RU2438963C1 - Attachment tower crane with tower connections and device to attach crane tower to high-rise building, method of extending crane tower and device to this end - Google Patents
Attachment tower crane with tower connections and device to attach crane tower to high-rise building, method of extending crane tower and device to this end Download PDFInfo
- Publication number
- RU2438963C1 RU2438963C1 RU2010123717/11A RU2010123717A RU2438963C1 RU 2438963 C1 RU2438963 C1 RU 2438963C1 RU 2010123717/11 A RU2010123717/11 A RU 2010123717/11A RU 2010123717 A RU2010123717 A RU 2010123717A RU 2438963 C1 RU2438963 C1 RU 2438963C1
- Authority
- RU
- Russia
- Prior art keywords
- tower
- crane
- frames
- building
- mounting clip
- Prior art date
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Jib Cranes (AREA)
Abstract
Description
Изобретение относится к монтажным строительным кранам, предназначенным преимущественно для строительства высотных зданий, при этом основными отличительными элементами таких кранов являются установленная на секционной башне стрела с крюковой подвеской, башня, оснащенная средством ее наращивания дополнительными секциями башни, и расположенные по высоте башни в ярус распорки, соединяющие башню крана со строящимся высотным зданием, высота которого может достигать нескольких сотен метров. Башенный кран может быть также использован в качестве крана для строительства зданий, имеющих высоту до 50 метров.The invention relates to mounting construction cranes intended primarily for the construction of high-rise buildings, the main distinguishing elements of such cranes being an arrow mounted on a sectional tower with a hook suspension, a tower equipped with a means of building it up with additional sections of the tower, and the towers located along the height of the tower connecting the crane tower with a high-rise building under construction, the height of which can reach several hundred meters. A tower crane can also be used as a crane for the construction of buildings with a height of up to 50 meters.
Известен способ наращивания башни башенного крана, включающий операцию подъема секции до места ее установки в проем башни, введение секции в проем и ее соединение с нижней и верхней секциями башни, причем для введения секции в проем башни используются поворотная рама, монтажная стойка с кронштейнами и другие элементы [1].A known method of building a tower tower crane, including the operation of lifting the section to the place of its installation in the opening of the tower, introducing the section into the opening and its connection with the lower and upper sections of the tower, and for introducing the section into the opening of the tower, a rotary frame, mounting rack with brackets and others are used elements [1].
Известен способ монтажа башни башенного крана, имеющего в нижней части портал, в проем которого вводят наращиваемую секцию башни путем ее поворота в вертикальной плоскости, при этом секцию перед ее поворотом навешивают на нижний край секции, которая прикреплена к башне, нижний край наращиваемой секции соединяют канатом с порталом, после чего поднимают всю башню на высоту секции, опускают наращиваемую секцию в проектное вертикальное положение [2].There is a method of mounting a tower tower tower having a portal at the bottom, into the opening of which an expandable section of the tower is introduced by turning it in a vertical plane, while the section before hanging it is hung on the lower edge of the section that is attached to the tower, the lower edge of the section being expanded is connected by a rope with a portal, after which they raise the entire tower to the height of the section, lower the stackable section to the design vertical position [2].
Данные способы являются весьма трудоемкими и энергоемкими, поскольку при подращивании башни наращиваемой секцией снизу приходится каждый раз поднимать башню крана и всю верхнюю часть крана над порталом.These methods are very time-consuming and energy-intensive, because when the tower is being tilted with a stackable section from the bottom, each time it is necessary to raise the crane tower and the entire upper part of the crane above the portal.
Известен башенный кран с наращиваемой башней, содержащей устройство для наращивания и введения наращиваемой секции в проем башни, при этом устройство включает направляющие, по которым наращиваемую секцию в ее вертикальном положении вводят в проем башни, причем наращиваемую секцию башни поднимают с земли краном в ее вертикальном положении [3].Known tower crane with a stackable tower containing a device for building and introducing a stackable section into the tower opening, the device includes guides along which the stackable section in its vertical position is introduced into the tower opening, and the stackable tower section is lifted from the ground by a crane in its vertical position [3].
