CN206667042U - Bridge expanssion joint installation and adjustment instrument - Google Patents

Bridge expanssion joint installation and adjustment instrument Download PDF

Info

Publication number
CN206667042U
CN206667042U CN201720285437.3U CN201720285437U CN206667042U CN 206667042 U CN206667042 U CN 206667042U CN 201720285437 U CN201720285437 U CN 201720285437U CN 206667042 U CN206667042 U CN 206667042U
Authority
CN
China
Prior art keywords
support
expansion joint
installation
bridge expanssion
welded
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720285437.3U
Other languages
Chinese (zh)
Inventor
鹿红雷
李玉川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Sixth Group Co Ltd
Beijing Railway Construction Co of China Railway Sixth Group Co Ltd
Original Assignee
China Railway Sixth Group Co Ltd
Beijing Railway Construction Co of China Railway Sixth Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Sixth Group Co Ltd, Beijing Railway Construction Co of China Railway Sixth Group Co Ltd filed Critical China Railway Sixth Group Co Ltd
Priority to CN201720285437.3U priority Critical patent/CN206667042U/en
Application granted granted Critical
Publication of CN206667042U publication Critical patent/CN206667042U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

A kind of bridge expanssion joint installation and adjustment instrument.It includes the support of two foundation, two support posts, four supporting legs, a support beam, a suspension ring, two diagonal braces, a jack and expansion joint fixture;Bridge expanssion joint installation and adjustment instrument provided by the utility model is solved in the case of without using Large-scale Hoisting equipment, the problem of the accurate installation and adjustment in the larger expansion joint of weight.In practice of construction, this regulation instrument can not only be adjusted from upper and lower, left and right all directions, and it while rapid construction, can improve the security of expansion joint construction.In addition, the bridge expanssion joint installation and adjustment tool making is easy, convenient disassembly, installation method, which is easily understood, is advantageous to site operation use.

Description

Bridge expanssion joint installation and adjustment instrument
Technical field
The utility model belongs to bridge construction technical field of auxiliary equipment, installs and adjusts more particularly to a kind of bridge expanssion joint Section instrument.
Technical background
Expansion joint setting is mainly used in meeting flexible and waterproof, avoids raindrop erosion beam body etc. in bridge floor beam gap It is required that.The quality of bridge expanssion joint construction quality can directly affect the service life and function of bridge.If expansion joint it is parallel, Position installation is inaccurate in the both direction of bridge axes, insecure, and vehicle can produce when travelling jumps car, noise etc. now As directly affecting flatness, the comfortableness on road surface.Once expansion joint is destroyed, difficulty is changed, and expense is high.Therefore, remove It is outer to ensure that expansion joint quality is met the technical standards, correctly construction and installation are expansion joint application success whether key points. But still lack the specific purpose tool of expansion joint installation and adjustment at present.
The content of the invention
In order to solve the above problems, the purpose of this utility model be to provide it is a kind of make simple, economic and practical, safety can Lean on, and be easy to the bridge expanssion joint installation and adjustment instrument of regulation.
In order to achieve the above object, installation and adjustment instrument in expansion joint provided by the utility model include two foundation support, two Support post, four supporting legs, a support beam, a suspension ring, two diagonal braces, a jack and expansion joint fixture;Wherein two Foundation support is set in parallel in the side lower part of regulation instrument two in the horizontal direction;Support post is vertically arranged, under two support posts End is respectively welded in the middle part of the top surface of two foundation support;Four supporting legs are symmetrically obliquely installed two-by-two, and one end of every supporting leg is welded on Portion before or after the top of one foundation support, the other end are welded on side before or after the support post of the same side;Support beam Horizontally arranged, both ends are respectively welded at the top surface of two support posts;Two diagonal braces are symmetrically obliquely installed, every diagonal brace One end is welded on the outer side bottom surface position of support beam, and the other end is welded on positioned at the support post medial surface top of the same side; Suspension ring semicircular in shape, both ends are welded in the middle part of the bottom surface of support beam;Hook on jack is hung on suspension ring, and the one of chain Hold for hanging expansion joint fixture, the other end is operated for staff.
Described bottom bracing, support post, support beam and diagonal brace uses 10# channel-section steels;Supporting leg uses 5# channel-section steels;Suspension ring make With the reinforcing bars of Ф 20.
Described suspension ring, jack and expansion joint fixture is centrally located on same vertical line.
Angle between described supporting leg, diagonal brace and horizontal plane is to be less than 45 ° more than 30 °.
Bridge expanssion joint installation and adjustment instrument provided by the utility model is solved without using Large-scale Hoisting equipment situation Under, the problem of the accurate installation and adjustment in the larger expansion joint of weight.In practice of construction, this regulation instrument can not only from it is upper and lower, Left and right all directions are adjusted, and it while rapid construction, can improve the security of expansion joint construction.In addition, The bridge expanssion joint installation and adjustment tool making is easy, convenient disassembly, and installation method, which is easily understood, is advantageous to site operation use.
Brief description of the drawings
Fig. 1 is bridge expanssion joint installation and adjustment instrument forward direction schematic diagram provided by the utility model.
Fig. 2 is bridge expanssion joint installation and adjustment instrument side schematic view provided by the utility model.
Embodiment
Bridge expanssion joint installation and adjustment instrument provided by the utility model is carried out with specific embodiment below in conjunction with the accompanying drawings Describe in detail.
Now illustrated by taking certain science of bridge building as an example:The bridge floor expansion joint is using welding and concrete construction. Expansion joint totally 114, wherein weathering steel expansion joint totally 112, aluminium alloy expansion joint totally 2, TSSF-160 Xing Gong 16, TSSF-100 Xing Gong 96, CJSSF-240 type totally 2.The quality of bridge expanssion joint construction and installation quality directly affects its use Life-span and bridge function.In order to ensure the installation quality at expansion joint, the engineering uses the bridge expanssion joint of new offer from this Installation and adjustment instrument carries out expansion joint installation and adjustment, and the regulation tool making is easy, and convenient disassembly, installation method, which is easily understood, to be had Used beneficial to site operation.
As Figure 1-Figure 2, bridge expanssion joint installation and adjustment instrument provided by the utility model includes two foundation support 1, two The support beam 4, one of supporting leg 3, one 5, two, suspension ring diagonal brace, the 6, jacks 7 of root support post 2, four and expansion joint fixture 8;Wherein two foundation support 1 is set in parallel in the side lower part of regulation instrument two in the horizontal direction;Support post 2 is vertically arranged, two branch The lower end of support column 2 is respectively welded in the middle part of the top surface of two foundation support 1;Four supporting legs 3 are symmetrically obliquely installed two-by-two, every supporting leg 3 one end is welded on portion before or after the top of foundation support 1, and the other end is welded on before or after the support post 2 of the same side On side;Support beam 4 is horizontally arranged, and both ends are respectively welded at the top surface of two support posts 2;Two diagonal braces 6 are symmetrical It is obliquely installed, one end of every diagonal brace 6 is welded on the outer side bottom surface position of support beam 4, and the other end is welded on positioned at the same side The medial surface top of support post 2;The semicircular in shape of suspension ring 5, both ends are welded in the middle part of the bottom surface of support beam 4;On jack 7 Hook hang on suspension ring 5, one end of chain is used to hang expansion joint fixture 8, and the other end is operated for staff.
Described bottom bracing 1, support post 2, support beam 4 and diagonal brace 6 uses 10# channel-section steels;Supporting leg 3 uses 5# channel-section steels; Suspension ring 5 use the reinforcing bars of Ф 20.
Described suspension ring 5, jack 7 and expansion joint fixture 8 is centrally located on same vertical line.
Angle between described supporting leg 3, diagonal brace 6 and horizontal plane is to be less than 45 ° more than 30 °.
The installation and adjustment of expansion joint 9 are carried out when needing to use bridge expanssion joint installation and adjustment instrument provided by the utility model When, this regulation instrument is lifted into expansion joint installing zone by staff first, a regulation work is respectively placed at the both ends of expansion joint 9 Tool, is then blocked the one end of expansion joint 9 using expansion joint fixture 8, utilizes the side for pulling the chain other end by staff afterwards Method is finely adjusted to expansion joint 9 from upper and lower, left and right all directions, size required by being adjusted to installation drawing.So Reinforcing bar, expansion joint anchor bar and embedded bar firm welding, then casting concrete are will travel across using electric welding machine afterwards, treats concrete After solidification and when reaching more than the 80% of design strength, bridge expanssion joint installation and adjustment instrument is removed.

Claims (4)

  1. A kind of 1. bridge expanssion joint installation and adjustment instrument, it is characterised in that:Described expansion joint installation and adjustment instrument includes two Bottom bracing (1), two support posts (2), four supporting legs (3), a support beam (4), a suspension ring (5), two diagonal braces (6), One jack (7) and expansion joint fixture (8);Wherein two foundation support (1) is set in parallel under regulation instrument both sides in the horizontal direction Portion;Support post (2) is vertically arranged, and the lower end of two support posts (2) is respectively welded in the middle part of the top surface of two foundation support (1); Four supporting legs (3) are symmetrically obliquely installed two-by-two, and one end of every supporting leg (3) is welded on portion before or after the top of foundation support (1), The other end is welded on side before or after the support post (2) of the same side;Support beam (4) is horizontally arranged, both ends It is respectively welded at the top surface of two support posts (2);Two diagonal braces (6) are symmetrically obliquely installed, one end welding of every diagonal brace (6) At the outer side bottom surface position of support beam (4), the other end is welded on positioned at support post (2) medial surface top of the same side;Hang Ring (5) semicircular in shape, both ends are welded in the middle part of the bottom surface of support beam (4);Hook on jack (7) hangs over suspension ring (5) On, one end of chain is used to hang expansion joint fixture (8), and the other end is operated for staff.
  2. 2. bridge expanssion joint installation and adjustment instrument according to claim 1, it is characterised in that:Described bottom bracing (1), support Column (2), support beam (4) and diagonal brace (6) use 10# channel-section steels;Supporting leg (3) uses 5# channel-section steels;Suspension ring (5) use the steel of Ф 20 Muscle.
  3. 3. bridge expanssion joint installation and adjustment instrument according to claim 1, it is characterised in that:Described suspension ring (5), jack (7) and expansion joint fixture (8) is centrally located on same vertical line.
  4. 4. bridge expanssion joint installation and adjustment instrument according to claim 1, it is characterised in that:Described supporting leg (3), diagonal brace (6) angle between horizontal plane is to be less than 45 ° more than 30 °.
CN201720285437.3U 2017-03-22 2017-03-22 Bridge expanssion joint installation and adjustment instrument Expired - Fee Related CN206667042U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720285437.3U CN206667042U (en) 2017-03-22 2017-03-22 Bridge expanssion joint installation and adjustment instrument

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720285437.3U CN206667042U (en) 2017-03-22 2017-03-22 Bridge expanssion joint installation and adjustment instrument

Publications (1)

Publication Number Publication Date
CN206667042U true CN206667042U (en) 2017-11-24

Family

ID=60373163

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720285437.3U Expired - Fee Related CN206667042U (en) 2017-03-22 2017-03-22 Bridge expanssion joint installation and adjustment instrument

Country Status (1)

Country Link
CN (1) CN206667042U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110359371A (en) * 2019-06-21 2019-10-22 中国十七冶集团有限公司 A kind of bridge expanssion joint construction hoisting tool
CN111252684A (en) * 2020-03-11 2020-06-09 浙江交工高等级公路养护有限公司 Equipment with hoisting and attitude adjustment functions and hoisting attitude adjustment method
CN111809513A (en) * 2020-07-24 2020-10-23 中国十七冶集团有限公司 Expansion joint levelness adjusting device and method
CN112854003A (en) * 2021-02-23 2021-05-28 徐娟 Bridge expansion joint installation construction method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110359371A (en) * 2019-06-21 2019-10-22 中国十七冶集团有限公司 A kind of bridge expanssion joint construction hoisting tool
CN110359371B (en) * 2019-06-21 2021-05-11 中国十七冶集团有限公司 Bridge expansion joint construction lifting device
CN111252684A (en) * 2020-03-11 2020-06-09 浙江交工高等级公路养护有限公司 Equipment with hoisting and attitude adjustment functions and hoisting attitude adjustment method
CN111809513A (en) * 2020-07-24 2020-10-23 中国十七冶集团有限公司 Expansion joint levelness adjusting device and method
CN112854003A (en) * 2021-02-23 2021-05-28 徐娟 Bridge expansion joint installation construction method

Similar Documents

Publication Publication Date Title
CN104389313B (en) The positioning and plumbing device of Two bors d's oeuveres type i iron lattice column and positioning and plumbing method thereof
CN102661054B (en) Lateral reinforcing structure in whole lifting of plane steel truss and whole lifting method
CN206667042U (en) Bridge expanssion joint installation and adjustment instrument
CN111622781B (en) A device and method for constructing the secondary lining of the anchor chamber vault of a suspension bridge tunnel
CN101372865A (en) Stay suspender multispan beam structure highly hollow-out formwork system and construction method
CN109235280A (en) The operation platform and construction method of bridge coping
CN209194347U (en) The operation platform of bridge coping
CN109869153A (en) The whole of rapid construction vertical shaft lining cutting promotes cantilever form device and construction method
CN114104990B (en) Construction process of cable crane steel pipe assembly type cable buckle integrated tower
CN106522542A (en) Single-station hydraulic formwork climbing system and climbing method thereof
CN206267031U (en) A kind of solid pier climbing support of bridge construction
CN106522541B (en) A kind of template suspension centre spandrel girder of steel platform and the hanging method of template system
CN208310204U (en) Base for supporting and arranging elevator shaft coupling beam template
CN211173007U (en) Novel tripod of encorbelmenting
CN204386135U (en) Portable Hanging Basket
CN106245531A (en) Steel structural bridge installation method is hung under bilateral derrick type
CN217580664U (en) Construction device with post-pouring section for prefabricated shear wall
CN103437292A (en) Lifting combination device for bidirectional inclined A-shaped main tower cable-stayed bridge template
CN205741935U (en) The mounting and positioning device of Wavelike steel webplate
CN211228141U (en) A New Type of T-beam Diaphragm Construction Platform Cross Bracing
CN205296821U (en) Oblique roofing formwork system of heavy grade cast in situ concrete
CN210594932U (en) T beam mold board hoist
CN204343294U (en) The positioning and plumbing device of Two bors d's oeuveres type i iron lattice column
CN204038917U (en) Detachable external hanging type operating platform
CN211368613U (en) Gate pier bracket formwork braced system that encorbelments

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171124

CF01 Termination of patent right due to non-payment of annual fee