CN106677509A - Design finalization external protective frame system used for assembly type building construction - Google Patents

Design finalization external protective frame system used for assembly type building construction Download PDF

Info

Publication number
CN106677509A
CN106677509A CN201710078083.XA CN201710078083A CN106677509A CN 106677509 A CN106677509 A CN 106677509A CN 201710078083 A CN201710078083 A CN 201710078083A CN 106677509 A CN106677509 A CN 106677509A
Authority
CN
China
Prior art keywords
protective frame
square steel
support body
protective
frame system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710078083.XA
Other languages
Chinese (zh)
Inventor
侯鹏飞
叶文启
林鸿炜
张建强
周洌铖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongtian Construction Group Co Ltd
Original Assignee
Zhongtian Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongtian Construction Group Co Ltd filed Critical Zhongtian Construction Group Co Ltd
Priority to CN201710078083.XA priority Critical patent/CN106677509A/en
Publication of CN106677509A publication Critical patent/CN106677509A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/20Scaffolds essentially supported by building constructions, e.g. adjustable in height supported by walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/24Scaffolds essentially supported by building constructions, e.g. adjustable in height specially adapted for particular parts of buildings or for buildings of particular shape, e.g. chimney stacks or pylons
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/08Scaffold boards or planks
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/14Railings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G7/00Connections between parts of the scaffold
    • E04G7/02Connections between parts of the scaffold with separate coupling elements
    • E04G7/28Clips or connections for securing boards
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/14Railings
    • E04G2005/148Railings latticed or netted

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a design finalization external protective frame system used for assembly type building construction. The design finalization external protective frame system comprises a horizontal protective device, a supporting device and a vertical protective device, wherein the supporting device is supported below the horizontal protective device, and the vertical protective device is arranged on the side face of the horizontal protective device. The horizontal protective device comprises a foot plank frame body formed through welding of square steel and foot planks laid on the foot plank frame body, a row of square steel sleeve pipes are welded outside the foot plank frame body, and skirting boards are fixed between the square steel sleeve pipes. The vertical protective device comprises protective screening frame bodies formed through welding of square steel and protective screenings fixed to the protective screening frame bodies, and the bottom of the vertical square steel in the protective screening frame bodies is inserted into the square steel sleeve pipes. According to the design finalization external protective frame system used for assembly type building construction, a design finalization external protective frame is reliable in structural design, few in materials, convenient and quick to mount, low in using cost and high in safety factor, construction is conducted on the ground or in a room, the construction working face is not occupied, and construction period shortening is facilitated.

