally
The outer protective frame structure design of the regularization of utility model is reliable, and material is few, and install convenient, use cost is low, construct on ground or
Indoor progress, safety coefficient is high, and is not take up operation side, is advantageous to save the duration;4th, outside regularization of the present utility model
Protective frame is provided with rubber sheet gasket in support meanss, effectively protects the exterior wall finish processed.
Brief description of the drawings
The utility model is further described with reference to the accompanying drawings and detailed description:
Fig. 1 is the three-dimensional structure diagram of the outer protective frame of the utility model standard;
Fig. 2 is the front elevation view of the outer protective frame of the utility model standard;
Fig. 3 is the side elevational view of the outer protective frame of the utility model standard;
Fig. 4 is the upward view of the outer protective frame of the utility model standard;
Fig. 5 is the 3D effect figure of the outer protective frame of the utility model bay window;
Fig. 6 is the front elevation view of the outer protective frame of the utility model bay window;
Fig. 7 is the side elevational view of the outer protective frame of the utility model bay window;
Fig. 8 is the upward view of the outer protective frame of the utility model bay window;
Fig. 9 is the 3D effect figure of the outer protective frame of the utility model balcony;
Figure 10:The front elevation view of the outer protective frame of the utility model balcony;
Figure 11:The side elevational view of the outer protective frame of the utility model balcony;
Figure 12:The upward view of the outer protective frame of the utility model balcony;
Figure 13:The support meanss schematic diagram of the outer protective frame of the utility model standard;
Figure 14:The support meanss schematic diagram of the outer protective frame of the utility model bay window;
Figure 15:The support meanss schematic diagram of the outer protective frame of the utility model balcony;
Figure 16:The horizontal protective schematic device of the outer protective frame of the utility model;
Figure 17:The vertical protector schematic diagram of the outer protective frame of the utility model;
In figure:1. the builder's jack 8. of right angle 6. exterior finish of support 2. diagonal brace, 3. screw rod, 4. rubber cushion blocks, 5. precast facade 7.
Prefabricated 10. sheer pole of bay window 11. montant, 12. cross tube, 13. diagonal brace, 14. screw rod, 15. prefabricated balconies 16. of screw rod 9. are pre-
Bury the bolt 24. of 22 bolt of the balcony slab of screw shell 17. anti-18. lumps of wood of bank 19. steel plate washer, 20. bolt, 21. bolt 23.
The siffener angle plate of 29. square steel sleeve pipe of scaffold board support body 25. scaffold board, 26. bolt, 27. inverted U fixture, 28. channel-section steel 30.
31. 34. bolt of bolt 32. protection network support body, 33. protection network, 35. skirting board, the 36. short angle steel diagonal brace of square steel cushion block 37.
38. the baffle plate of bolt 39..
Embodiment
As shown in Figures 1 to 7, outer protection frame system of the present utility model is by protective frame, sun outside protective frame outside standard, bay window
The outer class support body of protective frame three composition of platform, per class, outer protective frame is made up of three parts:Support meanss, horizontal protective device, vertically prevent
Protection unit, the outer protective frame of three classes share that identical is horizontal, vertical protector, and horizontal, vertical protector uses mould in factory
Number customization, is combined for various sizes of prefabricated components, is assembled into the support body for meeting to go along with sb. to guard him range size, and design phase
The support meanss answered.
As shown in Figure 1 to Figure 4, shown in Figure 13, Figure 16, Figure 17, the support meanss of the outer protective frame of standard with precast facade by fixing
Right angle support 1 and be welded on the combination of diagonal brace 2 supportted between two right-angle sides at right angle and formed, upper right-angle side and the scaffold board frame of right angle support
Body is fixed using bolt, and the side right-angle side of right angle support is connected with precast facade using screw rod, primarily serves the connection He of precast facade 5
Support top support body simultaneously transmits the function of load, and wherein diagonal brace 2 primarily serves the effect of reinforcing.Right angle support 1 be 100mm ×
100mm × 8mm angle steel, diagonal brace 2 use 60mm × 60mm × 8mm angle steel;Angle steel 1 pastes and is provided with two circles on the side right-angle side of wall
Perforate, tapping are fixed with screw rod 3, for connecting outer protective frame and precast facade 5;Angle steel 1 paste wall side right-angle side with it is prefabricated
Exterior wall 5 is provided with two square rubber cushion blocks 4, avoids the contact of the exterior finish 6 of support body and precast facade 5 that extruding occurs and destroys,
Beneficial to finished product protection.
