Prior art keywords
support
guide rail
connection
eccentric wheel
attached wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201621285173.3U
Other languages
Chinese (zh)
Inventor
李勇
赵钰辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mould Bases Engineering Co Ltd Is Pacified In Hunan Nine
Original Assignee
Mould Bases Engineering Co Ltd Is Pacified In Hunan Nine
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mould Bases Engineering Co Ltd Is Pacified In Hunan Nine filed Critical Mould Bases Engineering Co Ltd Is Pacified In Hunan Nine
Priority to CN201621285173.3U priority Critical patent/CN206205415U/en
Application granted granted Critical
Publication of CN206205415U publication Critical patent/CN206205415U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Emergency Lowering Means (AREA)

Abstract

A kind of climbing frame, including support body;At least two row are fixed on the attached wall support on building;At least two guide rails for being fixedly connected with the support body respectively and being connected with the attached wall bracket slide;The lifting device being connected with the support body;The fixed pulley being connected with the support body bottom;First end is connected with the attached wall support, and the other end bypasses the steel wire rope being connected with the lifting device after the fixed pulley;At least two sets anti-fall devices being connected with the attached wall support and guide rail respectively;At least two sets off-loads being connected with the attached wall support and guide rail respectively are shored;The guide rail, anti-fall device, off-load are shored and are at least provided with the two ends of the support body.The technical scheme that the utility model is provided, support body lifting or reduction are convenient, be provided with anti-fall device and off-load is shored, and security reliability is high.

