CN107217836A - A kind of construction hanging basket suspension arrangement for steel construction shelter bridge - Google Patents

A kind of construction hanging basket suspension arrangement for steel construction shelter bridge Download PDF

Info

Publication number
CN107217836A
CN107217836A CN201710553210.7A CN201710553210A CN107217836A CN 107217836 A CN107217836 A CN 107217836A CN 201710553210 A CN201710553210 A CN 201710553210A CN 107217836 A CN107217836 A CN 107217836A
Authority
CN
China
Prior art keywords
construction
shelter bridge
longeron
hanging basket
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710553210.7A
Other languages
Chinese (zh)
Inventor
胡锋
亓乙强
李志强
李顺
齐加云
许仕达
张明岩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Sixth Engineering Division Co Ltd
Original Assignee
China Construction Sixth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Sixth Engineering Division Co Ltd filed Critical China Construction Sixth Engineering Division Co Ltd
Priority to CN201710553210.7A priority Critical patent/CN107217836A/en
Publication of CN107217836A publication Critical patent/CN107217836A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/30Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G2003/286Mobile scaffolds; Scaffolds with mobile platforms mobile vertically

Abstract

The invention belongs to construction hanging basket technical field in architectural engineering, a kind of construction hanging basket suspension arrangement for steel construction shelter bridge is disclosed, including the longeron that direction is set is moved towards perpendicular to shelter bridge, the longeron is made up of suspension section, regulation section, jackscrew and the first nut;The crossbeam for hanging steel wire rope is respectively welded at the top of longeron two ends, longeron two ends bottom is respectively welded supporting leg, and each supporting leg is installed on side rod at the top of shelter bridge by two groups of U-shaped connecting bolts.The present invention is suitable to install and use on the steel constructions such as vestibule, vestibule, sightseeing shelter bridge, overline bridge closing shelter bridge, hang construction hanging basket and carry out exterior trim surface construction, and without prejudice to shelter bridge roof expanse other construction operations, can not occupied road and parkland, avoid blocking traffic, it is ensured that current and construction safety, improve efficiency of construction, material tool is saved, cost is reduced;The device have it is simple in construction, stable safely, the features such as install, dismantle convenient, flexible and convenient to use.