As shown in Fig. 5 to Fig. 8, Figure 14, Figure 16, Figure 17, the support meanss of the outer protective frame of bay window are mainly made up of builder's jack 7,
Builder's jack 7 includes the square steel for using screw rod to be fixed together with the prefabricated medial surface of bay window two respectively, and institute's square steel is adopted with scaffold board support body
Fixed with bolt, primarily serve the prefabricated bay window 9 of connection and support top support body and transmit the function of load, builder's jack 7 uses 100mm
× 100mm × 10mm square steel, there are on builder's jack 7 two screw rods 8 to be used for be connected outer protective frame and prefabricated bay window 9.
As shown in Fig. 9 to Figure 12, Fig. 1 to Figure 17, the support meanss of the outer protective frame of balcony by sheer pole 10, montant 11, on
Cross bar 12, diagonal brace 13 form, be connected by screw bolts it is integral, support meanss primarily serve connection prefabricated balcony 15 and support top
Support body transmits the function of load.Wherein sheer pole 10 is 120mm × 120mm × 10mm square steel, and montant 11 and cross tube 12 are
100mm × 100 × 10mm square steel, diagonal brace 13 use 75mm × 75mm × 10mm angle steel;Sheer pole 10 and diagonal brace 13, sheer pole 12
With montant 11, montant 11 and diagonal brace 13, montant 11 and cross tube 12, cross tube 12 and diagonal brace 13, respectively with bolt 20, bolt
21st, bolt 22, bolt 23, bolt 38 connect integral, wherein because there is spacing between diagonal brace 13 and montant 11, therefore place short side
Steel cushion block 36 ensures both contacts;Support meanss are with screw rod 3 by the pre-buried screw shell 16 in sheer pole 10 and prefabricated balcony 15
Be connected, the outside of sheer pole 1 is ridden on the anti-bank 17 of balcony slab, the inner side of sheer pole 10 with the pad of the lumps of wood 18 to the anti-bank of balcony slab
17 the same as high, guarantee support meanss level;During site operation, user can take the measure of welding angle steel diagonal brace 37 to be added
By force.
As shown in fig. 6, horizontal protective device is made up of scaffold board support body 24 and scaffold board 25, make as operating platform
With.Scaffold board support body 24 is welded to form using 50mm × 50mm × 4mm square steel, and scaffold board 25 uses 3mm thickness punching sheet metals.
When use outside balcony in protective frame when, the cross tube 12 of scaffold board support body 24 and support meanss is connected with bolt 26
It is fixed, when use protective frame outside bay window, fixed with the square steel of builder's jack 7, when use outside standard in protective frame when, be with directly
The upper right angle corner angle of angle brace 1 is fixed.
In addition, horizontal protective device side is welded with the high 50mm × 50mm of 250mm × 4mm square steel sleeve pipe 29, and with putting more energy into
The welding of gusset 30 is strengthened, and square steel sleeve pipe 29 is easy to vertical protector insertion connection, in scaffold board support body 24 and cross tube 12
Junction is provided with inverted U fixture, and channel-section steel 28 is provided with below cross tube 12 as backing plate and is used, with bolt by inverted U card
27 tools are fixed on whole support body, and suspension ring use when installing, dismantle as each outer protective frame;It is provided with the inside of horizontal protective device
Rotatable baffle plate 39, the length 150mm of baffle plate 39, for blocking horizontal protective device and whole outer protective frame and prefabricated components
Between gap.
As shown in fig. 7, vertical protector is mainly made up of protection network support body 32 and protection network 33, it is different types of outer anti-
The vertical protector of retaining frame and other adjacent protection support bodys play the function of operation side edge protection together.
