- Publication number
- CN205088580U CN205088580U CN201520884662.XU CN201520884662U CN205088580U CN 205088580 U CN205088580 U CN 205088580U CN 201520884662 U CN201520884662 U CN 201520884662U CN 205088580 U CN205088580 U CN 205088580U
- Authority
- CN
- China
- Prior art keywords
- rod
- bridge pier
- iii
- members
- hanging basket
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000009434 installation Methods 0.000 title abstract description 10
- XEEYBQQBJWHFJM-UHFFFAOYSA-N iron Chemical compound data:image/svg+xml;base64,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 data:image/svg+xml;base64,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 [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 title abstract 6
- 229910052742 iron Inorganic materials 0.000 title abstract 3
- 238000010276 construction Methods 0.000 claims abstract description 25
- 210000002356 Skeleton Anatomy 0.000 claims abstract description 16
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 4
- 239000010959 steel Substances 0.000 claims abstract description 4
- 239000000725 suspension Substances 0.000 claims description 10
- 230000000875 corresponding Effects 0.000 claims description 3
- 239000002965 rope Substances 0.000 abstract 1
- 230000000694 effects Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
- 231100000817 safety factor Toxicity 0.000 description 1
Abstract
The utility model discloses an iron road bridge mound hanging flower basket installation frock, include: the frock frame of fixing at pier dun ding hangs the frame with the construction of hanging on the frock frame, the frock frame includes connects the skeleton and the guardrail of setting on the skeleton that forms by the angle steel member in a plurality of bolted connection of having holes, be provided with rings on the skeleton, the construction is hung the frame and is hung on rings through wire rope. The utility model discloses an installation of iron road bridge mound hanging flower basket provides work platform, has guaranteed construction safety, has improved work efficiency, has the input cost and hangs down, installs characteristics simple, construction convenience.
Description
Technical field
The utility model relates to railroad bridge construction equipment, provides a kind of Railway Bridges And Piers hanging basket mounting tool especially.
Background technology
Railroad bridge is constructed after complete and railway normal operation, maintenance to be made regular check on to pier topmast seat, because Railway Bridges And Piers is general higher, Dun Ding is not again for the space that maintainer bases oneself upon, so installation pier top hanging basket will be carried out after Bridge Pier Construction, to provide maintenance and inspection space, as shown in Figure 1 and Figure 2, pier top hanging basket is arranged on the top outside bridge pier, and around bridge pier arranged outside; The top of bridge pier is provided with the pinner placing bridge pad, and pinner is two that are symmetrical set, and pinner is arranged along the width of bridge pier; Pier top hanging basket is installed front bridge abutment moulding plate and has been removed complete, in bridge pier end face surrounding, pier top hanging basket to be installed and must set up job platform to construction worker, when carrying out setting up job platform with scaffold, activity duration very long and cost is very large, greatly reduces construction operation efficiency and economic benefit is very low; With mobile crane or tower crane hang construction hanging box handling workman's job execution time longer, benefit is low and safety factor is low.
Utility model content
The purpose of this utility model is to provide a kind of Railway Bridges And Piers hanging basket mounting tool, can effectively solve the problem.
The technical solution of the utility model is: Railway Bridges And Piers hanging basket mounting tool, comprising: the machine frame being fixed on bridge pier 1 Dun Ding and the construction hanging box 4 be suspended on machine frame; Described machine frame comprises by multiple skeleton be connected to form with the angle member of bolt connecting hole and the guardrail 5 be arranged on skeleton, described skeleton is provided with suspension ring 6, described construction hanging box 4 by steel wire hang on suspension ring 6.