Данное устройство предусматривает способ наращивания башни, заключающийся в том, что наращиваемую секцию вводят в проем башни в вертикальном положении, что отрицательно влияет на безопасность наращивания и трудоемкость. При этом требуется сложная конструкция для введения секции в проем башни.This device provides a method for building the tower, which consists in the fact that the expandable section is introduced into the tower opening in a vertical position, which negatively affects the security of the building and the complexity. This requires a complex structure for introducing a section into the opening of the tower.
Известен башенный кран с монтажной обоймой для наращивания башни, при этом для введения секции башни в ее проем используются катучие опоры [4].Known tower crane with mounting clip for building the tower, while for the introduction of the tower section in its opening are used rolling supports [4].
Наращиваемая секция башни вводится в проем башни в вертикальном положении и по катучим опорам перемещается в проем башни в ее проектное положение, что отрицательно влияет на безопасность монтажных работ, поскольку перекатываемая по катучим опорам в вертикальном положении секция имеет наименьшую устойчивость.The expanding section of the tower is introduced into the tower aperture in a vertical position and moves along the rolling supports into the tower opening to its design position, which negatively affects the safety of installation work, since the section rolled over the rolling supports in the vertical position has the least stability.
Известны башенные краны с монтажными обоймами, закрепленными в верхних частях башенных кранов на башнях, при этом конструкция каждого из этих кранов и его монтажная обойма предусматривают закатывание по направляющим наращиваемой секции в ее вертикальном положении в проем башни [5-7].Known tower cranes with mounting clips fixed in the upper parts of tower cranes on the towers, while the design of each of these cranes and its mounting clip provide rolling along the guides of the stackable section in its vertical position in the opening of the tower [5-7].
Известен способ наращивания башни башенного крана, включающий подъем краном наращиваемой секции до уровня проема монтажной обоймы и проема башни крана, фиксацию наращиваемой секции и ее введение в проем башни путем поворота относительно точек фиксации, установку наращиваемой секции в проектное вертикальное положение и ее соединение с башней [8].A known method of building a tower tower tower crane, including lifting the crane of the stackable section to the level of the opening of the mounting clip and the opening of the tower of the crane, fixing the stackable section and its introduction into the tower opening by turning relative to the fixing points, setting the stackable section in the design vertical position and connecting it to the tower [ 8].
В этом техническом решении фиксацию наращиваемой секции в проеме башни производят путем опирания наружного нижнего края этой секции на верхний наружный край нижней секции башни. Для этого поднятую в вертикальном положении наращиваемую секцию наклоняют по отношению к башне или сначала заводят нижний ее конец в проем башни, а затем заводят в проем верхний конец секции, что связано с выполнением множества монтажных операций, отрицательно влияющих на трудоемкость и безопасность выполняемых на большой высоте работ.In this technical solution, the fixation of the stackable section in the opening of the tower is carried out by supporting the outer lower edge of this section on the upper outer edge of the lower section of the tower. To do this, the stackable section raised in a vertical position is tilted with respect to the tower, or its lower end is first brought into the tower opening, and then the upper end of the section is led into the opening, which is associated with many installation operations that adversely affect the complexity and safety at high altitude works.
Известен приставной башенный кран, содержащий башню, которая присоединена к стене здания рамами и раскосами [9].Known attached tower crane containing a tower, which is attached to the wall of the building with frames and braces [9].
Известен приставной башенный кран с наращиваемой башней и устройством для крепления башни крана к высотному зданию, характеризующийся тем, что он содержит башню, на верхней части которой смонтированы стрела, консоль и оголовок, расчалы стрелы и консоли, установленную на стреле грузовую тележку с крюковой подвеской, подвижно установленную на башне монтажную обойму для наращивания башни, расположенные вокруг башни друг над другом рамы, соединяющие башню с настенными опорами здания [10].Known attached tower crane with a stackable tower and a device for mounting the tower of the crane to a high-rise building, characterized in that it contains a tower, on the upper part of which are mounted an arrow, a console and a head, boom and console brackets, a load trolley with hook suspension mounted on the arrow, a mounting clip movably mounted on the tower for building the tower; frames located around the tower above each other connecting the tower with the wall supports of the building [10].