Wherein protection network support body 32 is that 40mm × 40mm × 4mm square steel is welded to form, and protection network 33 is using the thick punchings of 1.5mm
Hole sheet metal.Protection network support body 32 includes some unit frameworks being arranged side by side, and unit framework is welded by the square steel of vertical and horizontal
Connect composition, then corresponding laying protection network.It is connected between the adjacent framework of Unit two with upper and lower twice bolt 34, protection network support body
In vertical square steel insertion horizontal protective device in square steel sleeve pipe 29 in, and be connected with twice bolt 31.
Technological principle of the present utility model is as follows:
For protective frame outside protective frame outside standard and bay window, mainly by support meanss, horizontal protective device, vertical protection dress
Composition is put, is bolted the fixed structure for forming overall stress.During construction, the outer protective frame of two sets of same types is generally set,
A set of to be fixed on n-th layer precast facade and prefabricated bay window position, the outer protective frame as n-th layer uses, it is a set of be fixed on n-th+
1 layer of precast facade and prefabricated bay window position, the outer protective frame as (n+1)th layer use, when constructing for the n-th+2 layers, you can by the
The outer protective frame of n-layer is removed and is transported to ground, is reinstalled on corresponding prefabricated components, is then lifted to the n-th+2 layers conduct
The n-th+2 layers of outer protective frame, so recycle until the architecture construction finishes.
For protective frame outside prefabricated balcony, mainly it is made up of, leads to support meanss, horizontal protective device, vertical protector
Cross bolt connection and fix the structure to form overall stress.During construction, two sets balconies protective frame outside is generally set, it is a set of to be fixed on the
N-1 layers prefabricated balcony 15 uses as the outer protective frame of n-th layer, and a set of n-th layer prefabricated balcony 15 that is fixed on is as (n+1)th layer
Outer protective frame uses, after the completion for the treatment of that (n+1)th layer of prefabricated balcony 15 lifts, you can remove (n-1)th layer of outer protective frame and pacify again
The outer protective frame as the n-th+2 layers on (n+1)th layer of prefabricated balcony is filled to, is so recycled until the architecture construction is complete
Finish.
Specific construction process of the present utility model includes following steps:
Step 1:Lifting, the inverted U card of outer protective frame is caught on using hanging device, outer protective frame is hung to corresponding prefabricated
Member position;
Step 2:Installation is fixed, and outer protective frame and prefabricated components are connected with screw rod, so as to will whole outer protective frame
It is fixed on prefabricated components;
Step 3:Adult is connected, mounted all types of outer protective frames are attached fixation;So as to ring whole building thing
Periphery forms the outer protector of an integrally closed, and the protector can also use as the operating platform of workmen.
Step 4:Remove and recycle, after the completion for the treatment of upper layer main body structure construction, the outer protective frame of lower floor is removed simultaneously
New construction floor is hung to be installed and used;
To sum up told, one kind of the utility model description is used to protect support body outside the working regularization of assembled architecture
System, is mainly made up of, three parts are bolted into whole support meanss, horizontal protective device, vertical protector three parts
Body, it is fixed on different prefabricated components, after connecting entirety, uses together as the protective fence of construction floor, also may be used
Operating platform as workmen uses.Compared to traditional floor scaffolding, builder's jack, the utility model description is determined
Horizontal protective structure and vertical safeguard structure in the outside the pale of civilization protection frame system of type use punching sheet metal, and hole is small, can be effective
Small objects falling from high altitude is avoided, ensure that lower section workmen's safety;Whole frame structure is simple, can accomplish that dismounting is again completely
Assembly, high recycling rate;Single building compare using the outer protective frame of the type with traditional defense device uses material few, can be with
The effective hiring cost for saving user;And outer protective frame installation is not take up operation side, can save the duration.
Outside a kind of single type in protection frame system outside the working regularization of assembled architecture of foregoing description
Protective frame is not used alone typically, generally requires collocation and be used in combination that complete protector could be formed.The utility model is retouched
Frame system is protected to apply in general to external wall facing and the one-time formed assembled-type house item of prefabricated components outside the regularization stated
Mesh or industrial project.