Preferably, described skeleton comprises four rod members, I 7, four rod members, II 8, two rod members, III 9, two rod members, IV 10, two rod members, V 11, two rod members VI 12; Described rod member I 7 and rod member II 8 are arranged on around two pinners 2 of bridge pier 1 Dun Ding, and described rod member I 7 is arranged along bridge pier length direction, and described rod member II 8 is arranged along bridge pier width and is connected on rod member I 7; Described rod member III 9, rod member IV 10, rod member V 11 are arranged on bridge pier 1 pier top edge, described two rod members III 9 are arranged along bridge pier length direction and are connected to the two ends of four rod members II 8, described rod member IV 10, rod member V 11 are arranged along bridge pier width, each root rod member IV 10 and rod member V 11 form one group, often in group, one end of rod member IV 10 and rod member V 11 is connected on corresponding rod member II 8 by rod member VI 12, and in two groups, the other end of rod member IV 10 and rod member V 11 is connected to the two ends of two rod members III 9.
Preferably, described rod member III 9 and rod member VI 12 are welded with leveling bolt 13.
Preferably, the two ends of described rod member II 8 and rod member III 9 and one end of rod member IV 10 and rod member V 11 are respectively equipped with multiple bolt hole.
Preferably, described rod member I 7 is fixed with pinner 2 embedded bar by U-shaped connecting bolt 14, and described rod member II 8 is fixed by location adjusting bolt 15 and pinner 2.
Preferably, described suspension ring 6 interval 50cm distribution is arranged on rod member III 9, rod member IV 10, rod member V 11.
Preferably, described construction hanging box 4 comprises base plate and fence.
The utility model has following useful effect:
The utility model is that the installation of Railway Bridges And Piers hanging basket provides job platform, ensure that construction safety, improves operating efficiency, have input cost low, feature that is simple, easy construction is installed.
Accompanying drawing explanation
Fig. 1, Fig. 2 are the arrangement diagram of railroad bridge pier top hanging basket;
Fig. 3 is front view of the present utility model;
Fig. 4 is the top view of the utility model skeleton;
In figure: 1, bridge pier; 2, pinner; 3, hanging basket; 4, construction hanging box; 5, guardrail; 6, suspension ring; 7, rod member I; 8, rod member II; 9, rod member III; 10, rod member IV; 11, rod member V; 12, rod member VI; 13, leveling bolt; 14, U-shaped connecting bolt; 15, adjusting bolt is located.
Detailed description of the invention
Below in conjunction with drawings and Examples, the utility model is described in detail.
The utility model is installed for Railway Bridges And Piers hanging basket, proposes a kind of Railway Bridges And Piers hanging basket mounting tool, as Figure 1-4, comprising: machine frame and construction hanging box 4; Machine frame comprises by multiple skeleton of being connected to form with the angle member of bolt connecting hole and guardrail 5;
Concrete, skeleton comprises four rod members, I 7, four rod members, II 8, two rod members, III 9, two rod members, IV 10, two rod members, V 11, two rod members VI 12; Rod member I 7 and rod member II 8 are arranged on around two pinners 2 of bridge pier 1 Dun Ding, and rod member I 7 is arranged along bridge pier length direction, and rod member II 8 is arranged along bridge pier width and is connected on rod member I 7; Rod member III 9, rod member IV 10, rod member V 11 are arranged on bridge pier 1 pier top edge, two rod members III 9 are arranged along bridge pier length direction and are connected to the two ends of four rod members II 8, rod member IV 10, rod member V 11 are arranged along bridge pier width, each root rod member IV 10 and rod member V 11 form one group, often in group, one end of rod member IV 10 and rod member V 11 is connected on corresponding rod member II 8 by rod member VI 12, and in two groups, the other end of rod member IV 10 and rod member V 11 is connected to the two ends of two rod members III 9;
Guardrail 5 is arranged on rod member III 9, rod member IV 10, rod member V 11, forms complete closure fence in Dun Ding, effectively ensures pier top operating personnel's construction safety;
On rod member III 9, rod member IV 10, rod member V 11 interval 50cm distribution be provided with suspension ring 6, construction hanging box 4 by steel wire hang on suspension ring 6; Construction hanging box 4 provides constructor the job platform when installing bridge pier hanging basket support, often completes the installation of a bridge pier hanging basket support, and construction hanging box 4 is moved or moved forward after carrying out and carries out the installation of next bridge pier hanging basket support; Suspension ring 6 and guardrail 5 provide the hanging point of the safety belt that workman wears;
Rod member III 9 and rod member VI 12 are welded with leveling bolt 13, by leveling bolt 13 leveling and the whole machine frame of support;
The two ends of rod member II 8 and rod member III 9 and one end of rod member IV 10 and rod member V 11 are respectively equipped with multiple bolt hole, according to pier footpath size adjustment link position, thus reach the adjustment to machine frame plane width;
For building pinner concrete employing location adjusting bolt 15, rod member II 8 and pinner 2 being fixed, to not yet building the concrete employing of pinner U-shaped connecting bolt 14, rod member I 7 and pinner embedded bar being fixed;
Construction hanging box 4 is monolithic construction, includes base plate and fence, and base plate and fence adopt high strength light quality quarter bend, and hanging box load-bearing is not less than 500kg, and quality is not more than 30kg.
