CN205296799U - Construction of elevator well and protection platform - Google Patents

Construction of elevator well and protection platform Download PDF

Info

Publication number
CN205296799U
CN205296799U CN201521058873.4U CN201521058873U CN205296799U CN 205296799 U CN205296799 U CN 205296799U CN 201521058873 U CN201521058873 U CN 201521058873U CN 205296799 U CN205296799 U CN 205296799U
Authority
CN
China
Prior art keywords
bearing platform
spandrel girder
elevator hoistways
platform
elevator well
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201521058873.4U
Other languages
Chinese (zh)
Inventor
刘永涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN201521058873.4U priority Critical patent/CN205296799U/en
Application granted granted Critical
Publication of CN205296799U publication Critical patent/CN205296799U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

The utility model provides a construction of elevator well and protection platform, belongs to the technical field of construction engineering, its structure includes spandrel girder and bearing platform, the reservation square hole has been offered on the wall to the shear force of the elevator well relative with the door opening department of elevator well, the one end of spandrel girder is pegged graft in shear force reservation square hole on the wall, the door opening department at the elevator well is fixed to the other end of spandrel girder, the top level of spandrel girder is provided with the bearing platform, the flat edge of table of bearing is provided with respectively and turns over the board, be provided with the spacing insertion rod of scaffold steel pipe on the bearing platform, the bottom of elevator well scaffold is inserted the spacing insertion rod of scaffold steel pipe respectively and is carried on spacing fixedly, elevator well scaffold upwards extends the installation in the side along the elevator well. This construction of elevator well and protection platform can be applicable to the elevator well of multiple size, and the structural strength of spandrel girder and bearing platform can fully guarantee the intensity and the rigidity of elevartor shaft construction and protection platform, and the security when making the construction improves.