Данный приставной кран [10] предопределяет способ наращивания башни крана, характеризующийся тем, что он включает операцию фиксации башни крана на установленной высоте в проектном положении путем соединения башни крана со зданием посредством расположенных на башне рам, соединяемых с расположенными на здании настенными опорами, операцию образования между нижней частью башни и ее верхней частью проема с помощью монтажной обоймы, операцию введения в проем наращиваемой секции башни и операцию соединения наращиваемой секции с верхней и нижней частями башни.This attached crane [10] determines the method of building the tower of the crane, characterized in that it includes the operation of fixing the tower of the crane at a set height in the design position by connecting the tower of the crane to the building by means of the frames located on the tower connected to the wall supports located on the building, the formation operation between the lower part of the tower and its upper part of the opening with the help of a mounting clip, the operation of introducing the expandable section of the tower into the opening and the operation of connecting the expandable section with the upper and lower s part of the tower.
Приставной башенный кран [10] включает устройство для реализации способа, характеризующееся тем, что оно содержит установленную на башне крана монтажную обойму и установленные друг над другом в ярус рамы.The attached tower crane [10] includes a device for implementing the method, characterized in that it comprises a mounting clip installed on the tower of the crane and mounted one above the other in the frame tier.
Приставной башенный кран, способ и устройство, представленные в источнике информации [10], требуют большой трудоемкости наращивания башни и ее соединения со зданием, так как для соединения башни со зданием на разных отметках высоты башни необходимо каждый раз поднимать раму краном, устанавливать ее на башне вручную на большой высоте, что существенно усложняет монтажно-демонтажные работы.The attached tower crane, the method and device presented in the information source [10], require great laboriousness of building the tower and its connection with the building, since to connect the tower to the building at different elevation heights of the tower, it is necessary to raise the frame with a crane each time and install it on the tower manually at high altitude, which greatly complicates the installation and dismantling work.
Техническим результатом изобретений является снижение трудоемкости монтажно-демонтажных работ и повышение безопасности.The technical result of the invention is to reduce the complexity of installation and dismantling and increase security.
Технический результат получен приставным башенным краном с устройством наращивания башни и устройством для крепления башни крана к высотному зданию, характеризующимся тем, что он содержит башню, на верхней части которой смонтированы стрела, консоль и оголовок или шарнирно связанная с башней стойка, расчалы стрелы и консоли, установленную на стреле грузовую тележку с крюковой подвеской, подвижно установленную на башне монтажную обойму для наращивания башни, расположенные вокруг башни друг над другом рамы, соединяющие башню с настенными опорами здания, при этом рамы соединены между собой и монтажной обоймой и установлены на башне с возможностью их перемещения монтажной обоймой вдоль башни.The technical result was obtained by an attached tower crane with a tower extension device and a device for attaching a crane tower to a high-rise building, characterized in that it comprises a tower, on the upper part of which a boom, a console and a head are mounted or a rack pivotally connected to the tower, boom and console brackets, mounted on a boom cargo trolley with hook suspension, a mounting clip movably mounted on the tower for building the tower, frames located around the tower one above the other, connecting the tower to the wall the supports of the building, while the frames are interconnected and the mounting clip and mounted on the tower with the possibility of moving the mounting clip along the tower.
Рамы и монтажная обойма соединены друг с другом тягами, расположенными по периметру рам и монтажной обоймы крана параллельно башни, при этом тяги шарнирно связаны с рамами, а между рамами и монтажной обоймой по высоте образованы зазоры.The frames and the mounting clip are connected to each other by rods located around the perimeter of the frames and the mounting clip of the crane parallel to the tower, while the rods are pivotally connected to the frames, and gaps are formed between the frames and the mounting clip in height.