Description

A kind of climbing frame
Technical field
The utility model is related to construction equipment technical field, more particularly, to a kind of climbing frame.
Background technology
Climbing frame is the abbreviation of attachment type raise scaffold.It is towering in construction shear wall system, cylinder system and bridge pier Gui etc. It is a kind of effective instrument in structure.Due to possessing from the ability climbed, therefore the handling of hoisting machinery is not required to, which reduces construction The handling workload of middle Transport Machinery.The external scaffolding in work progress can be saved.Climbing frame can reduce hoisting machinery quantity, accelerate Speed of application, therefore better economic benefit.Skyscraper flourishes in numerous cities in recent years, to shorten construction work Phase, construction generally uses not contour construction technology, and Core Walls Structure is constructed using climbing frame.
In the prior art, the security protection of climbing frame typically uses common guard rail and close mesh safety net, close mesh safety net Often because tied silk is insecure and unlimited, to operation, workmen brings very big potential safety hazard;Simultaneously may be because of Falling object from high altitude, causes great security incident.Also have using integrated form monoblock safety guard net, be arranged in erecting bed and climbed On frame, integrated form monoblock safety guard net weight is big, and volume is larger, can not be folded because the rigidity of frame of rectifying is larger, installs not side Just.For the anti-fall device of climbing support, its anti-fall principle be mounted in yaw or star-wheel on attachment support by spring with it is attached The similar ladder guide rail contact of support body, the setting of the structure makes scaffold to rise, when declining, it is necessary to take auxiliary Measure, easily breaks down.To ensure anti-fall effect, need to set three anti-fall devices in same lifting seat in the plane.Climbing frame is every Secondary lifting finishes rear, it is necessary to be fixed support to support body, in the prior art, use is shored in the off-load that support is fixed to support body Bolt is fixedly connected, and is taken time and effort during installing/dismounting.
CN204000615U discloses a kind of lifting climbing frame on December 10th, 2014.Including climbing frame main body, guide rail and climb Frame lifting device, the climbing frame main body is provided with road wheel corresponding with the guide rail, and climbing frame main body is by detachable positioned at same The inside and outside layer framework composition of one plane, is connected with some connecting rods between inside and outside layer framework, base plate is equipped with connecting rod, Stood as workmen, the operation platform of operation is used.Anti-fall device is set between climbing frame main body and bridge pier, anti-fall device by The positioning seat being fixed on bridge pier, several fixture blocks set up along climbing frame body height side and the branch being connected on positioning seat Strut member constitute, support rod member be obliquely installed, and with fixture block movable top press-fit.The utility model disclosure, safely may be used Relatively low by property, Lifting and lowering for scaffold is inconvenient.
Utility model content
In order to overcome the defect of prior art, the technical problem that the utility model is solved to be:A kind of protective value is provided Height, climbing frame easy to install.
In order to solve the above-mentioned technical problem, the utility model provides a kind of climbing frame, including support body;At least two row are fixed on to be built Build the attached wall support on thing;At least two be fixedly connected with the support body respectively and with leading that the attached wall bracket slide is connected Rail;The lifting device being connected with the support body;The fixed pulley being connected with the support body bottom;First end connects with the attached wall support Connect, the other end bypasses the steel wire rope being connected with the lifting device after the fixed pulley;At least two sets respectively with the attached wall branch Frame and the anti-fall device of guide rail connection;At least two sets off-loads being connected with the attached wall support and guide rail respectively are shored;It is described to lead Rail, anti-fall device, off-load are shored and are at least provided with the two ends of the support body, and the anti-fall device includes being connected to attached wall support On support, the first eccentric wheel and the second eccentric wheel being connected with the support respectively by rotating shaft, first end respectively with it is described The first extension spring bar and the second extension spring bar of support connection, rotating shaft of the first end respectively with the first eccentric wheel and the second eccentric wheel are connected The first rocking arm and the second rocking arm, two ends be connected with