In the utility model, the position relationship of each rod member of skeleton is: rod member II 8 is positioned at rod member I 7 bottom, and rod member VI 12 is positioned at rod member II 8, rod member IV 10, rod member V 11 top, and rod member III 9 is positioned at rod member II 8, rod member IV 10, rod member V 11 top.
The lifting of this frock in use, installing to Dun Ding with crane, by the handling of bridge pier hanging basket 3 material to Dun Ding, can carry out bridge pier hanging basket installation exercise when not using hanging device by the utility model.Skeleton can after ground is assembled again Integral lifting be fixed and adjustment to Dun Ding, also can directly assemble at pier jacking row.After the installation of bridge pier hanging basket, frock Integral lifting is carried out lower one operation to next bridge pier.Workman can carry out installation bridge pier hanging basket 3 on this device, simple and convenient safety again.
Above-described embodiment, only for technical conceive of the present utility model and feature are described, its object is to person skilled in the art can be understood content of the present utility model and implement according to this, can not limit protection domain of the present utility model with this.All equivalences done according to the utility model Spirit Essence change or modify, and all should be encompassed within protection domain of the present utility model.
Claims (7)
1. Railway Bridges And Piers hanging basket mounting tool, is characterized in that, comprising: the machine frame being fixed on bridge pier (1) Dun Ding and the construction hanging box (4) be suspended on machine frame; Described machine frame comprises by multiple with the angle member of the bolt connecting hole skeleton be connected to form and the guardrail (5) be arranged on skeleton, described skeleton is provided with suspension ring (6), described construction hanging box (4) by steel wire hang on suspension ring (6).
2. according to Railway Bridges And Piers hanging basket mounting tool according to claim 1, it is characterized in that, described skeleton comprises four rod members, I (7), four rod members, II (8), two rod members, III (9), two rod members, IV (10), two rod members, V (11), two rod members VI (12), described rod member I (7) and rod member II (8) are arranged on two pinners (2) of bridge pier (1) Dun Ding around, described rod member I (7) is arranged along bridge pier length direction, and described rod member II (8) is arranged along bridge pier width and is connected on rod member I (7), described rod member III (9), rod member IV (10), rod member V (11) is arranged on bridge pier (1) pier top edge, described two rod members III (9) are arranged along bridge pier length direction and are connected to the two ends of four rod members II (8), described rod member IV (10), rod member V (11) is arranged along bridge pier width, each root rod member IV (10) and rod member V (11) form one group, often in group, one end of rod member IV (10) and rod member V (11) is connected on corresponding rod member II (8) by rod member VI (12), in two groups, the other end of rod member IV (10) and rod member V (11) is connected to the two ends of two rod members III (9).
3. according to Railway Bridges And Piers hanging basket mounting tool according to claim 2, it is characterized in that, described rod member III (9) and rod member VI (12) are welded with leveling bolt (13).