Технический результат получен способом наращивания башни крана, характеризующимся тем, что он включает операцию фиксации башни крана на установленной высоте в проектном положении путем соединения башни крана со зданием посредством расположенных на башне рам, соединяемых с расположенными на здании настенными опорами, операцию образования между нижней частью башни и ее верхней частью проема с помощью монтажной обоймы, операцию введения в проем наращиваемой секции башни и операцию соединения наращиваемой секции с верхней и нижней частями башни, причем до выполнения указанных операций сначала в нижнем опущенном положении монтажной обоймы устанавливают под монтажной обоймой друг над другом рамы вокруг башни и соединяют рамы тягами между собой и с монтажной обоймой, затем перемещают вдоль башни крюковой подвеской крана монтажную обойму вместе с соединенными с ней рамами до положения наращивания башни крана и осуществляют указанный подъем верхней части башни над ее нижней частью монтажной обоймой с подвешенными на ней рамами до расчетной высоты, при достижении которой осуществляют первое соединение башни со зданием, для чего используют сначала нижнюю раму, которую связывают с башней и опорами здания, далее наращивают указанным образом башню до следующей расчетной высоты и после этого указанным образом на следующей высоте соединяют башню со зданием второй снизу рамой и следующими по высоте опорами здания, после этого описанный цикл наращивания башни и ее фиксации в проектном положении повторяют до момента соединения всех рам с башней крана и опорами здания, а при уменьшении высоты башни при демонтаже крана указанные операции проводят в обратной последовательности.The technical result is obtained by the method of building the tower of the crane, characterized in that it includes the operation of fixing the tower of the crane at a set height in the design position by connecting the tower of the crane to the building by means of the frames located on the tower connected to the wall supports located on the building, the formation operation between the lower part of the tower and its upper part of the opening using the mounting clip, the operation of introducing into the opening of the expandable section of the tower and the operation of connecting the expandable section with the upper and lower parts towers, and before performing these operations, first in the lower lowered position of the mounting clip, install frames around the tower under the mounting clip one above the other and connect the frames with rods to each other and with the mounting clip, then move the mounting clip along with the crane hook suspension together with the tower frames to the position of the crane tower building and carry out the specified rise of the upper part of the tower above its lower part of the mounting clip with frames suspended on it to the estimated height, upon reaching which there is a first connection of the tower with the building, for which they first use the lower frame, which is connected to the tower and the supports of the building, then extend the tower in this way to the next design height and then in the specified way at the next height connect the tower to the building with a second frame from the bottom and the next in height building supports, then the described cycle of tower extension and its fixation in the design position is repeated until all frames are connected to the crane tower and the building supports, and when the tower height is reduced during dismantling, the wound indicated operations are performed in reverse order.
Устройство для реализации способа содержит установленную на башне крана монтажную обойму и установленные друг над другом в ярус рамы, соединенные с монтажной обоймой и между собой тягами.A device for implementing the method comprises a mounting clip mounted on a tower of a crane and frames mounted on top of each other in a tier, connected to the mounting clip and to each other by rods.
Рамы шарнирно соединены между собой и монтажной обоймой, шарниры соединения расположены на концах тяг, каждое шарнирное соединение выполнено разъемным.The frames are pivotally connected to each other and the mounting clip, the hinges of the connection are located at the ends of the rods, each swivel connection is detachable.
На фиг.1 показан башенный кран с устройством наращивания башни и устройством крепления башни к зданию;Figure 1 shows a tower crane with a tower extension device and a device for attaching the tower to the building;
на фиг.2 - башня крана с устройством наращивания башни и устройством крепления башни к зданию;figure 2 - tower crane with a tower extension device and a device for mounting the tower to the building;
на фиг.3 - башенный кран в рабочем положении, присоединенный к зданию опорами;figure 3 - tower crane in working position, attached to the building with supports;
на фиг.4 - башенный кран в монтажном положении при выполнении операций соединения рам с монтажной обоймой;figure 4 - tower crane in the mounting position when performing operations connecting the frames with the mounting clip;
на фиг.5 - сечение А-А на фиг.3 (повернуто).figure 5 is a section aa in figure 3 (rotated).