the other end of the first extension spring bar and the other end of the first rocking arm respectively first Extension spring, the second extension spring that two ends are connected with the other end of the second extension spring bar and the other end of the second rocking arm respectively, first end and the The drag-line of the other end connection of one rocking arm and the second rocking arm, the other end of the drag-line is connected with the steel wire rope, the support Side be provided with the gap passed through for guide rail, first eccentric wheel and the second eccentric wheel are respectively positioned at the both sides of guide rail, first The outer minimum range of eccentric wheel and the second eccentric wheel is less than the width of guide rail, width of their the outer ultimate range more than guide rail Degree;The unloading braces including being detachably connected with guide rail are shored in the off-load, the off-load spiral shell being threadedly coupled with the unloading braces Bar, the bearing bar being detachably connected with the off-load screw rod lower end, the bearing bar is supported on the attached wall support, described to lead Rail is provided with some equidistant support bars, and the side of the unloading braces is provided with least two and is connected with the support bar Draw-in groove.
Used as the climbing frame that further improved technology scheme, the utility model are provided, the anti-fall device is also with two ends point The 3rd extension spring not being connected with attached wall support and the steel wire rope;The other end of the drag-line is with the 3rd extension spring away from attached wall Bracket end is connected with lower portion.
Used as the climbing frame that further improved technology scheme, the utility model are provided, the anti-fall device also has position respectively In the first eccentric wheel and support away between gap side, the second eccentric wheel and support away from two axle sleeves between gap side, it is described Rotating shaft is pivotally connected after being each passed through the axle sleeve with support.
Used as the climbing frame that further improved technology scheme, the utility model are provided, the anti-fall device also has position respectively Two connecting plates between support gap side and the first rocking arm, support gap side and the second rocking arm, the rotating shaft passes through the company It is pivotally connected with support after fishplate bar;The connecting plate is detachably connected with the support by bolt.
Used as the climbing frame that further improved technology scheme, the utility model are provided, the off-load is shored also to have and is arranged on The lockable mechanism of the draw-in groove openend.
Used as the climbing frame that further improved technology scheme, the utility model are provided, the upper end of the off-load screw rod is with more Side shape shell of column, the polygon shell of column is for turning off-load screw rod using electric wrench, pneumatic impact spanner or manual wrench.
Used as the climbing frame that further improved technology scheme, the utility model are provided, the middle part top of the bearing bar has The groove being connected with the lower end of the off-load screw rod;Have below the two ends of bearing bar and be connected with the attached wall support assorted Bayonet lock.
Used as the climbing frame that further improved technology scheme, the utility model are provided, the support body is provided with protecting wire net, the protecting wire net Including being connected with support body, upper protecting network slot and lower protecting network slot that opening direction is oppositely arranged;Upper and lower end respectively with the upper shield The mesh sheet that net slot and lower protecting network slot are detachably connected;The mesh sheet is the punching mesh sheet with ripple rib.
Used as the climbing frame that further improved technology scheme, the utility model are provided, the depth of the upper protecting network slot is more than The depth of the lower protecting network slot;The height of the mesh sheet is less than between the bottom land and the notch of lower protecting network slot of upper protecting network slot Height, and be more than the height between the bottom land of the notch of upper protecting network slot and lower protecting network slot;The mesh sheet can be in upper protecting network Slided in slot and lower protecting network slot.
Used as the climbing frame that further improved technology scheme, the utility model are provided, the mesh sheet is provided with several to be used for The fixing hole of fixed mesh sheet, protecting wire net also has the bolt being connected with the support body through the fixing hole.
In the case where not conflicting, above-mentioned improvement project can be implemented alone or in combination.