Description

One kind is for the outside the pale of civilization protective frame system of the working sizing of assembled architecture
Technical field
The present invention relates to building construction technology.
Background technology
The assembled architecture that building exterior finish and prefabricated components are processed and formed at one time, in construction, if outer protective frame is still Using traditional form, i.e. floor scaffolding or the mode of builder's jack, can there is problems with:1st, floor scaffolding construction Using limited height system;2nd, the I-steel of builder's jack will arrange hole to be provided in prefabricated components such as exterior walls, and hole to be provided opening is big, Later stage repair procedure is complicated, it is difficult to meet the prescriptions such as insulation and seepage;3rd, conventional steel scaffold is more using material, sets up When take time and effort, be unfavorable for cost and duration control, and potential safety hazard is more;When the 4th, setting up steel pipe scaffold, destructible is prefabricated outer The exterior finish that wall is processed, causes the patch work that the later stage is extra.
The content of the invention
The technical problem to be solved is just to provide a kind of outside the pale of civilization anti-for the working sizing of assembled architecture Retaining frame system, assembles convenient and convenient dismounting.
To solve above-mentioned technical problem, the present invention is adopted the following technical scheme that:One kind is working for assembled architecture Shape outside the pale of civilization protective frame system, including horizontal protective device, the support meanss that are supported on below horizontal protective device and be located at The vertical preventer of horizontal protective device side, the horizontal protective device includes the scaffold board support body being welded by square steel And the scaffold board being laid on scaffold board support body, row's square steel sleeve pipe, the side are welded with the outside of the scaffold board support body Skirting board is fixed between steel thimble, the vertical preventer includes the protection network support body being welded by square steel and is fixed on Protection network on protection network support body, in the vertical square steel bottom insertion square steel sleeve pipe in the protection network support body.
Preferably, the support meanss include the right angle fixed with precast facade support and are welded on two right-angle sides of right angle support Between diagonal brace, the upper right-angle side of right angle support fixed with scaffold board support body using bolt, the side right-angle side that the right angle is supportted It is connected using screw rod with precast facade, and rubber cushion blocks is provided between side right-angle side and precast facade.
Preferably, the support meanss include with prefabricated bay window fix builder's jack, the builder's jack include respectively with it is prefabricated The square steel that the medial surface of bay window two is fixed together using screw rod, the square steel with fixed using bolt with scaffold board support body.
Preferably, the support meanss include the sheer pole being fixed on prefabricated balcony and are supported in scaffold board support body The cross tube of lower section, is provided with montant and diagonal brace is supported between the cross tube and sheer pole, the scaffold board support body and upper Cross bar is joined with bolts, and screw shell is embedded with the prefabricated balcony, and screw rod, the screw rod are passed through in the sheer pole It is threadedly coupled with screw shell, nut is combined with the screw rod, the screw nut pressing is on sheer pole.
Preferably, riding on the outside of the sheer pole on the anti-bank of prefabricated balcony, on the inside of the sheer pole lumps of wood is used Pad to anti-bank with high.
Preferably, being fastened by bolts square steel cushion block between the diagonal brace and montant.
Preferably, welding angle steel diagonal brace between the montant and scaffold board support body.
Preferably, the bottom of the scaffold board support body is provided with the channel-section steel used as backing plate, the channel-section steel and foot handss The square steel of grillage body adopts inverted U fixture conjunction, and is fixed inverted U fixture using bolt.
Preferably, being welded with the siffener angle plate of reinforcement between the square steel sleeve pipe and scaffold board support body.
Preferably, the protection network support body includes some unit frameworks being arranged side by side, between the adjacent framework of Unit two It is fixed with bolts.
The protection frame system of the present invention, is divided into the outer protective frame of standard, the outer protective frame of bay window, the outer class frame of protective frame three of balcony Body, is made up of support meanss, horizontal protective device, the part of vertical preventer three.The shared identical level of the outer protective frame of three classes, Vertical preventer, level, vertical preventer are customized in factory using modulus, and for various sizes of prefabricated components group is carried out Close, be assembled into satisfaction and go along with sb. to guard him the support body of range size, and design corresponding support meanss.The support meanss of the outer protective frame of three classes Be attached using screw rod with corresponding prefabricated components, support meanss and horizontal protective device connection and horizontal protective device and Vertical preventer is with bolts.
The support body and other prefabricated components protection support bodys can form closing preventer, provide for whole operation side Reliable building enclosure, while the protective frame also can be used as construction operation platform.Compare traditional floor scaffolding and hang Outrigger scaffold, the present invention and other prefabricated components pylons have obvious cost advantage and technical advantage when being used in combination:
1st, two stock body circulations are used when the outside the pale of civilization protective frame of sizing of the invention is constructed, without using limitation in height;2nd, it is peace The hole to be provided very little for filling outer protective frame and arranging on corresponding prefabricated components, it is convenient that the later stage repairs, and quality is guaranteed;3rd, the present invention The outside the pale of civilization protective frame structure design reliability of sizing, material is few, and install convenient, use cost is low, and construction is carried out on ground or interior, Safety coefficient is high, and is not take up operation side, is conducive to saving the duration;4th, the outside the pale of civilization protective frame of sizing of the invention is supporting dress Rubber sheet gasket is centered, the effective protection exterior wall finish for processing.
Description of the drawings
