CN205296799U - Construction of elevator well and protection platform - Google Patents
Construction of elevator well and protection platform Download PDFInfo
- Publication number
- CN205296799U CN205296799U CN201521058873.4U CN201521058873U CN205296799U CN 205296799 U CN205296799 U CN 205296799U CN 201521058873 U CN201521058873 U CN 201521058873U CN 205296799 U CN205296799 U CN 205296799U
- Authority
- CN
- China
- Prior art keywords
- bearing platform
- spandrel girder
- elevator hoistways
- platform
- elevator well
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 21
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 12
- 239000010959 steel Substances 0.000 claims abstract description 12
- 238000009434 installation Methods 0.000 claims abstract description 4
- 230000007306 turnover Effects 0.000 claims description 19
- 230000001681 protective effect Effects 0.000 claims description 17
- 235000017166 Bambusa arundinacea Nutrition 0.000 claims description 4
- 235000017491 Bambusa tulda Nutrition 0.000 claims description 4
- 241001330002 Bambuseae Species 0.000 claims description 4
- 235000015334 Phyllostachys viridis Nutrition 0.000 claims description 4
- 239000011425 bamboo Substances 0.000 claims description 4
- 239000011120 plywood Substances 0.000 claims description 4
- 230000037431 insertion Effects 0.000 abstract 2
- 238000003780 insertion Methods 0.000 abstract 2
- 238000010586 diagram Methods 0.000 description 3
- 230000000694 effects Effects 0.000 description 2
- 230000007812 deficiency Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000002372 labelling Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
Landscapes
- Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
Abstract
The utility model provides a construction of elevator well and protection platform, belongs to the technical field of construction engineering, its structure includes spandrel girder and bearing platform, the reservation square hole has been offered on the wall to the shear force of the elevator well relative with the door opening department of elevator well, the one end of spandrel girder is pegged graft in shear force reservation square hole on the wall, the door opening department at the elevator well is fixed to the other end of spandrel girder, the top level of spandrel girder is provided with the bearing platform, the flat edge of table of bearing is provided with respectively and turns over the board, be provided with the spacing insertion rod of scaffold steel pipe on the bearing platform, the bottom of elevator well scaffold is inserted the spacing insertion rod of scaffold steel pipe respectively and is carried on spacing fixedly, elevator well scaffold upwards extends the installation in the side along the elevator well. This construction of elevator well and protection platform can be applicable to the elevator well of multiple size, and the structural strength of spandrel girder and bearing platform can fully guarantee the intensity and the rigidity of elevartor shaft construction and protection platform, and the security when making the construction improves.
Description
Technical field
This utility model relates to construction engineering technical field, specifically a kind of elevator hoistways construction and protective platform.
Background technology
General, along with the lifting of Chinese Urbanization degree, skyscraper gets more and more, and elevator is skyscraper important component part. Elevator hoistways position within high-rise, due to up/down perforation, danger coefficient is big, and workmen is when carrying out the associated construction work such as wall steel bar colligation, template construction, concreting, form removable, it is necessary to sets up safe operation platform and constructs to facilitate. Traditional hoistway operation platform is to be set up from bottom to top by steel pipe scaffold to form, and builds dismounting time and effort consuming, makes the build process very complicated of traditional hoistway operation platform. Have also appeared a kind of special elevator hoistways operation platform in recent years, overall employing shaped steel is welded, and overall dimensions is relatively big, poor universality between different engineerings, and does not possess the horizontal protective effect preventing object from falling.
Summary of the invention
Technical assignment of the present utility model is to solve the deficiencies in the prior art, it is provided that a kind of elevator hoistways construction and protective platform.
The technical solution of the utility model realizes in the following manner, and this one elevator hoistways is constructed and protective platform, and its structure includes spandrel girder and bearing platform,
The door opening place of elevator hoistways is provided with spandrel girder, the shear wall of the elevator hoistways relative with the door opening place of elevator hoistways offers reserved square hole, one end of spandrel girder is plugged in the reserved square hole on shear wall, the other end of spandrel girder is fixed on the door opening place of elevator hoistways, and spandrel girder is horizontally disposed with;
The upper horizontal of spandrel girder is provided with bearing platform,
The edge of bearing platform is arranged in elevator hoistways inwall surrounding and encloses, the edge of bearing platform is respectively arranged with turnover panel, one edge of turnover panel passes through the hinged upset of hinged seat with the frame of adjacent bearing platform, the width of turnover panel is more than the frame of place bearing platform to the horizontal range between shear wall, and the abduction edge of turnover panel rides upon on the metope of the shear wall above bearing platform plane;
Bearing platform is provided with the spacing shank of scaffolding steel pipe,
The bottom of elevator hoistways scaffold is inserted the spacing shank of scaffolding steel pipe respectively and is fixed, and elevator hoistways scaffold extends installation upward along elevator hoistways.