The technical scheme that the utility model is provided, attached wall support is fixed on building structure, play fixed supporting role, frame Body is fixedly connected with guide rail, and guide rail is connected with attached wall bracket slide so that support body can be moved up and down.Lifting device is connected to support body On, the two ends of steel wire rope are connected with lifting device and attached wall support respectively so that support body can be lifted or reduced by lifting device.If There are anti-fall device and off-load to shore, security reliability is high.The side of anti-fall device support is provided with the gap passed through for guide rail, mobile Support can easily be such that guide rail snaps between the first eccentric wheel and the second eccentric wheel, or leave the first eccentric wheel and the second bias Between wheel, anti-fall device can be from the realization of any position and the connection of guide rail, easy installation and removal.Guide rail snap in the first eccentric wheel and Between second eccentric wheel, the width of the outer minimum range less than guide rail of the first eccentric wheel and the second eccentric wheel, their outer Width of the ultimate range more than guide rail.In normal condition, the pulling force of the first extension spring, the second extension spring and drag-line is set to be in equilibrium-like More than the width of guide rail, guide rail can be freely moved up and down for the distance between outer of state, the first eccentric wheel and the second eccentric wheel. When the moment that wire cable rupture falls, drag-line loses pulling force, and the first extension spring, the second extension spring are shunk, and drive the first rocking arm and second Rocking arm is rotated up, and then drives the first eccentric wheel and the second eccentric wheel to rotate, when the first eccentric wheel and the second eccentric wheel go to During certain angle, two eccentric wheels can pin guide rail, and so as to reach anti-fall purpose, reliability is high.
Brief description of the drawings
Accompanying drawing is used for providing being further understood to of the present utility model, constitutes the part of the application, of the present utility model Schematic description and description is used to explain the utility model, does not constitute to improper restriction of the present utility model.In accompanying drawing In:
Fig. 1 is the left view structural representation of embodiment climbing frame;
Fig. 2 is the I portions mplifying structure schematic diagram of Fig. 1;
Fig. 3 is the main structure diagram of the main part of the anti-fall device of embodiment climbing frame;
Fig. 4 is the left view structural representation of Fig. 3;
Fig. 5 is A-A in Fig. 3 to structural representation;
Fig. 6 is II mplifying structure schematic diagram of Fig. 1;
Fig. 7 is the main structure diagram shored of off-load of embodiment climbing frame;
Fig. 8 is the left view structural representation of Fig. 7;
Fig. 9 is the main structure diagram of the protecting wire net of embodiment climbing frame;
Figure 10 is the left view structural representation of Fig. 9.
Specific embodiment
Climbing frame as shown in Figures 1 to 10, including support body 1;At least two row are fixed on the attached wall support 2 on building, often One row at least have three attached wall supports 2 respectively, and they are arranged vertically on the same line up and down;The two ends of each product support body 1 It is respectively equipped with the guide rail 3 for being fixedly connected with support body 1 and being slidably connected with attached wall support 2;Lifting device 4 can be electric block Deng overweight equipment, it is connected with support body 1 is stated;The two ends bottom of each product support body 1 is provided with two fixed pulleys 5;The first end of steel wire rope 6 and its In an attached wall support 2 connect, the other end is connected after bypassing fixed pulley 5 with lifting device 4;The two ends of each product support body 1 point It is not provided with least a set of anti-fall device 7 being connected with attached wall support 2 and guide rail 3, each product support body 1 is respectively arranged at two ends with least A set of off-load being connected with attached wall support 2 and guide rail 3 shores 8.Anti-fall device as shown in Figures 2 to 5 includes being connected to attached wall Support 101 on support 2, the first eccentric wheel 102 and the second eccentric wheel 103 being connected with support 101 respectively by rotating shaft, first End the first extension spring bar 104 and the second extension spring bar 105 that are connected with support 101 respectively, first end respectively with the first eccentric wheel 102 and First rocking arm 106 and the second rocking arm 107 of the rotating shaft connection of the second eccentric wheel 103, two ends are another with the first extension spring bar 104 respectively First extension spring 108 of the other end connection of one end and the first rocking arm 106, two ends respectively with the other end of the second extension spring bar 105 and Second extension spring 109 of the other end connection of the second rocking arm 107, first end and the first rocking arm 106 and the other end of the second