Above-mentioned is only the description of implementation example preferable to the utility model, and any limit is not done to the scope of the utility model
Calmly, any change, the modification that the others skilled in the art in the utility model field make according to the utility model content, belong to weigh
The protection domain of sharp claim.
Claims (10)
1. one kind is used to protect frame system outside the working regularization of assembled architecture, it is characterised in that:Filled including horizontal protective
The support meanss put, being supported on below horizontal protective device and the vertical protector located at horizontal protective device side, institute
Stating horizontal protective device includes the scaffold board support body being welded by square steel and the scaffold board being laid on scaffold board support body, institute
State and row's square steel sleeve pipe is welded with the outside of scaffold board support body, skirting board is fixed between the square steel sleeve pipe, it is described vertical anti-
Protection unit includes the protection network support body being welded by square steel and the protection network being fixed on protection network support body, the protective net frame
In vertical square steel bottom insertion square steel sleeve pipe in body.
2. according to claim 1 a kind of for protecting frame system outside the working regularization of assembled architecture, its feature
It is:The diagonal brace that the support meanss include the right angle support with precast facade fixation and are welded between two right-angle sides of right angle support,
The upper right-angle side of the right angle support is fixed with scaffold board support body using bolt, and the side right-angle side of the right angle support is adopted with precast facade
Connected with screw rod, and rubber cushion blocks are provided between side right-angle side and precast facade.
3. according to claim 1 a kind of for protecting frame system outside the working regularization of assembled architecture, its feature
It is:The support meanss include with prefabricated bay window fix builder's jack, the builder's jack include respectively with the prefabricated medial surface of bay window two
The square steel being fixed together using screw rod, the square steel are fixed with scaffold board support body using bolt.
4. according to claim 1 a kind of for protecting frame system outside the working regularization of assembled architecture, its feature
It is:The support meanss include the sheer pole being fixed on prefabricated balcony and the upper horizontal stroke being supported in below scaffold board support body
Bar, it is provided with montant between the cross tube and sheer pole and diagonal brace is supported, the scaffold board support body and cross tube bolt
It is connected, screw shell is embedded with the prefabricated balcony, screw rod, the screw rod and screw shell are passed through in the sheer pole
It is threadedly coupled, is combined with nut on the screw rod, the screw nut pressing is on sheer pole.
5. according to claim 4 a kind of for protecting frame system outside the working regularization of assembled architecture, its feature
It is:Ridden on the outside of the sheer pole on the anti-bank of prefabricated balcony, the inner side of the sheer pole is same extremely with anti-bank with lumps of wood pad
It is high.
6. according to claim 4 a kind of for protecting frame system outside the working regularization of assembled architecture, its feature
It is:Square steel cushion block has been fastened by bolts between the diagonal brace and montant.
7. according to claim 4 a kind of for protecting frame system outside the working regularization of assembled architecture, its feature
It is:Angle steel diagonal brace is welded between montant and the scaffold board support body.
8. according to claim 1 a kind of for protecting frame system outside the working regularization of assembled architecture, its feature
It is:The bottom of the scaffold board support body is provided with the channel-section steel used as backing plate, the square steel of channel-section steel and the scaffold board support body
Using inverted U fixture conjunction, and inverted U fixture is fixed using bolt.
9. according to claim 1 a kind of for protecting frame system outside the working regularization of assembled architecture, its feature
It is:The siffener angle plate of reinforcement is welded between the square steel sleeve pipe and scaffold board support body.