With reference to the accompanying drawings and detailed description the invention will be further described:
Fig. 1 is the three-dimensional structure diagram of the outer protective frame of standard of the present invention;
Fig. 2 is the front elevation view of the outer protective frame of standard of the present invention;
Fig. 3 is the side elevational view of the outer protective frame of standard of the present invention;
Fig. 4 is the upward view of the outer protective frame of standard of the present invention;
Fig. 5 is the 3D effect figure of the outer protective frame of bay window of the present invention;
Fig. 6 is the front elevation view of the outer protective frame of bay window of the present invention;
Fig. 7 is the side elevational view of the outer protective frame of bay window of the present invention;
Fig. 8 is the upward view of the outer protective frame of bay window of the present invention;
Fig. 9 is the 3D effect figure of the outer protective frame of balcony of the present invention;
Figure 10:The front elevation view of the outer protective frame of balcony of the present invention;
Figure 11:The side elevational view of the outer protective frame of balcony of the present invention;
Figure 12:The upward view of the outer protective frame of balcony of the present invention;
Figure 13:The support meanss schematic diagram of the outer protective frame of standard of the present invention;
Figure 14:The support meanss schematic diagram of the outer protective frame of bay window of the present invention;
Figure 15:The support meanss schematic diagram of the outer protective frame of balcony of the present invention;
Figure 16:The horizontal protective schematic device of the outer protective frame of the present invention;
Figure 17:The vertical preventer schematic diagram of the outer protective frame of the present invention;
In figure:1. right angle supports the builder's jack 8. of 2. diagonal brace, 3. screw rod, 4. rubber cushion blocks, 5. precast facade, 6. exterior finish 7. Prefabricated 10. sheer pole of bay window 11. montant, 12. cross tube, 13. diagonal brace, 14. screw rod, 15. prefabricated balconies 16. of screw rod 9. are pre- Bury the bolt 24. of 22 bolt of the balcony slab of screw shell 17. anti-18. lumps of wood of bank 19. steel plate washer, 20. bolt, 21. bolt 23. The siffener angle plate of 29. square steel sleeve pipe of scaffold board support body 25. scaffold board, 26. bolt, 27. inverted U fixture, 28. channel-section steel 30. The angle steel diagonal brace of 31. bolt, 32. protection network support body, 33. protection network, 34. bolt, 35. 36. short square steel cushion block of skirting board 37. The baffle plate of 38. bolt 39..
Specific embodiment
As shown in Figures 1 to 7, outer protection frame system of the invention by the outer protective frame of standard, the outer protective frame of bay window, balcony outside The class support body of protective frame three is constituted, and per class, outer protective frame is made up of three parts:Support meanss, horizontal protective device, vertical protection dress Put, the outer protective frame of three classes shares identical level, vertical preventer, and level, vertical preventer are fixed using modulus in factory System, is combined for various sizes of prefabricated components, is assembled into satisfaction and goes along with sb. to guard him the support body of range size, and designs corresponding Support meanss.
As shown in Figure 1 to Figure 4, shown in Figure 13, Figure 16, Figure 17, the support meanss of the outer protective frame of standard with precast facade by fixing Right angle support 1 and be welded on the combination of diagonal brace 2 supportted between two right-angle sides at right angle and formed, upper right-angle side and the scaffold board frame of right angle support Body is fixed using bolt, and the side right-angle side of right angle support is connected with precast facade using screw rod, primarily serves the connection He of precast facade 5 Support top support body and transmit the function of load, wherein diagonal brace 2 primarily serves the effect of reinforcing.Right angle support 1 be 100mm × 100mm × 8mm angle steel, diagonal brace 2 adopts 60mm × 60mm × 8mm angle steel;Two circles are provided with the side right-angle side of the patch wall of angle steel 1 Perforate, tapping is fixed with screw rod 3, for connecting outer protective frame and precast facade 5;Angle steel 1 patch wall side right-angle side with it is prefabricated Exterior wall 5 is provided with two square rubber cushion blocks 4, it is to avoid the contact of exterior finish 6 of support body and precast facade 5 occurs extruding destruction, Beneficial to finished product protection.
As shown in Fig. 5 to Fig. 8, Figure 14, Figure 16, Figure 17, the support meanss of the outer protective frame of bay window are mainly made up of builder's jack 7, Builder's jack 7 includes the square steel that is fixed together using screw rod with the medial surface of prefabricated bay window two respectively, institute's square steel with scaffold board support body Fixed using bolt, primarily serve the prefabricated bay window 9 of connection and support top support body and transmit the function of load, builder's jack 7 is adopted The square steel of 100mm × 100mm × 10mm, has two screw rods 8 for be connected outer protective frame and prefabricated bay window 9 on builder's jack 7.
As shown in Fig. 9 to Figure 12, Fig. 1 to Figure 17, the support meanss of the outer protective frame of balcony by sheer pole 10, montant 11, on Cross bar 12, diagonal brace 13 are constituted, with bolts integral, and support meanss primarily serve connection prefabricated balcony 15 and support top Support body transmits the function of load.Wherein sheer pole 10 is 120mm × 120mm × 10mm square steel, and montant 11 and cross tube 12 are 100mm × 100 × 10mm square steel, diagonal brace 13 adopts 75mm × 75mm × 10mm angle steel;Sheer pole 10 and diagonal brace 13, sheer pole 12 With montant 11, montant 11 and diagonal brace 13, montant 11 and cross tube 12, cross tube 12 and diagonal brace 13, respectively with bolt 20, bolt 21st, bolt 22, bolt 23, bolt 38 connect integral, wherein because there is spacing between diagonal brace 13 and montant 11, therefore place short side Steel cushion block 36 ensures both contacts;Support meanss screw rod 3 is by the pre-buried screw shell 16 in sheer pole 10 and prefabricated balcony 15 Be connected, the outside of sheer pole 1 is ridden on the anti-bank 17 of balcony slab, the inner side lumps of wood 18 of sheer pole 10 pad to the anti-bank 17 of balcony slab With high, it is ensured that support meanss level;During site operation, user can take the measure of welding angle steel diagonal brace 37 to be strengthened.
As shown in fig. 6, horizontal protective device is made up of scaffold board support body 24 and scaffold board 25, make as operating platform With.Scaffold board support body 24 is welded to form using 50mm × 50mm × 4mm square steel, and scaffold board 25 is using 3mm thickness punching sheet metals.
When using in the outer protective frame of balcony, the cross tube 12 of scaffold board support body 24 and support meanss is connected with bolt 26 It is fixed, when using in bay window outer protective frame, fixed with the square steel of builder's jack 7, when using in the outer protective frame of standard, be with directly The upper right angle corner angle of angle brace 1 is fixed.
In addition, horizontal protective device side is welded with the high 50mm × 50mm of 250mm × 4mm square steel sleeve pipe 29, and with putting more energy into The welding of gusset 30 is strengthened, and square steel sleeve pipe 29 is easy to vertical preventer insertion connection, in scaffold board support body 24 and cross tube 12 Junction is provided with inverted U fixture, channel-section steel 28 is provided with below cross tube 12 and is used as backing plate, with bolt by inverted U card 27 tools are fixed on whole support body, and suspension ring are used when installing, dismantle as each outer protective frame;Horizontal protective device inner side is provided with Rotatable baffle plate 39, length 150mm of baffle plate 39, for blocking horizontal protective device and whole between outer protective frame and prefabricated components Gap.
As shown in fig. 7, vertical preventer is mainly made up of protection network support body 32 and protection network 33, it is different types of outer anti- The vertical preventer of retaining frame and other adjacent protection support bodys play together the function that construction operation faces frontier defense shield.
Wherein protection network support body 32 is welded to form for 40mm × 40mm × 4mm square steel, and protection network 33 is using 1.5mm thickness punchings Sheet metal.Protection network support body 32 includes some unit frameworks being arranged side by side, and unit framework is welded by the square steel of vertical and horizontal Composition, then corresponding laying protection network.It is connected with upper and lower twice bolt 34 between the adjacent framework of Unit two, in protection network support body Vertical square steel insertion horizontal protective device in square steel sleeve pipe 29 in, and be connected with twice bolt 31.
The technological principle of the present invention is as follows:
For the outer protective frame of standard and the outer protective frame of bay window, mainly by support meanss, horizontal protective device, vertical protection dress Composition is put, the fixed structure for forming overall stress is bolted.During construction, the outer protective frame of two sets of same types is generally set, It is a set of to be fixed on n-th layer precast facade and prefabricated bay window position, use as the outer protective frame of n-th layer, it is a set of to be fixed on (n+1)th Layer precast facade and prefabricated bay window position, use as (n+1)th layer of outer protective frame, when constructing for the n-th+2 layers, you can by n-th The outer protective frame of layer is removed and is transported to ground, is reinstalled on corresponding prefabricated components, then lift to the n-th+2 layers as the The outer protective frame of n+2 layers, so recycles until the architecture construction is finished.
For the outer protective frame of prefabricated balcony, mainly it is made up of support meanss, horizontal protective device, vertical preventer, is led to Cross bolt connection and fix the structure to form overall stress.During construction, two sets balconies protective frame outward is generally set, it is a set of to be fixed on the N-1 layers prefabricated balcony 15 is used as the outer protective frame of n-th layer, and a set of n-th layer prefabricated balcony 15 that is fixed on is used as (n+1)th layer Outer protective frame is used, after the completion for the treatment of that (n+1)th layer of prefabricated balcony 15 is lifted, you can remove (n-1)th layer of outer protective frame and pacify again The outer protective frame as the n-th+2 layers is filled on (n+1)th layer of prefabricated balcony, is so recycled until the architecture construction is complete Finish.
The Specific construction operation of the present invention includes following step:
Step 1:Lifting, using hanging device the inverted U card of outer protective frame is caught on, and outer protective frame is hung to corresponding prefabricated Member position;
Step 2:Install and fix, outer protective frame and prefabricated components are connected with screw rod, so as to will whole outer protective frame It is fixed on prefabricated components;
Step 3:Mounted all types of outer protective frames are attached fixation by connection adult;So as to ring whole building thing Periphery forms the outer preventer of an integrally closed, and the preventer also can be used as the operating platform of workmen.
Step 4:Remove and recycle, after the completion for the treatment of upper layer main body structure construction, the outer protective frame of lower floor is removed simultaneously It is hung to new construction floor to be installed and used;
To sum up told, one kind of present invention description is used for the outside the pale of civilization protective frame system of the working sizing of assembled architecture, main To be made up of support meanss, horizontal protective device, the part of vertical preventer three, three parts are bolted integral, peace Dress is fixed on different prefabricated components, after connection entirety, is used together as the protective fence of construction floor, also can be used as applying The operating platform of workman person is used.Compare traditional floor scaffolding, builder's jack, the outside the pale of civilization protection of sizing of present invention description Horizontal protective structure and vertical safeguard structure in frame system adopts punching sheet metal, and hole is little, can be prevented effectively from fines Body falling from high altitude, it is ensured that lower section workmen's safety;Whole frame structure is simple, can accomplish to dismantle again assembled, repetition completely Utilization rate is high;Build for single and compare with traditional defense device few using material using the outer protective frame of the type, can effectively save Save the hiring cost of user;And outer protective frame is installed and is not take up operation side, can be saved the duration.
Outside single type in a kind of outside the pale of civilization protective frame system for the working sizing of assembled architecture of foregoing description Protective frame is not typically used alone, and generally requiring to arrange in pairs or groups to be used in combination could form complete preventer.The invention description Outside the pale of civilization protective frame system of shaping apply in general to external wall facing and the one-time formed assembled-type house project of prefabricated components or Industrial project.
Above-mentioned is only the description for implementing example preferable to the present invention, and any restriction is not done to the scope of the present invention, this Any change, modification that the others skilled in the art in bright field make according to present invention, belong to the protection of claims Scope.