rocking arm 107 The drag-line 110 of connection, the other end of drag-line 110 is connected with steel wire rope 6, and the side of support 101 is provided with for slitting that guide rail 3 passes through Mouthful, the first eccentric wheel 102 and the second eccentric wheel 103 are respectively positioned at the both sides of guide rail 3, the first eccentric wheel 102 and the second eccentric wheel 103 outer minimum range is less than the width of guide rail 3, width of their the outer ultimate range more than guide rail 3.Such as the institutes of Fig. 6 to 8 The off-load shown shores 8 includes the unloading braces 201 being detachably connected with guide rail 3, the off-load spiral shell being threadedly coupled with unloading braces 201 Bar 202, the bearing bar 203 being detachably connected with the lower end of off-load screw rod 202, bearing bar 203 is supported on attached wall support 2, guide rail 3 Some equidistant support bars 204 are provided with, the side of unloading braces 201 is provided with least two and is connected with support bar 204 Draw-in groove.
Operation principle:Attached wall support 2 is fixed on building structure, is play fixed supporting role, and support body 1 and guide rail 3 are fixed Connection, guide rail 3 is slidably connected with attached wall support 2 so that support body 1 can be moved up and down.Lifting device 4 is connected on support body 1, steel wire The two ends of rope 6 are connected with lifting device 4 and attached wall support 2 respectively so that support body 1 can be lifted or reduced by lifting device 4.
In normal condition, the pulling force of first extension spring 108, the second extension spring 109 and drag-line 110 of anti-fall device is adjusted, made The pulling force of the first extension spring 108, the second extension spring 109 and drag-line 110 is in poised state, and the first eccentric wheel 102 and second of control is inclined More than the width of guide rail 3, now, the first rocking arm 106 and the second rocking arm 107 are remained stationary as the distance between outer of heart wheel 103 State, guide rail 3 is freely moved up and down.When steel wire rope 6 is broken the moment fallen, flexible cable 110 loses pulling force(Steel Cord breakaway poing with the tie point of drag-line 110 more than when, less than the intensity of steel wire rope 6, drag-line 110 connects for the intensity of drag-line 110 Fracture, drag-line 110 also can then lose pulling force), the first extension spring 108, the second extension spring 109 shrink, and drives the He of the first rocking arm 106 Second rocking arm 107 is rotated up, and then drives the first eccentric wheel 102 and the second eccentric wheel 103 to rotate, due to the first eccentric wheel 102 and second eccentric wheel 103 width of the outer minimum range less than guide rail 3, therefore when the first eccentric wheel 102 and second eccentric When wheel 103 goes to certain angle, two eccentric wheels can pin guide rail 3, frictional resistance be produced during decline, so as to reach Anti-fall purpose.
During the Height Adjustment of support body 1, support body 1 is slightly improved with lifting device 4, bearing bar 203 is no longer undertaken support body 1 Weight, turns off-load screw rod 202, removes bearing bar 203, and after unloading braces 201 are taken out from guide rail 3, support body 1 can rise In the presence of heavy equipment, the adjustment of height is completed.Height Adjustment in place after, the draw-in groove of unloading braces 201 snaps in three of guide rail 3 On support bar 204, bearing bar 203 is installed, turn off-load screw rod 202, bearing bar 203 is undertaken the weight of support body 1.
Alternatively, the utility model provide climbing frame, anti-fall device also have two ends respectively with attached wall support 2 and steel wire rope 3rd extension spring 111 of 6 connections;The other end of drag-line 110 is connected away from the end of attached wall support 2 with the 3rd extension spring 111 with lower portion.When Steel wire rope 6 is broken the moment fallen, and the 3rd extension spring 111 is shunk, and drives flexible cable 110 and the breakaway poing of steel wire rope 6 with upper bit Overcome and moved on gravity, the first extension spring 108, the second extension spring 109 are shunk and drive the first eccentric wheel 102 and the second eccentric wheel 103 to rotate, When the first eccentric wheel 102 and the second eccentric wheel 103 go to certain angle, two eccentric wheels can pin guide rail 3, so as to reach Anti-fall purpose.
Alternatively, the climbing frame that the utility model is provided, anti-fall device also has respectively positioned at the first eccentric wheel 102 and second Eccentric wheel 103 and support 101 away between gap side, the second eccentric wheel 103 and support 101 be away from two axle sleeves between gap side 113, rotating shaft is pivotally connected after being each passed through axle sleeve 113 with support 101.