Description

A kind of elevator hoistways construction and protective platform
Technical field
This utility model relates to construction engineering technical field, specifically a kind of elevator hoistways construction and protective platform.
Background technology
General, along with the lifting of Chinese Urbanization degree, skyscraper gets more and more, and elevator is skyscraper important component part. Elevator hoistways position within high-rise, due to up/down perforation, danger coefficient is big, and workmen is when carrying out the associated construction work such as wall steel bar colligation, template construction, concreting, form removable, it is necessary to sets up safe operation platform and constructs to facilitate. Traditional hoistway operation platform is to be set up from bottom to top by steel pipe scaffold to form, and builds dismounting time and effort consuming, makes the build process very complicated of traditional hoistway operation platform. Have also appeared a kind of special elevator hoistways operation platform in recent years, overall employing shaped steel is welded, and overall dimensions is relatively big, poor universality between different engineerings, and does not possess the horizontal protective effect preventing object from falling.
Summary of the invention
Technical assignment of the present utility model is to solve the deficiencies in the prior art, it is provided that a kind of elevator hoistways construction and protective platform.
The technical solution of the utility model realizes in the following manner, and this one elevator hoistways is constructed and protective platform, and its structure includes spandrel girder and bearing platform,
The door opening place of elevator hoistways is provided with spandrel girder, the shear wall of the elevator hoistways relative with the door opening place of elevator hoistways offers reserved square hole, one end of spandrel girder is plugged in the reserved square hole on shear wall, the other end of spandrel girder is fixed on the door opening place of elevator hoistways, and spandrel girder is horizontally disposed with;
The upper horizontal of spandrel girder is provided with bearing platform,
The edge of bearing platform is arranged in elevator hoistways inwall surrounding and encloses, the edge of bearing platform is respectively arranged with turnover panel, one edge of turnover panel passes through the hinged upset of hinged seat with the frame of adjacent bearing platform, the width of turnover panel is more than the frame of place bearing platform to the horizontal range between shear wall, and the abduction edge of turnover panel rides upon on the metope of the shear wall above bearing platform plane;
Bearing platform is provided with the spacing shank of scaffolding steel pipe,
The bottom of elevator hoistways scaffold is inserted the spacing shank of scaffolding steel pipe respectively and is fixed, and elevator hoistways scaffold extends installation upward along elevator hoistways.
The upper surface of bearing platform and/or turnover panel is laid with bamboo slab rubber or plywood.
Adopt between bearing platform and spandrel girder that spandrel girder upper horizontal is arranged and removably connect.
This utility model compared with prior art produced by provide the benefit that:
The construction of this one elevator hoistways is simple when constructing in elevator with protective platform, and can reuse after time processing success, can be suitably used for the elevator hoistways of sizes, save manpower and materials, the structural strength of spandrel girder and bearing platform can fully ensure that intensity and the rigidity of construction of lift well and protective platform, safety during construction is made to improve, avoid and build the safety problem that scaffold brings from bottom to up, effectively save work, time, shorten the duration of a project greatly, possesses the horizontal protective effect preventing object from falling, decrease the potential safety hazard of high-rise working.
Turnover panel free end can be shelved on shear wall, so that bearing platform has the horizontal protective effect preventing object from falling. Turnover panel flip angle is free, so that bearing platform horizontal protective size adjustable is whole, thus adapting to common elevator hoistways. Almost without space between turnover panel free end and shear wall, can preventing object from falling, play the effect of horizontal protective, decrease the potential safety hazard of high-rise working, effect is better than prior art.
The construction of this one elevator hoistways with protective platform is reasonable in design, simple in construction, be prone to processing, safe and reliable, easy to use, be easily maintained, have good value for applications.
Accompanying drawing explanation
Accompanying drawing 1 is plan structure schematic diagram of the present utility model;
Accompanying drawing 2 is side-looking structural representation of the present utility model;
Accompanying drawing 3 is main TV structure schematic diagram of the present utility model;
Accompanying drawing 4 is fragmentary top TV structure schematic diagram of the present utility model.
Labelling in accompanying drawing represents respectively:
1, elevator hoistways, 2, door opening, 3, spandrel girder, 4, shear wall, 5, reserved square hole,
6, bearing platform, 7, turnover panel, 8, frame, 9, hinged seat, 10, the spacing shank of scaffolding steel pipe, 11, elevator hoistways scaffold,
12, bamboo slab rubber or plywood.
Detailed description of the invention
Below in conjunction with accompanying drawing, a kind of elevator hoistways construction of the present utility model is described in detail below with protective platform.
As shown in drawings, a kind of elevator hoistways of the present utility model is constructed and protective platform, and its structure includes spandrel girder and bearing platform,
Door opening 2 place of elevator hoistways 1 is provided with spandrel girder 3, the shear wall 4 of the elevator hoistways relative with the door opening place of elevator hoistways offers reserved square hole 5, one end of spandrel girder 3 is plugged in the reserved square hole 5 on shear wall, the other end of spandrel girder 3 is fixed on door opening 2 place of elevator hoistways, and spandrel girder 3 is horizontally disposed with;
The upper horizontal of spandrel girder 3 is provided with bearing platform 6,
The edge of bearing platform 6 is arranged in elevator hoistways inwall surrounding and encloses, the edge of bearing platform 6 is respectively arranged with turnover panel 7, one edge of turnover panel 7 passes through the hinged upset of hinged seat 9 with the frame 8 of adjacent bearing platform, the width of turnover panel 7 is more than the frame of place bearing platform to the horizontal range between shear wall, and the abduction edge of turnover panel 7 rides upon on the metope of the shear wall 4 above bearing platform plane;
Bearing platform 6 is provided with the spacing shank 10 of scaffolding steel pipe,
The bottom of elevator hoistways scaffold 11 is inserted the spacing shank 10 of scaffolding steel pipe respectively and is fixed, and elevator hoistways scaffold 11 extends installation upward along elevator hoistways.
The upper surface of bearing platform 6 and/or turnover panel 7 is laid with bamboo slab rubber or plywood 12.
Adopt between bearing platform 6 and spandrel girder 3 that spandrel girder upper horizontal is arranged and removably connect.

Claims (3)