Description

A kind of construction hanging basket suspension arrangement for steel construction shelter bridge
Technical field
It is to be related to one kind to be used for steel construction corridor specifically the invention belongs to construction hanging basket technical field in architectural engineering The construction hanging basket suspension arrangement of bridge.
Background technology
In building engineering construction, various steel construction closing shelter bridges, including the company being arranged between building can be often run into Corridor, vestibule, the sightseeing shelter bridge at scenic spot and Midspan sag, the overline bridge of highway etc., its common feature is across road or vehicle, the stream of people The place of concentration.Due to this feature so that steel construction shelter bridge exterior finish construction operation platform is selected to long-standing problem construction The a great problem of enterprise.Because, constructed according to traditional floor scaffolding operating platform, lower section road, field certainly will be taken Ground, blocks traffic, causes economic loss and social influence, while scaffold takes the cycle of tearing open longer, increase construction period and cost.
At present, the best option of steel construction shelter bridge exterior finish construction operation platform is construction hanging basket, and it is suspended in the air, no Lower section road, place are accounted for, using maneuverability, can stagger peak period construction, it is ensured that have a good transport and communication network and pass through safety, and transfer It is convenient, fast, save the material for taking, tearing open scaffold, artificial, reduction construction cost.But construction is set on steel construction shelter bridge Hanging basket suspension point has current insurmountable problem again:One is not allow to weld suspension element on steel construction;Two be standard Construction hanging basket hitch is adapted only to be seated on overall structure plate, and can not be erected at the shelter bridge steel being laid out using space truss On structural member, cause construction hanging basket not apply herein, and have to still continue to use traditional floor scaffolding.
The content of the invention
In view of standard construction hanging basket hitch can not be shelved on above the rod member of steel construction shelter bridge at present, construction is caused to be hung The technical problem of basket application difficult, the invention provides a kind of construction hanging basket suspension arrangement for steel construction shelter bridge, suitable for Installed and used on the steel constructions such as vestibule, vestibule, sightseeing shelter bridge, overline bridge closing shelter bridge, suspension construction hanging basket carries out exterior trim surface construction, And without prejudice to shelter bridge roof expanse other construction operations, can not occupied road and parkland, it is to avoid block traffic, it is ensured that it is current and Construction safety, improves efficiency of construction, saves material tool, reduces cost;The device has simple in construction, stable safety, installs, dismantles Convenient, flexible and convenient to use the features such as.
The present invention is achieved by following technical scheme:
A kind of construction hanging basket suspension arrangement for steel construction shelter bridge, including move towards the vertical of direction setting perpendicular to shelter bridge Beam, the longeron is made up of two suspension sections and the regulation section being arranged between two suspension sections, the regulation section and institute It is fixedly connected after stating suspension section inserting by jackscrew and the first nut;A crossbeam is respectively welded at the top of the longeron two ends, The crossbeam is used for the steel wire rope for hanging construction hanging basket;Longeron two ends bottom is respectively welded a supporting leg, the supporting leg Set in the inner part relative to the crossbeam;Each supporting leg includes the column for being welded in the longeron bottom surface, the column bottom Portion is provided with the bottom plate being seated at the top of shelter bridge at the top of side rod, and the bottom plate is installed on corridor by U-shaped connecting bolt described in two groups Side rod at the top of bridge;U-shaped connecting bolt described in two groups is arranged at intervals along shelter bridge top sides pole length direction, is enclosed on opening upwards At the top of shelter bridge on side rod, the U-shaped connecting bolt is thread through the bottom plate of the column with its top and tightened by the second nut.
Wherein, the inner drilling of suspension section of the longeron and welding first nut, first nut at hole position Wear and connect the installation jackscrew, insert the regulation section of two suspension sections respectively for fixing two ends.
Wherein, the crossbeam plane is perpendicular to the longeron, and takes middle welding equipment at the top of the longeron outer end.
Wherein, crossbeam two ends top surface is welded with two limit steel bars vertically respectively.
Wherein, the vertical screw rod and the connection cross bar of bottom that the U-shaped connecting bolt is parallel to each other by two are constituted, wherein Vertical screw rod end processing screw thread.
Wherein, side rod height dimension+50mm at the top of the vertical screw rod clear length size=shelter bridge, the vertical screw rod in both sides is net Away from=shelter bridge top side rod width dimensions+10mm.
The beneficial effects of the invention are as follows:
The construction hanging basket suspension arrangement for steel construction shelter bridge of the present invention, solves the installation on steel construction shelter bridge Hanging basket carries out the problem of exterior trim surface construction, compared to traditional floor scaffolding operating platform, using construction hanging basket not occupied road, field Ground, without prejudice to traffic, saving takes, tears scaffolding open, artificial, the time, improves work efficiency, accelerates construction speed;Compared to list The standard suspension mechanism of hanging point, the suspension arrangement uses two ends double hanging point so that institute's hanging basket quantity is doubled, in addition not Other construction operations of roof are hindered, the decoration for vertical face construction of shelter bridge both sides can be made to be carried out simultaneously with top cover construction, so as to greatly shorten Duration;And the apparatus structure is simple, materials facility is processed and easy to use, quick, stable safety, it is adaptable to various steel Structure closes shelter bridge alien invasion decorative operation, with larger economic benefit and social benefit.
Brief description of the drawings