Alternatively, the climbing frame that the utility model is provided, anti-fall device also has respectively positioned at the gap side of support 101 and first Two connecting plates 114 between rocking arm 106, the gap side of support 101 and the second rocking arm 107, rotating shaft through after connecting plate 114 with support 101 pivot joints;Connecting plate 114 is detachably connected with support 101 by bolt.By connecting plate 114 and support 101, connection side Just quick, bonding strength is high.
Alternatively, the locking for also having and being arranged on the draw-in groove openend is shored in the climbing frame that the utility model is provided, off-load Mechanism 205.Lockable mechanism 205 can prevent unloading braces 201 from guide rail 3 because maloperation is dropped out.
Alternatively, the climbing frame that the utility model is provided, the upper end of the off-load screw rod 202 that off-load is shored has polygon post Section, polygon shell of column is for turning off-load screw rod 202 using electric wrench, pneumatic impact spanner or manual wrench.
Alternatively, the climbing frame that the utility model is provided, the middle part top of the bearing bar 203 that off-load is shored has and off-load spiral shell The groove that the lower end of bar 202 is connected;The two ends lower section of bearing bar 203 has the bayonet lock being connected with attached wall support 2. During 1 Height Adjustment of support body, after the lifting device 4 of support body 1 is slightly improved, off-load screw rod 202 is just easy to turn, bearing bar 203 Middle part top is provided with the groove being connected with the lower end of off-load screw rod 202, after support body 1 is slightly improved with lifting device 4, unloads The lower end of lotus screw rod 202 can avoid bearing bar 203 or unloading braces 201 from dropping out still in groove, improve security.
Alternatively, the climbing frame that the utility model is provided, support body 1 is provided with protecting wire net, and protecting wire net includes being connected with support body 1, openings To the upper protecting network slot 301 and lower protecting network slot 302 that are oppositely arranged;Upper and lower end is inserted with upper protecting network slot 301 and lower protecting network respectively The mesh sheet 303 that groove 302 is detachably connected;Mesh sheet 303 is the punching mesh sheet with ripple rib 304.In embodiment, upper protecting network is inserted Groove 301 and lower protecting network slot 302 can be set to U-shaped protecting groove, be fixed on support body 1, during installation, piecewise insert mesh sheet 303 Can complete to install in protecting wire net slot 301 and lower protecting network slot 302, it is easy to install.Mesh sheet 303 can reduce for punching mesh sheet Windage, improves security.Mesh sheet 303 is roll-up punching steel plate mesh sheet, carrying when being readily transported and installing.Mesh sheet 303 With ripple rib 304, the rigidity of mesh sheet 303 can be improved, reduce deformation under external force, improve security and wind resistance energy Power.
Alternatively, the climbing frame that the utility model is provided, the depth of the depth more than lower protecting network slot 302 of upper protecting network slot 301 Degree;The height of mesh sheet 303 is more than less than the height between the bottom land and the notch of lower protecting network slot 302 of upper protecting network slot 301 Height between the notch of upper protecting network slot 301 and the bottom land of lower protecting network slot 302;Mesh sheet 303 can be in the He of upper protecting network slot 301 Slided in lower protecting network slot 302.During installation or removal, the upper end of mesh sheet 303 is inserted in upper protecting network slot 301, lower end moves into Removed in lower protecting network slot 302 or from lower protecting network slot 302, mesh sheet 303 can be inserted directly into upper protecting network slot 301 and lower protecting network Removed in slot 302 or from upper protecting network slot 301 and lower protecting network slot 302, it is quick for installation.
Alternatively, the climbing frame that the utility model is provided, mesh sheet 303 is provided with several is used to fix the fixation of mesh sheet 303 Hole, protecting wire net also has the bolt 305 being connected with the support body 1 through the fixing hole.Bolt 305 can make mesh sheet 303 in upper shield Position in net slot 301 and lower protecting network slot 302 is fixed, mesh sheet 303 be subject to external impacts when, remain to securely with support body 1 connection, improves security.
Obviously, the utility model is not limited to above preferred embodiment, can also be in the utility model claim and explanation In the spirit that book is limited, the conversion and improvement of diversified forms are carried out, same technical problem can be solved, and obtain expected technology Effect, therefore do not repeat.One of ordinary skill in the art can from the utility model disclosure directly or associate it is all Scheme, as long as within the spirit that claim is limited, falling within protection domain of the present utility model.