Башенный кран содержит выполненную из соединенных между собой отдельных секций башню 1 (фиг.1), на верхней части которой смонтированы стрела 2, противовесная консоль 3 и оголовок 4, при этом на стреле подвижно вдоль нее установлена грузовая тележка 5, на которой посредством грузового каната 6 подвешен грузовой крюк 7. Данный башенный кран установлен на основании строительной площадке неподвижно, что не исключает возможности установки башни данного крана на ходовой тележке для его передвижения по рельсовому пути.The tower crane contains a
На башне крана установлено устройство для наращивания башни, в частности монтажная обойма 8, которая зафиксирована на башне с возможностью ее перемещения по башне вверх и вниз. В рабочем положении крана, модифицированного для строительства высотных зданий, монтажная обойма всегда находится в верхней части башни (фиг.3). В этой модификации крана монтажная обойма служит как для монтажа башни крана (увеличения высоты и уменьшения высоты башни с целью выполнения монтажно-демонтажных работ), так и для увеличения высоты башни крана в случае повышения высоты строящегося здания.A device for building the tower is installed on the tower of the crane, in particular a
В рабочем положении стандартного крана для строительства невысоких зданий, высота которых находится в пределах до 50 метров, монтажная обойма 8 всегда находится в нижней части башни (фиг.4), поскольку в этом случае монтажная обойма предназначена лишь для монтажа и демонтажа башни крана - увеличения или уменьшения ее высоты. В конструкции приставного башенного крана, модифицированного для строительства высотных зданий, на кране под его монтажной обоймой 8 расположено устройство для крепления башни крана к зданию (фиг.1). Устройство шарнирно закреплено на обойме 8 и представляет собой связанные между собой рамы 9-12, которые предназначены для соединения башни крана со зданием, высота которого постоянно увеличивается и соответственно этой высоте увеличивается высота башни. Связанные со зданием рамы 9-12 используют с целью исключения изгиба башни. Рамы 9-12 имеют идентичную конструкцию. Рамы расположены под монтажной обоймой 8 и связаны в их нерабочем положении между собой и с монтажной обоймой 8. В этом положении рамы по сути подвешены к монтажной обойме. Каждая рама (фиг.5) содержит расположенные в горизонтальной плоскости переднюю П-образную часть 13 и заднюю П-образную часть 14, которые жестко соединены между собой болтовым соединением 15 так, как это показано на изображении. Части рамы образуют замкнутый контур, внутри которого расположена башня 1. Части рамы имеют одинаковую конструкцию, идентичны по форме и взаимозаменяемы. Передняя часть 13 рамы имеет кронштейны 16, которыми рама соединена со съемными настенными опорами 17 (раскосами или растяжками). Один конец каждой опоры соединен пальцем 18 со зданием 19. Это соединение выполнено посредством жестко закрепленного на здании несущего элемента 20, в проушине которого расположен палец 18. Другой конец каждой настенной опоры 17 соединен пальцем 18 с соответствующей рамой, в частности с рамой 14 на фиг.5. Каждая рама в ее рабочем положении зафиксирована на башне 1 средствами 21 и 22 фиксации. Рамы 10-12 (фиг.2) соединены между собой тягами 23. Рама 10 соединена с монтажной обоймой 8 тягами 24. Концы каждой тяги 23 и каждой тяги 24 шарнирно связаны с соответствующей рамой съемными пальцами 25 и 26. Тяги 23 и 24 расположены, преимущественно, на двух противоположных сторонах рамы (на лицевой и обратной сторонах на фиг.2). Тяги 23 и 24 могут также быть расположены равномерно по периметру рамы в любом другом порядке. Башня 1 состоит из множества соединенных между собой секций 27 (фиг.1). Между башней и оголовком 4 расположено опорно-поворотное устройство 28 для поворота верхней части относительно башни.In the working position of a standard crane for the construction of low buildings, the height of which is up to 50 meters, the