Fig. 1 is the overall structure diagram of construction hanging basket suspension arrangement provided by the present invention;
Fig. 2 is the schematic view of the mounting position of construction hanging basket suspension arrangement provided by the present invention;
Fig. 3 is the suspension status schematic diagram of construction hanging basket suspension arrangement provided by the present invention;
Fig. 4 is the partial enlarged drawing of A nodes in Fig. 3;
Fig. 5 is Fig. 4 drawing in side sectional elevation;
Fig. 6 is the partial enlarged drawing of B node in Fig. 3;
Fig. 7 is Fig. 6 lateral plan.
Fig. 8 is the partial enlarged drawing of C nodes in Fig. 3
In above-mentioned figure:1st, longeron, 11, suspension section, 12, regulation section, the 13, first nut, 14, jackscrew;2nd, crossbeam, 3, branch Leg, 31, column, 32, bottom plate, 33, bolt hole;4th, U-shaped connecting bolt, the 5, second nut, 6, limit steel bar, 7, shelter bridge top sides Bar, 8, steel wire rope, 9, construction hanging basket.
Embodiment
For present disclosure, feature and effect can be further appreciated that, following examples are hereby enumerated, and coordinate accompanying drawing detailed It is described as follows:
As shown in Figure 1 to Figure 3, a kind of construction hanging basket suspension arrangement for steel construction shelter bridge is present embodiments provided, it is main To include longeron 1, crossbeam 2, supporting leg 3, U-shaped connecting bolt 4.Longeron 1 moves towards direction perpendicular to shelter bridge and set, the two ends of longeron 1 top Portion is welded with crossbeam 2 respectively, and the every two ends bottom of longeron 1 is welded with supporting leg 3 respectively, and supporting leg 3 is installed by U-shaped connecting bolt 4 The side rod 7 at the top of shelter bridge.
With reference to shown in Fig. 4 and Fig. 5, longeron 1 is made up of suspension section 11, regulation section 12, the first nut 13, jackscrew 14.Two Suspension section 11 is welded into square-section using two specification >=22# channel-section steels, hangs the inner bottom hole of section 11 and at hole position Beam back welding has the first nut 13 matched with jackscrew 14.Regulation section 12 is welded into square-section by two channel-section steels, and channel-section steel specification is pressed Spelling cross-sectional outer diameter is slightly less than the principle selection of the suspension section internal diameter of section 11.The use of jackscrew 14 specification >=M16, length 60mm~ 80mm hexagon-headed bolt, the screw thread specification of the first nut 13 is matched with jackscrew 14, for installing jackscrew 14.Two suspension sections 11 Both sides are divided into, for undertaking the load of construction hanging basket 9.A piece regulation section 12 is located between two suspension sections 11, and outstanding by two Section 11 is hung to connect;Regulation section 12 two ends are inserted in the inner abdominal cavities of two suspension sections 11 respectively, can be with by changing its stroke Adjust the length of longeron 1.Jackscrew 14 is screwed into the first nut 13 of suspension section 11 bottom surface, by its end withstand regulation section 12 and incite somebody to action Regulation section 12 is connected with suspension section 11.
With reference to shown in Fig. 6 and Fig. 7, the quantity of crossbeam 2 is two, and every crossbeam 2 is processed using specification >=20# I-steel, Length is 500mm or so.Two equal planes of crossbeam 2 take middle welding equipment in the side-by-side mounting of longeron 1 section 11 respectively perpendicular to longeron 1 At the top of outer end, crossbeam 2 is used for the steel wire rope 8 for hanging construction hanging basket 9.The two ends top surface of crossbeam 2 be welded with vertically two diameters >= 20mm, length 200mm or so limit steel bar 6, for preventing the steel wire rope 8 of construction hanging basket 9 from slipping.
With reference to shown in Fig. 8, the quantity of supporting leg 3 is two, and the height of supporting leg 3 is 400mm~500mm.Each supporting leg 3 is by column 31 and 32 groups of welderings of bottom plate form, column 31 is processed using square steel tube, 32 uses of bottom plate >=10mm steel plates processing;32 4 jiaos of bottom plate It is drilled with 4 aperture >=18mm bolt hole 33.Two supporting legs 3 are separately positioned on suspension section 11 and the shelter bridge top of the both sides of longeron 1 Between portion's side rod 7, set in the inner part with small distance relative to crossbeam 2, the top of column 31 and the bottom surface of longeron 1 of supporting leg 3 are welded, Bottom plate 32 is seated in the top surface of side rod 7 at the top of shelter bridge.
With reference to shown in Fig. 8, the quantity of U-shaped connecting bolt 4 is four, and it is vertical that U-shaped connecting bolt 4 is parallel to each other by two Screw rod and the connection cross bar of bottom are constituted, using HPB235 grades, diameter >=16mm round steel processing, wherein vertical screw rod end is processed Screw thread, with the second nut of standard 5, the size of vertical screw rod and connection cross bar is set according to the sectional dimension of side rod 7 at the top of shelter bridge. Side rod 7 at the top of one supporting leg 3 and shelter bridge is connected by each two U-shaped connecting bolt 4, and two U-shaped connecting bolts 4 are along shelter bridge top sides The length direction of bar 7 is arranged at intervals, and opening up to be enclosed at the top of shelter bridge outside side rod 7, it connects cross bar and is resisted against shelter bridge top sides The bottom surface of bar 7, two vertical screw rods fit in the both sides of side rod 7 at the top of shelter bridge, and vertical screw rod is thread through the bottom of column 31 with its top The bolt hole 33 of plate 32, and tightened by the second nut 5, so that the stabilization of supporting leg 3 is installed on into side rod 7 at the top of shelter bridge.
Suspension arrangement when in use, is first pressed longeron by the construction hanging basket suspension arrangement for steel construction shelter bridge of the present embodiment 1 moves towards direction perpendicular to shelter bridge is erected at shelter bridge top mounting location, and steel wire rope 8 is then installed on the crossbeam 2 of the end of longeron 1 And be connected the lower end of steel wire rope 8 with the hoisting mechanism of construction hanging basket 9, the hoisting mechanism on construction hanging basket 9 is by being hung on suspension Steel wire rope 8 on device, the vertical lifting of traction construction hanging basket 9 movement carries workmen and carries out shelter bridge alien invasion decoration construction. Every construction hanging basket 9 is hung on shelter bridge side, need to set two hitch points, shares two suspension arrangements, and two suspension arrangements exist Shelter bridge opposite side hangs another construction hanging basket 9.
