CN205693609U - Ground photovoltaic bracket and photovoltaic module hanger bracket device are installed - Google Patents

Ground photovoltaic bracket and photovoltaic module hanger bracket device are installed Download PDF

Info

Publication number
CN205693609U
CN205693609U CN201620581023.0U CN201620581023U CN205693609U CN 205693609 U CN205693609 U CN 205693609U CN 201620581023 U CN201620581023 U CN 201620581023U CN 205693609 U CN205693609 U CN 205693609U
Authority
CN
China
Prior art keywords
vertical rod
photovoltaic
ladder
scaffold board
photovoltaic module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620581023.0U
Other languages
Chinese (zh)
Inventor
梁飞飞
欧阳达
张彦
侯创
窦海林
王波
吴治国
李亮亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Middle Northwest Co Ltd Of Study On Engineering Design Institute
Original Assignee
Middle Northwest Co Ltd Of Study On Engineering Design Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Middle Northwest Co Ltd Of Study On Engineering Design Institute filed Critical Middle Northwest Co Ltd Of Study On Engineering Design Institute
Priority to CN201620581023.0U priority Critical patent/CN205693609U/en
Application granted granted Critical
Publication of CN205693609U publication Critical patent/CN205693609U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Abstract

This utility model belongs to photovoltaic power station component mounting technique field, it is specifically related to ground photovoltaic bracket and photovoltaic module hanger bracket device are installed, including scaffold board, the suspension ladder at scaffold board two ends, described suspension ladder top is oblique angle structure, hang ladder top and be evenly distributed with multiple hook along oblique angle structure, multiple hooks are on same oblique line and this oblique line gradient is consistent with oblique angle structure gradient, hang ladder support body by the cross bar being provided with step-like distribution after forward direction, movable being placed on cross bar of described scaffold board, simple in construction, easy to use, it is easy to continuous production process, ground photovoltaic power plant bracket purlin and the installation effectiveness of assembly can be increased substantially.