Claims (10)

1. a kind of for the outside the pale of civilization protective frame system of the working sizing of assembled architecture, it is characterised in that:Including horizontal protective dress The support meanss put, being supported on below horizontal protective device and the vertical preventer located at horizontal protective device side, institute Stating horizontal protective device includes the scaffold board support body being welded by square steel and the scaffold board being laid on scaffold board support body, institute State and row's square steel sleeve pipe is welded with the outside of scaffold board support body, skirting board is fixed between the square steel sleeve pipe, it is described vertical anti- Protection unit includes the protection network support body being welded by square steel and the protection network being fixed on protection network support body, the protective net frame In vertical square steel bottom insertion square steel sleeve pipe in body.
2. according to claim 1 a kind of for the outside the pale of civilization protective frame system of the working sizing of assembled architecture, its feature It is:The diagonal brace that the support meanss include the right angle fixed with precast facade support and are welded between two right-angle sides of right angle support, The upper right-angle side of the right angle support is fixed with scaffold board support body using bolt, and the side right-angle side of the right angle support is adopted with precast facade Connected with screw rod, and rubber cushion blocks are provided between side right-angle side and precast facade.
3. according to claim 1 a kind of for the outside the pale of civilization protective frame system of the working sizing of assembled architecture, its feature It is:The support meanss include with prefabricated bay window fix builder's jack, the builder's jack include respectively with the medial surface of prefabricated bay window two The square steel being fixed together using screw rod, the square steel with fixed using bolt with scaffold board support body.
4. according to claim 1 a kind of for the outside the pale of civilization protective frame system of the working sizing of assembled architecture, its feature It is:The support meanss include the sheer pole being fixed on prefabricated balcony and the upper horizontal stroke being supported in below scaffold board support body Bar, is provided with montant between the cross tube and sheer pole and diagonal brace is supported, the scaffold board support body and cross tube bolt It is connected, screw shell is embedded with the prefabricated balcony, screw rod, the screw rod and screw shell is passed through in the sheer pole Threaded connection, is combined with nut on the screw rod, the screw nut pressing is on sheer pole.
5. according to claim 1 a kind of for the outside the pale of civilization protective frame system of the working sizing of assembled architecture, its feature It is:Ride on the outside of the sheer pole on the anti-bank of prefabricated balcony, the inner side of the sheer pole is extremely same with anti-bank with lumps of wood pad It is high.
6. according to claim 1 a kind of for the outside the pale of civilization protective frame system of the working sizing of assembled architecture, its feature It is:Square steel cushion block has been fastened by bolts between the diagonal brace and montant.
7. according to claim 1 a kind of for the outside the pale of civilization protective frame system of the working sizing of assembled architecture, its feature It is:Angle steel diagonal brace is welded between the montant and scaffold board support body.
8. according to claim 1 a kind of for the outside the pale of civilization protective frame system of the working sizing of assembled architecture, its feature It is:The bottom of the scaffold board support body is provided with the square steel of the channel-section steel used as backing plate, the channel-section steel and scaffold board support body Using inverted U fixture conjunction, and inverted U fixture is fixed using bolt.
9. according to claim 1 a kind of for the outside the pale of civilization protective frame system of the working sizing of assembled architecture, its feature It is:The siffener angle plate of reinforcement is welded between the square steel sleeve pipe and scaffold board support body.
10. according to claim 1 a kind of for the outside the pale of civilization protective frame system of the working sizing of assembled architecture, its feature It is:The protection network support body includes some unit frameworks being arranged side by side, with bolts between the adjacent framework of Unit two It is fixed.
CN201710078083.XA 2017-02-14 2017-02-14 Design finalization external protective frame system used for assembly type building construction Pending CN106677509A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710078083.XA CN106677509A (en) 2017-02-14 2017-02-14 Design finalization external protective frame system used for assembly type building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710078083.XA CN106677509A (en) 2017-02-14 2017-02-14 Design finalization external protective frame system used for assembly type building construction

Publications (1)

Publication Number Publication Date
CN106677509A true CN106677509A (en) 2017-05-17

Family

ID=58861618

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710078083.XA Pending CN106677509A (en) 2017-02-14 2017-02-14 Design finalization external protective frame system used for assembly type building construction

Country Status (1)

Country Link
CN (1) CN106677509A (en)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107130783A (en) * 2017-07-05 2017-09-05 中国二十二冶集团有限公司 The prefabricated sandwich heat preservation Side fascia protection frame construction method of assembling type steel structure house
CN107461033A (en) * 2017-09-08 2017-12-12 深圳前海特辰科技有限公司 Construction protection canopy and its construction method
CN107524284A (en) * 2017-09-18 2017-12-29 山东天齐置业集团股份有限公司 A kind of regularization pylon protection system and installation method
CN108756196A (en) * 2018-08-20 2018-11-06 中建四局第六建筑工程有限公司 A kind of assembled architecture main body protective device and its construction method
CN108868096A (en) * 2018-06-14 2018-11-23 上海二十冶建设有限公司 It is fixed on the outer protection tripod of pin-connected panel safety and its application method of precast facade
CN109356402A (en) * 2018-12-24 2019-02-19 中冶建工集团有限公司 A kind of active well pin-connected panel spiral stairway
CN109594759A (en) * 2017-09-30 2019-04-09 中国二十冶集团有限公司 The double-deck outer protection rack device of height-adjustable pin-connected panel and its application method
CN109826455A (en) * 2019-01-22 2019-05-31 北京博创绿色建筑科技有限公司 Assembled architecture construction protective frame and application method
CN109914776A (en) * 2019-04-29 2019-06-21 中冶建工集团有限公司 A kind of assembled architecture overhanging balcony position peripheral structure
CN110552495A (en) * 2019-09-24 2019-12-10 北京城建亚泰建设集团有限公司 assembled building combined tool type outer protective frame system and construction method thereof
JP2019218830A (en) * 2018-06-22 2019-12-26 株式会社 ▲高▼▲橋▼監理 Up-and-down movable external scaffolding for high-rise building with no vacant neighboring land
CN113356553A (en) * 2021-06-29 2021-09-07 中铁十四局集团有限公司 Assembly type external hanging rack and construction method thereof
CN114737739A (en) * 2022-03-01 2022-07-12 锦萧建筑科技有限公司 Connecting structure of overhanging outer frame step plate and cantilever frame
CN115929001A (en) * 2022-10-18 2023-04-07 湖南航天建筑工程有限公司 Assembly type building cast-in-place structure outer frame-free protection system and construction method thereof

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB831148A (en) * 1956-05-30 1960-03-23 Scaffolding Great Britain Ltd A new or improved scaffolding assembly
CN102168484A (en) * 2011-04-01 2011-08-31 姚康华 External hanging scaffold and application method thereof
KR101297794B1 (en) * 2012-11-27 2013-08-19 비코비엔주식회사 Scaffolding system for seismic retrofit of building structures and seismic retrofit method using the same
CN105178618A (en) * 2015-07-31 2015-12-23 中天建设集团有限公司 Protecting frame for construction of prefabricated external wall board with bay window
CN205012627U (en) * 2015-07-02 2016-02-03 中天建设集团有限公司 Assembly type structure outer wall protects stores pylon outward
CN205577451U (en) * 2016-04-05 2016-09-14 上海建工五建集团有限公司 Instrument formula protection frame suitable for assemble integral concrete horizontal element
CN205894638U (en) * 2016-08-15 2017-01-18 慧邦大成科技(北京)有限公司 Balcony scaffolding structure that encorbelments
CN206571130U (en) * 2017-02-14 2017-10-20 中天建设集团有限公司 A kind of outside the pale of civilization protective frame of sizing for Fabricated balcony
CN206722368U (en) * 2017-02-14 2017-12-08 中天建设集团有限公司 One kind is used to protect frame system outside the working regularization of assembled architecture

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB831148A (en) * 1956-05-30 1960-03-23 Scaffolding Great Britain Ltd A new or improved scaffolding assembly
CN102168484A (en) * 2011-04-01 2011-08-31 姚康华 External hanging scaffold and application method thereof
KR101297794B1 (en) * 2012-11-27 2013-08-19 비코비엔주식회사 Scaffolding system for seismic retrofit of building structures and seismic retrofit method using the same
CN205012627U (en) * 2015-07-02 2016-02-03 中天建设集团有限公司 Assembly type structure outer wall protects stores pylon outward
CN105178618A (en) * 2015-07-31 2015-12-23 中天建设集团有限公司 Protecting frame for construction of prefabricated external wall board with bay window
CN205577451U (en) * 2016-04-05 2016-09-14 上海建工五建集团有限公司 Instrument formula protection frame suitable for assemble integral concrete horizontal element
CN205894638U (en) * 2016-08-15 2017-01-18 慧邦大成科技(北京)有限公司 Balcony scaffolding structure that encorbelments
CN206571130U (en) * 2017-02-14 2017-10-20 中天建设集团有限公司 A kind of outside the pale of civilization protective frame of sizing for Fabricated balcony
CN206722368U (en) * 2017-02-14 2017-12-08 中天建设集团有限公司 One kind is used to protect frame system outside the working regularization of assembled architecture

