CN109853929A - One kind sliding laterally portable construction hanging basket and application method - Google Patents
One kind sliding laterally portable construction hanging basket and application method Download PDFInfo
- Publication number
- CN109853929A CN109853929A CN201910172064.2A CN201910172064A CN109853929A CN 109853929 A CN109853929 A CN 109853929A CN 201910172064 A CN201910172064 A CN 201910172064A CN 109853929 A CN109853929 A CN 109853929A
- Authority
- CN
- China
- Prior art keywords
- hanger
- internal
- sunpender
- outer hanger
- cross beam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 22
- 238000000034 method Methods 0.000 title claims abstract description 11
- 235000004443 Ricinus communis Nutrition 0.000 claims abstract description 23
- 238000003466 welding Methods 0.000 claims description 7
- 229910000831 Steel Inorganic materials 0.000 claims description 4
- 238000009434 installation Methods 0.000 claims description 4
- 239000010959 steel Substances 0.000 claims description 4
- 241001465382 Physalis alkekengi Species 0.000 claims description 2
- 238000005034 decoration Methods 0.000 claims description 2
- 230000005526 G1 to G0 transition Effects 0.000 claims 1
- 230000005540 biological transmission Effects 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 230000009545 invasion Effects 0.000 description 2
- 230000033001 locomotion Effects 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 230000001681 protective effect Effects 0.000 description 2
- 239000007787 solid Substances 0.000 description 2
- 239000000725 suspension Substances 0.000 description 2
- 229910001335 Galvanized steel Inorganic materials 0.000 description 1
- HCHKCACWOHOZIP-UHFFFAOYSA-N Zinc Chemical compound [Zn] HCHKCACWOHOZIP-UHFFFAOYSA-N 0.000 description 1
- 230000002411 adverse Effects 0.000 description 1
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 235000013399 edible fruits Nutrition 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000008397 galvanized steel Substances 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000003973 paint Substances 0.000 description 1
- 238000010422 painting Methods 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
- 230000004584 weight gain Effects 0.000 description 1
- 235000019786 weight gain Nutrition 0.000 description 1
- 239000011701 zinc Substances 0.000 description 1
- 229910052725 zinc Inorganic materials 0.000 description 1
Landscapes
- Movable Scaffolding (AREA)
Abstract
The invention discloses one kind to slide laterally portable construction hanging basket and application method, and the outer hanger and internal hanger are fixedly linked by dismountable bayonet joint, and using connection bolt;The outer hanger includes outer hanger sunpender, outer hanger connecting cross beam, support bracket, safety guard net, bottom plate, castor under castor and outer hanger on outer hanger, the outer hanger sunpender is vertically connected with outer hanger connecting cross beam, the support bracket is fixedly linked with outer hanger sunpender vertical bar, and the bottom plate is fixedly connected with outer hanger boom foot rod piece and outer hanger connecting cross beam bottom rod piece;The internal hanger includes internal hanger sunpender, internal hanger connecting cross beam and internal hanger castor, and the internal hanger sunpender is vertically connected with internal hanger connecting cross beam.The configuration of the present invention is simple is easily installed, shifts, greatly improves working efficiency.
Description
Technical field
The present invention relates to installation Technology fields, the specially structures such as building parapet, bridge-collision-avoidance wall, dam bulwark
The one kind for building beyond the region of objective existence elevation construction slides laterally the installation of portable construction hanging basket and application method.
Background technique
When building the construction of the structures alien invasions such as parapet, bridge-collision-avoidance wall, dam bulwark, surrounding was mostly used to take in the past
If scaffold or the job platform installed by electric block as hanging basket, generally existing at high cost, security risk is greatly or mobile
The unfavorable execution conditions such as inconvenience.
Prior art discloses application No. is a kind of high altitude moving hanging basket of: CN105645323A and moving methods, including
Hanging basket and the hanger component being fixed on hanging basket, the hanger component include main sunpender and secondary sunpender;The master hangs
Bar lower part is main boom, and the main sunpender top is main suspension hook;The secondary sunpender is U-shaped structure, on the left of the pair sunpender
For the first secondary boom, it is to move between the described first secondary boom and the second secondary boom that pair sunpender right side, which is the second secondary boom,
Dynamic horizontal axis;The secondary boom of described first and the second secondary boom upper end are equipped with secondary suspension hook;The main boom and mobile horizontal axis phase
It is mutually vertically arranged, the mobile horizontal axis is connect with main boom by adjusting cross axle joint part, and connect by adjusting cross axle
The mobile horizontal axis of head control is moved up and down relative to main boom or left and right movement.Alternatively, and by adjusting cross axle joint part
Main boom is controlled to move up and down relative to mobile horizontal axis or left and right movement.High altitude moving hanging basket of the present invention is by shaking sprocket wheel hand
Shaking device can drive roller bearing to move forward or back, and production is simple, recycle rate height, at low cost, not cause to waste, mill construction
It can be used, high safety, can expand to be used in outside the structures such as building parapet, bridge-collision-avoidance wall, dam bulwark and stand
Face, but disadvantage is that it is mobile slowly and some small tools on hanging basket are not easy to place, are easy to fall, to making
Certain adverse effect is brought with process.
Prior art discloses application No. is a kind of packaged type bridges anti-collision wall construction hanging basket of CN108824207A, packets
Bracket and workbench are included, the upper end of bracket is equipped with runner, and the side of bracket is fixedly connected with crossbeam, and one end of crossbeam is fixedly connected
There is traction rope, the other end of crossbeam is fixedly connected with connection frame, and the lower end of connection frame is equipped with weight gain block, and the lower end of crossbeam is fixed to be connected
It is connected to connection buckle, is connected with transmission chain through the position of connection buckle, workbench is flexibly connected by transmission chain with bracket, work
The upper end for making platform is equipped with fixed frame close to the position at the edge of workbench.The configuration of the present invention is simple is set by the lower end in motor
The noise reducing plate of cystosepiment material is set, the noise of motor can be absorbed, the noise generated when device work, Er Qietong are reduced
The containing box for crossing setting, some small tools on hanging basket can be placed on in containing box one prevents tool drop, has practicability,
But transverse shifting is inconvenient, and labor efficiency is relatively low.
Summary of the invention
It is more existing in the prior art it is an object of the invention to overcome the problems, such as, and one kind is provided and slides laterally portable
Construction hanging basket and application method.
In order to realize above-mentioned technical characteristic, the object of the present invention is achieved like this: one kind sliding laterally portable and applies
Work hanging basket, it includes outer hanger and internal hanger, it is characterised in that: the outer hanger and internal hanger are connected by dismountable spigot-and-socket
It connects, and is fixedly linked using connection bolt;The outer hanger includes outer hanger sunpender, outer hanger connecting cross beam, support bracket, peace
Full protection net, bottom plate, castor, the outer hanger sunpender are vertical with outer hanger connecting cross beam solid under castor and outer hanger on outer hanger
Fixed to be connected, the support bracket is fixedly linked with outer hanger sunpender vertical bar, the bottom plate and outer hanger boom foot rod piece
It is fixedly connected with outer hanger connecting cross beam bottom rod piece;The internal hanger includes internal hanger sunpender, internal hanger connecting cross beam and interior
Hanger castor, the internal hanger sunpender are vertically connected with internal hanger connecting cross beam.
The safety guard net is wrapped in outer hanger lower part operating area, this operating area is by outer hanger sunpender, outer hanger
Connecting cross beam and bottom plate welding are assembled.
The internal hanger upper pole segments socket joint is in outer hanger upper pole segments, outer hanger sunpender and internal hanger sunpender horizon bar
Part is respectively equipped with outer hanger prepared screw-bolt hole and internal hanger prepared screw-bolt hole, according to construction structures thickness, by adjusting bolt
It is fastened after hole location using connection bolt.
Castor and internal hanger castor all use directional wheel, the wheel of the directional wheel under castor, outer hanger on the outer hanger
Axis connection component uses steel member, and solid with outer hanger sunpender, internal hanger sunpender and the outer hanger connecting cross beam of welded connecting respectively
It is fixed to be connected.
Compared with prior art, the present invention provides a kind of transverse shifting portable construction hanging baskets, have following beneficial to effect
Fruit:
1, the transverse shifting portable construction hanging basket weight is small, and structure is simple, can be hung by manual handling and assembling without borrowing
Vehicle or other installation tools, transverse shifting is convenient, and work material rate is high.
2, some small apply can be placed by the protective action of safety guard net in the transverse shifting portable construction hanging basket
Work tool, it is convenient to use for staff, and avoid tool from falling and cause safety accident.
Detailed description of the invention
Present invention will be further explained below with reference to the attached drawings and examples.
Fig. 1 is a kind of side structure schematic view for sliding laterally portable construction hanging basket of the present invention.
Fig. 2 is a kind of schematic view of the front view for sliding laterally portable construction hanging basket of the present invention.
Fig. 3 is hanger superstructure enlarged drawing in the China and foreign countries Fig. 1 of the present invention.
Fig. 4 is internal hanger superstructure enlarged drawing in Fig. 1 of the present invention.
In figure: castor under the outer hanger of the outer hanger of 1-, 2- internal hanger, 3-, castor, 5- bottom plate, 6- are anti-safely on the outer hanger of 4-
The outer hanger connecting cross beam of protective net, 7-, 8- support bracket, the outer hanger sunpender of 9-, the outer hanger prepared screw-bolt hole of 10-, 11- connection spiral shell
Bolt, 12- internal hanger castor, 13- internal hanger connecting cross beam, 14- internal hanger prepared screw-bolt hole, 15- internal hanger sunpender.
Specific embodiment
Embodiments of the present invention are described further with reference to the accompanying drawing.
As shown in Figs 1-4, one kind of the present invention slides laterally portable construction hanging basket, including outer hanger 1 and internal hanger 2, outside
Hanger 1 includes castor on outer hanger sunpender 9, outer hanger connecting cross beam 7, support bracket 8, safety guard net 6, bottom plate 5, outer hanger
4, castor 3 under outer hanger, outer hanger sunpender 9 and support bracket 8 constitute two planar junctions being parallel to each other using being welded to connect
Structure is connect with outer hanger connecting cross beam 7 using welding manner, and outer 7 right side vertical bar of hanger beam also serves as ladder use;It hangs outside
Frame 1 is connect with bottom plate 5 using welding manner, and safety guard net 6 is wrapped in outer 1 personnel operating space of hanger, prevents tool and other items
It falls;Castor 3 is connect with outer hanger sunpender 9 using welding manner under castor 4, outer hanger on outer hanger.Internal hanger 2 includes interior hangs
Frame sunpender 15, internal hanger connecting cross beam 13, internal hanger castor 12, internal hanger sunpender 15 be two l-shaped rod parts, respectively with internal hanger
By being welded to connect, internal hanger sunpender 15 is connect with internal hanger castor 12 by welding manner connecting cross beam 13.
Further, the outer hanger sunpender 9 and 15 upper level rod piece of internal hanger sunpender use bayonet joint, and same
Spacing 5cm is respectively arranged the outer hanger prepared screw-bolt hole 10 and internal hanger prepared screw-bolt hole 14 of equal aperture 14mm, according to structures
It is connected after the contraposition of width adjustment bolt hole by connection bolt 11.
Further, the outer hanger sunpender 9 and outer hanger connecting cross beam 7 are all made of the zinc-plated side of 35mm × 35mm × 4mm
Pipe, support bracket 8 use ∠ 35mm × 35mm × 3mm Zinc-coated angle steel, and internal hanger sunpender 15 and internal hanger connecting cross beam 13 are adopted
With 30mm × 30mm × 4mm zinc-plated square tube, bottom plate 5 spreads checkered steel plate using 3mm thickness, play it is anti-skidding well, after completing
All welding positions use aluminum powder paint painting, 120 μm of thickness.
Further, the safety guard net uses 1.0# × 10mm × 10mm galvanized steel wire netting.
Working process and principle of the invention:
In use, operating personnel can crawl into bottom plate 5 by the outer hanger connecting cross beam 7 that outer 9 right side of hanger sunpender is vertically welded
On;For safety rope hanging with operating personnel on the internal hanger connecting cross beam 13 of internal hanger lower part, worker has duplicate protection hanging
Lamps and lanterns can be carried out to structures alien invasions such as building parapet, bridge-collision-avoidance wall, dam bulwarks in basket, identification label is installed
Implemented with work such as decorations, worker can push wall to move forward or back hanging basket integrally, operation easy to remove.
Above-described embodiment is used to illustrate the present invention, rather than limits the invention, in spirit of the invention and
In scope of protection of the claims, to any modifications and changes that the present invention makes, protection scope of the present invention is both fallen within.
Claims (5)
1. one kind slides laterally portable construction hanging basket, it is characterised in that: it includes outer hanger (1) and internal hanger (2), feature
Be: the outer hanger (1) and internal hanger (2) use connection bolt (11) stationary phase by dismountable bayonet joint
Even;The outer hanger (1) includes outer hanger sunpender (9), outer hanger connecting cross beam (7), support bracket (8), safety guard net
(6), bottom plate (5), castor (3), the outer hanger sunpender (9) connect cross with outer hanger under castor (4) and outer hanger on outer hanger
Beam (7) is vertically connected, and the support bracket (8) is fixedly linked with outer hanger sunpender (9) vertical bar, the bottom plate (5)
It is fixedly connected with outer hanger sunpender (9) bottom rod piece and outer hanger connecting cross beam (7) bottom rod piece;The internal hanger (2) includes
Internal hanger sunpender (15), internal hanger connecting cross beam (13) and internal hanger castor (12), the internal hanger sunpender (2) and internal hanger connect
Crossbeam (13) is connect to be vertically connected.
2. one kind according to claim 1 slides laterally portable construction hanging basket, it is characterised in that: the safety guard net
(6) be wrapped in outer hanger (1) lower part operating area, this operating area by outer hanger sunpender (9), outer hanger connecting cross beam (7) and
Bottom plate (5) welding is assembled.
3. one kind according to claim 1 slides laterally portable construction hanging basket, it is characterised in that: the internal hanger (2)
In outer hanger (1) upper pole segments, outer hanger sunpender (9) and internal hanger sunpender (15) horizontal bars are set upper pole segments socket joint respectively
There are outer hanger prepared screw-bolt hole (10) and internal hanger prepared screw-bolt hole (14), according to construction structures thickness, by adjusting bolt
It is fastened after hole location using connection bolt (11).
4. one kind according to claim 1 slides laterally portable construction hanging basket, it is characterised in that: foot on the outer hanger
It takes turns castor (3) and internal hanger castor (12) under (4), outer hanger and all uses directional wheel, the wheel shaft connecting elements of the directional wheel is adopted
With steel member, and respectively with outer hanger sunpender (9), internal hanger sunpender (15) and be welded to connect outer hanger connecting cross beam (7) fixation
It is connected.
5. sliding laterally the application method of portable construction hanging basket described in claim 1-4 any one, which is characterized in that it is wrapped
Include following steps:
Step1: in use, operating personnel can be climbed by the outer hanger connecting cross beam (7) vertically welded on the right side of outer hanger sunpender (9)
Into on bottom plate (5);
Step2: the safety rope hanging with operating personnel is on the internal hanger connecting cross beam (13) of internal hanger lower part;
Step3: worker has duplicate protection that can construct to building parapet, bridge-collision-avoidance wall, dam bulwark etc. in hanging basket
Beyond the region of objective existence facade, which carries out the work such as lamps and lanterns, identification label installation and decoration, to be implemented;
Step4: worker pushes wall to move forward or back hanging basket integrally in implementation process, operation easy to remove.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910172064.2A CN109853929A (en) | 2019-03-07 | 2019-03-07 | One kind sliding laterally portable construction hanging basket and application method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910172064.2A CN109853929A (en) | 2019-03-07 | 2019-03-07 | One kind sliding laterally portable construction hanging basket and application method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109853929A true CN109853929A (en) | 2019-06-07 |
Family
ID=66900187
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910172064.2A Pending CN109853929A (en) | 2019-03-07 | 2019-03-07 | One kind sliding laterally portable construction hanging basket and application method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109853929A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113565013A (en) * | 2021-07-31 | 2021-10-29 | 陈霖 | Collude shoulder formula of taking back of body bridge maintenance construction platform |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08199805A (en) * | 1995-01-25 | 1996-08-06 | Kageaki Toyoshima | Gondola exclusively used for ladder |
CN202055178U (en) * | 2011-04-27 | 2011-11-30 | 武汉一冶钢结构有限责任公司 | Shifting device for mounting of steel box girder crash barrier |
CN203452012U (en) * | 2013-09-09 | 2014-02-26 | 中建八局第三建设有限公司 | Mobile hanging basket for guard bar outer side construction |
CN203669395U (en) * | 2013-12-13 | 2014-06-25 | 中建三局第一建设工程有限责任公司 | Protective operation hanging frame for top die system |
CN207079898U (en) * | 2017-06-22 | 2018-03-09 | 中航天建设工程有限公司 | Outer hanging basket structure |
CN109057401A (en) * | 2018-09-11 | 2018-12-21 | 中国建筑第四工程局有限公司 | Assembled architecture hoistway regularization protection and vertical passageway device and construction method |
-
2019
- 2019-03-07 CN CN201910172064.2A patent/CN109853929A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08199805A (en) * | 1995-01-25 | 1996-08-06 | Kageaki Toyoshima | Gondola exclusively used for ladder |
CN202055178U (en) * | 2011-04-27 | 2011-11-30 | 武汉一冶钢结构有限责任公司 | Shifting device for mounting of steel box girder crash barrier |
CN203452012U (en) * | 2013-09-09 | 2014-02-26 | 中建八局第三建设有限公司 | Mobile hanging basket for guard bar outer side construction |
CN203669395U (en) * | 2013-12-13 | 2014-06-25 | 中建三局第一建设工程有限责任公司 | Protective operation hanging frame for top die system |
CN207079898U (en) * | 2017-06-22 | 2018-03-09 | 中航天建设工程有限公司 | Outer hanging basket structure |
CN109057401A (en) * | 2018-09-11 | 2018-12-21 | 中国建筑第四工程局有限公司 | Assembled architecture hoistway regularization protection and vertical passageway device and construction method |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113565013A (en) * | 2021-07-31 | 2021-10-29 | 陈霖 | Collude shoulder formula of taking back of body bridge maintenance construction platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100590277C (en) | High-altitude bridge type cantilever scaffold | |
US20170355582A1 (en) | Apparatus for providing safety netting on closed-sided manlifts | |
CN106481061B (en) | Climbing frame | |
CN206205415U (en) | A kind of climbing frame | |
CN109853929A (en) | One kind sliding laterally portable construction hanging basket and application method | |
CN215671267U (en) | Telescopic edge protection device | |
RU2383701C2 (en) | Mobile scaffolding | |
JP3950800B2 (en) | Suspension scaffold | |
CN205693609U (en) | Ground photovoltaic bracket and photovoltaic module hanger bracket device are installed | |
CN211286565U (en) | Climbing frame | |
CN208641587U (en) | Hanging-gate style movable safety band tying device | |
CN207109614U (en) | A kind of Hanging Basket for building | |
CN207749818U (en) | A kind of suspension type hanging basket for anti-lift-slb construction | |
CN202359509U (en) | Bridge wet joint operation vehicle | |
JP3180873U (en) | Repair scaffold | |
WO2019220080A1 (en) | An extendable scaffolding safety barrier and method | |
RU115364U1 (en) | DEVICE FOR TIPS | |
CN211421800U (en) | Lower operating platform for hanging basket | |
CN214692987U (en) | A safe platform of walking for maintenance of tower crane | |
CN217923074U (en) | A simple low-cost trackless mobile construction device for bridge detects | |
CN204112694U (en) | Open excavation section side wall waterproof construction support | |
CN219333006U (en) | Safety rope hanging device | |
CN218951967U (en) | Protection system for coating construction of bridge tower | |
CN217352125U (en) | Bailey bridge builds with channel-section steel assembled steel landing stage railing | |
CN219993595U (en) | Workshop filling area personnel ladder |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190607 |