4. according to Railway Bridges And Piers hanging basket mounting tool according to claim 2, it is characterized in that, the two ends of described rod member II (8) and rod member III (9) and one end of rod member IV (10) and rod member V (11) are respectively equipped with multiple bolt hole.
5. according to Railway Bridges And Piers hanging basket mounting tool according to claim 2, it is characterized in that, described rod member I (7) is fixed by U-shaped connecting bolt (14) and pinner (2) embedded bar, and described rod member II (8) is fixed by location adjusting bolt (15) and pinner (2).
6. according to Railway Bridges And Piers hanging basket mounting tool according to claim 2, it is characterized in that, described suspension ring (6) interval 50cm distribution is arranged on rod member III (9), rod member IV (10), rod member V (11).
7. according to Railway Bridges And Piers hanging basket mounting tool according to claim 1, it is characterized in that, described construction hanging box (4) comprises base plate and fence.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520884662.XU CN205088580U (en) | 2015-11-06 | 2015-11-06 | Iron road bridge mound hanging flower basket installation frock |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520884662.XU CN205088580U (en) | 2015-11-06 | 2015-11-06 | Iron road bridge mound hanging flower basket installation frock |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205088580U true CN205088580U (en) | 2016-03-16 |
Family
ID=55479282
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520884662.XU Expired - Fee Related CN205088580U (en) | 2015-11-06 | 2015-11-06 | Iron road bridge mound hanging flower basket installation frock |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205088580U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106087751A (en) * | 2016-06-30 | 2016-11-09 | 中交航局第四工程有限公司 | Operating platform in a kind of hollow thin-walled high pier |
-
2015
- 2015-11-06 CN CN201520884662.XU patent/CN205088580U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106087751A (en) * | 2016-06-30 | 2016-11-09 | 中交航局第四工程有限公司 | Operating platform in a kind of hollow thin-walled high pier |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206768611U (en) | Bridge pier hanging basket mounting operation platform | |
CN203255914U (en) | Unit-typed curtain wall lifting device | |
CN205088580U (en) | Iron road bridge mound hanging flower basket installation frock | |
CN104895335A (en) | Method for mounting hanging pillar | |
CN108979131A (en) | A kind of high-building construction steel form and operation frame integral hoisting stage apparatus | |
CN205259628U (en) | Pipe truss structure anchor clamps formula safety protective guard pole | |
CN204212065U (en) | Bridge crossing anticollision barrier punching block erection equipment | |
CN104153586B (en) | A kind of suspension cable hangs the construction method of mounting purlines | |
CN107217912B (en) | A kind of superelevation physical isolation construction method for neighbouring high-speed rail Business Line construction | |
CN105464456A (en) | Method and lifting sling for assembling extra-high voltage transmission iron tower through helicopter | |
CN202731270U (en) | Movable platform for high-altitude installation operation of space steel structure | |
CN204475182U (en) | The mounting tool of a kind of Railway Bridges And Piers pier top hanging basket | |
CN202023149U (en) | Hanging basket used in construction | |
CN204199185U (en) | A kind of prestressed stretch-draw support | |
CN205693609U (en) | Ground photovoltaic bracket and photovoltaic module hanger bracket device are installed | |
CN202990386U (en) | Externally-suspended scaffold | |
CN204959611U (en) | A lifting device for highway construction bridge railing base template | |
CN104925687A (en) | Electric lifting device and working method thereof | |
CN207209786U (en) | The cast-in-place boom support monoblock type automatic disassembling device of falsework | |
CN206308702U (en) | A kind of portable basis of derrick crane | |
CN204714417U (en) | A kind of power ramp device | |
CN204038917U (en) | Dismountable external hanging service platform | |
CN205529939U (en) | Bridge testing and maintenance platform of rope type | |
CN204551271U (en) | A kind of reinforcement type Hanging Basket | |
CN104453339B (en) | Power circuit steel pipe pole erection assembling tool and technique |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |