CN204552051U - The cradle structure of high-altitude crossbeam soffit monitoring point layout - Google Patents

The cradle structure of high-altitude crossbeam soffit monitoring point layout Download PDF

Info

Publication number
CN204552051U
CN204552051U CN201520189444.4U CN201520189444U CN204552051U CN 204552051 U CN204552051 U CN 204552051U CN 201520189444 U CN201520189444 U CN 201520189444U CN 204552051 U CN204552051 U CN 204552051U
Authority
CN
China
Prior art keywords
base plate
hanging basket
crossbeam
connecting rod
intermediate transverse
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201520189444.4U
Other languages
Chinese (zh)
Inventor
周俊龙
余流
邵辉
郭颖
高璞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Sixth Engineering Division Co Ltd
Original Assignee
China Construction Sixth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Sixth Engineering Division Co Ltd filed Critical China Construction Sixth Engineering Division Co Ltd
Priority to CN201520189444.4U priority Critical patent/CN204552051U/en
Application granted granted Critical
Publication of CN204552051U publication Critical patent/CN204552051U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses the cradle structure of high-altitude crossbeam soffit monitoring point layout, it comprises the steel work intermediate transverse girder will arranging measuring point and two Hanging Baskets being symmetricly set on the left and right sides below intermediate transverse girder, two " Π " shape frameworks are provided with above between the opposite side of two Hanging Baskets, two " Π " shape framework horizontal components are across being fixed on steel work intermediate transverse girder, be fixedly linked with the top cross-bar of Hanging Basket opening both sides respectively bottom the vertical portion of two " Π " shape frameworks, be connected respectively by the horizontal-associate square steel pipe through degree of lip-rounding groove between the corresponding crossbeam of two Hanging Basket opening both sides, being fixedly linked by the longitudinal connecting rod of base plate between Hanging Basket base plate, the longitudinal connecting rod of base plate is fixedly linked by multiple base plate lateral connection bar, on the base plate of Hanging Basket, the longitudinal connecting rod of base plate and base plate lateral connection bar are equipped with scaffold floor.Adopt this structure that the operation of high-altitude steel structure crossbeam beam soffit monitoring point layout can be made safer, convenient.

Description

The cradle structure of high-altitude crossbeam soffit monitoring point layout
Technical field
The utility model relates to steel work monitoring field, relates in particular to a kind of high-altitude steel structure crossbeam beam soffit monitoring point layout Special hanging basket structure.
Background technology
Along with popularizing of steel building, large space steel building emerges in an endless stream, and the technical problem of the construction monitoring of high-altitude steel structure is then more and more outstanding.The difficult point that the soffit construction monitoring point layout of high-altitude steel structure crossbeam becomes in construction monitoring point layout because of its overhead high and operating position inconvenience.Known in steel work monitoring field at present, high trestle method is mainly adopted for high-altitude steel structure crossbeam beam soffit monitoring point layout, namely sets up support on ground and to go directly crossbeam soffit.This kind of method is time-consuming takes material, and efficiency is extremely low.
Summary of the invention
The purpose of this utility model is the deficiency overcoming prior art, and provide a kind of cradle structure of high-altitude crossbeam soffit monitoring point layout of highly versatile, this structure is simple, and safety is high, easy to use and can recycle.
For achieving the above object, the utility model adopts following technical proposals:
The cradle structure of high-altitude of the present utility model crossbeam soffit monitoring point layout, it comprises the steel work intermediate transverse girder will arranging measuring point and two Hanging Baskets being symmetricly set on the left and right sides below intermediate transverse girder, two described Hanging Basket opened top and leave in the centre of a side opening formed semi-closed structure, each of two described Hanging Baskets is grid structure, the crossbeam of described two Hanging Basket opening both sides is welded with degree of lip-rounding groove respectively, two described semiclosed faces of Hanging Basket are oppositely arranged, two " Π " shape frameworks are provided with above between the opposite side of two Hanging Baskets, two described " Π " shape framework horizontal components are across being arranged on steel work intermediate transverse girder, be fixedly linked with the top cross-bar of Hanging Basket opening both sides respectively bottom the vertical portion of two " Π " shape frameworks, be connected respectively by the horizontal-associate square steel pipe through degree of lip-rounding groove between the corresponding crossbeam of two Hanging Basket opening both sides, the pin-and-hole vertically arranged is had at described horizontal-associate square steel pipe two ends, bearing pin is inserted with in each pin-and-hole, the elbow end of described bearing pin is affixed on the other Hanging Basket longeron place of pin-and-hole, the crossbeam that the both sides protuberance of the longitudinal connecting rod of " Mi " shape base plate of multiple setting spaced in parallel to each other is stuck in two Hanging Basket base plate places make two Hanging Basket base plate places be fixedly linked, the both sides protuberance of multiple base plate lateral connection bar be set parallel to each other is stuck on the longitudinal connecting rod of outermost two foundation plates and makes to be fixedly linked between the longitudinal connecting rod of multiple base plate, on the base plate of described Hanging Basket, the longitudinal connecting rod of base plate and base plate lateral connection bar are equipped with scaffold floor, the height of described " Π " shape framework be from the upper surface of scaffold floor to the bottom level of the horizontal component of intermediate transverse girder be 1.4-1.6m, the lower chord of described " Π " shape framework horizontal component is fixed with fixing steel plate and slidably connects adjustment steel plate, leading screw is connected with between described fixing steel plate and adjustment steel plate, described steel work intermediate transverse girder clamping be arranged on described fixing steel plate and regulate between steel plate and the two ends of leading screw by nut and fixing steel plate with regulate Interal fixation and be connected.
The beneficial effects of the utility model are:
(1) by adopting this structure, the operation of high-altitude steel structure crossbeam beam soffit monitoring point layout can be made safer, convenient;
(2) adopt square steel pipe welded cradle structure to be conducive to the making of structure, maintenance, recovery, and intensity and the safety of structure can be ensured;
(3) adopt " Π " shape hanging rack structure of square steel pipe welded to be conducive to being connected with cradle structure, and be convenient to contact with crossbeam, lay conveniently;
(4) leading screw that fixing steel plate is supporting with it with regulating steel plate forms navigation system, can make cradle structure registration when hanging crossbeam;
(5) type of attachment adopting fixing steel plate and adjustment steel plate to match can adapt to the fixing needs of various width crossbeam, improves the applicability of structure;
(6) degree of lip-rounding groove structure in Hanging Basket frame construction is conducive to the horizontal-associate square steel pipe of fixing square-section;
(7) horizontal-associate square steel pipe adopts and is connected with the Fast Installation being beneficial to steel pipe;
(8) the longitudinal connecting rod of base plate and base plate lateral connection bar adopt " Mi " font steel pipe to be conducive to structure Fast Installation;
(9) scaffold floor convenient operation personnel laid by Hanging Basket frame construction, the longitudinal connecting rod of base plate and base plate lateral connection bar walk on Hanging Basket and operate;
(10) structural requirement of " Π " shape framework to be limited in from scaffold floor to crossbeam bottom level 1.4-1.6m, to be conducive to the placement operations of operating personnel for measuring point bottom beam;
(11) cradle structure adopts symmetric form to be conducive to the whole machine balancing of structure, improves the stability of structure.
Accompanying drawing explanation
Fig. 1 is the structural representation of the cradle structure of the utility model high-altitude crossbeam soffit monitoring point layout;
Fig. 2 is Hanging Basket in the structure shown in Fig. 1 and intermediate transverse girder syndeton schematic diagram;
Fig. 3 is the structural representation of Hanging Basket in the structure shown in Fig. 1;
Fig. 4 is the structural representation of " Π " shape framework of two in the structure shown in Fig. 1;
The connection diagram that Fig. 5 is the Hanging Basket in the structure shown in Fig. 1 and two " Π " shape frameworks;
The connection diagram that Fig. 6 is the horizontal-associate square steel pipe in the structure shown in Fig. 1 and degree of lip-rounding groove;
The structural representation that Fig. 7 is the longitudinal connecting rod of the base plate in the structure shown in Fig. 1 and base plate lateral connection bar;
Fig. 8 is the utility model structure actual use schematic diagram.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, use of the present utility model is described further.
The cradle structure of high-altitude of the present utility model as shown in drawings crossbeam soffit monitoring point layout, it comprises the steel work intermediate transverse girder will arranging measuring point and two Hanging Baskets 1 being symmetricly set on the left and right sides below intermediate transverse girder, two described Hanging Basket 1 opened top and leave in the centre of a side opening formed semi-closed structure, each of two described Hanging Baskets 1 is grid structure, the crossbeam of described two Hanging Basket 1 opening both sides is welded with degree of lip-rounding groove 12 respectively, two described semiclosed faces of Hanging Basket 1 are oppositely arranged, two " Π " shape frameworks 2 are provided with above between the opposite side of two Hanging Baskets 1, two described " Π " shape framework 2 horizontal components are across being arranged on steel work intermediate transverse girder 11, be fixedly linked with the top cross-bar of Hanging Basket 1 opening both sides respectively bottom the vertical portion of two " Π " shape frameworks 2, in figure, A place is junction.Be connected respectively by the horizontal-associate square steel pipe 5 through degree of lip-rounding groove 12 between the corresponding crossbeam of two Hanging Basket 1 opening both sides, the pin-and-hole vertically arranged is had at described horizontal-associate square steel pipe 5 two ends, bearing pin 4 is inserted with in each pin-and-hole, the elbow end of described bearing pin is affixed on the other Hanging Basket 1 longeron place of pin-and-hole, the crossbeam that the both sides protuberance of the longitudinal connecting rod 6 of " Mi " shape base plate of multiple setting spaced in parallel to each other is stuck in two Hanging Basket 1 base plate places make two Hanging Basket 1 base plate places be fixedly linked, the both sides protuberance of multiple base plate lateral connection bar 7 be set parallel to each other is stuck on the longitudinal connecting rod 6 of outermost two foundation plates and makes to be fixedly linked between the longitudinal connecting rod 6 of multiple base plate, on the base plate of described Hanging Basket 1, the longitudinal connecting rod 6 of base plate and base plate lateral connection bar 7 are equipped with scaffold floor 3.The height of described " Π " shape framework 2 is be 1.4-1.6m from the upper surface of scaffold floor 3 to intermediate transverse girder 11 horizontal component bottom level.
Two described " Π " shape framework 2 horizontal components are demountable structures across the structure employing be arranged on steel work intermediate transverse girder 11, be specially: on the lower chord of described " Π " shape framework 2 horizontal component, be fixed with fixing steel plate 8 and slidably connect adjustment steel plate 9, between described fixing steel plate 8 and adjustment steel plate 9, be connected with leading screw 10, described steel work intermediate transverse girder 11 clamping is arranged on described fixing steel plate 8 and regulates between the steel plate 9 and two ends of leading screw 10 by nut and fixing steel plate 8 and regulate steel plate 9 to be fixedly linked.In Fig. 8, B place is ground.
After this device of Hanging Basket installs, operating personnel by " Π " shape framework 2 times in Hanging Basket 1, can operate at the layout measuring point of scaffold floor 3 enterprising interline crossbeam 11 soffit.
The mounting method of this structure, it comprises the following steps:
(1) with crane or Chain block, Hanging Basket is sling, make two Hanging Basket 1 symmetries split intermediate transverse girder 11 left and right sides.
(2) by the horizontal component of " Π " shape framework 2 across being placed on the upper surface of intermediate transverse girder 11, fixing steel plate 8 on " Π " shape framework 2 horizontal component lower chord and adjustment steel plate 9 are adjacent to the two sides of intermediate transverse girder 11, by leading screw through the circular hole on fixing steel plate 8 and adjustment steel plate 9, with fastening nuts leading screw 10, intermediate transverse girder 11 fixing steel plate 8 and adjustment steel plate 9 are clamped, makes Hanging Basket located lateral; The height of described " Π " shape framework 2 is the upper surface of scaffold floor 3 to be laid on Hanging Basket 1 is 1.4-1.6m to intermediate transverse girder 11 bottom level;
(3) horizontal-associate square steel pipe 5 is passed the degree of lip-rounding groove 12 on the crossbeam of both sides before and after Hanging Basket 1 middle opening position, the pin-and-hole of horizontal-associate square steel pipe 5 both sides is vertically arranged;
(4) bearing pin 4 being inserted pin-and-hole makes described horizontal-associate square steel pipe 5 be connected with left and right sides Hanging Basket 1, and bearing pin elbow end is affixed on the other Hanging Basket 1 longeron place of pin-and-hole.
(5) crossbeam both sides protuberance of longitudinal for base plate connecting rod 6 being stuck in described Hanging Basket 1 base plate place make two Hanging Basket 1 base plate places be fixedly linked.
(6) the both sides protuberance of base plate lateral connection bar 7 is stuck on the longitudinal connecting rod 6 of outermost two base plates and makes to be fixedly linked between the longitudinal connecting rod 6 of multiple base plate.
(7) on described Hanging Basket 1, the longitudinal connecting rod 6 of base plate and base plate lateral connection bar 7, scaffold floor 3 is laid.

Claims (1)

1. the cradle structure of high-altitude crossbeam soffit monitoring point layout, it is characterized in that: it comprises the steel work intermediate transverse girder will arranging measuring point and two Hanging Baskets being symmetricly set on the left and right sides below intermediate transverse girder, two described Hanging Basket opened top and leave in the centre of a side opening formed semi-closed structure, each of two described Hanging Baskets is grid structure, the crossbeam of described two Hanging Basket opening both sides is welded with degree of lip-rounding groove respectively, two described semiclosed faces of Hanging Basket are oppositely arranged, two " Π " shape frameworks are provided with above between the opposite side of two Hanging Baskets, two described " Π " shape framework horizontal components are across being arranged on steel work intermediate transverse girder, be fixedly linked with the top cross-bar of Hanging Basket opening both sides respectively bottom the vertical portion of two " Π " shape frameworks, be connected respectively by the horizontal-associate square steel pipe through degree of lip-rounding groove between the corresponding crossbeam of two Hanging Basket opening both sides, the pin-and-hole vertically arranged is had at described horizontal-associate square steel pipe two ends, bearing pin is inserted with in each pin-and-hole, the elbow end of described bearing pin is affixed on the other Hanging Basket longeron place of pin-and-hole, the crossbeam that the both sides protuberance of the longitudinal connecting rod of " Mi " shape base plate of multiple setting spaced in parallel to each other is stuck in two Hanging Basket base plate places make two Hanging Basket base plate places be fixedly linked, the both sides protuberance of multiple base plate lateral connection bar be set parallel to each other is stuck on the longitudinal connecting rod of outermost two foundation plates and makes to be fixedly linked between the longitudinal connecting rod of multiple base plate, on the base plate of described Hanging Basket, the longitudinal connecting rod of base plate and base plate lateral connection bar are equipped with scaffold floor, the height of described " Π " shape framework be from the upper surface of scaffold floor to the bottom level of the horizontal component of intermediate transverse girder be 1.4-1.6m, the lower chord of described " Π " shape framework horizontal component is fixed with fixing steel plate and slidably connects adjustment steel plate, leading screw is connected with between described fixing steel plate and adjustment steel plate, described steel work intermediate transverse girder clamping be arranged on described fixing steel plate and regulate between steel plate and the two ends of leading screw by nut and fixing steel plate with regulate Interal fixation and be connected.
CN201520189444.4U 2015-03-31 2015-03-31 The cradle structure of high-altitude crossbeam soffit monitoring point layout Withdrawn - After Issue CN204552051U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520189444.4U CN204552051U (en) 2015-03-31 2015-03-31 The cradle structure of high-altitude crossbeam soffit monitoring point layout