The upper surface of bearing platform and/or turnover panel is laid with bamboo slab rubber or plywood.
Adopt between bearing platform and spandrel girder that spandrel girder upper horizontal is arranged and removably connect.
This utility model compared with prior art produced by provide the benefit that:
The construction of this one elevator hoistways is simple when constructing in elevator with protective platform, and can reuse after time processing success, can be suitably used for the elevator hoistways of sizes, save manpower and materials, the structural strength of spandrel girder and bearing platform can fully ensure that intensity and the rigidity of construction of lift well and protective platform, safety during construction is made to improve, avoid and build the safety problem that scaffold brings from bottom to up, effectively save work, time, shorten the duration of a project greatly, possesses the horizontal protective effect preventing object from falling, decrease the potential safety hazard of high-rise working.
Turnover panel free end can be shelved on shear wall, so that bearing platform has the horizontal protective effect preventing object from falling. Turnover panel flip angle is free, so that bearing platform horizontal protective size adjustable is whole, thus adapting to common elevator hoistways. Almost without space between turnover panel free end and shear wall, can preventing object from falling, play the effect of horizontal protective, decrease the potential safety hazard of high-rise working, effect is better than prior art.
The construction of this one elevator hoistways with protective platform is reasonable in design, simple in construction, be prone to processing, safe and reliable, easy to use, be easily maintained, have good value for applications.
Accompanying drawing explanation
Accompanying drawing 1 is plan structure schematic diagram of the present utility model;
Accompanying drawing 2 is side-looking structural representation of the present utility model;
Accompanying drawing 3 is main TV structure schematic diagram of the present utility model;
Accompanying drawing 4 is fragmentary top TV structure schematic diagram of the present utility model.
Labelling in accompanying drawing represents respectively:
1, elevator hoistways, 2, door opening, 3, spandrel girder, 4, shear wall, 5, reserved square hole,
6, bearing platform, 7, turnover panel, 8, frame, 9, hinged seat, 10, the spacing shank of scaffolding steel pipe, 11, elevator hoistways scaffold,
12, bamboo slab rubber or plywood.
Detailed description of the invention
Below in conjunction with accompanying drawing, a kind of elevator hoistways construction of the present utility model is described in detail below with protective platform.
As shown in drawings, a kind of elevator hoistways of the present utility model is constructed and protective platform, and its structure includes spandrel girder and bearing platform,
Door opening 2 place of elevator hoistways 1 is provided with spandrel girder 3, the shear wall 4 of the elevator hoistways relative with the door opening place of elevator hoistways offers reserved square hole 5, one end of spandrel girder 3 is plugged in the reserved square hole 5 on shear wall, the other end of spandrel girder 3 is fixed on door opening 2 place of elevator hoistways, and spandrel girder 3 is horizontally disposed with;
The upper horizontal of spandrel girder 3 is provided with bearing platform 6,
The edge of bearing platform 6 is arranged in elevator hoistways inwall surrounding and encloses, the edge of bearing platform 6 is respectively arranged with turnover panel 7, one edge of turnover panel 7 passes through the hinged upset of hinged seat 9 with the frame 8 of adjacent bearing platform, the width of turnover panel 7 is more than the frame of place bearing platform to the horizontal range between shear wall, and the abduction edge of turnover panel 7 rides upon on the metope of the shear wall 4 above bearing platform plane;
Bearing platform 6 is provided with the spacing shank 10 of scaffolding steel pipe,
The bottom of elevator hoistways scaffold 11 is inserted the spacing shank 10 of scaffolding steel pipe respectively and is fixed, and elevator hoistways scaffold 11 extends installation upward along elevator hoistways.
The upper surface of bearing platform 6 and/or turnover panel 7 is laid with bamboo slab rubber or plywood 12.
Adopt between bearing platform 6 and spandrel girder 3 that spandrel girder upper horizontal is arranged and removably connect.
Claims (3)
1. an elevator hoistways construction and protective platform, it is characterised in that include spandrel girder and bearing platform,
The door opening place of elevator hoistways is provided with spandrel girder, the shear wall of the elevator hoistways relative with the door opening place of elevator hoistways offers reserved square hole, one end of spandrel girder is plugged in the reserved square hole on shear wall, the other end of spandrel girder is fixed on the door opening place of elevator hoistways, and spandrel girder is horizontally disposed with;
The upper horizontal of spandrel girder is provided with bearing platform,
The edge of bearing platform is arranged in elevator hoistways inwall surrounding and encloses, the edge of bearing platform is respectively arranged with turnover panel, one edge of turnover panel passes through the hinged upset of hinged seat with the frame of adjacent bearing platform, the width of turnover panel is more than the frame of place bearing platform to the horizontal range between shear wall, and the abduction edge of turnover panel rides upon on the metope of the shear wall above bearing platform plane;
Bearing platform is provided with the spacing shank of scaffolding steel pipe,
The bottom of elevator hoistways scaffold is inserted the spacing shank of scaffolding steel pipe respectively and is fixed, and elevator hoistways scaffold extends installation upward along elevator hoistways.
2. a kind of elevator hoistways construction according to claim 1 and protective platform, it is characterised in that: the upper surface of bearing platform and/or turnover panel is laid with bamboo slab rubber or plywood.
3. a kind of elevator hoistways construction according to claim 1 and protective platform, it is characterised in that: adopt between bearing platform and spandrel girder that spandrel girder upper horizontal is arranged and removably connect.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201521058873.4U CN205296799U (en) | 2015-12-18 | 2015-12-18 | Construction of elevator well and protection platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201521058873.4U CN205296799U (en) | 2015-12-18 | 2015-12-18 | Construction of elevator well and protection platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205296799U true CN205296799U (en) | 2016-06-08 |
Family
ID=56470733
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201521058873.4U Expired - Fee Related CN205296799U (en) | 2015-12-18 | 2015-12-18 | Construction of elevator well and protection platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205296799U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107654059A (en) * | 2017-08-31 | 2018-02-02 | 上海宝冶集团有限公司 | For the mobile operating platform constructed in elevator hoistway |
CN109469309A (en) * | 2018-11-28 | 2019-03-15 | 中国建筑第七工程局有限公司 | A kind of multi-functional construction operation platform for vertical hoistway |
CN113235961A (en) * | 2021-05-27 | 2021-08-10 | 中建八局第一建设有限公司 | Protection plate for elevator shaft structure in building engineering and construction method thereof |
CN114876174A (en) * | 2022-05-29 | 2022-08-09 | 中国五冶集团有限公司 | Construction method of open-hole-free well way bearing beam |
-
2015
- 2015-12-18 CN CN201521058873.4U patent/CN205296799U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107654059A (en) * | 2017-08-31 | 2018-02-02 | 上海宝冶集团有限公司 | For the mobile operating platform constructed in elevator hoistway |
CN109469309A (en) * | 2018-11-28 | 2019-03-15 | 中国建筑第七工程局有限公司 | A kind of multi-functional construction operation platform for vertical hoistway |
CN113235961A (en) * | 2021-05-27 | 2021-08-10 | 中建八局第一建设有限公司 | Protection plate for elevator shaft structure in building engineering and construction method thereof |
CN113235961B (en) * | 2021-05-27 | 2022-04-08 | 中建八局第一建设有限公司 | Protection plate for elevator shaft structure in building engineering and construction method thereof |
CN114876174A (en) * | 2022-05-29 | 2022-08-09 | 中国五冶集团有限公司 | Construction method of open-hole-free well way bearing beam |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205296799U (en) | Construction of elevator well and protection platform | |
CN103206074B (en) | Elevator shaft template construction method, platform and support | |
CN107190964A (en) | A kind of construction method of prefabricated hoistway operation platform | |
CN206233546U (en) | A kind of elevator hoistways workbench | |
CN204590555U (en) | Assembling elevator hoistway construction platform | |
CN204645570U (en) | One can have enough to meet the need elevator shaft protective platform | |
CN204001731U (en) | A kind of shuttering supporting vertical rod base fixing device | |
CN104563280B (en) | A kind of operating construction elevator basis conversion method | |
CN204081424U (en) | A kind of for the removable steel inclined ladder in boat segmental construction | |
CN206418751U (en) | One kind can freely lift flexible assembled hoistway operation platform | |
CN206784884U (en) | Curved-surface building climbing device | |
CN204059906U (en) | Elevator hoistways Integral lifting type steel scaffold | |
CN204238537U (en) | A kind of elevated hoistway operation platform | |
CN206784891U (en) | A kind of prefabricated hoistway operation platform | |
CN204126237U (en) | A kind of elevator hoistway construction platform | |
CN203475801U (en) | Telescopic steel platform for elevator shaft | |
CN204492173U (en) | Elevator shaft integral lifting template operation platform | |
CN205348729U (en) | A instrument formula operation protection platform for in shaft | |
CN204850513U (en) | Horizontal protector of elevator well | |
CN204728675U (en) | A kind of high rise elevator well is with layer activity operations frame | |
CN202913678U (en) | Hinged elevator shaft material platform | |
CN204691249U (en) | A kind of with can the stair step steel form of tread | |
CN203514752U (en) | Shaped elevator shaft operating platform | |
CN204162235U (en) | Lift crosshead safety overhauling device | |
CN206768613U (en) | For the U-shaped beam of auxiliary erection urban rail and the moving hanging basket of tensioning bent cap |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160608 |