Башенный кран работает следующим образом. В рабочем положении крана его верхняя часть, в которую входят стрела, противовесная консоль и оголовок, всегда находятся над строящимся зданием 19 (фиг.1, 3, 4). По мере возведения здания и увеличения его высоты, наращивают известным образом монтажной обоймой 8 башню 1 и увеличивают ее высоту каждый раз, когда возникает опасность изгиба башни, при этом высоту башни увеличивают также в связи с другим условием - чтобы стрела крана находилась над строящимся зданием.Tower crane works as follows. In the working position of the crane, its upper part, which includes an arrow, a counterweight console and a head, is always located above the building under construction 19 (Figs. 1, 3, 4). As the building is erected and its height increases, the
Наращивание башни осуществляют известным образом путем введения в проем между секциями 27 башни наращиваемой дополнительной секции башни, которую поднимают с земли грузовым крюком 7 крана и вводят в образованный с помощью монтажной обоймы проем между секциями 27 башни. После соединения наращиваемой секции башни с нижней и верхней секциями 27 башни описанный цикл наращивания башни повторяют. После увеличения высоты башни до определенного значения башню соединяют со зданием для обеспечения устойчивости крана. Соединение башни со зданием выполняют устройством для крепления башни крана к зданию, работа которого функционально связана с работой крана. Это объясняется тем, что представленный в данном описании приставной башенный кран кроме операций подъема и перемещения грузов выполняет также другие операции, связанные с наращиванием башни и ее соединением со зданием.Tower extension is carried out in a known manner by introducing into the opening between the tower sections 27 an expandable additional section of the tower, which is lifted from the ground by the
Работа устройства для наращивания башни и ее соединения со зданием поясняется способом, предусматривающим, что сначала на башне (фиг.4) к монтажной обойме 8 присоединяют тягами 23 и 24 рамы 9-12. Далее грузовым крюком 7 поднимают монтажную обойму 8 вместе с рамами в положение, которое показано на фиг.1. Это положение соответствует высоте, на которой требуется осуществить первое соединение башни 1 крана со зданием 19 (фиг.3) и соединяют сначала нижнюю раму 9 со зданием так, как это показано на фиг.3. Затем при увеличении высоты возводимого здания до высоты, которая соответствует следующему соединению башни со зданием, последовательно соединяют башню крана со зданием рамами 10, 11 и 12.The operation of the device for building the tower and its connection with the building is illustrated by the method, providing that first on the tower (figure 4) to the mounting
Соединение башни 1 со зданием осуществляют следующим образом. Сначала средствами 22 фиксации фиксируют и закрепляют на башне, например, раму 11 (фиг.5), а затем настенными опорами 17 и пальцами 20 соединяют раму 11 со зданием посредством специальных, закрепленных на здании крепежных элементов.The connection of the
При работе крана, осуществляющего монтаж здания 19, по мере увеличения высоты здания до расчетной высоты постоянно наращивают башню 1 крана дополнительными секциями башни и после наращивания башни на высоту приблизительно более 50 метров башню крана соединяют со зданием рамой и настенными опорами для обеспечения устойчивости башни и крана в целом.During the operation of the crane mounting the
Таким образом, способ включает операцию увеличения высоты башни и операцию соединения башни со зданием посредством установленных на обойме в подвешенном состоянии рам 9-12. Поскольку рамы 9-12 устанавливают на обойме 8 с возможностью беспрепятственного отсоединения от обоймы и освобождения от настенных опор 17, то при демонтаже крана последние демонтируют последовательно путем извлечения пальцев из проушин рам и опор. Во время уменьшения высоты башни и демонтажа крана все вышеописанные операции проводят в обратной последовательности.Thus, the method includes the operation of increasing the height of the tower and the operation of connecting the tower to the building by means of frames 9-12 mounted on a clip in a suspended state. Since the frames 9-12 are mounted on the
Источники информацииInformation sources