The construction hanging basket suspension arrangement for steel construction shelter bridge of the present embodiment, its Specific construction process is as follows:
1) suspension arrangement makes
(1) longeron 1 is processed:
A, suspension section 11 are processed:Quantity is two, and material, construction, size are identical.Single suspension section 11 length dimension= 2300mm, square-section is welded into using two 22#b channel-section steels;Piece is located above and below.An end carriage bottom of section 11 is hung far from end One a diameter of 18mm of middle brill hole is laterally taken at portion 300mm.
B, regulation section 12 are processed:Quantity is one, length dimension=4500mm, using rectangular section of 18#a channel-section steel weldings Face;Piece is located above and below.
C, the first nut 13:Quantity is two, selects M16 standard nuts, is respectively welded at two suspension bottom holes of section 11 Position.
D, jackscrew 14:Quantity is two, selects the hexagon-headed bolt that M16, length are 70mm.
(2) crossbeam 2 is processed:Quantity is two, is processed using 20# I-steel, length=500mm.The every two ends of crossbeam 2 top Two a diameter of 20mm, length=200mm limit steel bars 6 are welded vertically in face.
(3) supporting leg 3 is processed:Quantity is two, is made up of column 31 and bottom plate 32, height=500mm.Column 31 is used 150 × 10 square steel tubes are processed, and bottom plate 32 is using the processing of 10mm steel plates, 32 length dimensions of bottom plate=shelter bridge top width of side rod 7 Size+150mm, the length of side+150m of width dimensions=column 31.The four a diameter of 18mm of angular bit of bottom plate 32 4 bolt hole 33, spiral shell The middle-range of the two vertical screw rods along along the length direction hole centre-to-centre spacing of bottom plate 32=U-shaped connecting bolt 4 of keyhole 33.Column 31 and bottom plate 32 Centering assembly welding.
(4) U-shaped connecting bolt 4 is processed:Quantity is four, is bent using a diameter of 16mm round steel.U-shaped connecting bolt 4 The vertical screw rod and the connection cross bar of bottom being parallel to each other by both sides two are constituted;At the top of vertical screw rod clear length size=shelter bridge Height dimension+the 50mm of side rod 7;Width dimensions+the 10mm of side rod 7 at the top of the vertical screw rod clear distance in both sides=shelter bridge;Vertical screw rod end Process screw thread, screw thread segment length=50mm;Every vertical screw rod is with second nut of standard 5.
(5) suspension arrangement is assembled:
A, two suspension sections 11 respectively fill a supporting leg 3, and supporting leg 3 is located at away from bottom at the suspension outer end 800mm of section 11, during installation Welded parallel to the suspension beam longitudinal axis of section 11, the top surface of 3 column of supporting leg 31 with the bottom surface of longeron 1 on the long side of 3 bottom plate of supporting leg 32.
B, two suspension sections 11 respectively fill a crossbeam 2, and crossbeam 2 takes middle welding equipment to be hung in longeron 1 by plane perpendicular to longeron 1 At the top of 11 outer ends of section.
2) suspension arrangement is installed
Step is as follows:
(1) suspension arrangement installation site is determined, mark is made on shelter bridge.
(2) suspension arrangement Assembling:Suspension arrangement is first assembled before installing on ground, and regulation section 12 is placed in into two suspensions Between section 11, insert two and hang the inner intraperitoneal of section 11, the length of longeron 1 is adjusted according to the installation site spacing of two side leg 3, Then jackscrew 14 is screwed into the first nut 13 to fix two suspension sections 11 with regulation section 12.
(3) suspension arrangement is installed:Suspension arrangement is hoisted at the top of shelter bridge, longeron 1 is pressed perpendicular to corridor according to mark Bridge moves towards direction in place, the bottom plate 32 of 1 liang of side leg of longeron 3 is seated at the top of the shelter bridge of both sides on side rod 7;Align behind orientation, point Not by the opening up bottom and both sides for being enclosed on side rod 7 at the top of shelter bridge of two U-shaped connecting bolts 4, through on the bottom plate 32 of supporting leg 3 Screwed hole 33, the second nut 5 is tightened on vertical screw rod exposed threads section set.
3) suspension arrangement is used
On the crossbeam 2 that steel wire rope 8 and safety rope are winded to the top of suspension arrangement longeron 1, the lifting of connection construction hanging basket 9 Machine and safety lock, the vertical lifting of traction construction hanging basket 9 movement carry workmen and carry out shelter bridge alien invasion decoration construction.
It could be aware that in summary, the construction hanging basket suspension arrangement for steel construction shelter bridge of the invention has following excellent Gesture:
(1) device uses bar shaped split heads structure type, and two ends can hang construction hanging basket 9 and be constructed, are adapted in steel Installed and used on structure shelter bridge.
(2) device due to bar shaped split heads structure type stability itself it is good, and height reduction can be made, in addition by both sides Supporting leg 3 is connected with side rod 7 at the top of shelter bridge, the standard gondola-hanging mechanism of relatively existing use counterweight equilibrium principle, safety Stability is greatly enhanced.
(3) device by two side legs 3 by the frame of longeron 1 from shelter bridge top surface, do not influence top cover to construct.
(4) longeron 1 is designed to adjustable telescopic structure by the device, can adjusting means span as needed, meet not With being installed and used on the shelter bridge of cross-sectional width, and detachably decompose, convenient storage, transport.
(5) connected between the device and shelter bridge steel construction using U-shaped connecting bolt 4, it is quick and easy for installation, it is fixed, It can avoid that steel construction and suspension arrangement are caused to damage, while meeting suspension arrangement is used in turn requirement.
(6) apparatus structure is simple, materials facility, processing, easy to use.
Although the preferred embodiments of the present invention are described above in conjunction with accompanying drawing, the invention is not limited in upper The embodiment stated, above-mentioned embodiment is only schematical, be not it is restricted, this area it is common Technical staff is under the enlightenment of the present invention, in the case of invention objective and scope of the claimed protection is not departed from, can be with The specific conversion of many forms is made, these are belonged within protection scope of the present invention.