Claims (10)

1. a kind of climbing frame, including support body(1);At least two row are fixed on the attached wall support on building(2);At least two respectively with The support body(1)Be fixedly connected and with the attached wall support(2)The guide rail being slidably connected(3);With the support body(1)Connection Lifting device(4);With the support body(1)The fixed pulley of bottom connection(5);First end and the attached wall support(2)Connection, it is another End bypasses the fixed pulley(5)Afterwards with the lifting device(4)The steel wire rope of connection(6);At least two sets respectively with the attached wall Support(2)And guide rail(3)The anti-fall device of connection(7);At least two sets respectively with the attached wall support(2)And guide rail(3)Connection Off-load shore(8);The guide rail(3), anti-fall device(7), off-load shores(8)At least in the support body(1)Two ends at set Have, it is characterised in that the anti-fall device includes being connected to attached wall support(2)On support(101), by rotating shaft respectively with institute State support(101)First eccentric wheel of connection(102)With the second eccentric wheel(103), first end respectively with the support(101)Even The the first extension spring bar for connecing(104)With the second extension spring bar(105), first end respectively with the first eccentric wheel(102)With the second eccentric wheel (103)Rotating shaft connection the first rocking arm(106)With the second rocking arm(107), two ends respectively with the first extension spring bar(104)It is another End and the first rocking arm(106)The other end connection the first extension spring(108), two ends respectively with the second extension spring bar(105)It is another End and the second rocking arm(107)The other end connection the second extension spring(109), first end and the first rocking arm(106)With the second rocking arm (107)The other end connection drag-line(110), the drag-line(110)The other end and the steel wire rope(6)Connection, the machine Seat(101)Side be provided with and supply guide rail(3)The gap for passing through, first eccentric wheel(102)With the second eccentric wheel(103)Respectively Positioned at guide rail(3)Both sides, the first eccentric wheel(102)With the second eccentric wheel(103)Outer minimum range be less than guide rail(3)'s Width, their outer ultimate range is more than guide rail(3)Width;The off-load is shored(8)Including with guide rail(3)Detachably connect The unloading braces for connecing(201), with the unloading braces(201)The off-load screw rod of threaded connection(202), with the off-load screw rod (202)The bearing bar that lower end is detachably connected(203), the bearing bar(203)It is supported on the attached wall support(2)On, it is described Guide rail(3)It is provided with some equidistant support bars(204), the unloading braces(201)Side be provided with least two and institute State support bar(204)The draw-in groove of mating connection.
2. climbing frame according to claim 1, it is characterised in that the anti-fall device also have two ends respectively with attached wall support (2)With the steel wire rope(6)3rd extension spring of connection(111);The drag-line(110)The other end and the 3rd extension spring (111)Away from attached wall support(2)End is connected with lower portion.
3. climbing frame according to claim 1, it is characterised in that the anti-fall device also has and is located at the first eccentric wheel respectively (102)With support(101)Away between gap side, the second eccentric wheel(103)With support(101)Away from two axles between gap side Set(113), the rotating shaft is each passed through the axle sleeve(113)Afterwards with support(101)Pivot joint.
4. climbing frame according to claim 1, it is characterised in that the anti-fall device also has and is located at support respectively(101) Gap side and the first rocking arm(106), support(101)Gap side and the second rocking arm(107)Between two connecting plates(114), it is described Rotating shaft passes through the connecting plate(114)Afterwards with support(101)Pivot joint;The connecting plate(114)By bolt and the support (101)It is detachably connected.
5. climbing frame according to claim 1, it is characterised in that the off-load is shored also to have and is arranged on the draw-in groove opening The lockable mechanism at end(205).
6. climbing frame according to claim 1, it is characterised in that the off-load screw rod(202)Upper end there is polygon post Section, the polygon shell of column is for turning off-load screw rod using electric wrench, pneumatic impact spanner or manual wrench(202).
7. climbing frame according to claim 1, it is characterised in that the bearing bar(203)Middle part top have with it is described Off-load screw rod(202)Lower end be connected groove;Bearing bar(203)Two ends lower section have and the attached wall support(2) The bayonet lock of mating connection.
8. climbing frame according to claim 1, it is characterised in that the support body(1)Protecting wire net is provided with, the protecting wire net includes and frame Body(1)Connection, the upper protecting network slot that opening direction is oppositely arranged(301)With lower protecting network slot(302);Upper and lower end respectively with institute State upper protecting network slot(301)With lower protecting network slot(302)The mesh sheet being detachably connected(303);The mesh sheet(303)It is with ripple Line rib(304)Punching mesh sheet.
9. climbing frame according to claim 8, it is characterised in that the upper protecting network slot(301)Depth more than under described Protecting wire net slot(302)Depth;The mesh sheet(303)Height be less than upper protecting network slot(301)Bottom land and lower protecting network slot (302)Notch between height, and be more than upper protecting network slot(301)Notch and lower protecting network slot(302)Bottom land between Height;The mesh sheet(303)Can be in upper protecting network slot(301)With lower protecting network slot(302)Interior slip.
10. climbing frame according to claim 8, it is characterised in that the mesh sheet(303)Several are provided with for fixing net Piece(303)Fixing hole, protecting wire net also has through the fixing hole and the support body(1)The bolt of connection(305).
CN201621285173.3U 2016-11-28 2016-11-28 A kind of climbing frame Withdrawn - After Issue CN206205415U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621285173.3U CN206205415U (en) 2016-11-28 2016-11-28 A kind of climbing frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621285173.3U CN206205415U (en) 2016-11-28 2016-11-28 A kind of climbing frame