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520189444.4U CN204552051U (en) 2015-03-31 2015-03-31 The cradle structure of high-altitude crossbeam soffit monitoring point layout

Publications (1)

Publication Number Publication Date
CN204552051U true CN204552051U (en) 2015-08-12

Family

ID=53827180

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520189444.4U Withdrawn - After Issue CN204552051U (en) 2015-03-31 2015-03-31 The cradle structure of high-altitude crossbeam soffit monitoring point layout

Country Status (1)

Country Link
CN (1) CN204552051U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104746861A (en) * 2015-03-31 2015-07-01 中国建筑第六工程局有限公司 Hanging basket structure for high crossbeam lower surface monitoring point arrangement and installation method
CN107217836A (en) * 2017-07-07 2017-09-29 中国建筑第六工程局有限公司 A kind of construction hanging basket suspension arrangement for steel construction shelter bridge

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104746861A (en) * 2015-03-31 2015-07-01 中国建筑第六工程局有限公司 Hanging basket structure for high crossbeam lower surface monitoring point arrangement and installation method
CN107217836A (en) * 2017-07-07 2017-09-29 中国建筑第六工程局有限公司 A kind of construction hanging basket suspension arrangement for steel construction shelter bridge

Similar Documents

Publication Publication Date Title
CN206800949U (en) Operating platform for construction work high above the ground
CN105484164B (en) Spanning type bailey beam bracket and construction method thereof
CN106592962A (en) Large-height-difference long-span stiff-skeleton cladding concrete formwork construction method and apparatus
CN202000658U (en) Hydraulic climbing system for wall-attached support frame
CN105201208B (en) Y type pier stud oblique fulcrum bars punching block removes system
CN204552051U (en) The cradle structure of high-altitude crossbeam soffit monitoring point layout
CN204753397U (en) Temporary mounting hanger for steel box bridge
CN203255914U (en) Unit-typed curtain wall lifting device
CN110863648A (en) Super high-rise construction platform steel frame plank sheathing suspension
CN206667042U (en) Bridge expanssion joint installation and adjustment instrument
CN204059901U (en) A kind of high-altitude construction operation platform
CN204475182U (en) Installation frock of railway pier mound top hanging flower basket
CN104746861A (en) Hanging basket structure for high crossbeam lower surface monitoring point arrangement and installation method
CN203383516U (en) Construction device for installing connecting beam on frame type steel structure
CN205132926U (en) Special well word hoist of hydroelectric set tail water ell
CN205293909U (en) Mobilizable assembled transport auxiliary device
CN203361596U (en) Auxiliary support of integrated lifting operation platform
CN203715136U (en) Tool for hoisting lifting hole cover plate in nuclear power plant
CN203373661U (en) Movable operation platform device below cantilever arm of steel-structure bridge
CN203345912U (en) Portable special suspension tool
CN204455876U (en) Paste the constructing structure of fiber composite plate
CN203654706U (en) Movable operation platform for pot top
CN206328690U (en) A kind of big discrepancy in elevation, large span stiff skeleton external wrapping concrete template construction equipment
CN205077876U (en) Prestressed steel strand pulling machine and tensioning jack suspension device
CN203866962U (en) Profile steel lifting and supporting system of super high-rise steel structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20150812

Effective date of abandoning: 20160907

C25 Abandonment of patent right or utility model to avoid double patenting