Claims (6)

1. a kind of construction hanging basket suspension arrangement for steel construction shelter bridge, it is characterised in that including moving towards direction perpendicular to shelter bridge The longeron of setting, the longeron is made up of two suspension sections and the regulation section being arranged between two suspension sections, described to adjust Section is fixedly connected after being inserted with suspension section by jackscrew and the first nut;One is respectively welded at the top of the longeron two ends Root crossbeam, the crossbeam is used for the steel wire rope for hanging construction hanging basket;Longeron two ends bottom is respectively welded a supporting leg, institute Supporting leg is stated to set in the inner part relative to the crossbeam;Each supporting leg includes the column for being welded in the longeron bottom surface, described Column bottom is provided with the bottom plate being seated at the top of shelter bridge at the top of side rod, and the bottom plate is pacified by U-shaped connecting bolt described in two groups Loaded on side rod at the top of shelter bridge;U-shaped connecting bolt described in two groups along shelter bridge top sides pole length direction be arranged at intervals, with opening to On be enclosed at the top of shelter bridge on side rod, the U-shaped connecting bolt is thread through the bottom plate of the column and by the second spiral shell with its top Mother tightens.
2. a kind of construction hanging basket suspension arrangement for steel construction shelter bridge according to claim 1, it is characterised in that described The inner drilling of suspension section of longeron simultaneously welds first nut at hole position, and first nut, which is worn, connects the installation jackscrew, Insert the regulation section of two suspension sections respectively for fixing two ends.
3. a kind of construction hanging basket suspension arrangement for steel construction shelter bridge according to claim 1, it is characterised in that described Crossbeam plane takes middle welding equipment at the top of the longeron outer end perpendicular to the longeron.
4. a kind of construction hanging basket suspension arrangement for steel construction shelter bridge according to claim 1, it is characterised in that described Crossbeam two ends top surface is welded with two limit steel bars vertically respectively.
5. a kind of construction hanging basket suspension arrangement for steel construction shelter bridge according to claim 1, it is characterised in that described The vertical screw rod and the connection cross bar of bottom that U-shaped connecting bolt is parallel to each other by two are constituted, wherein vertical screw rod end is processed Screw thread.
6. a kind of construction hanging basket suspension arrangement for steel construction shelter bridge according to claim 5, it is characterised in that described Side rod at the top of side rod height dimension+50mm at the top of vertical screw rod clear length size=shelter bridge, the vertical screw rod clear distance in both sides=shelter bridge Width dimensions+10mm.
CN201710553210.7A 2017-07-07 2017-07-07 A kind of construction hanging basket suspension arrangement for steel construction shelter bridge Pending CN107217836A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710553210.7A CN107217836A (en) 2017-07-07 2017-07-07 A kind of construction hanging basket suspension arrangement for steel construction shelter bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710553210.7A CN107217836A (en) 2017-07-07 2017-07-07 A kind of construction hanging basket suspension arrangement for steel construction shelter bridge