Publications (1)

Publication Number Publication Date
CN206205415U true CN206205415U (en) 2017-05-31

Family

ID=58747754

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621285173.3U Withdrawn - After Issue CN206205415U (en) 2016-11-28 2016-11-28 A kind of climbing frame

Country Status (1)

Country Link
CN (1) CN206205415U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106481061A (en) * 2016-11-28 2017-03-08 湖南玖安模架工程技术有限公司 Climbing frame
CN109721010A (en) * 2019-01-23 2019-05-07 深圳市特辰科技股份有限公司 A kind of hook type linkage mechanism
CN110700104A (en) * 2019-10-17 2020-01-17 中国十七冶集团有限公司 Construction platform of suspension bridge suspender tensioning equipment and use method
CN114704068A (en) * 2022-06-07 2022-07-05 中铁城建集团第一工程有限公司 Attached lifting scaffold system

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106481061A (en) * 2016-11-28 2017-03-08 湖南玖安模架工程技术有限公司 Climbing frame
CN106481061B (en) * 2016-11-28 2018-06-19 湖南玖安模架工程技术有限公司 Climbing frame
CN109721010A (en) * 2019-01-23 2019-05-07 深圳市特辰科技股份有限公司 A kind of hook type linkage mechanism
CN110700104A (en) * 2019-10-17 2020-01-17 中国十七冶集团有限公司 Construction platform of suspension bridge suspender tensioning equipment and use method
CN110700104B (en) * 2019-10-17 2021-02-26 中国十七冶集团有限公司 Construction platform of suspension bridge suspender tensioning equipment and use method
CN114704068A (en) * 2022-06-07 2022-07-05 中铁城建集团第一工程有限公司 Attached lifting scaffold system
CN114704068B (en) * 2022-06-07 2022-08-19 中铁城建集团第一工程有限公司 Attached lifting scaffold system

Similar Documents

Publication Publication Date Title
CN106481061B (en) Climbing frame
CN206205415U (en) A kind of climbing frame
CN110034506B (en) Power equipment overhauls auxiliary device
CN205188839U (en) Movably -assembled anti -collision bridge wall construction hanging basket
CN105071298B (en) A kind of collapsible operating platform of manned operation of high-tension line
CN102556890B (en) Self-lifting mounting platform for steel head material hoister and mounting method for mounting platform
CN204038917U (en) Dismountable external hanging service platform
CN204310727U (en) The machine of tearing open built by high-rise structures
CN208456185U (en) A kind of tower crane wall-connecting piece safe walkway
CN210683124U (en) Aerial work platform with rotatable bearing seat
CN210262793U (en) Safety device for municipal building construction
CN211949696U (en) Protection device for assembly type building construction
CN206519937U (en) A kind of voltage-stablizer foldable overhaul platform
CN203795885U (en) Tower-type large-height-building demolition machine
CN210684458U (en) Bridge auxiliary inspection device with help of bridge guardrail
CN201261939Y (en) Overhead vehicle for construction
CN105178837B (en) Electric system Rapid Combination ascending tool
CN214692987U (en) A safe platform of walking for maintenance of tower crane
CN206205421U (en) A kind of off-load for climbing frame is shored
CN220847135U (en) Bridge construction removes hanging flower basket
CN210563756U (en) Novel safety barrier is used in construction of roof beam node on water
CN203624981U (en) Three-suspension-point maintenance platform for wind power blades
KR200493313Y1 (en) Electric type lifting device
CN211596451U (en) Hanging flower basket device for bridge construction
CN207633228U (en) A kind of fixed scaffold of bridge maintaining

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20170531

Effective date of abandoning: 20180619