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2010123717/11A RU2438963C1 (en) | 2010-06-10 | 2010-06-10 | Attachment tower crane with tower connections and device to attach crane tower to high-rise building, method of extending crane tower and device to this end |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2010123717/11A RU2438963C1 (en) | 2010-06-10 | 2010-06-10 | Attachment tower crane with tower connections and device to attach crane tower to high-rise building, method of extending crane tower and device to this end |
Publications (1)
Publication Number | Publication Date |
---|---|
RU2438963C1 true RU2438963C1 (en) | 2012-01-10 |
Family
ID=45783959
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
RU2010123717/11A RU2438963C1 (en) | 2010-06-10 | 2010-06-10 | Attachment tower crane with tower connections and device to attach crane tower to high-rise building, method of extending crane tower and device to this end |
Country Status (1)
Country | Link |
---|---|
RU (1) | RU2438963C1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106545093A (en) * | 2016-11-01 | 2017-03-29 | 中国建筑第八工程局有限公司 | Tear down and reconstruct method in lifting platform high-altitude |
CN112443149A (en) * | 2019-09-02 | 2021-03-05 | 广东博智林机器人有限公司 | Method for mounting and dismounting anti-deflection device of outer wall jacking tower |
-
2010
- 2010-06-10 RU RU2010123717/11A patent/RU2438963C1/en not_active IP Right Cessation
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106545093A (en) * | 2016-11-01 | 2017-03-29 | 中国建筑第八工程局有限公司 | Tear down and reconstruct method in lifting platform high-altitude |
CN112443149A (en) * | 2019-09-02 | 2021-03-05 | 广东博智林机器人有限公司 | Method for mounting and dismounting anti-deflection device of outer wall jacking tower |
CN112443149B (en) * | 2019-09-02 | 2022-06-14 | 广东博智林机器人有限公司 | Method for mounting and dismounting anti-deflection device of outer wall jacking tower |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207582986U (en) | Go out roofing combination formula glass curtain wall hoist and mount construction system | |
CN104746883B (en) | A kind of arcuate space truss lifts construction method of installation with three machines | |
US9133632B2 (en) | Platform support device for lifting loads or persons the height of a structure | |
CN104948211A (en) | Large mining height end-mining net hanging process | |
RU2438963C1 (en) | Attachment tower crane with tower connections and device to attach crane tower to high-rise building, method of extending crane tower and device to this end | |
RU2736256C2 (en) | Assembled protective screen for perimeter fencing | |
CN108643364A (en) | Single-arch progressive net rack mounting method | |
CN104153586B (en) | A kind of suspension cable hangs the construction method of mounting purlines | |
CN115306137A (en) | Operation platform structure for mounting suspended ceiling at bottom of overhead corridor and construction method thereof | |
JP5421143B2 (en) | Overhead crane installation equipment | |
CN206784172U (en) | Overpass anti-collision wall formwork hoisting conveyance | |
CN112523112A (en) | Method for dismantling overhead suspension casting hanging basket | |
US11788306B1 (en) | Building debris containment method | |
CN207609188U (en) | A kind of dust-proof curtain device | |
CN210341680U (en) | Door type corrugated steel web plate installation and overhanging type hanging bracket structure | |
CN108708541A (en) | A kind of suspension platform and its construction method for skybridge construction | |
CN209556401U (en) | A kind of super high-rise building super large curtain wall unit hydraulic synchronizing lifting system | |
RU120692U1 (en) | DEVICE FOR MOUNTING THE TOWER TYPE DRILL RIGS | |
CN2216104Y (en) | Hanging lift scaffold | |
CN106939660A (en) | Curtain wall positioning apparatus and its construction method | |
CN217231499U (en) | Separated double-width bridge anti-collision wall construction hanging basket | |
CN220790526U (en) | Adjustable pull rod type suspension scaffold | |
CN217149922U (en) | A closed can fix and remove and hang basket for construction of bridge railing outside | |
CN216105699U (en) | Hoisting and dismantling device for track beam of hydropower station suspended ceiling trolley | |
CN201834702U (en) | Pulley type nacelle hanging mechanism |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
MM4A | The patent is invalid due to non-payment of fees |
Effective date: 20140611 |