Description

Ground photovoltaic bracket and photovoltaic module hanger bracket device are installed
Technical field
This utility model belongs to photovoltaic power station component mounting technique field, is specifically related to install ground photovoltaic bracket and photovoltaic Assembly hanger bracket device.
Background technology
In ground light overhead utility work progress, the installation of support purlin and assembly is very important ring in power plant construction Joint, wide, the duration of often constructing is tight and task weight, and can the speed of its construction speed directly influences power station the most grid-connected Electricity, and then be related to power station and can benefit as early as possible.
When ground photovoltaic power plant bracket purlin and assembly are installed, most commonly seen mode is by mean of console model and moves foot hands Frame (see Fig. 5) is installed.This device is used ground photovoltaic power plant bracket purlin to be installed and is primarily present following problem during assembly: 1, device is heavy, at least needs two or more operating personnel's cooperations just removable time mobile.2, console model moves foot hands When frame moves, to ground from scaffold, the operating personnel on scaffold top need to treat that scaffold moves to next installation site After, operating personnel climbs up the landing stage of scaffold again and carries out installation exercise, and efficiency of construction is low, and the work adding operating personnel is strong Degree.
Utility model content
The purpose of this utility model is to provide installs ground photovoltaic bracket and photovoltaic module hanger bracket device, structure letter Single, easy to use, it is possible to increase substantially ground photovoltaic power plant bracket purlin and the installation effectiveness of assembly.
The technical scheme that this utility model solves the employing of its technical problem is as follows:
Ground photovoltaic bracket and photovoltaic module hanger bracket device are installed, including scaffold board, the suspension ladder at scaffold board two ends Frame, described suspension ladder top is oblique angle structure, hangs ladder top and is evenly distributed with multiple hook along oblique angle structure, multiple Hook is on same oblique line and this oblique line gradient is consistent with oblique angle structure gradient, hangs ladder support body by being provided with step after forward direction The cross bar of shape distribution, movable being placed on cross bar of described scaffold board, hang oblique angle and the light of the oblique angle structure of ladder bottom The oblique angle of the cant beam of volt support is consistent, is hung on cant beam by suspension ladder by hook, hangs ladder top and oblique beam structure Coordinating, scaffold board is then placed on the fixed mount and the cross bar that hang ladder, scaffold board stepped structure distribution, the most not With, making multiple operator may stand on the scaffold board of differing heights, coordinate with ground staff, the human world, ground is by photovoltaic bracket Purlin, photovoltaic module pass the personnel standing on scaffold board, and the personnel at differing heights can be simultaneously on purlin, photovoltaic module Lower end is installed, and efficiency is high, and this apparatus structure is simple, and mounting or dismounting are convenient, it is possible to increase substantially installation effectiveness.
Further, described suspension ladder by fixing bar, many vertical vertical rods, braces are constituted, vertical rod is along fixing bar bar Body is uniformly distributed, and vertical rod bottom is connected with fixing bar, and vertical rod is incremented by the most successively, and rod end is connected with brace, described Cross bar is horizontally set between two adjacent vertical rods, is incremented by along fixing pole length direction cross bar with fixing span, described hook Being connected with rod end, suspension ladder is frame structure, and scaffold board can be placed on cross bar and on fixing bar, makes scaffold board Step-like structure distribution is formed after placement.
Further, described suspension ladder by fixing bar, the first vertical rod, the second vertical rod, the 3rd vertical rod, brace are constituted, First vertical rod, the second vertical rod, the increasing height of the 3rd vertical rod, the first vertical rod bottom is connected with fixing bar forward end, and the 3rd stands Bar bottom is connected with fixing rod rear end end, and the second vertical rod bottom is connected in the middle part of fixing club body, the first vertical rod, second stand Bar, the 3rd vertical rod are on same straight line, and described brace and the first vertical rod, the second vertical rod, the 3rd vertical rod upper end connect, described Hook number be two, hook is connected with the first vertical rod, the 3rd vertical rod upper end respectively, and it is vertical that described cross bar is arranged on second Between bar, the 3rd vertical rod, can place two scaffold boards between two hanger bracket ladders, a scaffold board is disposed close to consolidating of the first vertical rod At fixed pole, another block is placed on cross bar, forms the step-like structure that height is different, makes operator be in different height Place, installs purlin, photovoltaic module, and hook is connected at vertical direction with vertical rod, and Impact direction is consistent with closure, holds Load power is more preferable.