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107130783A (en) * 2017-07-05 2017-09-05 中国二十二冶集团有限公司 The prefabricated sandwich heat preservation Side fascia protection frame construction method of assembling type steel structure house
CN107461033A (en) * 2017-09-08 2017-12-12 深圳前海特辰科技有限公司 Construction protection canopy and its construction method
CN107524284A (en) * 2017-09-18 2017-12-29 山东天齐置业集团股份有限公司 A kind of regularization pylon protection system and installation method
CN109594759A (en) * 2017-09-30 2019-04-09 中国二十冶集团有限公司 The double-deck outer protection rack device of height-adjustable pin-connected panel and its application method
CN109594759B (en) * 2017-09-30 2021-03-26 中国二十冶集团有限公司 Height-adjustable assembled double-layer outer protection frame device and using method thereof
CN108868096A (en) * 2018-06-14 2018-11-23 上海二十冶建设有限公司 It is fixed on the outer protection tripod of pin-connected panel safety and its application method of precast facade
JP2019218830A (en) * 2018-06-22 2019-12-26 株式会社 ▲高▼▲橋▼監理 Up-and-down movable external scaffolding for high-rise building with no vacant neighboring land
JP7048003B2 (en) 2018-06-22 2022-04-05 株式会社高橋監理 Vertically movable outer scaffolding for high-rise buildings with no vacant land next door
CN108756196A (en) * 2018-08-20 2018-11-06 中建四局第六建筑工程有限公司 A kind of assembled architecture main body protective device and its construction method
CN109356402A (en) * 2018-12-24 2019-02-19 中冶建工集团有限公司 A kind of active well pin-connected panel spiral stairway
CN109356402B (en) * 2018-12-24 2020-12-15 中冶建工集团有限公司 Pin-connected panel spiral stair for working well
CN109826455A (en) * 2019-01-22 2019-05-31 北京博创绿色建筑科技有限公司 Assembled architecture construction protective frame and application method
CN109914776A (en) * 2019-04-29 2019-06-21 中冶建工集团有限公司 A kind of assembled architecture overhanging balcony position peripheral structure
CN110552495A (en) * 2019-09-24 2019-12-10 北京城建亚泰建设集团有限公司 assembled building combined tool type outer protective frame system and construction method thereof
CN113356553A (en) * 2021-06-29 2021-09-07 中铁十四局集团有限公司 Assembly type external hanging rack and construction method thereof
CN114737739A (en) * 2022-03-01 2022-07-12 锦萧建筑科技有限公司 Connecting structure of overhanging outer frame step plate and cantilever frame
CN115929001A (en) * 2022-10-18 2023-04-07 湖南航天建筑工程有限公司 Assembly type building cast-in-place structure outer frame-free protection system and construction method thereof

Similar Documents

Publication Publication Date Title
CN106677509A (en) Design finalization external protective frame system used for assembly type building construction
CN105888108B (en) Built-in positioning prefabricated component reinforced concrete shear wall and construction method
CN206571130U (en) A kind of outside the pale of civilization protective frame of sizing for Fabricated balcony
CN104074358B (en) The construction method of prefabricated building
CN201053200Y (en) Assembled
CN104389419B (en) Encorbelment and prop up mould structure for mounting platform and a constructional method
CN103422668A (en) Construction method of super-thick large-slope shear wall and hydraulic self-jacking inclined creeping framework thereof
CN103206074A (en) Elevator shaft template construction method, platform and support
CN206722368U (en) One kind is used to protect frame system outside the working regularization of assembled architecture
CN105649314A (en) Suspension platform for high and long-span corridor construction
CN103882813A (en) Corbel bracket platform for bridge pier and transverse straining beam synchronous construction and construction method of corbel bracket platform
CN213329955U (en) Flower basket diagonal rod type overhanging scaffold
CN106400691A (en) Integrated construction process for anti-collision wall formwork
CN102912996A (en) Steel tube concrete column high-altitude construction safety protection system
CN202954552U (en) Steel tube concrete column high-altitude construction safety protection system
CN207296479U (en) Steel structure stairway in elevator
CN203452375U (en) Hydraulic self-jacking oblique creeping formwork
CN206581577U (en) Using housing construction builder's jack
CN205577383U (en) Attached lifting scaffold
CN205804911U (en) A kind of builder's jack
CN204126290U (en) Elevator shaft horizontal protective device
CN203947756U (en) Exterior wall protective frame
CN212247894U (en) A concrete placement support device for steel-concrete composite beam
CN205171979U (en) Integrated form all steel lift platform
CN107829553A (en) A kind of elevator hoistways construction platform system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170517