Publications (1)

Publication Number Publication Date
CN107217836A true CN107217836A (en) 2017-09-29

Family

ID=59952524

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710553210.7A Pending CN107217836A (en) 2017-07-07 2017-07-07 A kind of construction hanging basket suspension arrangement for steel construction shelter bridge

Country Status (1)

Country Link
CN (1) CN107217836A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109779233A (en) * 2017-11-10 2019-05-21 中国二十冶集团有限公司 A kind of fixation device based on girder construction
CN110029807A (en) * 2019-05-23 2019-07-19 中国二十二冶集团有限公司 For installing the device of steel construction traverse colored steel
CN114960437A (en) * 2022-05-24 2022-08-30 中国水利水电科学研究院 Walking type mobile operation trolley for external construction of large aqueduct
CN114961216A (en) * 2022-06-17 2022-08-30 中冶建工集团有限公司 Hanging basket installation device for corridor construction and hanging basket synchronous installation construction method
CN115142656A (en) * 2022-07-29 2022-10-04 江汉大学 Suspension structure suitable for annular hanging basket and construction method thereof

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030159884A1 (en) * 2002-02-22 2003-08-28 Cole Michael J. Movable scaffold and method for painting cylindrical tank
US20120017419A1 (en) * 2010-07-26 2012-01-26 Younassan Joseph Honein Tank plate erection system
CN104358211A (en) * 2014-10-16 2015-02-18 武汉二航路桥特种工程有限责任公司 Beam bottom overhaul platform capable of spanning bridge piers and obstacle pillars and use method of beam bottom overhaul platform
CN204552051U (en) * 2015-03-31 2015-08-12 中国建筑第六工程局有限公司 The cradle structure of high-altitude crossbeam soffit monitoring point layout
CN204571264U (en) * 2015-03-24 2015-08-19 中建八局第一建设有限公司 A kind of fastening devices without counterweight hanging basket
CN204899184U (en) * 2015-06-17 2015-12-23 中建钢构有限公司 Hanging flower basket equipment
CN205153510U (en) * 2015-11-17 2016-04-13 中国二冶集团有限公司 Building engineering vestibule colored steel installation hanging flower basket device
CN207063488U (en) * 2017-07-07 2018-03-02 中国建筑第六工程局有限公司 A kind of construction hanging basket suspension arrangement for steel construction shelter bridge