1. an elevator hoistways construction and protective platform, it is characterised in that include spandrel girder and bearing platform,
The door opening place of elevator hoistways is provided with spandrel girder, the shear wall of the elevator hoistways relative with the door opening place of elevator hoistways offers reserved square hole, one end of spandrel girder is plugged in the reserved square hole on shear wall, the other end of spandrel girder is fixed on the door opening place of elevator hoistways, and spandrel girder is horizontally disposed with;
The upper horizontal of spandrel girder is provided with bearing platform,
The edge of bearing platform is arranged in elevator hoistways inwall surrounding and encloses, the edge of bearing platform is respectively arranged with turnover panel, one edge of turnover panel passes through the hinged upset of hinged seat with the frame of adjacent bearing platform, the width of turnover panel is more than the frame of place bearing platform to the horizontal range between shear wall, and the abduction edge of turnover panel rides upon on the metope of the shear wall above bearing platform plane;
Bearing platform is provided with the spacing shank of scaffolding steel pipe,
The bottom of elevator hoistways scaffold is inserted the spacing shank of scaffolding steel pipe respectively and is fixed, and elevator hoistways scaffold extends installation upward along elevator hoistways.
2. a kind of elevator hoistways construction according to claim 1 and protective platform, it is characterised in that: the upper surface of bearing platform and/or turnover panel is laid with bamboo slab rubber or plywood.
3. a kind of elevator hoistways construction according to claim 1 and protective platform, it is characterised in that: adopt between bearing platform and spandrel girder that spandrel girder upper horizontal is arranged and removably connect.
CN201521058873.4U 2015-12-18 2015-12-18 Construction of elevator well and protection platform Expired - Fee Related CN205296799U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521058873.4U CN205296799U (en) 2015-12-18 2015-12-18 Construction of elevator well and protection platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521058873.4U CN205296799U (en) 2015-12-18 2015-12-18 Construction of elevator well and protection platform

Publications (1)

Publication Number Publication Date
CN205296799U true CN205296799U (en) 2016-06-08

Family

ID=56470733

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521058873.4U Expired - Fee Related CN205296799U (en) 2015-12-18 2015-12-18 Construction of elevator well and protection platform

Country Status (1)

Country Link
CN (1) CN205296799U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107654059A (en) * 2017-08-31 2018-02-02 上海宝冶集团有限公司 For the mobile operating platform constructed in elevator hoistway
CN109469309A (en) * 2018-11-28 2019-03-15 中国建筑第七工程局有限公司 A kind of multi-functional construction operation platform for vertical hoistway
CN113235961A (en) * 2021-05-27 2021-08-10 中建八局第一建设有限公司 Protection plate for elevator shaft structure in building engineering and construction method thereof
CN114876174A (en) * 2022-05-29 2022-08-09 中国五冶集团有限公司 Construction method of open-hole-free well way bearing beam

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107654059A (en) * 2017-08-31 2018-02-02 上海宝冶集团有限公司 For the mobile operating platform constructed in elevator hoistway
CN109469309A (en) * 2018-11-28 2019-03-15 中国建筑第七工程局有限公司 A kind of multi-functional construction operation platform for vertical hoistway
CN113235961A (en) * 2021-05-27 2021-08-10 中建八局第一建设有限公司 Protection plate for elevator shaft structure in building engineering and construction method thereof
CN113235961B (en) * 2021-05-27 2022-04-08 中建八局第一建设有限公司 Protection plate for elevator shaft structure in building engineering and construction method thereof
CN114876174A (en) * 2022-05-29 2022-08-09 中国五冶集团有限公司 Construction method of open-hole-free well way bearing beam

Similar Documents

Publication Publication Date Title
CN205296799U (en) Construction of elevator well and protection platform
CN103206074B (en) Elevator shaft template construction method, platform and support
CN107190964A (en) A kind of construction method of prefabricated hoistway operation platform
CN206233546U (en) A kind of elevator hoistways workbench
CN204590555U (en) Assembling elevator hoistway construction platform
CN204645570U (en) One can have enough to meet the need elevator shaft protective platform
CN204001731U (en) A kind of shuttering supporting vertical rod base fixing device
CN104563280B (en) A kind of operating construction elevator basis conversion method
CN204081424U (en) A kind of for the removable steel inclined ladder in boat segmental construction
CN206418751U (en) One kind can freely lift flexible assembled hoistway operation platform
CN206784884U (en) Curved-surface building climbing device
CN204059906U (en) Elevator hoistways Integral lifting type steel scaffold
CN204238537U (en) A kind of elevated hoistway operation platform
CN206784891U (en) A kind of prefabricated hoistway operation platform
CN204126237U (en) A kind of elevator hoistway construction platform
CN203475801U (en) Telescopic steel platform for elevator shaft
CN204492173U (en) Elevator shaft integral lifting template operation platform
CN205348729U (en) A instrument formula operation protection platform for in shaft
CN204850513U (en) Horizontal protector of elevator well
CN204728675U (en) A kind of high rise elevator well is with layer activity operations frame
CN202913678U (en) Hinged elevator shaft material platform
CN204691249U (en) A kind of with can the stair step steel form of tread
CN203514752U (en) Shaped elevator shaft operating platform
CN204162235U (en) Lift crosshead safety overhauling device
CN206768613U (en) For the U-shaped beam of auxiliary erection urban rail and the moving hanging basket of tensioning bent cap

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160608