Further, described scaffold board is strip plank or steel plate.
Further, described hook exceeds brace surface, hangs in cant beam groove, and hook exceeds brace surface can Avoid interfering between brace and cant beam.
Further, described hook bottom is connected with brace.
Provide the benefit that acquired by this utility model: use such scheme,
1) hanging ladder, the simple in construction of scaffold board, cost of manufacture is low.
2) hang ladder, scaffold board assembling is quick and convenient, installation effectiveness is high, and efficiency is the 1.2-of console model movable Scaffold 2 times;
3) operating personnel's labor intensity is low, and personnel's utilization rate is high, can realize the most uninterrupted operation.
Accompanying drawing explanation
By detailed description below in conjunction with the accompanying drawings, the aforesaid objects, features and advantages with other of this utility model are incited somebody to action Become apparent.
Fig. 1 is the structural representation of this utility model embodiment 1.
Fig. 2 is the structural representation that this utility model embodiment 1 hangs ladder.
Fig. 3 is the schematic diagram that this utility model embodiment 1 is suspended on cant beam.
Fig. 4 is that this utility model embodiment 1 uses state diagram.
Fig. 5 is console model scaffold schematic diagram.
Wherein: 1 for hanging ladder, and 1.1 is fixing bar, and 1.2 is the first vertical rod, and 1.3 is the second vertical rod, 1.4 is the 3rd to stand Bar, 1.5 is brace, and 1.6 is hook, and 1.7 is brace, and 2 is scaffold board, and 3 is cant beam, and 4 is photovoltaic bracket purlin, and 5 is photovoltaic group Part.
Detailed description of the invention
Below in conjunction with the accompanying drawings and this utility model is described in detail by embodiment.
Embodiment 1: installation ground photovoltaic bracket as shown in Figure 1 and photovoltaic module hanger bracket device, including scaffold board 2, the suspension ladder 1 at scaffold board 2 two ends, hanging terraced 1 frame number is three, and the number of scaffold board 2 is four, as in figure 2 it is shown, outstanding Hanging ladder frame 1 is made up of fixing bar the 1.1, first vertical rod the 1.2, second vertical rod the 1.3, the 3rd vertical rod 1.4 of bottom, brace 1.5, and first Vertical rod the 1.2, second vertical rod the 1.3, the 3rd vertical rod 1.4 is vertically arranged in order, and first vertical rod the 1.2, second vertical rod the 1.3, the 3rd The increasing height of vertical rod 1.4, the first vertical rod 1.2 bottom welds with fixing bar 1.1 forward end, and the 3rd vertical rod 1.4 bottom is with solid End, fixed pole 1.1 rear end is welded, and the second vertical rod 1.3 bottom is welded in the middle part of fixing bar 1.1 shaft, and the first vertical rod 1.2, second is stood Bar the 1.3, the 3rd vertical rod 1.4 is on same straight line, and brace 1.3 is obliquely installed, the first vertical rod 1.2 top and brace 1.3 front end Welding, the second vertical rod 1.3 top is welded in the middle part of brace 1.5 shaft, and the 3rd vertical rod 1.4 top is welded with end, brace 1.5 rear end Connect, brace 1.5 make suspension ladder 1 top for being retreaded acclivitous oblique angle structure by forward direction, the angle of inclination of brace 1.5 and ground The angle of inclination of face photovoltaic bracket cant beam is consistent, and the upper end, top of the first vertical rod the 1.2, the 3rd vertical rod 1.4 is welded with hook 1.6, The middle part of the second vertical rod the 1.2, the 3rd vertical rod 1.4 is provided with the cross bar 1.7 of level, the distribution of cross bar 1.7 end and the second vertical rod 1.2, Weld in the middle part of the shaft of the 3rd vertical rod 1.4, fixing bar 1.1 shaft between first vertical rod the 1.2, second vertical rod 1.3 and cross bar 1.7 Forming two-stage step-like structure, four scaffold boards 2 are divided into two groups and are laid on three suspension ladders 1, and the end of scaffold board 2 is laid On fixing bar 1.1 shaft hung between ladder 1 first vertical rod the 1.2, second vertical rod 1.3 and cross bar 1.7, formed after laying Two-stage is step-like, and personnel can stand on the scaffold board 2 at differing heights, installs purlin, photovoltaic module upper and lower side, Efficiency is high, and two hooks 1.6 are on same oblique line and this oblique line gradient is consistent with the gradient of brace 1.5, link up with 1.6 eminences vertical Masthead end, it is simple to hung dismantling operation, owing to cant beam is made up of C-type steel, hook 1.6 is easy to the slot fit with cant beam, it is possible to Quickly being hung on cant beam by suspension ladder 1, and agree with cant beam, simple to operate, hook 1.6 is with vertical rod at vertical direction even Connecing, Impact direction is consistent with closure, and bearing capacity is more preferable, it is possible to heavy duty weight, and scaffold board 2 is strip plank or steel plate, Durable, service life is long, fixing bar the 1.1, first vertical rod the 1.2, second vertical rod the 1.3, the 3rd vertical rod 1.4, brace 1.5, horizontal stroke Bar 1.7 is made by round steel or steel pipe, and with reference to Fig. 3, three are hung the hanger bracket device that 1, four scaffold boards 2 of ladder are constituted, knot Structure is simple, it is simple to manufacturing, scaffold board 2 is laid simply, it is simple to be hung on cant beam, it is possible to increase substantially mounting purlines, photovoltaic The efficiency of assembly.Three are hung 1, four scaffold boards 2 of ladder and form an operation unit, and unit includes can by two positions Being constituted with operating portion, the preparatory function portion mutually converted, corresponding four operator of operation unit, four operator divide Being two platform operations personnel, two Ground Operation personnel, two platform operations personnel stand respectively at foot corresponding to operating portion On palm 2, Ground Operation personnel are responsible for delivering photovoltaic bracket purlin, photovoltaic module, platform operations personnel to platform operations personnel Being fixed upper and lower two ends various location, efficiency is high, and after operating portion installs, platform operations personnel can be directly across Middle cant beam enters preparatory function district, and bottom surface operating personnel delivers photovoltaic bracket purlin, photovoltaic for platform operations personnel again Assembly, remove subsequently the scaffold board 2 installed and hang ladder 1, and will remove after suspension ladder 1 hang preparation On the cant beam being close on rear side of operating portion, re-lay scaffold board 2, so circulate, until by photovoltaic bracket purlin, photovoltaic module peace Installing complete, the division of labor clearly, reduces labor intensity, and installation effectiveness is high.
Embodiment 2: referring to figs. 1 through the installation ground photovoltaic bracket shown in Fig. 3 and photovoltaic module hanger bracket device, including Two are hung ladders 1 and two and hang two scaffold boards 2 between ladders 1, being laid on two and hang ladder of scaffold board 2 activity On frame 1, hang ladder 1 by fixing bar the 1.1, first vertical rod the 1.2, second vertical rod the 1.3, the 3rd vertical rod 1.4 of bottom, brace 1.5 Constituting, first vertical rod the 1.2, second vertical rod the 1.3, the 3rd vertical rod 1.4 is vertically arranged in order, and first vertical rod the 1.2, second vertical rod 1.3, the increasing height of the 3rd vertical rod 1.4, the first vertical rod 1.2 bottom welds with fixing bar 1.1 forward end, the 3rd vertical rod 1.4 Bottom is welded with end, fixing bar 1.1 rear end, and the second vertical rod 1.3 bottom is welded in the middle part of fixing bar 1.1 shaft, the first vertical rod 1.2, the second vertical rod the 1.3, the 3rd vertical rod 1.4 is on same straight line, and brace 1.3 is obliquely installed, and the first vertical rod 1.2 top is with oblique Bar 1.3 front end is welded, and the second vertical rod 1.3 top is welded in the middle part of brace 1.5 shaft, behind the 3rd vertical rod 1.4 top and brace 1.5 The welding of end end, brace 1.5 make suspension ladder 1 top for being retreaded acclivitous oblique angle structure by forward direction, the inclination of brace 1.5 Angle is consistent with the angle of inclination of ground photovoltaic bracket cant beam, and the middle part of the second vertical rod the 1.2, the 3rd vertical rod 1.4 is provided with level Cross bar 1.7, the distribution of cross bar 1.7 end welds in the middle part of the shaft of the second vertical rod the 1.2, the 3rd vertical rod 1.4, the first vertical rod 1.2, the Fixing bar 1.1 shaft between two vertical rods 1.3 and cross bar 1.7 form two-stage step-like structure, and two scaffold boards 2 are laid on two Hanging on ladder 1, the end of one piece of scaffold board 2 is laid on and hangs fixing between ladder 1 first vertical rod the 1.2, second vertical rod 1.3 On bar 1.1 shaft, another block is laid on cross bar 1.7, forms two-stage step-like after laying, and personnel can stand at differing heights On the scaffold board 2 at place, brace 1.5 is provided with three hooks 1.6, and three hooks 1.6 are uniformly distributed along brace 1.5 shaft, three Hook 1.6 is on same oblique line and this oblique line gradient is consistent with the gradient of brace 1.5, owing to photovoltaic frame cant beam is by C-type steel system Becoming, suspension ladder 1 quickly and the slot fit of cant beam can be hung on cant beam, and agree with cant beam by hook 1.6, assembling Suspension ladder 1, scaffold board 2 are simple to operate, quick, and scaffold board 2 is strip plank or steel plate, fixing bar the 1.1, first vertical rod 1.2, the second vertical rod the 1.3, the 3rd vertical rod 1.4, brace 1.5, cross bar 1.7 are made by round steel or steel pipe, durable, use the longevity Life is long, the simple in construction of this device, and this device is hung on cant beam during use by low cost of manufacture, and platform operations personnel stand On scaffold board 2, purlin, photovoltaic module are passed platform operations personnel by bottom surface operating personnel, and platform operations personnel install, The efficiency of mounting purlines, photovoltaic module can be increased substantially.
Referring to figs. 1 through Fig. 4, ground photovoltaic bracket and the photovoltaic module using method of hanger bracket device are installed, including with Lower step,
1) make three and hang ladder 1 and 4 pieces of square stripe shape scaffold boards 2;
2) hanging on three adjacent photovoltaic bracket cant beams 3 by the hook 1.6 that three are hung ladder 1, hook 1.6 snaps in tiltedly In the groove of beam 3C shaped steel;
3) four pieces of scaffold boards 2 being laid on adjacent two two-by-two and hang on ladder 1, from front to back, adjacent two are hung ladder Scaffold board 2 between frame 1 forms two-stage step-like structure after laying, the end of corresponding scaffold board 2 respectively with hang ladder 1 Shaft and the cross bar 1.7 of the fixing bar 1.1 between the first vertical rod the 1.2, the 3rd vertical rod 1.3 contact;
4) three adjacent scaffold boards 2 hung between ladder 1 and three suspension ladders 1 constitute an operation unit, make Industry unit includes being hung, by adjacent two suspension ladders 1 and adjacent two, operating portion, the preparation that 1 scaffold board 2 of ladder are formed Operating portion, corresponding two the platform operations personnel of operation unit and two Ground Operation personnel, platform operations personnel stand On scaffold board 2 at operating portion differing heights, photovoltaic bracket purlin 4, photovoltaic module 5 are passed platform and are made by Ground Operation personnel Industry personnel, the photovoltaic bracket purlin 4 of diverse location is fixed on bottom surface photovoltaic and props up by the platform operations personnel of various location respectively The corresponding position of frame cant beam 3, and photovoltaic module 5 upper and lower side is fixed on the corresponding position of cant beam 3, two platform operations personnel are respectively Stand on two scaffold boards 2 hanging ladder 1 upper end, lower end, carry out operation is installed, it is not necessary to climbing up and climb down, work is strong simultaneously Degree is substantially reduced, and promotes to improve installation effectiveness,
5), at operating portion after photovoltaic bracket purlin 4, photovoltaic module 5 installation, platform operations personnel stride across middle cant beam 3 Entering preparatory function portion, two Ground Operation personnel are passing the photovoltaic bracket purlin 4 of required installation, light for platform operations personnel After photovoltaic assembly 5, start immediately to remove the scaffold board 2 at the operating portion installed and suspension ladder 1,1 will removed Individual suspension ladder and two scaffold boards 2 move at the cant beam 3 that side is close to preparatory function portion, and are hung by suspension ladder 1 Being located on this cant beam 3, then be laid on by two scaffold boards 2 on suspension ladder 1, two platform operations personnel are to preparatory function simultaneously Photovoltaic bracket purlin 4, photovoltaic module 5 at portion are installed, and so circulate operation, until by the photovoltaic bracket on photovoltaic bracket Purlin 4, photovoltaic module 5 install;
6), after on photovoltaic bracket, photovoltaic bracket purlin 4, photovoltaic module 5 install, scaffold board 2, suspension ladder 1 are torn open Remove.
One operation unit corresponding two platform operations personnel, two ground handling operator, Ground Operation personnel be responsible for Platform operations personnel deliver photovoltaic bracket purlin 4, photovoltaic module 5 mounting or dismounting and hang ladder 1 and scaffold board 2, platform operations people Member is then constantly on the scaffold board plate 2 of operating portion, and platform operations personnel only need to install the photovoltaic bracket purlin of fixing corresponding position Bar 4, photovoltaic module 5, personnel divide the work clearly, greatly reduce labor intensity, hang ladder 1, the simple in construction of scaffold board 2, system Making low cost, it is possible to be rapidly performed by assembling and disassemble, operation people divides the work clearly, cooperates, and personnel's utilization rate is high, can the company of realization Continuous uninterrupted operation, substantially increases installation effectiveness, and installation effectiveness is 1.2-2 times of console model movable Scaffold, operating portion, in advance The position of standby operating portion is mutually changed, and after operating portion installs, platform operations personnel move to preparatory function portion, random ground Operating personnel by installing photovoltaic bracket purlin 4, the suspension ladder 1 of photovoltaic module 5 part, scaffold board 2 are removed and are installed to tight The subsequent work section being close to, then preparatory function portion is converted to operating portion, and next section is then preparatory function portion, can the most uninterruptedly make Industry.
The foregoing is only preferred embodiment of the present utility model, not thereby limit the scope of the claims of the present utility model, Every equivalent structure utilizing this utility model description and accompanying drawing content to be made or equivalence flow process conversion, or directly or indirectly transport It is used in other relevant technical fields, is the most in like manner included in scope of patent protection of the present utility model.