10. according to claim 1 a kind of for protecting frame system outside the working regularization of assembled architecture, its feature
It is:The protection network support body includes some unit frameworks being arranged side by side, and is connected by screw bolts between the adjacent framework of Unit two
It is fixed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720131277.7U CN206722368U (en) | 2017-02-14 | 2017-02-14 | One kind is used to protect frame system outside the working regularization of assembled architecture |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720131277.7U CN206722368U (en) | 2017-02-14 | 2017-02-14 | One kind is used to protect frame system outside the working regularization of assembled architecture |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206722368U true CN206722368U (en) | 2017-12-08 |
Family
ID=60500273
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720131277.7U Expired - Fee Related CN206722368U (en) | 2017-02-14 | 2017-02-14 | One kind is used to protect frame system outside the working regularization of assembled architecture |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206722368U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106677509A (en) * | 2017-02-14 | 2017-05-17 | 中天建设集团有限公司 | Design finalization external protective frame system used for assembly type building construction |
CN108104454A (en) * | 2017-12-29 | 2018-06-01 | 北京城建北方建设有限责任公司 | Prefabricated outer wall panel safety protection frame |
CN109826414A (en) * | 2019-03-26 | 2019-05-31 | 中国二十二冶集团有限公司 | Assembly of shear wall structure can have enough to meet the need outer protective frame and its construction method |
CN110541516A (en) * | 2019-09-05 | 2019-12-06 | 深圳市建工集团股份有限公司 | construction method for grid ceiling decoration at bottom of high-altitude cantilever frame |
-
2017
- 2017-02-14 CN CN201720131277.7U patent/CN206722368U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106677509A (en) * | 2017-02-14 | 2017-05-17 | 中天建设集团有限公司 | Design finalization external protective frame system used for assembly type building construction |
CN108104454A (en) * | 2017-12-29 | 2018-06-01 | 北京城建北方建设有限责任公司 | Prefabricated outer wall panel safety protection frame |
CN109826414A (en) * | 2019-03-26 | 2019-05-31 | 中国二十二冶集团有限公司 | Assembly of shear wall structure can have enough to meet the need outer protective frame and its construction method |
CN109826414B (en) * | 2019-03-26 | 2024-03-26 | 中国二十二冶集团有限公司 | Outer protective frame capable of turning over for assembled shear wall structure and construction method thereof |
CN110541516A (en) * | 2019-09-05 | 2019-12-06 | 深圳市建工集团股份有限公司 | construction method for grid ceiling decoration at bottom of high-altitude cantilever frame |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106677509A (en) | Design finalization external protective frame system used for assembly type building construction | |
CN206722368U (en) | One kind is used to protect frame system outside the working regularization of assembled architecture | |
CN206571130U (en) | A kind of outside the pale of civilization protective frame of sizing for Fabricated balcony | |
CN101736893B (en) | Overhanging type scaffold supporting system | |
CN103206074A (en) | Elevator shaft template construction method, platform and support | |
CN104310165A (en) | Guide rail type adhesion construction lifter and construction method thereof | |
CN104314095B (en) | A kind of shaped steel buttress for the construction of super thick raft plate and valve plate and construction method | |
CN104389419A (en) | Cantilevered formwork platform installation structure and construction method | |
CN106368430A (en) | Aluminum formwork installation process | |
CN203961238U (en) | Bolt anchor slab adjustable tool formula builder's jack | |
CN101265748A (en) | Tools type section steel fastener steel tube outer scaffold | |
CN206289945U (en) | A kind of assembled Portable safety crosshead | |
CN105603884A (en) | Safety protection platform for bridge cap beam construction | |
CN204282803U (en) | To encorbelment formwork structure for mounting platform | |
CN201190408Y (en) | Tool type exterior scaffolding of section steel fastening tube | |
CN206888904U (en) | A kind of cat ladder for bridge pier column construction | |
CN103552911B (en) | A kind of movable boom hoisting and the construction installation method of use thereof | |
CN204126290U (en) | Elevator shaft horizontal protective device | |
CN205474859U (en) | Bridge bent cap construction safety protection platform | |
CN109653484B (en) | Roofing superelevation faces external hanging flower basket mounting structure of empty curtain engineering | |
CN205134921U (en) | Building outer wall concrete constructional column hangs construction platform | |
CN206220461U (en) | A kind of packaged type I-steel hoistway operation platform | |
CN204662926U (en) | A kind of operating platform for steel pipe column top construction operation | |
CN209703987U (en) | Assembly of shear wall structure can have enough to meet the need outer protective frame | |
CN204662933U (en) | A kind of hoistway operation frame lift-type steel platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171208 Termination date: 20210214 |
|
CF01 | Termination of patent right due to non-payment of annual fee |