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030159884A1 (en) * 2002-02-22 2003-08-28 Cole Michael J. Movable scaffold and method for painting cylindrical tank
US20120017419A1 (en) * 2010-07-26 2012-01-26 Younassan Joseph Honein Tank plate erection system
CN104358211A (en) * 2014-10-16 2015-02-18 武汉二航路桥特种工程有限责任公司 Beam bottom overhaul platform capable of spanning bridge piers and obstacle pillars and use method of beam bottom overhaul platform
CN204571264U (en) * 2015-03-24 2015-08-19 中建八局第一建设有限公司 A kind of fastening devices without counterweight hanging basket
CN204552051U (en) * 2015-03-31 2015-08-12 中国建筑第六工程局有限公司 The cradle structure of high-altitude crossbeam soffit monitoring point layout
CN204899184U (en) * 2015-06-17 2015-12-23 中建钢构有限公司 Hanging flower basket equipment
CN205153510U (en) * 2015-11-17 2016-04-13 中国二冶集团有限公司 Building engineering vestibule colored steel installation hanging flower basket device
CN207063488U (en) * 2017-07-07 2018-03-02 中国建筑第六工程局有限公司 A kind of construction hanging basket suspension arrangement for steel construction shelter bridge

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109779233A (en) * 2017-11-10 2019-05-21 中国二十冶集团有限公司 A kind of fixation device based on girder construction
CN110029807A (en) * 2019-05-23 2019-07-19 中国二十二冶集团有限公司 For installing the device of steel construction traverse colored steel
CN114960437A (en) * 2022-05-24 2022-08-30 中国水利水电科学研究院 Walking type mobile operation trolley for external construction of large aqueduct
CN114961216A (en) * 2022-06-17 2022-08-30 中冶建工集团有限公司 Hanging basket installation device for corridor construction and hanging basket synchronous installation construction method
CN115142656A (en) * 2022-07-29 2022-10-04 江汉大学 Suspension structure suitable for annular hanging basket and construction method thereof

Similar Documents

Publication Publication Date Title
CN107217836A (en) A kind of construction hanging basket suspension arrangement for steel construction shelter bridge
CN102864936B (en) Combination lifting construction method for large-scale high hollow building roof of steel structure
CN109339458B (en) Multifunctional trolley for binding and installing cast-in-situ beam reinforcement cage
CN211736298U (en) Double-rod diagonal cantilever scaffold
CN211622528U (en) Basket type outer vertical surface scaffold inclined-pulling type I-steel cantilever beam
CN207079828U (en) A kind of oblique outer reverse erecting device of eaves panel of large cantilever
CN105781096B (en) A kind of safe Hanging Basket and its construction method for working at height
CN211689948U (en) Suspension operation platform device for construction of suspension cable at tower part of cable-stayed bridge
CN207063488U (en) A kind of construction hanging basket suspension arrangement for steel construction shelter bridge
CN210598185U (en) Shaped steel platform of unloading of encorbelmenting of fast-assembling quick detach
CN216690350U (en) Concrete circular silo slip form construction equipment
JP3950800B2 (en) Suspension scaffold
CN213174742U (en) Top bracing steel stand structure
CN115095118A (en) Method for constructing coke quenching tower by suspended integrally-installed support
CN212773451U (en) Post-cast strip template support system
CN209874434U (en) Simple and easy scaffold frame of encorbelmenting of building high latitude
CN111979916B (en) Cable-stayed bridge tower part suspension construction method and suspension operation platform device
CN218324028U (en) Be used for pipeline welding protection portal assembled to hang corridor protector on road
CN219684325U (en) Steel column side column welding platform
CN220521918U (en) Combined type finalized steel pipe supporting temporary scaffold
CN211102482U (en) Pipe truss welding frock
CN212428050U (en) Floor surface regularization pedestrian passageway
CN218779913U (en) Operating platform for pouring operators
CN202706543U (en) Fastener-type steel pipe scaffold formwork support applicable to skeleton reinforced concrete girder
CN220365282U (en) Electric translation type hanging basket

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170929

WD01 Invention patent application deemed withdrawn after publication