Claims (6)

1. ground photovoltaic bracket and photovoltaic module hanger bracket device are installed, including scaffold board, the suspension ladder at scaffold board two ends, It is characterized in that: described suspension ladder top is oblique angle structure, hang ladder top and be evenly distributed with along oblique angle structure multiple Hook, multiple hooks are on same oblique line and this oblique line gradient is consistent with oblique angle structure gradient, hang ladder support body by forward direction After be provided with the cross bar of step-like distribution, movable being placed on cross bar of described scaffold board.
2. according to the installation ground photovoltaic bracket shown in claim 1 and photovoltaic module hanger bracket device, it is characterised in that: institute The suspension ladder stated by fixing bar, many vertical vertical rods, braces are constituted, vertical rod is uniformly distributed along fixing club body, vertical rod bottom Being connected with fixing bar, and vertical rod is incremented by the most successively, rod end is connected with brace, and it is adjacent that described cross bar is horizontally set on two Between vertical rod, being incremented by along fixing pole length direction cross bar with fixing span, described hook is connected with rod end.
3. according to the installation ground photovoltaic bracket shown in claim 2 and photovoltaic module hanger bracket device, it is characterised in that: institute The suspension ladder stated by fixing bar, the first vertical rod, the second vertical rod, the 3rd vertical rod, brace are constituted, the first vertical rod, the second vertical rod, The increasing height of three vertical rods, the first vertical rod bottom is connected with fixing bar forward end, the 3rd vertical rod bottom and fixing rod rear end end Portion connects, and the second vertical rod bottom is connected in the middle part of fixing club body, and the first vertical rod, the second vertical rod, the 3rd vertical rod are in always On line, described brace and the first vertical rod, the second vertical rod, the 3rd vertical rod upper end connect, and described hook number is two, hook Being connected with the first vertical rod, the 3rd vertical rod upper end respectively, described cross bar is arranged between the second vertical rod, the 3rd vertical rod.
4. according to the installation ground photovoltaic bracket shown in claim 1 and photovoltaic module hanger bracket device, it is characterised in that: institute The scaffold board stated is strip plank or steel plate.
5. according to the installation ground photovoltaic bracket shown in claim 1 and photovoltaic module hanger bracket device, it is characterised in that: institute The hook stated exceeds brace surface.
6. according to the installation ground photovoltaic bracket shown in claim 1 and photovoltaic module hanger bracket device, it is characterised in that: institute The hook bottom stated is connected with brace.
CN201620581023.0U 2016-06-13 2016-06-13 Ground photovoltaic bracket and photovoltaic module hanger bracket device are installed Expired - Fee Related CN205693609U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620581023.0U CN205693609U (en) 2016-06-13 2016-06-13 Ground photovoltaic bracket and photovoltaic module hanger bracket device are installed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620581023.0U CN205693609U (en) 2016-06-13 2016-06-13 Ground photovoltaic bracket and photovoltaic module hanger bracket device are installed

Publications (1)

Publication Number Publication Date
CN205693609U true CN205693609U (en) 2016-11-16

Family

ID=57428691

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620581023.0U Expired - Fee Related CN205693609U (en) 2016-06-13 2016-06-13 Ground photovoltaic bracket and photovoltaic module hanger bracket device are installed

Country Status (1)

Country Link
CN (1) CN205693609U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105978454A (en) * 2016-06-13 2016-09-28 中联西北工程设计研究院有限公司 Suspension bracket apparatus for mounting ground photovoltaic supporting frame and photovoltaic module, and use method
CN107070388A (en) * 2017-02-13 2017-08-18 马倩 The hook lock device of installation photovoltaic component

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105978454A (en) * 2016-06-13 2016-09-28 中联西北工程设计研究院有限公司 Suspension bracket apparatus for mounting ground photovoltaic supporting frame and photovoltaic module, and use method
CN105978454B (en) * 2016-06-13 2017-11-24 中联西北工程设计研究院有限公司 Ground photovoltaic bracket and photovoltaic module suspension rack device and application method are installed
CN107070388A (en) * 2017-02-13 2017-08-18 马倩 The hook lock device of installation photovoltaic component

Similar Documents

Publication Publication Date Title
CN100590277C (en) High-altitude bridge type cantilever scaffold
CN107902545B (en) Horse way air pipe hoisting construction device and construction method
CN105888230A (en) Lifting device for building curtain wall construction and construction method thereof
CN105484502B (en) A kind of industrial premises steel structural roof purlin and support bar combined installation method
CN108979131B (en) Integral lifting platform device for high-rise building construction steel formwork and operation frame
CN106193568A (en) Mobile steel truss operating platform
CN206768611U (en) Bridge pier hanging basket mounting operation platform
CN205693609U (en) Ground photovoltaic bracket and photovoltaic module hanger bracket device are installed
CN204753397U (en) Gallows is installed to steel case bridge temporarily
CN205934718U (en) Travelling cradle device is used in bridge construction
CN103628692B (en) A kind of floor beam mounting bracket and use it to install the method for floor beam
CN105978454B (en) Ground photovoltaic bracket and photovoltaic module suspension rack device and application method are installed
CN208668903U (en) A kind of fabricated scaffold
CN206770787U (en) A kind of rolling support of pipe network internal pipeline installation
CN205088580U (en) Iron road bridge mound hanging flower basket installation frock
CN204781872U (en) Regularization post reinforcement operation platform
CN204552051U (en) The cradle structure of high-altitude crossbeam soffit monitoring point layout
CN104818859B (en) The installation method of orbit traffic overhead station operation platform
CN203394008U (en) Suspension type hanging bracket used on plane truss
CN209040527U (en) A kind of scaffold cradle structure
CN112627045A (en) Hang basket template scissors cat ladder
CN208034971U (en) A kind of removable detachable curing test block frame
CN202831591U (en) Special-shaped truss operation platform capable of hoisting to super high space
CN214302757U (en) Construction platform for building
CN214090854U (en) Safety protection operation platform for shaft lining construction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161116